Amendment_W90VN7-16-R-0099-0001_Heat_Treating_Furnace__Kunsan_AB.docx
DOCX document 23 KB Posted
- Solicitation number
- W90VN7-16-R-0099
About this file
Amendment 0001 - 1. Added Depth size for the chamber (24 ). 2. Added Required delivery/Shipping/install time (120 days ARO) 3. RFQ closing time is extended until 1 00 PM (Korean Standard Time) September 19 2016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.1-2_Revised_Salient_Characteristics_and_Technical_Requirement.doc | DOC document | |
| A.1_Salient_Characteristics_and_Technical_Requirement.doc | DOC document | |
| W90VN7-16-R-0099_Heat_Treating_Furnace__Kunsan_AB.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
411th CSB Kunsan Airbase, Unit 2112, APO AP 96264
FSC: 4430
NAICS Code: 333994 (Industrial Process Furnace and Oven Manufacturing)
Subject: Amendment 0001-Purchase and Install Aluminum Heat Furnace, Kunsan, AB Solicitation Number: W90VN7-16-R-0099-0001 Closing Response Date: 19 September 2016 @ 1300 (1:00 PM) Korea Standard Time
Time Point of Contact:
Mr. Kilchae Song, Contract Specialist/Contracting Officer COMMERCIAL 063-470-5629, or from the U.S.: 011-82-63-470-5629 kilchae.song.ln@mail.mil
I. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR subpart 12.6, as supplemented with additional information included in this notice. The procedures of FAR Parts 13, 14 and 15 may be used in this particular acquisition. This announcement constitutes the only solicitation; quotes are requested and a written solicitation will not be issued.
II. The solicitation number is W90VN7-16-R-0099-0001 and is issued as an Amendment.
III. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-88.
IV. Chamber size has revised. Added minimum depth size (24” of Depth) for the chambers. Please see revised specification.
V. Required Delivery/Install time for this requirement is 120 days After Receipt Order
VI. All other terms and conditions remain unchanged.
File details come from the government source that posted it. Updated .