SF1442.pdf

PDF 363 KB Posted

Attached to
Repair Vent System in MFH Bldgs, Osan AB (MA IDIQ Only)
Solicitation number
W90VN619R0030
Issued by

View the file

Other files

File Type Posted
Drawings.zip.001 ZIP file
Submittal_Register.pdf PDF
Drawings.zip.002 —
Drawings.zip.003 —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F3J3CE9150AW01

THIS IS GENERAL BUILDING REPAIR IDIQ RFP FOR THE FOLLOWING CONTRACTORS ONLY:

CONTRACT NO: W91QVN-19-D-0002, -0006, -0008, -0010, -0012.

OFFERORS MUST COMPLY WITH THE FOLLOWING:

A. Site Visit: Offerors w ho intend to propose on this solicitation are strongly encouraged to attend the site visit. See site visit clause, FAR 52.236-7 in Section L for the schedule.

B. Submittion of Proposals

(1) Proposal Packet: It shall be submitted by 1500 Hrs on the closing date of RFP through FBO.

(2) Pricing & Technical proposal

a. Price and Bidding Schedule w ith Sub-CLINs

b. Completion of Section K (5152.204-4032(Representations and Certif ications)

B. If the contractor is unable to submit the proposal in response to this RFP, the contractor shall submit a "No-Offer Letter" by the date and time specif ied in this solicitation.

MR. YI, CHAE YONG 315-757-6018

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

26-Jun-2019

(RFP)

(IFB)

X

CALL:

Repair Vent System in MFH Tow ers, B#211, #1014, #1015

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______0 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ Section F

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________22 Jul 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO OSAN, UNIT #2039

APO AP 96278-2039

UNITED STATES

W90VN6

PAGE OF PAGES

1 OF

CODE W90VN6

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour)

Sealed envelopes containing offers

411TH CSB, KOREA - RCO OSAN

POC: MR. YI, CHAE YONG

0503-357-6018

CHAEYONG.YI5.LN@MAIL.MIL

APO AP 96278-2039

KOREA, SOUTH

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

SMYU 20-4001

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: 315-757-6018 FAX:

W90VN619R0030 16

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W90VN619R0030

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Repair Vent System in MFH Bldg#211

FFP

Repair Vent System in MFH Bldg#211, #1014, #1015, Osan AB (SMYU 20-4001) FOB: Destination

PURCHASE REQUEST NUMBER: F3J3CE9150AW01

PSC CD: Z2FA

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Lot War Hazard

FFP

Estimated Cost for War Hazard Losses is Zero(0).

FOB: Destination

PSC CD: Z2FA

NET AMT

BIDDING SCHEDULE

ITEM NO. DESCRIPTION QTY U/T U/P AMOUNT

0001 AB Provide footholding scaffolding for ceiling work incl. fabricating & dismantling

4,632 SF ₩ ₩

0003 AF Remove existing gypsum board ceiling or acoustical tile ceiling system incl. frame & insulation

4,632 SF ₩ ₩

0003 AN Disposal for all construction debris & industrial waste to outside compound

43 CM ₩ ₩

0004 BI 5/8"thk water-resistant or type "X" gypsum board ceiling incl. joint taping

4,632 SF ₩ ₩

0004 BK Suspended ceiling metal frame for gypsum board ceiling system

4,632 SF ₩ ₩

0004 DZ Surface preparation for concrete, masonry, plaster, gypsum board & stucco surface

9,264 SF ₩ ₩

0004 EB Alkyd, 2-coats (MPI approved) 9,264 SF ₩ ₩

0004 EE Primer, 1-coat (MPI approved) 9,264 SF ₩ ₩

0007 AF Remove sheet metal air duct w/ insulation with fittings, hanger, any size

354 LF ₩ ₩

0007 AG Remove air diffuser, grille, register, any size 208 EA ₩ ₩

0007 AV Remove minor HVAC accessories, sensor, gauge, thermostat etc.

208 EA ₩ ₩

0008 AM Bathroom exhaust fan, ceiling mtd. 120V, up to 80CFM cap.

176 EA ₩ ₩

0008 BV In-line centrifugal exhaust fan, duct connected, up to 500 ~ 1200 CFM

32 EA ₩ ₩

0008 CN Sheet metal air duct, #26 and #24 gauge, flange, conner plate, C-grid bar, hanger with accessories.

1,750 SF ₩ ₩

0008 FV Electronic low voltage thermostat, w/ tamper proof cover

32 EA ₩ ₩

0010 AA Rigid Galv, Steel Conduit Incl. Fittings, Size; 1/2" to 1-1/2" dia

4,000 LF ₩ ₩

0010 AC Junction Box 30 EA ₩ ₩

0010 AD Flexible Conduit Pipe, 1/2" to 3/4" Dia 1,320 LF ₩ ₩

0010 AG Elect Wire,Solid Single Conductor, 600V,THW, #14 to #8 AWG

15,960 LF ₩ ₩

0010 CX Magnetic Motor Starter, 3P, 5 HP Nema Size-1 w/H-O-A Selection SW Nema-1 Encl

32 EA ₩ ₩

0012 AA (O/A Item) Ceiling Access Door, 2' x 2', 14GA steel access panel (Light weight metal) incl.

frame and cam latch & key. *Refer to OMA STD

DWG 2015

176 EA ₩ ₩

TOTAL AMOUNT (WON) ₩

Section C - Descriptions and Specifications

CONTRACT NUMBER: MA IDIQ GENERAL REPAIR OF BUILDING AND EXT.

SITE, OSAN AB

PROJECT NUMBER: SMYU 20-4001

DESCRIPTION: Repair Ventilation System in MFH Towers, B211, 1014 and 1015, OSAN

AB

STATEMENT OF WORK

1. GENERAL: The work to be performed for completion of this project shall be as described in general below.

1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies, test, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications.

1.2. Work by In-house Forces: N/A.

1.3. Work by Troop Labor: N/A.

2. TECHNICAL SPECIFICATIONS: Above project shall comply with specifications in awarded original contract package and attached particular specification, if any.

3. SCOPE OF WORKS (SOW):

3.1. B211

Architectural Work.

1. Remove existing gypsum board ceiling system to install exhaust fans in all bathrooms of each unit.

2. Repair and install gypsum board ceiling system including additional access doors and finish work after new exhaust fans installed.

Mechanical Work

1. Replace the existing exhaust grilles with new ceiling exhaust fans including gravity type backdraft dampers, disconnect switches, associate duct work, and accessories in the all bathrooms. Bathroom exhaust fan shall be maximum 1.5 sone. Interlock bathroom exhaust fans to run on low power full time and to run on high whenever the bathroom lights are turned on.

Exhaust fan flow capacity:

2BR type (1 bath per 48 units): 50 CFM at 0.25” SP 3BR type (2 bath per 48 units): 60 CFM at 0.25” SP 4BR type (2 bath per 16 units): 80 CFM at 0.25” SP

2. Replace the existing exhaust grilles with new exhaust fan at 9 ea, 100 CFM at 0.25” SP including, gravity type backdraft dampers, disconnect switches, room thermostat, associate duct work and accessories in the all electrical rooms. Control sequence is as follow.

Hand-Off-Auto Switch

a. Hand: Switch in the “HAND” position. The exhaust fan shall run the unit continuously until manually stop.

b. Off: Switch in the “OFF” position. The fan shall stop.

c. Auto: Switch in the “AUTO” position. Exhaust fan is energized. Setpoint 30 deg

C. (Range of 15 deg C ~ 35 deg C)

Electrical Work

1. Install power for the new exhaust fan from lighting fixture at toilet (typical for all exhaust fan at each unit). Refer elec sketches.

2. Install motor starter with H-O-A selector switch and pilot lamp on the wall for new exhaust fan control at electrical room in each floor. Location can be changed upon site condition.

3. Provide power to new exhaust fan via auto switch at each floor electrical room.

4. Install conduit and wire for the power source of new exhaust fan from ceiling mounted existing exhaust fan in the corridor at each floor as shown on the drawing. Power shall be connected with the same circuit of existing exhaust fan. Update existing panelboard load schedule that feeds existing exhaust fan.

3.2. B1014 and B1015

Mechanical Work

1. Replace the existing exhaust grilles with new exhaust fan at total 23 ea, 100 CFM at

0.25” SP including, gravity type backdraft dampers, disconnect switches, room thermostat, associate duct work and accessories in the all electrical rooms (10 rooms for B1014; 13 rooms for B1015). Control sequence is as follow.

A. Hand-Off-Auto Switch

a. Hand: Switch in the “HAND” position. The exhaust fan shall run the unit continuously until manually stop.

b. Off: Switch in the “OFF” position. The fan shall stop.

c. Auto: Switch in the “AUTO” position. Exhaust fan is energized. Setpoint 30 deg

C. (Range of 15 deg C ~ 35 deg C)

Electrical Work

1. Install motor starter with H-O-A selector switch and pilot lamp on the wall for new exhaust fan control at electrical room in each floor. Location can be changed upon site condition.

2. Provide power to new exhaust fan via auto switch at each floor electrical room.

3. Install conduit and wire for the power source of new exhaust fan from ceiling mounted existing exhaust fan in the corridor at each floor as shown on the drawing. Power shall be connected with the same circuit of existing exhaust fan. Update existing panelboard load schedule that feeds existing exhaust fan.

4. ATTACHED DRAWING OR SKETCH OR PICTURES: Yes

5. CONTRACT PERFORMANCE PERIOD: 180 calendar days ARO and it includes off-shore materials procurement + base pass authorization + military exercise (90 days) and construction period (90 days).

6. ATTACHED CLIN ITEMS INCL. COST (IGCE): Yes

7. REMARKS:

7-1. Site Orientation will be strongly recommended. The contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the works, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost IAW FAR 52.236-3.

7-2. Time on target of the site release date will be discussed with user & BCE at the pre-con meeting after award.

8. SECURITY REQUIRMENTS (AT/OPSEC):

8.1 ALERTS: During military alerts or special operations, the contractor may not be authorized on base or in the work site. When the contractor is prohibited from access to the base or work site for one (1) day or less per month, no adjustment in the contract time shall be made.

When the contractor is prohibited access for more than one (1) day per month, adjustments shall be made in accordance with applicable clauses of the General Provisions.

8.2 BASE PASSES: The contractor shall be required to obtain base passes to Osan Air Base to perform the requirements of this contract. The contractor shall be responsible to submit a base pass request no later than five (5) calendar days after award of this contract. It should be noted that it can take up to 30 days or more to process base pass paperwork. It shall be the responsibility of the contractor to prepare the necessary base pass paperwork to include USFK Form 82, USFK Form 225 EK, family history register, local register, etc. for each individual requiring access to Osan Air Base. The contractor shall also be authorized to receive vehicle passes for each of the contractor’s vehicles used in the performance of the requirements of this contract. It shall be the responsibility of the contractor to prepare the necessary paperwork to include USFK Form 195, vehicle registration, vehicle insurance, copy of driver’s license, etc. for each vehicle requiring access to Osan Air Base. The contractor shall prepare a cover letter listing each individual, skill, escort privileges, vehicle type, vehicle registration number, etc.

The contractor shall also provide the COR with two (2) copies of this request letter, with carbons, to include the top copy with original signatures. Escort privileges will only be authorized to company officials and the site superintendent and the Site Foreman. No other individual will be authorized escort privileges. The contractor shall not be authorized to perform any portion of the contract requirements until such time that the contractor has processed the necessary base pass paperwork for entry onto Osan Air Base. The COR shall not provide or be responsible to provide the contractor with escorts during performance of any part of this contract.

All of the above documents shall be turned in to the COR for processing with the 51st Security Forces.

8.3 The contractor and all associated sub-contractors shall practice Operations Security. The contractor shall not talk about work outside of the work area nor discuss the work being performed on social media. Unless absolutely necessary to perform the duties stated in the contract, the contractor shall not take pictures of or inside sensitive locations as determined by the contracting officer representative. It shall be the responsibility of the contractor to safeguard all documents provided. Documents shall be stored away from view when not being used.

Documents that are no longer needed shall be shredded in an approved government shredder.

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract immediately after the date the Contractor receives the delivery order, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days after receipt of task order. The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section I - Contract Clauses

52.232-18 AVAILABILITY OF FUNDS (APR 1984)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

(End of clause)

Section K - Representations, Certifications and Other Statements of Offerors

5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS

(a) SUBCONTRACTING:

If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.

(b) AFFILIATED OFFERORS:

(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.

(2) Each offeror shall furnish, below, the following information:

(i) Whether the offeror has any affiliates;

(ii) The names and addresses of all affiliates of the offeror; and

(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.

AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)

(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):

Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.

(d) STANDARDS OF CONDUCT CERTIFICATION:

This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.

(i) Name ______________________________________________ Former rank/grade ____________________________________

Last US Government position ___________________________

(ii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(iii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

Firm ____________________________________________________ Name _____________________________________________________ Signature __________________________________________________

Title _____________________________________________________ Date of Execution ____________________________________________

(e) TAXES:

(1) References:

(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."

(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.

(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.

(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.

(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

This item will be imported specifically for this contract? Yes _____ No _____

(ii) Special Excise Tax:

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

Name of item manufacturer

(iii) Value Added Tax (VAT):

Input VAT on materials purchased for this contract. 10% _____ Input VAT on transportation leased/rented for this contract.10% _____ Input VAT on equipment leased/rented for this contract. 10% _____ Input VAT on services purchased for this contract. 10% _____ Output VAT on total contract amount. 10% _____

(iv) Special Excise (Petroleum) Tax:

No. of U/P Liters w/o Tax Tax/Unit Total Tax Amount Regular Gasoline ________ (L) ________ w________ w_____________ Premium Gasoline ________ (L) ________ w________ w_____________ Diesel ________ (L) ________ w________ w_____________ Other ________ (L) ________ w________ w_____________

(v) Education Tax.

(3) Name of the oil company from which POL products will be purchased:

Oil Company: _________________________________________ (Name only)

(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.

Signed (Chop)

(f) CERTIFICATIONS AND REPRESENTATIONS

By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation.

The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.

Section L - Instructions, Conditions and Notices to Bidders

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

0930 Hrs, 8 July 2019

(c) Participants will meet at--

Morin Gate, Osan AFB

(End of provision)

5152.236-4011 CONSTRUCTION PRICE RANGE

Pursuant to FAR 36.204 the estimated price range is between $100,000 and $250,000.

INSTRUCTIONS TO OFFEROR

INSTRUCTIONS TO OFFEROR(S)

1. GENERAL INSTRUCTIONS

a. The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-1(f)(4).

b. Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.

2. SUBMISSION OF PROPOSAL:

a. FBO SUBMISSION REQUIRED: Offers shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to chaeyong.yi5.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to only FBO server problem not individual failure/problem. All questions should be emailed to chaeyong.yi5.ln@mail.mil within five (5) days by 1300 hours (Korea Standard Time) after the solicitation is issued.

b. CLOSING DATE: The electronic offer shall be submitted by 1500 hours (Korea Standard Time) on the closing date of RFP.

3. SUBMISSION REQUIREMENTS

a. PRICING PROPOSAL: The pricing proposal must clearly indicate prices for each Contract Line Item Number in Section B - Supplies or Services and Prices.

b. BIDDING SCHEDULE WITH SUB-CLINs: The bidding schedule with Sub-CLINs must clearly identify all costs that can materially impact the statement of work.

c. SECTION K - Representations, Certifications and Other Statements of Offerors

d. SECTION K-TAXES: Offerors must complete all tax portions of SECTION K. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, offerors shall propose exemptions of specific ROK taxes that are legitimate, attributable to the contract, and authorized by the applicable stated references.

e. SECTION K-OTHER: Offerors must complete all Non-Tax related portions of SECTION K.

f. COMPLIANCE WITH SOLICITATION: Failure to submit the above requirements under SECTION L may be grounds for determining the proposal to be non-compliant. For example, if a detailed offer breakdown is not submitted, the contracting officer will be unable to find the offeror's pricing proposal acceptable and the offeror's proposal will be ineligible for award. Non-compliance will only be cured if the government holds discussions as detailed in SECTION L.

4. NO OFFER LETTER: If MA IDIQ Contractor is unable to submit the proposal in response to this RFP, the Contractor shall submit a 'No-Offer Letter' by date and time specified in this solicitation.

5. SITE VISIT

a. Offerors who intend to propose on this solicitation are strongly encouraged to attend site visit. See site visit Clause, FAR 52.236-27 Alt I. Offerors are required to have a valid Korean Identification card or driver license when attending the site visit orientation

b. Offeror shall submit the following information to Hwang, Pyongha at chaeyong.yi5.ln@mail.mil by

02:00 PM, 3 Jul 2019 for temporary access. After sending E-mail, offerors may confirm with Mr. Yi, Chaeyong at (0503) 357-6018 (Commercial) if the e-mail is delivered to his e-mail account.

- Individual Name per offeror (Maximum 2 person may be escorted)

c. The attendee must bring a valid identification card with clean photo (주민등록증) or driver license.

Section M - Evaluation Factors for Award

BASIS OF AWARD

Evaluation Factors for Award

Electronic offers submitted by 1500 hours (Korea standard Time) on the closing date of RFP shall be considered timely.

1. EVALUATION CRITERIA

a. The pricing proposal shall be evaluated to determine whether it is complete and reasonable. A complete and reasonable pricing proposal will be deemed acceptable.

b. The bidding schedule with Sub-CLINs will be used by the contracting officer to determine whether proposed prices are complete and reasonable. A bidding schedule with Sub-CLINs may be used by the contracting officer to determine whether an offeror is able to complete the requirements under the contract, and/or whether discussions will be conducted pursuant to instructions to the offerors.

c. SECTION K - Representations, Certifications and Other Statements of Offerors

d. SECTION K-TAXES will be evaluated to determine whether it is complete. In addition, propose exemptions of specific ROK taxes will be evaluated to determine whether they are legitimate, attributable to the contract, authorized, and reasonable. A complete SECTION-K that only proposes exemptions of specific ROK taxes that are legitimate, attributable to the contract, necessary to complete the Task Order, do not improperly overstate any proposed tax exemption, authorized, and reasonable will be deemed acceptable.

e. SECTION K-OTHER will be evaluated to determine whether it is complete. A complete SECTION

K-OTHER will be deemed acceptable.

3. BASIS FOR AWARD: Award shall be made to the responsible offeror submitting the lowest priced offer that is evaluated as acceptable for all evaluation criteria.

File details come from the government source that posted it.