This document provides a synopsis of a proposed federal contract action for gunnery training systems. The U.S. Army Program Executive Office for Simulation, Training, and Instrumentation (PEO STRI), Project Manager Soldier Training (PM ST), Product Manager Virtual Training Systems (PdM VTS) is seeking to procure technical refresh, concurrency upgrades, and production of existing gunnery training simulation systems to support various Army and Marine Corps units. Systems included are Abrams Advanced Gunnery Training Systems, Bradley Conduct of Fire Trainer, Stryker Mobile Gun System AGTS, and USMC Light Armored Vehicle-25 AGTS. The estimated ceiling for the contract is $105 million, with an anticipated award date of Q1FY2022. Responses to the synopsis are due by December 16, 2020. The place of performance will be at locations to be determined. The procurement will be full and open competition with no set-aside designations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| Table 1. Required Information Table | ||||||
| Item | Description of information needed | Draft RFP Reference | Rationale | USG Response | ||
| 01 | Documentation identifying the extent (duration) of acceptance testing for each device type | IDIQ SOW Section 3.0 Tech Refresh | ||||
| Attach 5 | Requirement to be able to estimate the acceptance test time and in order to properly price the effort. | It is the bidders responsibility to determine the extent of the acceptance testing for each device type based upon their technical solution. | ||||
| 02 | Drawings and Parts Lists for Stryker TAGTS | IDIQ SOW Section 3.0 Production Systems Attach 5 | In order to replicate and price Stryker TAGTS production systems. DO2 CLIN Series 0003 1001, 2001 | The drawings and parts lists are contained in the SMM volumes. | ||
| 03 | Information identifying the OEM of the Sound system for each device type | IDIQ SOW Section 3.0 Tech Refresh | ||||
| Attach 5 | In order to gather the data to be able to refresh and price the system. | The OEM for the sound system is eMDee Technology, Inc. | ||||
| 04 | SPECIFICATION 63A154853P3 AND STATEMENT OF WORK |
63A154854 for Gunners AUX Sight referenced in drawing for Part
| number 139016-1 | IDIQ SOW Section 3.0 Production Systems Attach 5 | In order to replicate and price a M1A2 SEPV2 AGTS production system. DO1 CLIN Series 3001 and 4001 | The OEM for the Gunners AUX Sight is NVIS, Inc. | |
| 05 | SPECIFICATION 63A154853P2 AND STATEMENT OF WORK |
63A154854 for Gunners PRI EX
| Sight referenced in drawing for Part number 139015-1 | IDIQ SOW Section 3.0 Production Systems Attach 5 | In order to replicate and price a M1A2 SEPV2 AGTS production system. DO1 CLIN Series 3001 and 4001 | The OEM for the Gunners GPSE Sight is NVIS, Inc. | |||
| 06 | SPECIFICATION 63A154853P1 AND STATEMENT OF WORK | |||||
| 63A154854 for Gunners PRI Sight referenced in drawing for Part number 139014-1 | IDIQ SOW Section 3.0 Production Systems Attach 5 | In order to replicate and price a M1A2 SEPV2 AGTS production system. DO1 CLIN Series 3001 and 4001 | The OEM for the Gunners GPS Sight is NVIS, Inc. | |||
| 07 | Interface Control Document (ICD) for Abrams Common Software Library (ACSL) Version 4.8 | SOW Attch+08. Para 3.9.2.2.1 | In order to estimate the software modification effort, need to determine the scope of the changes from v4.6 to | |||
| v4.8 | The ACSL changes are listed in the SOW. They include the AMP round, JBC-P interface, and ammo selection menu changes. | |||||
| 08 | Documentation that describes the physical modifications to the Gunner’s Auxiliary Sight (GAS) reticle switch knob | SOW Attch+08. Para 3.9.2.2.2 | In order to estimate the hardware modification effort, need to determine the extent of the vehicle modification, | |||
| does the entire GAS Control Panel need to be replaced? | Whether the entire GAS Control Panel needs to be replaced is dependent on the bidder's technical solution. The GAS Control panel and reticle switch knob vehicle drawings are being provided as GFI prior to final RFP release. | |||||
| 09 | Documentation that describes the physical modifications being made to the vehicle for the FM3 Common Remotely Operated Weapon Station (CROWS) Handle | SOW Attch+08. Para 3.9.2.2.3 | In order to estimate the hardware modification effort, need to determine the extent of the vehicle modification, does the entire CROWS handle need to be replaced or can it be modified? | See GFI CROWS LP Handle slide for the physical modifications to the existing handle. Whether the entire handle needs to be replaced is dependent on the bidder's technical solution. | ||
| 10 | Documentation that describes the new capabilities being provided by the FM3 Common Remotely Operated Weapon Station (CROWS) | |||||
| Handle Upgrade | SOW Attch+08. Para 3.9.2.2.3 | In order to estimate the software modification effort, need to know the new capabilities being provided by the CROWS handle upgrade | There are no new capabilities. They are just being physically relocated on the handle. See GFI CROWS LP Handle slide and CROWS Menu update slides being provided prior to final RFP release. | |||
| 11 | Documentation that describes the physical modifications being made to the vehicle for the FM3 Manual Traverse Mechanism (MTM) | SOW Attch+08. Para 3.9.2.2.4 | In order to estimate the hardware modification effort, need to determine the extent of the vehicle modification, does the entire MTM need to be replaced or can it be modified? | The Manual Traverse handle in the vehicle/crewstation will be replaced to add a mechanism to engage a third gear. | ||
| 12 | Documentation that describes the new capabilities being provided by the FM3 Manual Traverse Mechanism (MTM) Upgrade | SOW Attch+08. Para 3.9.2.2.4 | In order to estimate the software modification effort, need to know the new capabilities being provided by the MTM upgrade | A third gear will be provided as part of the MTM design. Visual representation of the slew rate would have to be modified to match the MTM. | ||
| 13 | Documentation that describes the physical upgrades being made to the vehicle for the FM3 Joint Battle Command - Platform (JBC-P)? | SOW Attch+08. Para 3.9.2.2.6 | In order to estimate the hardware modification effort, need to know the extent of the modifications being made to the vehicle crew station (if any) | There are no physical upgrades required for FM3 JBC-P. | ||
| 14 | Documentation that describes the additional capabilities being provided by the FM3 Joint Battle Command - Platform (JBC-P) system when compared to the existing Force XXI Battle Command Brigade and | |||||
| Below (FBCB2) system | SOW Attch+08. Para 3.9.2.2.6 | In order to estimate the software modification effort, need to know the new capabilities being provided by the JBC-P system | The ACSL ICD defines the ownship messages to interface to FBCB2. The latest JBC-P ICD can be obtained at https://mcsc.army.mil. |
15 We noticed the ICD for Stryker Common Software Library (SCSL) is not included in the latest GFI package. Would the government please provide the ICD for SCSL as soon as possible?
| This ICD will help industry to better prepare the cost estimation for the Technical Refresh. | ||
| The SCSL ICD is called the Interface Requirement Specification (IRS) (Document # IR-8000-1888) that will be provided prior to final RFP release. | ||
| 16 | We noticed that the GFI Interface Control Document (ICD) for Abrams Common Software Library “INTERFACE CONTROL DOCUMENT FOR THE M1A2 SEP V2 ABRAMS COMMON SOFTWARE LIBRARY (ACSL)” is particular to M1A2 AGTS. |
If the Abrams Common Software Library (ACSL) is used in M1A1 CAGTS software, would the government please provide the ICD for M1A1 CSL?
| General. Abrams Common Software Library for Abrams | This ICD will help industry to better prepare the cost estimation for the Technical Refresh. | There is no ACSL for the Abrams M1A1 C-AGTS. The M1A1 tank is an analog vehicle. Common Software Libraries can only be developed for digital vehicles. | |||
| 17 | Would the government please provide the specifications of current DEUA such as size, dimension, and resolution (number of scan lines)? | Statement Of Work for Abrams, Attch_08_DO_01_SOW_Abrams_20200817.docx, Section 3.9.1 Tech Refresh, Page 56. “The upgrade shall also replace the current analog Display Electronic Unit Assembly (DEUA) (“gold box”) sight assemblies with new digital sight assemblies.” | This specific information will inform the level of effort required to replace this non-standard component in the Technical Refresh as well as New Production options, yielding a more accurate price estimate. | The information for this part is in the SMM. | |
| 18 | Would the government please provide the specifications of current DEUA such as size, dimension, and resolution (number of scan lines)? | Statement Of Work for Stryker, Attch_13_DO_02_SOW_Stryker_20200817.docx, Section 3.9.1 Tech Refresh, Page 53. “The upgrade shall also replace the current analog Display Electronic Unit Assembly (DEUA) (“gold box”) sight assemblies with new digital sight assemblies on the full fidelity systems.” | This specific information will inform the level of effort required to replace this non-standard component in the Technical Refresh as well as New Production options, yielding a more accurate price estimate. | The information for this part is in the SMM. | |
| 19 | Would the government please provide the specifications of current DEUA such as size, dimension, and resolution (number of scan lines)? | Statement Of Work for LAV-25, Attch_21_DO_04_SOW_LAV-25_2020017.docx, Section 3.9.1 LAV-25 AGTS Tech Refresh (PAGTS/RAGTS/MAGTS/DAGTS/TAGTS/PAAR), Page 60. “The upgrade shall also replace the current analog Display Electronic Unit Assembly (DEUA) (“gold box”) sight assemblies with new digital sight assemblies.” | This specific information will inform the level of effort required to replace this non-standard component in the Technical Refresh as well as New Production options, yielding a more accurate price estimate. | The information for this part is in the SMM. | |
| 20 | Would the Government please provide any documentation (ICD and Design Descriptions) for the Host software of each trainer? | Statement of Work, Attchs_08, 13,17,21 (Abrams, Stryker, Bradley and LAV-25 SOWS. |
Section 1.2.c, “Update software components”
| This information is required to ensure accuracy in pricing the effort required to support the Technical refresh effort. | The Government has provided all the available documentation for the software as GFI. | |
| 21 | We noticed that OneSAF is mentioned only in the SOW for Bradley COFT. |
Is OneSAF used on Abrams (M1A1, and M1A2), Stryker, and LAV-25 trainers? If so, which version. If not, what are the SAF/CGF used one the Abrams, Stryker and LAV-25?
Semi Automated Forces (SAF)/Computer Generated Forces (CGF) in general.
Attch_20_DO_03_Bradley-COFT_System_Spec_Rev_J_(PRF-PT-00514).docx, Section 1.4.2, Page 2.
| If OneSAF is not currently used on each of the trainers, there may be cost to re-built current training scenarios using a single SAF solution on all trainers. | OneSAF is not used in any AGTS (M1A1, M1A2, LAV-25, Stryker MGS) product. | |
| 22 | We noticed that OneSAF is mentioned only in the SOW for Bradley COFT. |
Are we correct to assume that OneSAF is the SAF for all Gunnery Training System? If not, would the government clarify the desired SAF solution.
Semi Automated Forces (SAF)/Computer Generated Forces (CGF) in general.
Attch_20_DO_03_Bradley-COFT_System_Spec_Rev_J_(PRF-PT-00514).docx, Section 1.4.2, Page 2.
| If OneSAF is not currently used on each of the trainers, there may be cost to re-built current training scenarios using a single SAF solution on all trainers. | No. OneSAF is only used in the Bradley COFT for placing targets within range bands, Ownvehicle (OV) routes, and OV enfilade/defilade. The scenarios were generated via a separate scenario generation tool. | ||||
| 23 | Would the government please provide the Interface Control Document (ICD) of FBCB2 and JBC-P? | Attch_08_DO_01_SOW_Abrams_20200817.docx, Section 3.9.2.2.6, Joint Battle Command – Platform (JBC-P), “The Contractor shall modify the M1A2 SEP v2 AGTS hardware and software baselines to replace the Force XXI Battle Command Brigade and Below (FBCB2) Joint Capability Release (JCR) with the JBC-P software obtained as GFI from Project Manager Mission Command (PM MC) at the commander and Instructor/Operator positions.” | This information is required to ensure accuracy in pricing the effort required to support the Technical Refresh and FM3 concurrency effort. | The ACSL ICD defines the ownship messages to interface to FBCB2. The latest JBC-P ICD can be obtained at https://mcsc.army.mil. |
| 24 | Would the government please provide the ICDs for OneSAF, ExportCGF, ROCV, Sound Software (such as CGSS, CGCS, and PAAR Audio), and any other software used in the trainer? | General, Interface Control Documents (ICD). | These ICD documents are required to ensure accuracy in pricing the effort required to maximize reuse of existing software employed by the trainers. | There is not an ICD for ROCV. It doesn’t interface with the host software. The OEM for the AGTS sound software is eMDee Technology, Inc. The Government does not have an ICD for ExportCGF or the version of OneSAF that is incorporated with the Bradley COFT. |
| 25 | Is it correct to assume that trailers required for new production units will be provided as GFE consistent with those trailers indicated as being provided under 3.9.1.2 and 3.9.1.3? | ABRAMS SOW, Attch_08_DO_01_SOW_Abrams_20200817.docx, Section 3.9.1.2 Tech Refresh First Article (Year One), Section 3.9.1.3 Option for Tech Refresh Kits (Year Two), and Section 3.9.3 Production Systems. | [No Rationale Provided] | No, the Government will not provide GFE trailers for production systems. The GFE trailers that are being provided are only for retrofits. New trailers will need to be purchased for new production units. |
| 26 | Is it correct to assume that upon award the Government will provide all application installers to enable software configuration in accordance with the new hardware design and new OS versions? |
Is it correct to assume that upon award, the Government will provide all installers for currently deployed applications in order to enable software configuration in accordance with the new hardware design and new OS Versions to be employed as part of the upgrade effort?
General This question informs approaches to how the upgrade effort may be approached and impacts how price is composed. Upon contract award, the Government will provide the existing source code.