Scope of Work HUSK TA 16 May 2022.pdf

PDF 130 KB Posted

Attached to
HUSK Windows
Solicitation number
W9098S21Q0062
Issued by

View the file

Other files

File Type Posted
B08 -HUSK Windows Price Matrix - revised May 2022.xlsx XLSX spreadsheet
21Q0062-0006.pdf PDF
21Q0062 conformed thru amendment 0005.pdf PDF
22Q0062-0005.pdf PDF
21Q0062-0004 conformed.pdf PDF
21Q0062-0001.pdf PDF
21Q0062-0003.pdf PDF
21Q0062-0002.pdf PDF
21Q0062-0004.pdf PDF
Attachment 0001 Scope of Work HUSK TA EM Revisions.pdf PDF
B08 -HUSK Windows Price Matrix.xlsx XLSX spreadsheet
A02 - Scope of Work HUSK TA.docx DOCX document
B08 - Solicitation 21Q0062.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work – HUSK Transparent Armor Dated: 16 May 2022

Background:

The HUSK cab is part of a HET transportation vehicle used by the US Army. There is a requirement to manufacture frames and Transparent Armor (TA) then and pot the TA into the frames. Transparent armor is a clear material that is designed and tested to provide protection against impact, ballistic and blast threats. Potting is a process of filling a gap between a frame and the transparent armor. The TA shall be produced in accordance with (IAW) TA Drawings:

12638671, 12638842, 12638870, 12638914, 12638881, 12638949, and 12638951.

General Contractor Requirements:

The contractor shall provide all materials, labor, tools, equipment, and supplies required to produce the TA and final assemblies. Using the drawings as instructions, the transparent armor shall be potted to interface with the frames. After potting, each assembly shall be completely assembled. The contractor shall deliver as the final assembly. The frames shall be painted green unless otherwise specified

Quality requirements:

TA shall be produced IAW Attachment 0002 - ATPD 2352T. All Certified Test Reports (CTR) and Certificate of Conformance (COC) are to be over packed with each shipment and delivered

IAW CDRL A001.

Transportation Requirements for the First article Test (FAT):

The contractor shall be responsible for shipping three each of the finished assemblies in their vendor-supplied shipping containers to RIA-JMTC once the assemblies are complete.

Transportation Requirements for production:

The contractor shall be responsible for shipping of each assembly in their vendor-supplied shipping containers to RIA-JMTC once the assemblies are complete.

Environmental:

The contractor must follow all applicable environmental, local, state, and federal environmental laws/regulations.

Schedule:

The contractor has 180 business days to complete the first article assemblies after the first order is placed. The 180 days includes shipment to the Government at RIA-JMTC.

Production schedule:

The contractor will deliver at a minimum: 88 of each assembly 12638671, and 44 of each assembly 12638842, and 12638870 to the Government at RIA-JMTC beginning 180 Days from FAT acceptance. FOB: Destination