A03_SUBMITTAL-REGISTER.xls

XLS spreadsheet 55 KB Posted

Attached to
Install Double Throw Switches (Osan MATOC Work Plan Only)
Solicitation number
W90VN6-19-R-0019
Issued by

About this file

submittal register

View the file

Other files

File Type Posted
A21_W90VN6-19-R-0019-0001.pdf PDF
A03_Drawings.pdf PDF
A21_W90VN6-19-R-0019.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Register

TITLE:Install Double Throw SwitchesSUBMITTAL REGISTER
JOB NAME:
LOCATION:Osan AB
CONTRACT NO:
CONTRACTOR:
CONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
LineActivity #Trans-mittal #Specification SectionSD #Submittal DescriptionItem SubmittedParagraph #Classification: GOVT or A/E RevwrSubmitApproval Needed ByMaterial Needed ByAction CodeDate Of ActionDate FWD to APPR / Auth Date RCD From CONTRDate FWD To Other RevwrDate RCD From Other RevwrAction CodeDate Of ActionMailed To CONTR/ Date RCD From APPR AuthorityRemarks
101 30 0001Preconstruction SubmittalsView location map1.4G
201 30 0001Preconstruction SubmittalsProgress and completion pictures1.5
301 32 01.00 1001Preconstruction SubmittalsPreliminary Project Schedule3.4.1G
401 32 01.00 1001Preconstruction SubmittalsInitial Project Schedule3.4.2G
501 32 01.00 1001Preconstruction SubmittalsInitial Project Schedule3.4.2G
601 32 01.00 1001Preconstruction SubmittalsPeriodic Schedule Updates3.4.3G
701 32 01.00 1001Preconstruction SubmittalsSchedule Status Report3.1.2G
801 33 0001Preconstruction SubmittalsSubmittal register1.8G
1201 35 2601Preconstruction SubmittalsSAFETY PLAN /ACCIDENT PREVENTION PLAN (APP)1.6
1301 35 2601Preconstruction SubmittalsActivity Hazard Analysis (AHA)1.7
1601 35 2606Test ReportsNotifications and Reports1.11
1701 35 2606Test ReportsAccident Reports1.11.2
2101 35 2607CertificatesHot work permit1.8
2201 35 2607CertificatesLicense Certificates1.13
2301 35 29.1302Shop DrawingsWork Zones1.20.1G
2401 35 29.1302Shop DrawingsDecontamination Facilities1.21.1G
2501 35 29.1303Product DataExposure Monitoring/Air Sampling Program1.13
2601 35 29.1303Product DataSite Control Log1.20.2
2701 35 29.1303Product DataEmployee Certificates1.12.4
2801 45 00.00 1001Preconstruction SubmittalsQuality Control Plan3.2G
2901 50 0001Preconstruction SubmittalsConstruction site plan1.4G
3001 50 0001Preconstruction SubmittalsTraffic control plan3.4.1G
3101 50 0001Preconstruction SubmittalsTemporary Power Services Diagram3.3.4
3501 57 20.00 1001Preconstruction SubmittalsEnvironmental Protection Plan1.7G
3601 58 0002Shop DrawingsConstruction Project Sign1.2.1G
3701 74 1901Preconstruction SubmittalsWaste Management Plan1.6G
3801 74 1911Closeout SubmittalsRecords1.7
3901 78 0003Product DataAs-Built Record of Equipment and Materials1.3.2
4001 78 0003Product DataEquipment-in-Place List1.3.4
4101 78 0003Product DataWarranty Management Plan1.6.1
4201 78 0003Product DataWarranty Tags1.6.5
4301 78 0003Product DataSpare Parts Data1.4
4401 78 0008Manufacturer’s InstructionsPreventative Maintenance1.5
4501 78 0008Manufacturer’s InstructionsCondition Monitoring (Predictive Testing)1.5
4601 78 0008Manufacturer’s InstructionsInspection1.5
4701 78 0008Manufacturer’s InstructionsInstructions1.6.1
4801 78 0010Operation and Maintenance DataOperation and Maintenance Manuals1.7
4901 78 0011Closeout SubmittalsRecord Drawings1.3.1
5001 78 0011Closeout SubmittalsInterim Form DD13541.9G
5101 78 0011Closeout SubmittalsChecklist for Form DD13541.9G
5202 41 0001Preconstruction SubmittalsExisting Conditions1.11G
1,34326 56 0001Preconstruction SubmittalsPhotometric Plan1.5.3G
1,34426 56 0001Preconstruction SubmittalsLED Luminaire Warranty1.7.1G
1,34526 56 0002Shop DrawingsLuminaire drawings1.5.1.1G
1,34626 56 0002Shop DrawingsPoles1.5.1.2G
1,34726 56 0003Product DataLuminaire Light Sources2.2.2G
1,34826 56 0003Product DataFluorescent, Induction and LED Luminaires2.2G
1,34926 56 0003Product DataLuminaire Ballasts, Generators and Power Supply Units (Drivers)2.2.3G
1,35026 56 0003Product DataLighting contactor2.3.3G
1,35126 56 0003Product DataTime switch2.3.2G
1,35226 56 0003Product DataLighting Control Relay Panel2.3.4G
1,35326 56 0003Product DataMotion Sensor2.3.5G
1,35426 56 0003Product DataPhotocell2.3.1G
1,35526 56 0003Product DataConcrete poles2.4.1G
1,35626 56 0003Product DataAluminum poles2.4.2G
1,35726 56 0003Product DataSteel poles2.4.3G
1,35826 56 0003Product DataFiberglass poles2.4.4G
1,35926 56 0003Product DataBrackets2.5
1,36026 56 0005Design DataDesign Data for luminaires1.5.4G
1,36126 56 0006Test ReportsLED Luminaire - IES LM-79 Test Report1.5.5G
1,36226 56 0006Test ReportsLED Light Source - IES LM-80 Test Report1.5.6G
1,36326 56 0006Test ReportsOperating test3.2
1,36426 56 0007CertificatesLuminaire Useful Life Certificate1.7.1G
1,36526 56 0008Manufacturer’s InstructionsConcrete poles2.4.1
1,36626 56 0008Manufacturer’s InstructionsFiberglass poles2.4.4
1,36726 56 0010Operation and Maintenance DataElectronic Ballast Warranty1.7.2