Limiting-Competition-under-120M.pdf

PDF 678 KB Posted

Attached to
Award to Butler Machinery
Solicitation number
W901UZ-16-P-0093
Issued by

About this file

J A for laser leveling of Trimble Equipment by Butler Machinery

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For All Actions At or Below the Simplified Acquisition Threshold Use for FAR Part 8, FAR Subpart 13.1, or FAR Part 16, Including Brand Name

Version – August 2015

Memorandum for Record – Limiting Competition at or below the Simplified

Acquisition Threshold

1. Contracting Activity: NGND-PFO-P&C

2. Description of Action:

Nature: New Requirement Follow-on Requirement

Contract Vehicle: Purchase Order Number _______________________________ Blanket Purchase Agreement (BPA) Number _______________ Order/BPA# _______ against FSS Contract #_____ _________ Order #___________ against Multiple Award IDIQ Contract Name or #______________

Order #_______ against a single award IDC Contract

Modification # _______ to existing PO/TO/DO/Call Order

Pricing/Contract Type: Fixed Price Time & Materials/Labor Hours Cost Reimbursable Hybrid (insert percentage of each contract type)

Funds: Operations & Maintenance, Army (OMA) Other Funds: ________

FY: ________

Name of Proposed Contractor(s) and Address:

Brand Name Buy: Yes No

3. Description of Services or Supplies: In layman’s terms, briefly describe the services or supplies to be provided, including make & model number where appropriate.

Include quantities of supplies or period of performance for services. Provide information for any options included. Include the total estimated value of the proposed action. If the action is a modification to an existing purchase order, distinguish clearly between the work covered by the basic order and the work to be obtained by the proposed modification. Do not use abbreviations.

Remove or Replace Text

Version – August 2015

Include quantities of supplies or provide the period of performance for services. Ensure all CLINs and associated estimates are accounted for in the appropriate year and total value.

For Actions without Options:

Period of Performance: ___________ to ___________ or (insert completion date) Total Value: $ ___________

For Actions with Options*:

Base Period: _______ to _______ or (insert completion date) Value: $________ Option Period 1: _______ to _______ or (insert completion date) Value: $________ Option Period 2: _______ to _______ or (insert completion date) Value: $________ Option Period 3: _______ to _______ or (insert completion date) Value: $________ Option Period 4: _______ to _______ or (insert completion date) Value: $________ Option Period 5: _______ to _______ or (insert completion date) Value: $________ FAR Clause 52.217-8 option: _______ to _______ or (insert completion date)

Value: $________ Total: $________

*Note: Option quantities or performance periods are typically not allowed in J&As citing Urgency. The total period of performance of a contract awarded using this authority may not exceed the time necessary to meet the requirements of the work to be performed and for the agency to enter into another contract for the required goods or services through the use of competitive procedures.

4. Authority: Select the appropriate authority below:

FAR 13.106-1(b)(1): For purchases not exceeding the simplified acquisition threshold (SAT), only one source reasonably available, urgency, exclusive licensing agreements, brand name, or industrial mobilization.

Or

FAR 8.405-6(a)(1)(i)(B) and 8.405-6(b)(1)Brand Name FAR 8.405-6(a)(1)(i)(A) Urgency FAR 8.405-6(a)(1)(i)(B) Only One Source is Capable FAR 8.405-6(a)(1)(i)(C) Logical Follow-on

Or

FAR 16.505(b)(2)(i)(B) Only One Awardee is Capable FAR 16.505(a)(4) Brand Name FAR 16.505(b)(2)(i)(A) Urgency FAR 16.505(b)(2)(i)(C) Logical Follow-on

Control No:

Remove or Replace Text

Version – August 2015

FAR 16.505(b)(2)(i)(D) Minimum Guarantee

5. Reasons for Authority Cited:

a. Explain why the intended Contractor is the only reasonable source who can provide the required supplies or services. Discuss the unique capabilities, expertise, etc. that support the lack of competition.

b. For a brand name restriction - brand name specifications shall not be used unless the particular brand name, product, or feature is essential to the Government’s requirements. Explain why the brand specified is the only brand that will meet the Government’s needs.

c. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the Government, financial or otherwise, that will result if this justification is not approved and the product or service cannot be provided by the intended sole source Contractor.

6. Publicizing Contract Actions: For FAR Part 13 actions, the public display and synopsis requirements of FAR 5.101 and FAR 5.203 do not apply due to the $ threshold, apply and will be followed, or do not apply due to an exception at

5.202 ______________________. (Fill in exception).

Requirement to post justification in accordance with FAR 8.405-6(b)(3), FAR 13.105(c), or FAR 16.505(a)(4)(iii)(A)

Action is NOT a brand name restriction and is under $150K, no posting required

Action is a brand name restriction, under $25K, no posting required Action is a brand name restriction, over $25K. It will be redacted and posted with the solicitation.

Action is a brand name restriction over $25K but will not be posted due to exception:

FAR 6.305(f) FAR 8.405-6(b)(3)(iii)(A) FAR 8.405-6(b)(3)(iii)(B) FAR 8.405-6(b)(3)(iii)(C) FAR 16.505(a)(4)(iii(C)

Control No:

Remove or Replace Text

Version – August 2015 companies’ similar products, or products lacking the particular feature specified, do not meet, or cannot be modified to meet, the agency’s needs.

8. Other Facts: Discuss any other facts which support the use of a sole source for this effort. Include the procurement history of the item/service. If this is a modification, include whether or not the contract award was competitive or not.

9. Technical/Requirements Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

Typed Name:__________________________________________________

Date:______________________

Title:______________________ Signature: ___________________________________________________________

10. Contracting Officer Certification/Approval: This certification should be made by the Contracting Officer who will sign the contract resulting from this justification memorandum.

I hereby determine that the anticipated cost or price to the Government for this contract action will be fair and reasonable based upon (describe technique to be used, e.g. price analysis, cost analysis, etc.).

I certify that this justification is accurate and complete to the best of my knowledge and belief, and that completing this purchase as a sole source is in the best interest of the Government. Additionally, I approve this justification to limit competition subject to the availability of funds and provided that the services or supplies herein described have otherwise been authorized for acquisition.

Typed Name:__________________________________________________

Date:_______________________

Title:_______________________ Signature: __________________________________________________________

7.. Market Research Describe the type, extent of the market research conducted to identify all qualified sources and the results thereof. In accordance with AFARS 5110.002, market research must be meaningful, complete, and current. Provide the timeframe in which market research was completed and who compiled the data. If the requirement is a brand name specification, market research must support that other

Control No:

kevin.magstadt Typewritten Text

PRICE ANALYSIS

Purchase Order Number: TBD
Blanket Purchase Agreement BPA Number:
OrderBPA:
against FSS Contract:
Order:
against Multiple Award IDIQ Contract:
Name or:
Order_2:
undefined:
Modification:
undefined_2:
Other Funds:
FY: 16
Name of Proposed Contractors and Address 1: Butler Machinery
Name of Proposed Contractors and Address 2: 7910 Highway 2 W
Name of Proposed Contractors and Address 3: Devils Lake, ND
Period of Performance: 26 September 2016
to: TBD
Total Value: 19,650.00
Base Period:
to_2:
Value:
Option Period 1:
to_3:
Value_2:
Option Period 2:
to_4:
Value_3:
Option Period 3:
to_5:
Value_4:
Option Period 4:
to_6:
Value_5:
Option Period 5:
to_7:
Value_6:
FAR Clause 522178 option:
to_8:
Value_7:
Total:
Fill in exception:
2016-09-20T15:49:59-0500
EVERSON.CORY.JOE.1146210704
2016-09-21T07:31:10-0500
MAGSTADT.KEVIN.MARC.1146421780
Check Box1: Yes
Check Box2: Off
Check Box3: Yes
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Yes
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Yes
Check Box14: Off
Check Box15: Yes
Check Box16: Off
Check Box17: Yes
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Yes
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off
Type Name 2: Kevin Magstadt
Date2: 21 SEP 16
Title2: Contracting Officer
Type Name: Cory Everson
Date: 19 Aug 16
Title: Senior Logistics NCO
7:
Market Research: Butler is the only company in the 90 mile radius that can install Trimble Laser Leveling equipment. We researched on the Internet the Trimble distributor in the area and they are the only company to provide this type of support.
8:
Other Facts:
3:
Description of Services or Supplies: The work shall consist of but is not limited to the following: Removing grade control systems from 130G motor graders, and re-installing, setting up, and calibrating onto 120M motor graders.
5:
Reasons for Authority Cited: A: Butler is the only company in the area that can provide the services required to remove and install the laser leveling equipment due to the machine being installed on their specific equipment. It is also the only company that Trimble will allow to work on the laser in the area.
Reasons for Authority Cited: B:
Reasons for Authority Cited: C: Currently the North Dakota 164th RTI is currently using this type of Laser Leveling System, the RTI needs to remove grade control systems from 130G motor graders, and re-installing, setting up, and calibrating onto 120M motor graders.

Control #: 16-037

File details come from the government source that posted it. Updated .