Limiting-Competition-under-120M.pdf
PDF 678 KB Posted
- Attached to
- Award to Butler Machinery
- Solicitation number
- W901UZ-16-P-0093
About this file
J A for laser leveling of Trimble Equipment by Butler Machinery
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For All Actions At or Below the Simplified Acquisition Threshold Use for FAR Part 8, FAR Subpart 13.1, or FAR Part 16, Including Brand Name
Version – August 2015
Memorandum for Record – Limiting Competition at or below the Simplified
Acquisition Threshold
1. Contracting Activity: NGND-PFO-P&C
2. Description of Action:
Nature: New Requirement Follow-on Requirement
Contract Vehicle: Purchase Order Number _______________________________ Blanket Purchase Agreement (BPA) Number _______________ Order/BPA# _______ against FSS Contract #_____ _________ Order #___________ against Multiple Award IDIQ Contract Name or #______________
Order #_______ against a single award IDC Contract
Modification # _______ to existing PO/TO/DO/Call Order
Pricing/Contract Type: Fixed Price Time & Materials/Labor Hours Cost Reimbursable Hybrid (insert percentage of each contract type)
Funds: Operations & Maintenance, Army (OMA) Other Funds: ________
FY: ________
Name of Proposed Contractor(s) and Address:
Brand Name Buy: Yes No
3. Description of Services or Supplies: In layman’s terms, briefly describe the services or supplies to be provided, including make & model number where appropriate.
Include quantities of supplies or period of performance for services. Provide information for any options included. Include the total estimated value of the proposed action. If the action is a modification to an existing purchase order, distinguish clearly between the work covered by the basic order and the work to be obtained by the proposed modification. Do not use abbreviations.
Remove or Replace Text
Version – August 2015
Include quantities of supplies or provide the period of performance for services. Ensure all CLINs and associated estimates are accounted for in the appropriate year and total value.
For Actions without Options:
Period of Performance: ___________ to ___________ or (insert completion date) Total Value: $ ___________
For Actions with Options*:
Base Period: _______ to _______ or (insert completion date) Value: $________ Option Period 1: _______ to _______ or (insert completion date) Value: $________ Option Period 2: _______ to _______ or (insert completion date) Value: $________ Option Period 3: _______ to _______ or (insert completion date) Value: $________ Option Period 4: _______ to _______ or (insert completion date) Value: $________ Option Period 5: _______ to _______ or (insert completion date) Value: $________ FAR Clause 52.217-8 option: _______ to _______ or (insert completion date)
Value: $________ Total: $________
*Note: Option quantities or performance periods are typically not allowed in J&As citing Urgency. The total period of performance of a contract awarded using this authority may not exceed the time necessary to meet the requirements of the work to be performed and for the agency to enter into another contract for the required goods or services through the use of competitive procedures.
4. Authority: Select the appropriate authority below:
FAR 13.106-1(b)(1): For purchases not exceeding the simplified acquisition threshold (SAT), only one source reasonably available, urgency, exclusive licensing agreements, brand name, or industrial mobilization.
Or
FAR 8.405-6(a)(1)(i)(B) and 8.405-6(b)(1)Brand Name FAR 8.405-6(a)(1)(i)(A) Urgency FAR 8.405-6(a)(1)(i)(B) Only One Source is Capable FAR 8.405-6(a)(1)(i)(C) Logical Follow-on
Or
FAR 16.505(b)(2)(i)(B) Only One Awardee is Capable FAR 16.505(a)(4) Brand Name FAR 16.505(b)(2)(i)(A) Urgency FAR 16.505(b)(2)(i)(C) Logical Follow-on
Control No:
Remove or Replace Text
Version – August 2015
FAR 16.505(b)(2)(i)(D) Minimum Guarantee
5. Reasons for Authority Cited:
a. Explain why the intended Contractor is the only reasonable source who can provide the required supplies or services. Discuss the unique capabilities, expertise, etc. that support the lack of competition.
b. For a brand name restriction - brand name specifications shall not be used unless the particular brand name, product, or feature is essential to the Government’s requirements. Explain why the brand specified is the only brand that will meet the Government’s needs.
c. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the Government, financial or otherwise, that will result if this justification is not approved and the product or service cannot be provided by the intended sole source Contractor.
6. Publicizing Contract Actions: For FAR Part 13 actions, the public display and synopsis requirements of FAR 5.101 and FAR 5.203 do not apply due to the $ threshold, apply and will be followed, or do not apply due to an exception at
5.202 ______________________. (Fill in exception).
Requirement to post justification in accordance with FAR 8.405-6(b)(3), FAR 13.105(c), or FAR 16.505(a)(4)(iii)(A)
Action is NOT a brand name restriction and is under $150K, no posting required
Action is a brand name restriction, under $25K, no posting required Action is a brand name restriction, over $25K. It will be redacted and posted with the solicitation.
Action is a brand name restriction over $25K but will not be posted due to exception:
FAR 6.305(f) FAR 8.405-6(b)(3)(iii)(A) FAR 8.405-6(b)(3)(iii)(B) FAR 8.405-6(b)(3)(iii)(C) FAR 16.505(a)(4)(iii(C)
Control No:
Remove or Replace Text
Version – August 2015 companies’ similar products, or products lacking the particular feature specified, do not meet, or cannot be modified to meet, the agency’s needs.
8. Other Facts: Discuss any other facts which support the use of a sole source for this effort. Include the procurement history of the item/service. If this is a modification, include whether or not the contract award was competitive or not.
9. Technical/Requirements Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
Typed Name:__________________________________________________
Date:______________________
Title:______________________ Signature: ___________________________________________________________
10. Contracting Officer Certification/Approval: This certification should be made by the Contracting Officer who will sign the contract resulting from this justification memorandum.
I hereby determine that the anticipated cost or price to the Government for this contract action will be fair and reasonable based upon (describe technique to be used, e.g. price analysis, cost analysis, etc.).
I certify that this justification is accurate and complete to the best of my knowledge and belief, and that completing this purchase as a sole source is in the best interest of the Government. Additionally, I approve this justification to limit competition subject to the availability of funds and provided that the services or supplies herein described have otherwise been authorized for acquisition.
Typed Name:__________________________________________________
Date:_______________________
Title:_______________________ Signature: __________________________________________________________
7.. Market Research Describe the type, extent of the market research conducted to identify all qualified sources and the results thereof. In accordance with AFARS 5110.002, market research must be meaningful, complete, and current. Provide the timeframe in which market research was completed and who compiled the data. If the requirement is a brand name specification, market research must support that other
Control No:
kevin.magstadt Typewritten Text
PRICE ANALYSIS
| Purchase Order Number: TBD | |
| Blanket Purchase Agreement BPA Number: | |
| OrderBPA: | |
| against FSS Contract: | |
| Order: | |
| against Multiple Award IDIQ Contract: | |
| Name or: | |
| Order_2: | |
| undefined: | |
| Modification: | |
| undefined_2: | |
| Other Funds: | |
| FY: 16 | |
| Name of Proposed Contractors and Address 1: Butler Machinery | |
| Name of Proposed Contractors and Address 2: 7910 Highway 2 W | |
| Name of Proposed Contractors and Address 3: Devils Lake, ND | |
| Period of Performance: 26 September 2016 | |
| to: TBD | |
| Total Value: 19,650.00 | |
| Base Period: | |
| to_2: | |
| Value: | |
| Option Period 1: | |
| to_3: | |
| Value_2: | |
| Option Period 2: | |
| to_4: | |
| Value_3: | |
| Option Period 3: | |
| to_5: | |
| Value_4: | |
| Option Period 4: | |
| to_6: | |
| Value_5: | |
| Option Period 5: | |
| to_7: | |
| Value_6: | |
| FAR Clause 522178 option: | |
| to_8: | |
| Value_7: | |
| Total: | |
| Fill in exception: | |
| 2016-09-20T15:49:59-0500 | |
| EVERSON.CORY.JOE.1146210704 |
| 2016-09-21T07:31:10-0500 | |
| MAGSTADT.KEVIN.MARC.1146421780 |
| Check Box1: Yes |
| Check Box2: Off |
| Check Box3: Yes |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Yes |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Yes |
| Check Box14: Off |
| Check Box15: Yes |
| Check Box16: Off |
| Check Box17: Yes |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Yes |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
| Check Box39: Off |
| Type Name 2: Kevin Magstadt |
| Date2: 21 SEP 16 |
| Title2: Contracting Officer |
| Type Name: Cory Everson |
| Date: 19 Aug 16 |
| Title: Senior Logistics NCO |
| 7: |
| Market Research: Butler is the only company in the 90 mile radius that can install Trimble Laser Leveling equipment. We researched on the Internet the Trimble distributor in the area and they are the only company to provide this type of support. |
| 8: |
| Other Facts: |
| 3: |
| Description of Services or Supplies: The work shall consist of but is not limited to the following: Removing grade control systems from 130G motor graders, and re-installing, setting up, and calibrating onto 120M motor graders. |
| 5: |
| Reasons for Authority Cited: A: Butler is the only company in the area that can provide the services required to remove and install the laser leveling equipment due to the machine being installed on their specific equipment. It is also the only company that Trimble will allow to work on the laser in the area. |
| Reasons for Authority Cited: B: |
| Reasons for Authority Cited: C: Currently the North Dakota 164th RTI is currently using this type of Laser Leveling System, the RTI needs to remove grade control systems from 130G motor graders, and re-installing, setting up, and calibrating onto 120M motor graders. |
Control #: 16-037
File details come from the government source that posted it. Updated .