Attachment_10-_Total_Proposed_Price_Spreadsheet-CDT_26_Oct_2018_Final.xlsx

XLSX spreadsheet 180 KB Posted

Attached to
New Amendment for Common Driver Trainer
Solicitation number
W900KK-18-R-0037
Issued by

About this file

This is an amendment to a synopsis for a Common Driver Trainer (CDT) Virtual Product Line solicitation from the U.S. Army's Program Executive Office for Simulation, Training, and Instrumentation. The Army intends to award a single-award IDIQ contract with a ceiling of $110 million over five years to provide CDT systems for both CONUS and OCONUS sites.

The CDT product line will leverage the Live Training Transformation Integrated Development Environment and focus on configuration management, common requirements, and an open architecture component approach to maximize reuse and reduce costs. The contractor will be responsible for producing CDT systems based on current components, developing and updating the component architecture, and integrating the CDT Integrated Development Environment into the LT2 IDE. The systems will provide initial and sustainment familiarization training for wheeled and tracked vehicles.

Pricing Workbook

View the file

Other files

File Type Posted
W900KK-18-R-0037_A0003.docx DOCX document
Attachment_10-_Total_Proposed_Price_Spreadsheet-CDT_13_Nov_2018_Final.xlsx XLSX spreadsheet
Attachment_7-CDT_VPL_SOW_DO_X_TWV_Phase_2_-_20181031.docx DOCX document
W900KK-18-R-0037_RFP_Questions_with_Gov't_Responses_-_6_Nov_18_ACC.xlsx XLSX spreadsheet
Attachment_10-_Total_Proposed_Price_Spreadsheet-CDT_06_Nov_2018_Final.xlsx XLSX spreadsheet
W900KK-18-R-0037_A0002_conformed_copy.docx DOCX document
Attachment_8-System_Requirements_Document_with_Appendix_A-G_20181031.pdf PDF
W900KK-18-R-0037_A0002.docx DOCX document
Attachment_2-_CDT_VPL_SOW_DO_X_MV_-_20181024.pdf PDF
W900KK-18-R-0037_A0001_Comformed_Copy.docx DOCX document
Attachment_4_-_CDT_VPL_SOW_DO_X_TEV_-_20181024.pdf PDF
Attachment_8-System_Requirements_Document_with_Appendix_A-G_20181024.pdf PDF
W900KK-18-R-0037_RFP_Questions_with_Gov't_Responses_-_26_Oct_18.xlsx XLSX spreadsheet
Attachment_1-_CDT_VPL_SOW_Base_-_20181024.pdf PDF
Exhibit_A-C_CDTVPL_CDRLs_20181024.pdf PDF
Attachment_7-_CDT_VPL_SOW_DO_X_TWV_Phase_2_-_20181024.pdf PDF
Attachment_3-_CDT_VPL_SOW_DO_X_SV_-_20181024.pdf PDF
Attachment_6-_CDT_VPL_SOW_DO_X_TWV_Phase_1_-_20181024.pdf PDF
Attachment_5_-_CDT_VPL_SOW_DO_X_TV_-_20181024.pdf PDF
W900KK-18-R-0037_A0001.docx DOCX document
FINAL_-_CDT_VPL_SOW_DO_X_TWV_Phase_2_-_20180914.docx DOCX document
Word_docs.zip ZIP file
ANNEX_TO_EXHIBIT_B.PDF PDF
ANNEX_TO_EXHIBIT_A_GEIA-STD-0007-B(LPDSummaries).docx DOCX document
Attachment_2-CDT_VPL_SOW_MV_-_20180914.pdf PDF
Exhibit_A-C_CDTVPL_CDRLs.pdf PDF
Attachment_6-CDT_VPL_SOW_TWV_Phase_1_-_20180914.pdf PDF
Attachment_9-_Past_Performance_Questionare_(PPQ).docx DOCX document
Attachment_3-CDT_VPL_SOW_SV_-_20180914.pdf PDF
Attachment_1-_CDT_VPL_SOW_Base_-_20180914.pdf PDF
Attachment_8-System_Requirements_Document_with_Appendix_A-G.pdf PDF
Attachment_5-CDT_VPL_SOW_TV_-_20180914.pdf PDF
Attachment_4-CDT_VPL_SOW_TEV_-_20180914.pdf PDF
Attachment_12-ACC-ORL_Guidelines_for_GFP.pdf PDF
Attachment_11-CDT_VPL_GFP_Smatform.xlsx XLSX spreadsheet
Attachment_10-_Total_Proposed_Price_Spreadsheet-CDT.XLSX XLSX spreadsheet
Attachment_7-_CDT_VPL_SOW_TWV_Phase_2_-_20180914.pdf PDF
W900KK-18-R-0037.docx DOCX document
FINAL_-_CDT_VPL_SOW_Base_-_20180803.docx DOCX document
FINAL_-_CDT_VPL_SOW_DO_X_TV_-_20180803.docx DOCX document
FINAL_-_CDT_VPL_SOW_DO_X_TWV_Phase_2_-_20180803.docx DOCX document
W900KK-18-R-0037_Draft_RFP_Questions_with_Gov't_Responses_-_3_Aug_18.xlsx XLSX spreadsheet
FINAL_-_CDT_VPL_SRD_Appendix_D_TWV_Phase_1_20180803.docx DOCX document
FINAL_-_CDT_VPL_SRD_Appendix_G_MV_20180803.docx DOCX document
FINAL_-_CDT_VPL_SRD_Appendix_E_TWV_Phase_2__20180803.docx DOCX document
FINAL_-_CDT_VPL_SRD_Appendix_B_SafetyChecklist_20171102.docx DOCX document
FINAL_-_CDT_VPL_SOW_DO1_TEV_-_20180803.docx DOCX document
FINAL_-_CDT_VPL_SRD_Appendix_A_Visual_20180803.docx DOCX document
FINAL_-_CDT_VPL_SOW_DO_X_SV_-_20180803.docx DOCX document
FINAL_-_CDT_VPL_SOW_DO_X_TWV_Phase_1_-_20180803.docx DOCX document
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS

- The Offeror shall fill out Column G of each CY tab. The cost/price input from Column G of each CY tab will automatically populate into the TEP tab worksheet.

- The Government will use the TEP worksheet as part of the Cost/Price Evaluation.

- Do NOT populate pricing into the TEP worksheet.

- The Est Qty tab is included for reference only.

- The TEP Tab of the worksheet includes an Estimated Purchase Quantity for each CLIN that has Range Pricing. The Total Estimated Purchase Quantity for the base and out years for a CLIN is totaled in Column AK and used as part of the TEP evaluation.

- A sample worksheet is located at the bottom of the TEP worksheet to be used as reference only.

- The worksheet is set up to round all unit prices and totals.

CY 19

CLINDescriptionSOW Reference(s)SRD Reference(s)Unit of IssueContract TypeUnit Cost/PriceDelivery LocationDelivery Schedule
TEV (6 Systems)
0001TEV Tech Refresh & Concurrency Upgrade (6 Systems)3.01 Lot = 6 each SystemsFFPFt. Leonard Wood, MO# Months ACA
0002TEV Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
0003TEV System Integration3.03.2.1.3.3 (App. A); 3.1, 3.4, 3.5 (App. C)1 Lot = Design/Development/NRECPFFOrigin
0004TEV Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
0005TEV Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
0006TEV NET3.9.1.11 eaFFPFt. Leonard Wood
0007TEV Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.131 LotFFPFt. Leonard Wood
0008TEV Operators Manual3.7.11 eaFFPOrigin
0009TEV Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
0010TEV Site Survey3.121 eaFFPFt. Leonard Wood
0011White Paper (Proposed in first DO)3.11 eaFFPOrigin
0012Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
TV (18 Systems)
0014TV Tech Refresh (18 Systems)3.0Range priceFt Benning, GA# Months ACA
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
0015TV Tech Refresh Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
0016TV Tech Refresh System Integration3.03.2.1.3.3 (App. A); 3.1, 3.4, 3.5 (App. C)1 Lot = Design/Development/NRECPFFOrigin
0017TV Tech Refresh Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
0018TV Tech Refresh Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
0019TV Tech Refresh NET3.9.1.11 eaFFPFt Benning
0020TV Tech Refresh Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 1001FFPFt Benning
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
0021TV Tech Refresh Operators Manual3.7.11 eaFFPOrigin
0022TV Tech Refresh Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
0023TV Tech Refresh Site Survey3.121 eaFFPFt Benning
0024TV Tech Refresh Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
0025TV Concurrency/upgrade (18 Systems)3.0Range priceFFPFt Benning# Months ACA
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
0026TV Concurrency/Upgrade Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
0027TV Concurrency/Upgrade System Integration3.03.2.1.3.3 (App. A); 3.1, 3.4, 3.5 (App. C)1 Lot = Design/Development/NRECPFFOrigin
0028TV Concurrency/Upgrade Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
0029TV Concurrency/Upgrade Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
0030TV Concurrency/upgrade Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 1013FFPFt Benning
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
TWV Phase I
0032TWV PH I Tech Refresh (14 Systems)3.0Range priceFt. Leonard Wood# Months ACA
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-14 EachFFPFt. Leonard Wood
0033TWV PH I Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
0034TWV PH I System Integration3.03.2.1.3.3 (App. A); 3.1, 3.2, 3.3, 3.4, 3.5 (App. D)1 Lot = Design/Development/NRECPFFOrigin
0035TWV PH I Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
0036TWV PH I Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
0037TWV PH I Tech Refresh NET3.9.1.11 eaFFPFt. Leonard Wood
0038TWV PH I Tech Refresh Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 2001FFPFt. Leonard Wood
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-14 EachFFPFt. Leonard Wood
0039TWV PH I Tech Refresh Operators Manual3.7.11 eaFFPOrigin
0040TWV PH I Tech Refresh Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
0041TWV PH I Site Survey3.121 eaFFPFt. Leonard Wood
0042TWV PH I Procure (18 Systems)3.0Range priceFFPFt. Leonard Wood
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-12 EachFFPFt. Leonard Wood
13-18 EachFFPFt. Leonard Wood
0043TWV PH I Procure (18 Systems) Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 2011FFPFt. Leonard Wood
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-12 EachFFPFt. Leonard Wood
13-18 EachFFPFt. Leonard Wood
0044TWV PH I Procure Operators Manual3.7.11 eaFFPOrigin
0045TWV PH I Procure Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
0046TWV PH I Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
TWV Phase II
0048TWV PH II Procure up to 8 systems including NRE for Production, Fabrication/Factory systems test for a complete system (STS and AAR/AS).3.04-8 EachCPFFOrigin# Months ACA
0049TWV PH II Procure Up To 57 Systems for Production, Fabrication/Factory systems test for a complete system (STS and AAR/AS).Range price - Systems
1-6 EachFFPOrigin
7-12 EachFFPOrigin
13-18 EachFFPOrigin
19-24 EachFFPOrigin
25-30 EachFFPOrigin
31-40 EachFFPOrigin
0050TWV PH II - 2 IOS Systems for Production, including NRE Fabrication/Factory, Test per IOS. Shall support the operation for a single IOS to support up to eight cabs; however, a single Pod consists of 1 IOS and 4 STS(s)s and 4 AAR/AS(s) .3.01 -2 EachCPFFOrigin
0051TWV PH II Up To 27 IOS Systems for Production, Fabrication/Factory, Test per IOS. Shall support the operation for a single IOS to support up to eight cabs; however, a single Pod consists of 1 IOS and 4 STS(s)s and 4 AAR/AS(s) .Range price - IOSOrigin
1-5 EachFFPOrigin
6-10 EachFFPOrigin
11-15 EachFFPOrigin
16-20 EachFFPOrigin
0052TWV PH II System Mobile Trailer, Integration and Test of a complete mobile system.3.0Range price mobile systemsFFP
1-5 EachFFPOrigin
6-10 EachFFPOrigin
11-15 EachFFPOrigin
16-20 EachFFPOrigin
0053TWV PH II System Installation and Testing (Inclusive of Travel and Shipping)3.0
SLIN 0053AA1 Lot - 24 Systems (Fixed)FFPFt. Leonard Wood, MO
SLIN 0053AB1 Lot - 5 Systems (Fixed)FFPOkinawa, Japan
SLIN 0053AC1 Lot - 2 Systems (Mobile)FFPIwakuni, Japan
SLIN 0053AD1 Lot - 2 Systems (Mobile)FFPKaneohe Bay, HI
SLIN 0053AE1 Lot - 6 Systems (Mobile)FFPCamp Pendleton, CA
SLIN 0053AF1 Lot - 4 Systems (Mobile)FFP29 Palms, CA
SLIN 0053AG1 Lot - 6 Systems (Mobile)FFPCamp Lejuene, NC
SLIN 0053AH1 Lot - 2 Systems (Mobile)FFPCamp Upshur, VA
0054TWV PH II New Equipment Training (Inclusive of Travel)3.9.1.1
SLIN 0054AA1 EachFFPFt. Leonard Wood, MO
SLIN 0054AB1 EachFFPOkinawa, Japan
SLIN 0054AC1 EachFFPIwakuni, Japan
SLIN 0054AD1 EachFFPKaneohe Bay, HI
SLIN 0054AE1 EachFFPCamp Pendleton, CA
SLIN 0054AF1 EachFFP29 Palms, CA
SLIN 0054AG1 EachFFPCamp Lejuene, NC
SLIN 0054AH1 EachFFPCamp Upshur, VA
0055TWV PH II Initial Spares and Consumables/Special Tools and Test Equipment3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13
SLIN 0055AA1 Lot - 24 SystemsFFPFt. Leonard Wood, MO
SLIN 0055AB1 Lot - 5 SystemsFFPOkinawa, Japan
SLIN 0055AC1 Lot - 2 SystemsFFPIwakuni, Japan
SLIN 0055AD1 Lot - 2 SystemsFFPKaneohe Bay, HI
SLIN 0055AE1 Lot - 6 SystemsFFPCamp Pendleton, CA
SLIN 0055AF1 Lot - 4 SystemsFFP29 Palms, CA
SLIN 0055AG1 Lot - 6 SystemsFFPCamp Lejuene, NC
SLIN 0055AH1 Lot - 2 SystemsFFPCamp Upshur, VA
0056TWV PH II Operators Manual3.7.11 EachFFPOrigin
0057TWV PH II Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 EachFFPOrigin
0058TWV PH II Site Survey3.12
SLIN 0058AA1 EachFFPFt. Leonard Wood, MO
SLIN 0058AB1 EachFFPOkinawa, Japan
SLIN 0058AC1 EachFFPIwakuni, Japan
SLIN 0058AD1 EachFFPKaneohe Bay, HI
SLIN 0058AE1 EachFFPCamp Pendleton, CA
SLIN 0058AF1 EachFFP29 Palms, CA
SLIN 0058AG1 EachFFPCamp Lejuene, NC
SLIN 0058AH1 EachFFPCamp Upshur, VA
0059TWV PH II Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
MV
0061MV Tech Refresh (10 Systems)3.0Range priceFFPOrigin# Months ACA
1-3 EachFFPOrigin
4-6 EachFFPOrigin
7-10 EachFFPOrigin
0062MV Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
0063MV System Integration3.03.2.1.3.3 (App. A); 3.1, 3.2, 3.3, 3.4 (App. G)1 Lot = Design/Development/NRECPFFOrigin
0064MV Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
0065MV Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
0066MV NET3.9.1.11 eaFFPOrigin
0067MV Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 4001FFPOrigin
1-3 EachFFPOrigin
4-6 EachFFPOrigin
7-10 EachFFPOrigin
0068MV Operators Manual3.7.11 eaFFPOrigin
0069MV Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
0070MV Site Survey3.12FFP
SLIN 0070AA1 eaFFPFt. Lewis, WA
SLIN 0070AB1 eaFFPFt. Wainwright, AK
SLIN 0070AC1 eaFFPFt. Benning, GA
SLIN 0070AD1 eaFFPRLFC, Korea
SLIN 0070AE1 eaFFPVilseck, Germany
SLIN 0070AF1 eaFFPFt. Indiantown Gap, PA
SLIN 0070AG1 eaFFPFt. Campbell, KY
SLIN 0070AH1 eaFFPCp. Shelby, MS
SLIN 0070AJ1 eaFFPCp. Atterbury, IN
0071MV Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
0072Shipping; Site Installation, Testing & Delivery (Inclusive of Travel)
SLIN 0072AA1 eaFFPFt. Lewis, WA
SLIN 0072AB1 eaFFPFt. Wainwright, AK
SLIN 0072AC1 eaFFPFt. Benning, GA
SLIN 0072AD1 eaFFPRLFC, Korea
SLIN 0072AE1 eaFFPVilseck, Germany
SLIN 0072AF1 eaFFPFt. Indiantown Gap, PA
SLIN 0072AG1 eaFFPFt. Campbell, KY
SLIN 0072AH2 eaFFPCp. Shelby, MS
SLIN 0072AJ1 eaFFPCp. Atterbury, IN
SV
0074SV Tech Refresh (5 Systems)3.01 Lot = 5 each SystemsFFPOrigin# Months ACA
0075SV Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
0076SV System Integration3.03.2.1.3.3 (App A); 3.1, 3.2, 3.3 (App G)1 Lot = Design/Development/NRECPFFOrigin
0077SV Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
0078SV Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
0079SV NET3.9.1.11 eaFFPOrigin
0080SV Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.131 Lot = 5 each SystemsFFPOrigin
0081SV Operators Manual3.7.11 eaFFPOrigin
0082SV Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
0083SV Site Survey3.121 eaFFP
SLIN 0083AA1 eaFFPFt. Lewis, WA
SLIN 0083AB1 eaFFPFt. Wainwright, AK
SLIN 0083AC1 eaFFPColton, CA
SLIN 0083AD1 eaFFPVilseck, Germany
SLIN 0083AE1 eaFFPFt. Indiantown Gap, PA
0084SV Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
0085Shipping; Site Installation, Testing & Delivery (Inclusive of Travel)
SLIN 0085AA1 eaFFPFt. Lewis, WA
SLIN 0085AB1 eaFFPFt. Wainwright, AK
SLIN 0085AC1 eaFFPColton, CA
SLIN 0085AD1 eaFFPVilseck, Germany
SLIN 1085AE1 eaFFPFt. Indiantown Gap, PA

CY 20

CLINDescriptionSOW Reference(s)SRD Reference(s)Unit of IssueContract TypeUnit Cost/PriceDelivery LocationDelivery Schedule
TEV (6 Systems)
1001TEV Tech Refresh & Concurrency Upgrade (6 Systems)3.01 Lot = 6 each SystemsFFPFt. Leonard Wood, MO# Months ACA
1002TEV Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
1003TEV System Integration3.03.2.1.3.3 (App. A); 3.1, 3.4, 3.5 (App. C)1 Lot = Design/Development/NRECPFFOrigin
1004TEV Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
1005TEV Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
1006TEV NET3.9.1.11 eaFFPFt. Leonard Wood
1007TEV Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.131 LotFFPFt. Leonard Wood
1008TEV Operators Manual3.7.11 eaFFPOrigin
1009TEV Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
1010TEV Site Survey3.121 eaFFPFt. Leonard Wood
1011White Paper (Proposed in first DO)3.11 eaFFPOrigin
1012Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
TV (18 Systems)
1014TV Tech Refresh (18 Systems)3.0Range priceFt Benning, GA# Months ACA
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
1015TV Tech Refresh Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
1016TV Tech Refresh System Integration3.03.2.1.3.3 (App. A); 3.1, 3.4, 3.5 (App. C)1 Lot = Design/Development/NRECPFFOrigin
1017TV Tech Refresh Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
1018TV Tech Refresh Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
1019TV Tech Refresh NET3.9.1.11 eaFFPFt Benning
1020TV Tech Refresh Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 1001FFPFt Benning
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
1021TV Tech Refresh Operators Manual3.7.11 eaFFPOrigin
1022TV Tech Refresh Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
1023TV Tech Refresh Site Survey3.121 eaFFPFt Benning
1024TV Tech Refresh Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
1025TV Concurrency/upgrade (18 Systems)3.0Range priceFFPFt Benning# Months ACA
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
1026TV Concurrency/Upgrade Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
1027TV Concurrency/Upgrade System Integration3.03.2.1.3.3 (App. A); 3.1, 3.4, 3.5 (App. C)1 Lot = Design/Development/NRECPFFOrigin
1028TV Concurrency/Upgrade Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
1029TV Concurrency/Upgrade Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
1030TV Concurrency/upgrade Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 1013FFPFt Benning
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
TWV Phase I
1032TWV PH I Tech Refresh (14 Systems)3.0Range priceFt. Leonard Wood# Months ACA
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-14 EachFFPFt. Leonard Wood
1033TWV PH I Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
1034TWV PH I System Integration3.03.2.1.3.3 (App. A); 3.1, 3.2, 3.3, 3.4, 3.5 (App. D)1 Lot = Design/Development/NRECPFFOrigin
1035TWV PH I Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
1036TWV PH I Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
1037TWV PH I Tech Refresh NET3.9.1.11 eaFFPFt. Leonard Wood
1038TWV PH I Tech Refresh Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 2001FFPFt. Leonard Wood
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-14 EachFFPFt. Leonard Wood
1039TWV PH I Tech Refresh Operators Manual3.7.11 eaFFPOrigin
1040TWV PH I Tech Refresh Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
1041TWV PH I Site Survey3.121 eaFFPFt. Leonard Wood
1042TWV PH I Procure (18 Systems)3.0Range priceFFPFt. Leonard Wood
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-12 EachFFPFt. Leonard Wood
13-18 EachFFPFt. Leonard Wood
1043TWV PH I Procure (18 Systems) Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 2011FFPFt. Leonard Wood
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-12 EachFFPFt. Leonard Wood
13-18 EachFFPFt. Leonard Wood
1044TWV PH I Procure Operators Manual3.7.11 eaFFPOrigin
1045TWV PH I Procure Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
1046TWV PH I Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
TWV Phase II
1048TWV PH II Procure up to 8 systems including NRE for Production, Fabrication/Factory systems test for a complete system (STS and AAR/AS).3.04-8 EachCPFFOrigin# Months ACA
1049TWV PH II Procure Up To 57 Systems for Production, Fabrication/Factory systems test for a complete system (STS and AAR/AS).Range price - Systems
1-6 EachFFPOrigin
7-12 EachFFPOrigin
13-18 EachFFPOrigin
19-24 EachFFPOrigin
25-30 EachFFPOrigin
31-40 EachFFPOrigin
1050TWV PH II - 2 IOS Systems for Production, including NRE Fabrication/Factory, Test per IOS. Shall support the operation for a single IOS to support up to eight cabs; however, a single Pod consists of 1 IOS and 4 STS(s)s and 4 AAR/AS(s) .3.01 -2 EachCPFFOrigin
1051TWV PH II Up To 27 IOS Systems for Production, Fabrication/Factory, Test per IOS. Shall support the operation for a single IOS to support up to eight cabs; however, a single Pod consists of 1 IOS and 4 STS(s)s and 4 AAR/AS(s) .Range price - IOSOrigin
1-5 EachFFPOrigin
6-10 EachFFPOrigin
11-15 EachFFPOrigin
16-20 EachFFPOrigin
1052TWV PH II System Mobile Trailer, Integration and Test of a complete mobile system.3.0Range price mobile systemsFFP
1-5 EachFFPOrigin
6-10 EachFFPOrigin
11-15 EachFFPOrigin
16-20 EachFFPOrigin
1053TWV PH II System Installation and Testing (Inclusive of Travel and Shipping)3.0
SLIN 1053AA1 Lot - 24 Systems (Fixed)FFPFt. Leonard Wood, MO
SLIN 1053AB1 Lot - 5 Systems (Fixed)FFPOkinawa, Japan
SLIN 1053AC1 Lot - 2 Systems (Mobile)FFPIwakuni, Japan
SLIN 1053AD1 Lot - 2 Systems (Mobile)FFPKaneohe Bay, HI
SLIN 1053AE1 Lot - 6 Systems (Mobile)FFPCamp Pendleton, CA
SLIN 1053AF1 Lot - 4 Systems (Mobile)FFP29 Palms, CA
SLIN 1053AG1 Lot - 6 Systems (Mobile)FFPCamp Lejuene, NC
SLIN 1053AH1 Lot - 2 Systems (Mobile)FFPCamp Upshur, VA
1054TWV PH II New Equipment Training (Inclusive of Travel)3.9.1.1
SLIN 1054AA1 EachFFPFt. Leonard Wood, MO
SLIN 1054AB1 EachFFPOkinawa, Japan
SLIN 1054AC1 EachFFPIwakuni, Japan
SLIN 1054AD1 EachFFPKaneohe Bay, HI
SLIN 1054AE1 EachFFPCamp Pendleton, CA
SLIN 1054AF1 EachFFP29 Palms, CA
SLIN 1054AG1 EachFFPCamp Lejuene, NC
SLIN 1054AH1 EachFFPCamp Upshur, VA
1055TWV PH II Initial Spares and Consumables/Special Tools and Test Equipment3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13
SLIN 1055AA1 Lot - 24 SystemsFFPFt. Leonard Wood, MO
SLIN 1055AB1 Lot - 5 SystemsFFPOkinawa, Japan
SLIN 1055AC1 Lot - 2 SystemsFFPIwakuni, Japan
SLIN 1055AD1 Lot - 2 SystemsFFPKaneohe Bay, HI
SLIN 1055AE1 Lot - 6 SystemsFFPCamp Pendleton, CA
SLIN 1055AF1 Lot - 4 SystemsFFP29 Palms, CA
SLIN 1055AG1 Lot - 6 SystemsFFPCamp Lejuene, NC
SLIN 1055AH1 Lot - 2 SystemsFFPCamp Upshur, VA
1056TWV PH II Operators Manual3.7.11 EachFFPOrigin
1057TWV PH II Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 EachFFPOrigin
1058TWV PH II Site Survey3.12
SLIN 1058AA1 EachFFPFt. Leonard Wood, MO
SLIN 1058AB1 EachFFPOkinawa, Japan
SLIN 1058AC1 EachFFPIwakuni, Japan
SLIN 1058AD1 EachFFPKaneohe Bay, HI
SLIN 1058AE1 EachFFPCamp Pendleton, CA
SLIN 1058AF1 EachFFP29 Palms, CA
SLIN 1058AG1 EachFFPCamp Lejuene, NC
SLIN 1058AH1 EachFFPCamp Upshur, VA
1059TWV PH II Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
MV
1061MV Tech Refresh (10 Systems)3.0Range priceFFPOrigin# Months ACA
1-3 EachFFPOrigin
4-6 EachFFPOrigin
7-10 EachFFPOrigin
1062MV Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
1063MV System Integration3.03.2.1.3.3 (App. A); 3.1, 3.2, 3.3, 3.4 (App. G)1 Lot = Design/Development/NRECPFFOrigin
1064MV Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
1065MV Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
1066MV NET3.9.1.11 eaFFPOrigin
1067MV Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 4001FFPOrigin
1-3 EachFFPOrigin
4-6 EachFFPOrigin
7-10 EachFFPOrigin
1068MV Operators Manual3.7.11 eaFFPOrigin
1069MV Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
1070MV Site Survey3.12FFP
SLIN 1070AA1 eaFFPFt. Lewis, WA
SLIN 1070AB1 eaFFPFt. Wainwright, AK
SLIN 1070AC1 eaFFPFt. Benning, GA
SLIN 1070AD1 eaFFPRLFC, Korea
SLIN 1070AE1 eaFFPVilseck, Germany
SLIN 1070AF1 eaFFPFt. Indiantown Gap, PA
SLIN 1070AG1 eaFFPFt. Campbell, KY
SLIN 1070AH1 eaFFPCp. Shelby, MS
SLIN 1070AJ1 eaFFPCp. Atterbury, IN
1071MV Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
1072Shipping; Site Installation, Testing & Delivery (Inclusive of Travel)
SLIN 1072AA1 eaFFPFt. Lewis, WA
SLIN 1072AB1 eaFFPFt. Wainwright, AK
SLIN 1072AC1 eaFFPFt. Benning, GA
SLIN 1072AD1 eaFFPRLFC, Korea
SLIN 1072AE1 eaFFPVilseck, Germany
SLIN 1072AF1 eaFFPFt. Indiantown Gap, PA
SLIN 1072AG1 eaFFPFt. Campbell, KY
SLIN 1072AH2 eaFFPCp. Shelby, MS
SLIN 1072AJ1 eaFFPCp. Atterbury, IN
SV
1074SV Tech Refresh (5 Systems)3.01 Lot = 5 each SystemsFFPOrigin# Months ACA
1075SV Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
1076SV System Integration3.03.2.1.3.3 (App A); 3.1, 3.2, 3.3 (App G)1 Lot = Design/Development/NRECPFFOrigin
1077SV Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
1078SV Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
1079SV NET3.9.1.11 eaFFPOrigin
1080SV Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.131 Lot = 5 each SystemsFFPOrigin
1081SV Operators Manual3.7.11 eaFFPOrigin
1082SV Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
1083SV Site Survey3.121 eaFFP
SLIN 1083AA1 eaFFPFt. Lewis, WA
SLIN 1083AB1 eaFFPFt. Wainwright, AK
SLIN 1083AC1 eaFFPColton, CA
SLIN 1083AD1 eaFFPVilseck, Germany
SLIN 1083AE1 eaFFPFt. Indiantown Gap, PA
1084SV Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
1085Shipping; Site Installation, Testing & Delivery (Inclusive of Travel)
SLIN 1085AA1 eaFFPFt. Lewis, WA
SLIN 1085AB1 eaFFPFt. Wainwright, AK
SLIN 1085AC1 eaFFPColton, CA
SLIN 1085AD1 eaFFPVilseck, Germany
SLIN 1085AE1 eaFFPFt. Indiantown Gap, PA

CY 21

CLINDescriptionSOW Reference(s)SRD Reference(s)Unit of IssueContract TypeUnit Cost/PriceDelivery LocationDelivery Schedule
TEV (6 Systems)
2001TEV Tech Refresh & Concurrency Upgrade (6 Systems)3.01 Lot = 6 each SystemsFFPFt. Leonard Wood, MO# Months ACA
2002TEV Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
2003TEV System Integration3.03.2.1.3.3 (App. A); 3.1, 3.4, 3.5 (App. C)1 Lot = Design/Development/NRECPFFOrigin
2004TEV Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
2005TEV Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
2006TEV NET3.9.1.11 eaFFPFt. Leonard Wood
2007TEV Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.131 LotFFPFt. Leonard Wood
2008TEV Operators Manual3.7.11 eaFFPOrigin
2009TEV Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
2010TEV Site Survey3.121 eaFFPFt. Leonard Wood
2011White Paper (Proposed in first DO)3.11 eaFFPOrigin
2012Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
TV (18 Systems)
2014TV Tech Refresh (18 Systems)3.0Range priceFt Benning, GA# Months ACA
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
2015TV Tech Refresh Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
2016TV Tech Refresh System Integration3.03.2.1.3.3 (App. A); 3.1, 3.4, 3.5 (App. C)1 Lot = Design/Development/NRECPFFOrigin
2017TV Tech Refresh Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
2018TV Tech Refresh Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
2019TV Tech Refresh NET3.9.1.11 eaFFPFt Benning
2020TV Tech Refresh Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 1001FFPFt Benning
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
2021TV Tech Refresh Operators Manual3.7.11 eaFFPOrigin
2022TV Tech Refresh Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
2023TV Tech Refresh Site Survey3.121 eaFFPFt Benning
2024TV Tech Refresh Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
2025TV Concurrency/upgrade (18 Systems)3.0Range priceFFPFt Benning# Months ACA
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
2026TV Concurrency/Upgrade Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
2027TV Concurrency/Upgrade System Integration3.03.2.1.3.3 (App. A); 3.1, 3.4, 3.5 (App. C)1 Lot = Design/Development/NRECPFFOrigin
2028TV Concurrency/Upgrade Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
2029TV Concurrency/Upgrade Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
2030TV Concurrency/upgrade Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 1013FFPFt Benning
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
TWV Phase I
2032TWV PH I Tech Refresh (14 Systems)3.0Range priceFt. Leonard Wood# Months ACA
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-14 EachFFPFt. Leonard Wood
2033TWV PH I Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
2034TWV PH I System Integration3.03.2.1.3.3 (App. A); 3.1, 3.2, 3.3, 3.4, 3.5 (App. D)1 Lot = Design/Development/NRECPFFOrigin
2035TWV PH I Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
2036TWV PH I Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
2037TWV PH I Tech Refresh NET3.9.1.11 eaFFPFt. Leonard Wood
2038TWV PH I Tech Refresh Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 2001FFPFt. Leonard Wood
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-14 EachFFPFt. Leonard Wood
2039TWV PH I Tech Refresh Operators Manual3.7.11 eaFFPOrigin
2040TWV PH I Tech Refresh Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
2041TWV PH I Site Survey3.121 eaFFPFt. Leonard Wood
2042TWV PH I Procure (18 Systems)3.0Range priceFFPFt. Leonard Wood
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-12 EachFFPFt. Leonard Wood
13-18 EachFFPFt. Leonard Wood
2043TWV PH I Procure (18 Systems) Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 2011FFPFt. Leonard Wood
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-12 EachFFPFt. Leonard Wood
13-18 EachFFPFt. Leonard Wood
2044TWV PH I Procure Operators Manual3.7.11 eaFFPOrigin
2045TWV PH I Procure Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
2046TWV PH I Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
TWV Phase II
2048TWV PH II Procure up to 2 systems including NRE for Production, Fabrication/Factory systems test for a complete system (STS and AAR/AS).3.04-8 EachCPFFOrigin# Months ACA
2049TWV PH II Procure Up To 74 Systems for Production, Fabrication/Factory systems test for a complete system (STS and AAR/AS).Range price - Systems
1-6 EachFFPOrigin
7-12 EachFFPOrigin
13-18 EachFFPOrigin
19-24 EachFFPOrigin
25-30 EachFFPOrigin
31-40 EachFFPOrigin
2050TWV PH II - 1 IOS Systems for Production, including NRE Fabrication/Factory, Test per IOS. Shall support the operation for a single IOS to support up to eight cabs; however, a single Pod consists of 1 IOS and 4 STS(s)s and 4 AAR/AS(s) .3.01-2 EachCPFFOrigin
2051TWV PH II Up To 29 IOS Systems for Production, Fabrication/Factory, Test per IOS. Shall support the operation for a single IOS to support up to eight cabs; however, a single Pod consists of 1 IOS and 4 STS(s)s and 4 AAR/AS(s) .Range price - IOSOrigin
1-5 EachFFPOrigin
6-10 EachFFPOrigin
11-15 EachFFPOrigin
16-20 EachFFPOrigin
2052TWV PH II System Mobile Trailer, Integration and Test of a complete mobile system.3.0Range price mobile systemsFFP
1-5 EachFFPOrigin
6-10 EachFFPOrigin
11-15 EachFFPOrigin
16-20 EachFFPOrigin
2053TWV PH II System Installation and Testing (Inclusive of Travel and Shipping)3.0
SLIN 2053AA1 Lot - 24 Systems (Fixed)FFPFt. Leonard Wood, MO
SLIN 2053AB1 Lot - 5 Systems (Fixed)FFPOkinawa, Japan
SLIN 2053AC1 Lot - 2 Systems (Mobile)FFPIwakuni, Japan
SLIN 2053AD1 Lot - 2 Systems (Mobile)FFPKaneohe Bay, HI
SLIN 2053AE1 Lot - 6 Systems (Mobile)FFPCamp Pendleton, CA
SLIN 2053AF1 Lot - 4 Systems (Mobile)FFP29 Palms, CA
SLIN 2053AG1 Lot - 6 Systems (Mobile)FFPCamp Lejuene, NC
SLIN 2053AH1 Lot - 2 Systems (Mobile)FFPCamp Upshur, VA
2054TWV PH II New Equipment Training (Inclusive of Travel)3.9.1.1
SLIN 2054AA1 EachFFPFt. Leonard Wood, MO
SLIN 2054AB1 EachFFPOkinawa, Japan
SLIN 2054AC1 EachFFPIwakuni, Japan
SLIN 2054AD1 EachFFPKaneohe Bay, HI
SLIN 2054AE1 EachFFPCamp Pendleton, CA
SLIN 2054AF1 EachFFP29 Palms, CA
SLIN 2054AG1 EachFFPCamp Lejuene, NC
SLIN 2054AH1 EachFFPCamp Upshur, VA
2055TWV PH II Initial Spares and Consumables/Special Tools and Test Equipment3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13
SLIN 2055AA1 Lot - 24 SystemsFFPFt. Leonard Wood, MO
SLIN 2055AB1 Lot - 5 SystemsFFPOkinawa, Japan
SLIN 2055AC1 Lot - 2 SystemsFFPIwakuni, Japan
SLIN 2055AD1 Lot - 2 SystemsFFPKaneohe Bay, HI
SLIN 2055AE1 Lot - 6 SystemsFFPCamp Pendleton, CA
SLIN 2055AF1 Lot - 4 SystemsFFP29 Palms, CA
SLIN 2055AG1 Lot - 6 SystemsFFPCamp Lejuene, NC
SLIN 2055AH1 Lot - 2 SystemsFFPCamp Upshur, VA
2056TWV PH II Operators Manual3.7.11 EachFFPOrigin
2057TWV PH II Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 EachFFPOrigin
2058TWV PH II Site Survey3.12
SLIN 2058AA1 EachFFPFt. Leonard Wood, MO
SLIN 2058AB1 EachFFPOkinawa, Japan
SLIN 2058AC1 EachFFPIwakuni, Japan
SLIN 2058AD1 EachFFPKaneohe Bay, HI
SLIN 2058AE1 EachFFPCamp Pendleton, CA
SLIN 2058AF1 EachFFP29 Palms, CA
SLIN 2058AG1 EachFFPCamp Lejuene, NC
SLIN 2058AH1 EachFFPCamp Upshur, VA
2059TWV PH II Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
MV
2061MV Tech Refresh (10 Systems)3.0Range priceFFPOrigin# Months ACA
1-3 EachFFPOrigin
4-6 EachFFPOrigin
7-10 EachFFPOrigin
2062MV Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
2063MV System Integration3.03.2.1.3.3 (App. A); 3.1, 3.2, 3.3, 3.4 (App. G)1 Lot = Design/Development/NRECPFFOrigin
2064MV Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
2065MV Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
2066MV NET3.9.1.11 eaFFPOrigin
2067MV Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 4001FFPOrigin
1-3 EachFFPOrigin
4-6 EachFFPOrigin
7-10 EachFFPOrigin
2068MV Operators Manual3.7.11 eaFFPOrigin
2069MV Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
2070MV Site Survey3.12FFP
SLIN 2070AA1 eaFFPFt. Lewis, WA
SLIN 2070AB1 eaFFPFt. Wainwright, AK
SLIN 2070AC1 eaFFPFt. Benning, GA
SLIN 2070AD1 eaFFPRLFC, Korea
SLIN 2070AE1 eaFFPVilseck, Germany
SLIN 2070AF1 eaFFPFt. Indiantown Gap, PA
SLIN 2070AG1 eaFFPFt. Campbell, KY
SLIN 2070AH1 eaFFPCp. Shelby, MS
SLIN 2070AJ1 eaFFPCp. Atterbury, IN
2071MV Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
2072Shipping; Site Installation, Testing & Delivery (Inclusive of Travel)
SLIN 2072AA1 eaFFPFt. Lewis, WA
SLIN 2072AB1 eaFFPFt. Wainwright, AK
SLIN 2072AC1 eaFFPFt. Benning, GA
SLIN 2072AD1 eaFFPRLFC, Korea
SLIN 2072AE1 eaFFPVilseck, Germany
SLIN 2072AF1 eaFFPFt. Indiantown Gap, PA
SLIN 2072AG1 eaFFPFt. Campbell, KY
SLIN 2072AH2 eaFFPCp. Shelby, MS
SLIN 2072AJ1 eaFFPCp. Atterbury, IN
SV
2074SV Tech Refresh (5 Systems)3.01 Lot = 5 each SystemsFFPOrigin# Months ACA
2075SV Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
2076SV System Integration3.03.2.1.3.3 (App A); 3.1, 3.2, 3.3 (App G)1 Lot = Design/Development/NRECPFFOrigin
2077SV Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
2078SV Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
2079SV NET3.9.1.11 eaFFPOrigin
2080SV Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.131 Lot = 5 each SystemsFFPOrigin
2081SV Operators Manual3.7.11 eaFFPOrigin
2082SV Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
2083SV Site Survey3.121 eaFFP
SLIN 2083AA1 eaFFPFt. Lewis, WA
SLIN 2083AB1 eaFFPFt. Wainwright, AK
SLIN 2083AC1 eaFFPColton, CA
SLIN 2083AD1 eaFFPVilseck, Germany
SLIN 2083AE1 eaFFPFt. Indiantown Gap, PA
2084SV Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
2085Shipping; Site Installation, Testing & Delivery (Inclusive of Travel)
SLIN 2085AA1 eaFFPFt. Lewis, WA
SLIN 2085AB1 eaFFPFt. Wainwright, AK
SLIN 2085AC1 eaFFPColton, CA
SLIN 2085AD1 eaFFPVilseck, Germany
SLIN 2085AE1 eaFFPFt. Indiantown Gap, PA

CY 22

CLINDescriptionSOW Reference(s)SRD Reference(s)Unit of IssueContract TypeUnit Cost/PriceDelivery LocationDelivery Schedule
TEV (6 Systems)
3001TEV Tech Refresh & Concurrency Upgrade (6 Systems)3.01 Lot = 6 each SystemsFFPFt. Leonard Wood, MO# Months ACA
3002TEV Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
3003TEV System Integration3.03.2.1.3.3 (App. A); 3.1, 3.4, 3.5 (App. C)1 Lot = Design/Development/NRECPFFOrigin
3004TEV Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
3005TEV Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
3006TEV NET3.9.1.11 eaFFPFt. Leonard Wood
3007TEV Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.131 LotFFPFt. Leonard Wood
3008TEV Operators Manual3.7.11 eaFFPOrigin
3009TEV Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
3010TEV Site Survey3.121 eaFFPFt. Leonard Wood
3011White Paper (Proposed in first DO)3.11 eaFFPOrigin
3012Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
TV (18 Systems)
3014TV Tech Refresh (18 Systems)3.0Range priceFt Benning, GA# Months ACA
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
3015TV Tech Refresh Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
3016TV Tech Refresh System Integration3.03.2.1.3.3 (App. A); 3.1, 3.4, 3.5 (App. C)1 Lot = Design/Development/NRECPFFOrigin
3017TV Tech Refresh Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
3018TV Tech Refresh Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
3019TV Tech Refresh NET3.9.1.11 eaFFPFt Benning
3020TV Tech Refresh Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 1001FFPFt Benning
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
3021TV Tech Refresh Operators Manual3.7.11 eaFFPOrigin
3022TV Tech Refresh Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
3023TV Tech Refresh Site Survey3.121 eaFFPFt Benning
3024TV Tech Refresh Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
3025TV Concurrency/upgrade (18 Systems)3.0Range priceFFPFt Benning# Months ACA
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
3026TV Concurrency/Upgrade Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
3027TV Concurrency/Upgrade System Integration3.03.2.1.3.3 (App. A); 3.1, 3.4, 3.5 (App. C)1 Lot = Design/Development/NRECPFFOrigin
3028TV Concurrency/Upgrade Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
3029TV Concurrency/Upgrade Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
3030TV Concurrency/upgrade Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 1013FFPFt Benning
1-4 EachFFPFt Benning
5-8 EachFFPFt Benning
9-12 EachFFPFt Benning
13-18 EachFFPFt Benning
TWV Phase I
3032TWV PH I Tech Refresh (14 Systems)3.0Range priceFt. Leonard Wood# Months ACA
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-14 EachFFPFt. Leonard Wood
3033TWV PH I Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
3034TWV PH I System Integration3.03.2.1.3.3 (App. A); 3.1, 3.2, 3.3, 3.4, 3.5 (App. D)1 Lot = Design/Development/NRECPFFOrigin
3035TWV PH I Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
3036TWV PH I Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
3037TWV PH I Tech Refresh NET3.9.1.11 eaFFPFt. Leonard Wood
3038TWV PH I Tech Refresh Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 2001FFPFt. Leonard Wood
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-14 EachFFPFt. Leonard Wood
3039TWV PH I Tech Refresh Operators Manual3.7.11 eaFFPOrigin
3040TWV PH I Tech Refresh Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
3041TWV PH I Site Survey3.121 eaFFPFt. Leonard Wood
3042TWV PH I Procure (18 Systems)3.0Range priceFFPFt. Leonard Wood
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-12 EachFFPFt. Leonard Wood
13-18 EachFFPFt. Leonard Wood
3043TWV PH I Procure (18 Systems) Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 2011FFPFt. Leonard Wood
1-4 EachFFPFt. Leonard Wood
5-8 EachFFPFt. Leonard Wood
9-12 EachFFPFt. Leonard Wood
13-18 EachFFPFt. Leonard Wood
3044TWV PH I Procure Operators Manual3.7.11 eaFFPOrigin
3045TWV PH I Procure Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
3046TWV PH I Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
TWV Phase II
3048TWV PH II Procure up to 8 systems including NRE for Production, Fabrication/Factory systems test for a complete system (STS and AAR/AS).3.04-8 EachCPFFOrigin# Months ACA
3049TWV PH II Procure Up To 57 Systems for Production, Fabrication/Factory systems test for a complete system (STS and AAR/AS).Range price - Systems
1-6 EachFFPOrigin
7-12 EachFFPOrigin
13-18 EachFFPOrigin
19-24 EachFFPOrigin
25-30 EachFFPOrigin
31-40 EachFFPOrigin
3050TWV PH II - 2 IOS Systems for Production, including NRE Fabrication/Factory, Test per IOS. Shall support the operation for a single IOS to support up to eight cabs; however, a single Pod consists of 1 IOS and 4 STS(s)s and 4 AAR/AS(s) .3.01 -2 EachCPFFOrigin
3051TWV PH II Up To 27 IOS Systems for Production, Fabrication/Factory, Test per IOS. Shall support the operation for a single IOS to support up to eight cabs; however, a single Pod consists of 1 IOS and 4 STS(s)s and 4 AAR/AS(s) .Range price - IOSOrigin
1-5 EachFFPOrigin
6-10 EachFFPOrigin
11-15 EachFFPOrigin
16-20 EachFFPOrigin
3052TWV PH II System Mobile Trailer, Integration and Test of a complete mobile system.3.0Range price mobile systemsFFP
1-5 EachFFPOrigin
6-10 EachFFPOrigin
11-15 EachFFPOrigin
16-20 EachFFPOrigin
3053TWV PH II System Installation and Testing (Inclusive of Travel and Shipping)3.0
SLIN 3053AA1 Lot - 24 Systems (Fixed)FFPFt. Leonard Wood, MO
SLIN 3053AB1 Lot - 5 Systems (Fixed)FFPOkinawa, Japan
SLIN 3053AC1 Lot - 2 Systems (Mobile)FFPIwakuni, Japan
SLIN 3053AD1 Lot - 2 Systems (Mobile)FFPKaneohe Bay, HI
SLIN 3053AE1 Lot - 6 Systems (Mobile)FFPCamp Pendleton, CA
SLIN 3053AF1 Lot - 4 Systems (Mobile)FFP29 Palms, CA
SLIN 3053AG1 Lot - 6 Systems (Mobile)FFPCamp Lejuene, NC
SLIN 3053AH1 Lot - 2 Systems (Mobile)FFPCamp Upshur, VA
3054TWV PH II New Equipment Training (Inclusive of Travel)3.9.1.1
SLIN 3054AA1 EachFFPFt. Leonard Wood, MO
SLIN 3054AB1 EachFFPOkinawa, Japan
SLIN 3054AC1 EachFFPIwakuni, Japan
SLIN 3054AD1 EachFFPKaneohe Bay, HI
SLIN 3054AE1 EachFFPCamp Pendleton, CA
SLIN 3054AF1 EachFFP29 Palms, CA
SLIN 3054AG1 EachFFPCamp Lejuene, NC
SLIN 3054AH1 EachFFPCamp Upshur, VA
3055TWV PH II Initial Spares and Consumables/Special Tools and Test Equipment3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13
SLIN 3055AA1 Lot - 24 SystemsFFPFt. Leonard Wood, MO
SLIN 3055AB1 Lot - 5 SystemsFFPOkinawa, Japan
SLIN 3055AC1 Lot - 2 SystemsFFPIwakuni, Japan
SLIN 3055AD1 Lot - 2 SystemsFFPKaneohe Bay, HI
SLIN 3055AE1 Lot - 6 SystemsFFPCamp Pendleton, CA
SLIN 3055AF1 Lot - 4 SystemsFFP29 Palms, CA
SLIN 3055AG1 Lot - 6 SystemsFFPCamp Lejuene, NC
SLIN 3055AH1 Lot - 2 SystemsFFPCamp Upshur, VA
3056TWV PH II Operators Manual3.7.11 EachFFPOrigin
3057TWV PH II Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 EachFFPOrigin
3058TWV PH II Site Survey3.12
SLIN 3058AA1 EachFFPFt. Leonard Wood, MO
SLIN 3058AB1 EachFFPOkinawa, Japan
SLIN 3058AC1 EachFFPIwakuni, Japan
SLIN 3058AD1 EachFFPKaneohe Bay, HI
SLIN 3058AE1 EachFFPCamp Pendleton, CA
SLIN 3058AF1 EachFFP29 Palms, CA
SLIN 3058AG1 EachFFPCamp Lejuene, NC
SLIN 3058AH1 EachFFPCamp Upshur, VA
3059TWV PH II Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
MV
3061MV Tech Refresh (10 Systems)3.0Range priceFFPOrigin# Months ACA
1-3 EachFFPOrigin
4-6 EachFFPOrigin
7-10 EachFFPOrigin
3062MV Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
3063MV System Integration3.03.2.1.3.3 (App. A); 3.1, 3.2, 3.3, 3.4 (App. G)1 Lot = Design/Development/NRECPFFOrigin
3064MV Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
3065MV Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
3066MV NET3.9.1.11 eaFFPOrigin
3067MV Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.13Range price to support CLIN 4001FFPOrigin
1-3 EachFFPOrigin
4-6 EachFFPOrigin
7-10 EachFFPOrigin
3068MV Operators Manual3.7.11 eaFFPOrigin
3069MV Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
3070MV Site Survey3.12FFP
SLIN 3070AA1 eaFFPFt. Lewis, WA
SLIN 3070AB1 eaFFPFt. Wainwright, AK
SLIN 3070AC1 eaFFPFt. Benning, GA
SLIN 3070AD1 eaFFPRLFC, Korea
SLIN 3070AE1 eaFFPVilseck, Germany
SLIN 3070AF1 eaFFPFt. Indiantown Gap, PA
SLIN 3070AG1 eaFFPFt. Campbell, KY
SLIN 3070AH1 eaFFPCp. Shelby, MS
SLIN 3070AJ1 eaFFPCp. Atterbury, IN
3071MV Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
3072Shipping; Site Installation, Testing & Delivery (Inclusive of Travel)
SLIN 3072AA1 eaFFPFt. Lewis, WA
SLIN 3072AB1 eaFFPFt. Wainwright, AK
SLIN 3072AC1 eaFFPFt. Benning, GA
SLIN 3072AD1 eaFFPRLFC, Korea
SLIN 3072AE1 eaFFPVilseck, Germany
SLIN 3072AF1 eaFFPFt. Indiantown Gap, PA
SLIN 3072AG1 eaFFPFt. Campbell, KY
SLIN 3072AH2 eaFFPCp. Shelby, MS
SLIN 3072AJ1 eaFFPCp. Atterbury, IN
SV
3074SV Tech Refresh (5 Systems)3.01 Lot = 5 each SystemsFFPOrigin# Months ACA
3075SV Development Environment3.13.14 (Common)1 Lot = Design/Development/NRECPFFOrigin
3076SV System Integration3.03.2.1.3.3 (App A); 3.1, 3.2, 3.3 (App G)1 Lot = Design/Development/NRECPFFOrigin
3077SV Testing3.1.3, 3.3.3.2, 3.3.3.3, 3.3.4, 3.3.5.3, 3.3.5.7, 3.4.2.1, 3.101 Lot = Design/Development/NRECPFFOrigin
3078SV Engineering & Logistic Support3.111 Lot = Design/Development/NRECPFFOrigin
3079SV NET3.9.1.11 eaFFPOrigin
3080SV Spares/Consumeables/Special Test Tools3.5, 3.6.1, 3.6.3.1, 3.7.1, 3.7.2, 3.131 Lot = 5 each SystemsFFPOrigin
3081SV Operators Manual3.7.11 eaFFPOrigin
3082SV Maintenance Manual3.7.2 (SMM); 3.7.3 (COTS)1 eaFFPOrigin
3083SV Site Survey3.121 eaFFP
SLIN 3083AA1 eaFFPFt. Lewis, WA
SLIN 3083AB1 eaFFPFt. Wainwright, AK
SLIN 3083AC1 eaFFPColton, CA
SLIN 3083AD1 eaFFPVilseck, Germany
SLIN 3083AE1 eaFFPFt. Indiantown Gap, PA
3084SV Cybersecurity3.2.11, 3.3.51 LotFFPOrigin
3085Shipping; Site Installation, Testing & Delivery (Inclusive of Travel)
SLIN 3085AA1 eaFFPFt. Lewis, WA
SLIN 3085AB1 eaFFPFt. Wainwright, AK
SLIN 3085AC1 eaFFPColton, CA
SLIN 3085AD1 eaFFPVilseck, Germany
SLIN 3085AE1 eaFFPFt. Indiantown Gap, PA

CY 23

CLINDescriptionSOW Reference(s)SRD Reference(s)Unit of IssueContract TypeUnit Cost/PriceDelivery LocationDelivery Schedule
TEV (6 Systems)
4001TEV Tech Refresh & Concurrency Upgrade (6 Systems)3.01 Lot = 6 each SystemsFFPFt. Leonard Wood, MO# Months ACA

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .