About this file

This sources sought synopsis requests capability statements from interested businesses to identify potential sources for the U.S. Army's requirement of 6,775 MQM 170 Outlaw Remotely Piloted Vehicle Targets, 120 MQM-171 Broadsword Unmanned Aerial System Targets, and 365 MQM-186 Redwing aerial targets, as well as associated components, field service labor hours, engineering services, and other support services over the next five years under the Air Defense Artillery Targets Project. Interested parties should submit a capabilities statement no longer than ten pages by 28 August 2020 to the identified contracting specialist at the Department of the Army Materiel Command Contracting Command Orlando Contracting Center. The NAICS code is 336411 for aircraft manufacturing with a small business size standard of 1,500 employees, and the PSC code is 1550 for unmanned aircraft. The incumbent contractor is Griffon Aerospace under contract W900KK20D0006 for $49 million expiring in February 2022.

View the file

Other files

File Type Posted
UAST ORD Revision 25 Aug 03_Redacted.pdf PDF
HW SPEC MIS-PRF-56674 FINAL_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RedWing Performance Requirements

RedWing Aerial Target Performance Requirements

Table 1: MQM-186, RedWing Requirements

Description Threshold Requirement

Objective Requirement

Wingspan

(millimeters)

3075 – 3085 3075 – 3085

Target Length

(millimeters)

1830 – 1840 1830 – 1840

Construction Fiberglass airframe/ wood bulkheads

Fiberglass airframe/ wood bulkheads

Engine Single SAITO FG-30 DA-35

Engine Location Puller Prop located in front of the target

Puller Prop located in front of the target

Internal Design Metal Wing spars Metal Wing spars

Launch Method catapult Catapult

Recovery Method

Belly land Parachute

Table 2: Performance Requirements

Description Threshold Requirement

Objective Requirement

Duration

Ground Control System

CloudCap Piccolo or approved equivalent

CloudCap Piccolo or approved equivalent

N/A

Flight Termination

System

Loss of Ground Control and Loss of GPS

Loss of Ground control and Loss of GPS

Adjustable to support mission requirements

Dash Speed 33.4 m/s

(65 knots)

37 m/s

(72 knots)

5 minutes

Cruise Speed 20 m/s

(39 knots)

30 m/s

(58 knots)

10 minutes

Endurance 3 hours 4 hours Cumulative Flight Time

Payload 12 pounds 20 pounds N/A

Maximum Altitude (MSL)

3,600 m

(11,810 feet)

5,000 m

(16,400 feet)

1 minute

Cruise Altitude

(MSL)

2,000 m

(6,560 feet)

3,000 m

(9,842 feet)

5 minutes

Low Altitude

(AGL)

500 m

(1640 feet)

500 m

(1640 feet)

30 seconds

Operational Range #

(Line-of-Sight)

32 km

(19 miles)

40 km

(24 miles)

N/A

# The “Line of Sight” requirement refers to the direct communication link between the Ground Control Station and the target. The operational range shall not require any additions or modifications to the Ground Control System (GCS) hardware such as a communications repeater or satellite radio to meet the line-of-sight requirement.

MQM-186, RedWing Aerial Target Performance Requirements
# The “Line of Sight” requirement refers to the direct communication link between the Ground Control Station and the target. The operational range shall not require any additions or modifications to the Ground Control System (GCS) hardware such as a ...

File details come from the government source that posted it. Updated .