W900KK-17-R-0015_Amendment_0002_with_attachments.pdf
PDF 2 MB Posted
- Attached to
- Synthetic Environment Core (SE Core) Services
- Solicitation number
- W900KK_17_R_0015
About this file
Solicitation Amendment 0002 with attachments and exhibits
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation revisions resultant of the Final RFP questions and answ ers.
1. CONTRACT ID CODE PAGE OF PAGES
1 78
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Apr-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W900KK-17-R-0015
X 9B. DATED (SEE ITEM 11)
14-Mar-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Apr-2017
CODE
U.S. ARMY PEO STRI ACQUISITION CENTER
ATTN: KOC/OPS
12350 RESEARCH PARKWAY
ORLANDO FL 32826
W900KK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W900KK-17-R-0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
BASE YEAR:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months $____________ System/Program Management
FFP
(IAW PWS-2016-032: 5.1)
Provide Program Management supporting all program activities. The period of performance will be specified in the individual task orders.
FOB: Destination
NET AMT $____________
0002 1 Each $___________ Contractor Management Reporting
FFP
(IAW PWS-2016-032: 5.15)
Provide Contractor Management Reporting for all program activities. The period of performance shall be 12 months.
NET AMT $___________
0003 NSP
Technical Data and Information
NSP (FFP CLIN 0001/CPFF CLINs 0100 and 0200) (IAW the Contract Data Requirements List (CDRL) Exhibits A-C) Provide technical data and information from Contract Award through 12 months.
Note: Exhibit A (Management Data) costs should be in CLIN 0001; Exhibit C (Engineering Data) costs should be in CLIN 0100; Exhibit B (Synthetic Environment and Models Generation Data) costs should be in CLIN 0200.
NSP
0100 1 Job UNDEFINED $____________ Project/Systems Engineering
CPFF
(IAW PWS-2016-032: 5.2)
Provide Program Systems Engineering supporting all program activities. The period of performance will be specified in the individual task orders.
MAX COST
FIXED FEE
TOTAL MAX COST +
FEE
0101 1 Job UNDEFINED $____________ Capability Development
CPFF
(IAW PWS-2016-032: 5.3; Sample Development Task List – Attachment 3) Develop new capabilities to extend program tools and processes and develop new technologies as required to meet terrain and model generation and product requirements. The period of performance will be specified in the individual task orders..
TOTAL MAX COST +
FEE
0102 1 Job UNDEFINED $____________ Capability Maintenance
CPFF
(IAW PWS-2016-032: 5.4)
Maintain program tools and processes. The period of performance will be specified in the individual task orders.
TOTAL MAX COST +
FEE
0103 1 Each UNDEFINED $ 650,000.00 Materials/Travel (Capability Development)
COST
IAW PWS-2016-032: 5.8.1, 5.9.1)
Conduct travel and purchase materials and maintain software licenses in support of System Engineering and Capability Development. The period of performance will be specified in the individual task orders.
MAX COST $ 650,000.00
0200 1 Job UNDEFINED $____________ Synthetic Environment (SE) Database (DB) Generation – ITE
CPFF
(IAW PWS-2016-032: 5.5; and Database Content Requirements (DCRs)) Complete terrain databases for ITE DB IAW the Database Content Requirements (DCRs) at Attachments 6 and 7 begun under prior contract – Attachment 44.
Gather source and prepare data for ITE DB IAW the DCRs at Attachments 11 and 12 – for OY1; and Attachments 16 and 17– for OY2. The period of performance will be specified in the individual task orders.
TOTAL MAX COST +
FEE
0201 1 Job UNDEFINED $____________ Synthetic Environment (SE) DB Generation – Constructive & Gaming
CPFF
(IAW PWS-2016-032: 5.5; and DCRs) Complete terrain databases for Constructive DB IAW the DCRs at Attachments 8 through 10 begun under prior contract – Attachment 44. Gather source and prepare data for future Constructive DB IAW the DCRs at Attachments 13 through 15 – for OY1; and Attachments 18 through 20 – for OY2. The period of performance will
TOTAL MAX COST +
FEE
0202 1 Job UNDEFINED $____________ Synthetic Environment (SE) Maintenance
CPFF
(IAW PWS-2016-032:5.6; Database Maintenance Request (DMR)) Generate terrain databases and perform maintenance on terrain databases IAW the Database Maintenance Requirement (DMR) at Attachment 21. The period of
TOTAL MAX COST +
FEE
0203 12 Months $____________ Common Moving Models (CM2)
FFP
(IAW PWS-2016-032: 5.7)
Generate common moving models equivalent to the Models List at Attachment 22.
The period of performance will be specified in the individual task orders.
0204 1 Each UNDEFINED $ 750,000.00 Materials/Travel (Synthetic Environment)
COST
IAW PWS-2016-032: 5.8.2, 5.9.2)
Conduct travel and purchase materials and maintain software licenses in support of SE/Models Generation and Capability Maintenance. The period of performance
MAX COST $ 750,000.00
0009 3 Months $____________ Transition
FFP
(IAW PWS-2016-032: 5.10.1)
Transition the entire program within the initial 90 days of the contract.
0150 DO NOT PRICE
Capability Development – Customer Funding (ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.14; Development Task List – TBD) Develop new capabilities to extend program tools and processes and develop new technologies as required to meet terrain and model generation and product requirements. The period of performance will be specified in the individual task orders.
0250 DO NOT PRICE
Synthetic Environment (SE) /Model Generation – Capacity Expansion
(ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.12)
Generate terrain databases and/or models IAW the Database Content Requirements (DCRs) in the task/order and/or Database Maintenance Requirement (DMR) in the task/order. The period of performance will be specified in the individual task
0300 DO NOT PRICE
Synthetic Environment (SE) /Model Generation – Customer Funded Efforts
(ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.13)
Generate terrain databases and/or models IAW the Database Content Requirements (DCRs) in the task/order and/or Database Maintenance Requirement (DMR) in the task/order. The period of performance will be specified in the individual task
OPTION YEAR 1 (OY1)
1001 12 Months $____________ System/Program Management
FFP
(IAW PWS-2016-032: 5.1)
Provide Program Management supporting all program activities. The period of
1002 1 Each $____________ Contractor Management Reporting
FFP
(IAW PWS-2016-032: 5.15)
Provide Contractor Management Reporting for all program activities. The period of
1003 NSP
Technical Data and Information
NSP(FFP CLIN 1001/CPFF CLINs 1100 and 1200) (IAW the Contract Data Requirements List (CDRL) Exhibits A-C) Provide technical data and information from Option Award through 12 months.
Note: Exhibit A (Management Data) costs should be in CLIN 1001; Exhibit C (Engineering Data) costs should be in CLIN 1100; Exhibit B (Synthetic Environment and Models Generation Data) costs should be in CLIN 1200.
1100 1 Job UNDEFINED $____________ Project/Systems Engineering
CPFF
(IAW PWS-2016-032: 5.2)
Provide Program Systems Engineering supporting all program activities The period of performance will be specified in the individual task orders..
TOTAL MAX COST +
FEE
1101 1 Job UNDEFINED $____________ Capability Development
CPFF
(IAW PWS-2016-032: 5.3; Sample Development Task List – Equivalent to Attachment 3) Develop new capabilities to extend program tools and processes and develop new technologies as required to meet terrain and model generation and product requirements. The period of performance will be specified in the individual task
TOTAL MAX COST +
FEE
1102 1 Job UNDEFINED $____________ Capability Maintenance
CPFF
(IAW PWS-2016-032: 5.4)
Maintain program tools and processes. The period of performance will be specified
TOTAL MAX COST +
FEE
1103 1 Each UNDEFINED $ 670,000.00 Materials/Travel (Capability Development)
COST
IAW PWS-2016-032: 5.8.1, 5.9.1)
Conduct travel and purchase materials and maintain software licenses in support of System Engineering and Capability Development. The period of performance will
MAX COST $ 670,000.00
1200 1 Job UNDEFINED $____________ Synthetic Environment (SE) Database (DB) Generation – ITE
CPFF
(IAW PWS-2016-032: 5.5; and Database Content Requirements (DCRs)) Complete terrain databases for ITE DB IAW the Database Content Requirements (DCRs) at Attachments 11, and 12. Gather source and prepare data for ITE DB IAW the DCRs at Attachments 16 and 17 – for OY 2; and Attachments 23 and 24– for OY3. The period of performance will be specified in the individual task orders.
TOTAL MAX COST +
FEE
1201 1 Job UNDEFINED $____________ Synthetic Environment (SE) DB Generation – Constructive & Gaming
CPFF
(IAW PWS-2016-032: 5.5; and DCRs) Complete terrain databases for Constructive DB IAW the DCRs at Attachments 13 through 15. Gather source and prepare data for future Constructive DB IAW the DCRs at Attachments 18 through 20 – for OY2; and Attachments 25 through 27 – for OY3. The period of performance will be specified in the individual task orders.
TOTAL MAX COST +
FEE
1202 1 Job UNDEFINED $____________ Synthetic Environment (SE) Maintenance
CPFF
(IAW PWS-2016-032:5.6; Database Maintenance Request (DMR)) Generate terrain databases and perform maintenance on terrain databases IAW the Database Maintenance Requirement (DMR) at Attachment 21. The period of
TOTAL MAX COST +
FEE
1203 12 Months $____________ Common Moving Models (CM2)
FFP
(IAW PWS-2016-032: 5.7)
Generate common moving models equivalent to the Models List at Attachment 22.
1204 1 Each UNDEFINED $ 770,000.00 Materials/Travel (Synthetic Environment)
COST
IAW PWS-2016-032: 5.8.2, 5.9.2)
Conduct travel and purchase materials and maintain software licenses in support of SE/Models Generation and Capability Maintenance. The period of performance
MAX COST $ 770,000.00
1150 DO NOT PRICE
Capability Development – Customer Funding (ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.14; Development Task List – TBD) Develop new capabilities to extend program tools and processes and develop new technologies as required to meet terrain and model generation and product requirements. The period of performance will be specified in the individual task
1250 DO NOT PRICE
Synthetic Environment (SE) /Model Generation – Capacity Expansion
(ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.12)
Generate terrain databases and/or models IAW the Database Content Requirements (DCRs) in the task/order and/or Database Maintenance Requirement (DMR) in the task/order. The period of performance will be specified in the individual task
1300 DO NOT PRICE
Synthetic Environment (SE) /Model Generation – Customer Funded Efforts
(ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.13)
Generate terrain databases and/or models IAW the Database Content Requirements (DCRs) in the task/order and/or Database Maintenance Requirement (DMR) in the task/order. The period of performance will be specified in the individual task
OPTION YEAR 2 (OY2)
2001 12 Months $____________ System/Program Management
FFP
(IAW PWS-2016-032: 5.1)
Provide Program Management supporting all program. The period of performance
2002 1 Each $____________ Contractor Management Reporting
FFP
(IAW PWS-2016-032: 5.15)
Provide Contractor Management Reporting for all program activities. The period of
2003 NSP
Technical Data and Information
NSP(FFP CLIN 2001/CPFF CLINs 2100 and 2200) (IAW the Contract Data Requirements List (CDRL) Exhibits A-C) Provide technical data and information from Option Award through 12 months.
Note: Exhibit A (Management Data) costs should be in CLIN 2001; Exhibit C (Engineering Data) costs should be in CLIN 2100; Exhibit B (Synthetic Environment and Models Generation Data) costs should be in CLIN 2200.
2100 1 Job UNDEFINED $____________ Project/Systems Engineering
CPFF
(IAW PWS-2016-032: 5.2)
Provide Program Systems Engineering supporting all program activities. The
TOTAL MAX COST +
FEE
2101 1 Job UNDEFINED $____________ Capability Development
CPFF
(IAW PWS-2016-032: 5.3; Sample Development Task List – Equivalent to Attachment 3) Develop new capabilities to extend program tools and processes and develop new technologies as required to meet terrain and model generation and product requirements. The period of performance will be specified in the individual task
TOTAL MAX COST +
FEE
2102 1 Job UNDEFINED $____________ Capability Maintenance
CPFF
(IAW PWS-2016-032: 5.4)
Maintain program tools and processes. The period of performance will be specified
TOTAL MAX COST +
FEE
2103 1 Each UNDEFINED $ 680,000.00 Materials/Travel (Capability Development)
COST
IAW PWS-2016-032: 5.8.1, 5.9.1)
Conduct travel and purchase materials and maintain software licenses in support of System Engineering and Capability Development. The period of performance will
MAX COST $ 680,000.00
2200 1 Job UNDEFINED $____________ Synthetic Environment (SE) Database (DB) Generation – ITE
CPFF
(IAW PWS-2016-032: 5.5; and Database Content Requirements (DCRs)) Complete terrain databases for ITE DB IAW the Database Content Requirements (DCRs) at Attachments 16 and 17. Gather source and prepare data for ITE DB IAW the DCRs at Attachments 23 and 24 – for OY3; and Attachments 28 and 29– for OY4. The period of performance will be specified in the individual task orders.
TOTAL MAX COST +
FEE
2201 1 Job UNDEFINED $____________ Synthetic Environment (SE) DB Generation – Constructive & Gaming
CPFF
(IAW PWS-2016-032: 5.5; and DCRs) Complete terrain databases for Constructive DB IAW the DCRs at Attachments 18 through 20. Gather source and prepare data for future Constructive DB IAW the DCRs at Attachments 25 through 27 – for OY3; and Attachments 30 through 32 – for OY4. The period of performance will be specified in the individual task orders.
TOTAL MAX COST +
FEE
2202 1 Job UNDEFINED $____________ Synthetic Environment (SE) Maintenance
CPFF
(IAW PWS-2016-032:5.6; Database Maintenance Request (DMR)) Generate terrain databases and perform maintenance on terrain databases IAW the Database Maintenance Requirement (DMR) at Attachment 21. The period of performance will be specified in the individual task orders..
TOTAL MAX COST +
FEE
2203 12 Months $____________ Common Moving Models (CM2)
FFP
(IAW PWS-2016-032: 5.7)
Generate common moving models equivalent to the Models List at Attachment 22.
2204 1 Each UNDEFINED $ 780,000.00 Materials/Travel (Synthetic Environment)
COST
IAW PWS-2016-032: 5.8.2, 5.9.2)
Conduct travel and purchase materials and maintain software licenses in support of SE/Models Generation and Capability Maintenance. The period of performance
MAX COST $ 780,000.00
2150 DO NOT PRICE
Capability Development – Customer Funding (ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.14; Development Task List – TBD) Develop new capabilities to extend program tools and processes and develop new technologies as required to meet terrain and model generation and product requirements. The period of performance will be specified in the individual task
2250 DO NOT PRICE
Synthetic Environment (SE) /Model Generation – Capacity Expansion
(ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.12)
Generate terrain databases and/or models IAW the Database Content Requirements (DCRs) in the task/order and/or Database Maintenance Requirement (DMR) in the task/order. The period of performance will be specified in the individual task orders.FOB: Destination
2300 DO NOT PRICE
Synthetic Environment (SE) /Model Generation – Customer Funded Efforts
(ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.13)
Generate terrain databases and/or models IAW the Database Content Requirements (DCRs) in the task/order and/or Database Maintenance Requirement (DMR) in the task/order. The period of performance will be specified in the individual task
OPTION YEAR 3 (OY 3)
3001 12 Months $____________ System/Program Management
FFP
(IAW PWS-2016-032: 5.1)
Provide Program Management supporting all program activities. The period of
3002 1 Each $___________ Contractor Management Reporting
FFP
(IAW PWS-2016-032: 5.15)
Provide Contractor Management Reporting for all program activities. The period of
NET AMT $___________
3003 NSP
Technical Data and Information
NSP(FFP CLIN 3001/CPFF CLINs 3100 and 3200) (IAW the Contract Data Requirements List (CDRL) Exhibits A-C) Provide technical data and information from Option Award through 12 months.
Note: Exhibit A (Management Data) costs should be in CLIN 3001; Exhibit C (Engineering Data) costs should be in CLIN 3100; Exhibit B (Synthetic Environment and Models Generation Data) costs should be in CLIN 3200.
3100 1 Job UNDEFINED $____________ Project/Systems Engineering
CPFF
(IAW PWS-2016-032: 5.2)
Provide Program Systems Engineering supporting all program activities. The
TOTAL MAX COST +
FEE
3101 1 Job UNDEFINED $____________ Capability Development
CPFF
(IAW PWS-2016-032: 5.3; Sample Development Task List –Equivalent to Attachment 3) Develop new capabilities to extend program tools and processes and develop new technologies as required to meet terrain and model generation and product requirements. The period of performance will be specified in the individual task
TOTAL MAX COST +
FEE
3102 1 Job UNDEFINED $____________ Capability Maintenance
CPFF
(IAW PWS-2016-032: 5.4)
Maintain program tools and processes. The period of performance will be specified
TOTAL MAX COST +
FEE
3103 1 Each UNDEFINED $ 700,000.00 Materials/Travel (Capability Development)
COST
IAW PWS-2016-032: 5.8.1, 5.9.1)
Conduct travel and purchase materials and maintain software licenses in support of System Engineering and Capability Development. The period of performance will
MAX COST $ 700,000.00
3200 1 Job UNDEFINED $____________ Synthetic Environment (SE) Database (DB) Generation – ITE
CPFF
(IAW PWS-2016-032: 5.5; and Database Content Requirements (DCRs)) Complete terrain databases for ITE DB IAW the Database Content Requirements (DCRs) at Attachments 23 and 24. Gather source and prepare data for ITE DB IAW the DCRs at Attachments 28 and 29 – for OY4; and Attachments 33 and 34– for Follow-on Year 1. The period of performance will be specified in the individual task orders.
TOTAL MAX COST +
FEE
3201 1 Job UNDEFINED $____________ Synthetic Environment (SE) DB Generation – Constructive & Gaming
CPFF
(IAW PWS-2016-032: 5.5; and DCRs) Complete terrain databases for Constructive DB IAW the DCRs at Attachments 25 through 27. Gather source and prepare data for future Constructive DB IAW the DCRs at Attachments 30 through 32 – for OY4; and Attachments 35 through 37 – for Follow-on Year 1. The period of performance will be specified in the individual task orders.
TOTAL MAX COST +
FEE
3202 1 Job UNDEFINED $____________ Synthetic Environment (SE) Maintenance
CPFF
(IAW PWS-2016-032:5.6; Database Maintenance Request (DMR)) Generate terrain databases and perform maintenance on terrain databases IAW the Database Maintenance Requirement (DMR) at Attachment 21. The period of
TOTAL MAX COST +
FEE
3203 12 Months $____________ Common Moving Models (CM2)
FFP
(IAW PWS-2016-032: 5.7)
Generate common moving models equivalent to the Models List at Attachment 22.
3204 1 Each UNDEFINED $ 800,000.00 Materials/Travel (Synthetic Environment)
COST
IAW PWS-2016-032: 5.8.2, 5.9.2)
Conduct travel and purchase materials and maintain software licenses in support of SE/Models Generation and Capability Maintenance. The period of performance
MAX COST $ 800,000.00
3150 DO NOT PRICE
Capability Development – Customer Funding (ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.14; Development Task List – TBD) Develop new capabilities to extend program tools and processes and develop new technologies as required to meet terrain and model generation and product requirements. The period of performance will be specified in the individual task
3250 DO NOT PRICE
Synthetic Environment (SE) /Model Generation – Capacity Expansion
(ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.12)
Generate terrain databases and/or models IAW the Database Content Requirements (DCRs) in the task/order and/or Database Maintenance Requirement (DMR) in the task/order. The period of performance will be specified in the individual task
3300 DO NOT PRICE
Synthetic Environment (SE) /Model Generation – Customer Funded Efforts
(ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.13)
Generate terrain databases and/or models IAW the Database Content Requirements (DCRs) in the task/order and/or Database Maintenance Requirement (DMR) in the task/order. The period of performance will be specified in the individual task
OPTION YEAR 4 (OY 4)
4001 12 Months $____________ System/Program Management
FFP
(IAW PWS-2016-032: 5.1)
Provide Program Management supporting all program activities. The period of
4002 1 Each $____________ Contractor Management Reporting
FFP
(IAW PWS-2016-032: 5.15)
Provide Contractor Management Reporting for all program activities. The period of
4003 NSP
Technical Data and Information
NSP(FFP CLIN 4001/CPFF CLINs 4100 and 4200) (IAW the Contract Data Requirements List (CDRL) Exhibits A-C) Provide technical data and information from Option Award through 12 months.
Note: Exhibit A (Management Data) costs should be in CLIN 4001; Exhibit C (Engineering Data) costs should be in CLIN 4100; Exhibit B (Synthetic Environment and Models Generation Data) costs should be in CLIN 4200.
4100 1 Job UNDEFINED $____________ Project/Systems Engineering
CPFF
(IAW PWS-2016-032: 5.2)
Provide Program Systems Engineering supporting all program activities. The
TOTAL MAX COST +
FEE
4101 1 Job UNDEFINED $____________ Capability Development
CPFF
(IAW PWS-2016-032: 5.3; Sample Development Task List – Equivalent to Attachment 3) Develop new capabilities to extend program tools and processes and develop new technologies as required to meet terrain and model generation and product requirements. The period of performance will be specified in the individual task
TOTAL MAX COST +
FEE
4102 1 Job UNDEFINED $____________ Capability Maintenance
CPFF
(IAW PWS-2016-032: 5.4)
Maintain program tools and processes. The period of performance will be specified
TOTAL MAX COST +
FEE
4103 1 Each UNDEFINED $ 710,000.00 Materials/Travel (Capability Development)
COST
IAW PWS-2016-032: 5.8.1, 5.9.1)
Conduct travel and purchase materials and maintain software licenses in support of System Engineering Capability Development The period of performance will be specified in the individual task orders..
MAX COST $ 710,000.00
4200 1 Job UNDEFINED $____________ Synthetic Environment (SE) Database (DB) Generation – ITE
CPFF
(IAW PWS-2016-032: 5.5; and Database Content Requirements (DCRs)) Complete terrain databases for ITE DB IAW the Database Content Requirements (DCRs) at Attachments 28 and 29. Gather source and prepare data for ITE DB IAW the DCRs at Attachments 33 and 34 – for Follow-on Year 1; and Attachments 38 and 39– for Follow-on Year 2. The period of performance will be specified in the individual task orders.
TOTAL MAX COST +
FEE
4201 1 Job UNDEFINED $____________ Synthetic Environment (SE) DB Generation – Constructive & Gaming
CPFF
(IAW PWS-2016-032: 5.5; and DCRs) Complete terrain databases for Constructive DB IAW the DCRs at Attachments 30 through 32. Gather source and prepare data for future Constructive DB IAW the DCRs at Attachments 35 through 37 – for Follow-on Year 1; and Attachments 40 through 42 – for Follow-on Year 2. The period of performance will be specified in the individual task orders.
TOTAL MAX COST +
FEE
4202 1 Job UNDEFINED $____________ Synthetic Environment (SE) Maintenance
CPFF
(IAW PWS-2016-032:5.6; Database Maintenance Request (DMR)) Generate terrain databases and perform maintenance on terrain databases IAW the Database Maintenance Requirement (DMR) at Attachment 21. The period of
TOTAL MAX COST +
FEE
4203 12 Months $____________ Common Moving Models (CM2)
FFP
(IAW PWS-2016-032: 5.7)
Generate common moving models equivalent to the Models List at Attachment 22.
Work shall be performed The period of performance will be specified in the individual task orders...
4204 1 Each UNDEFINED $ 820,000.00 Materials/Travel (Synthetic Environment)
COST
IAW PWS-2016-032: 5.8.2, 5.9.2)
Conduct travel and purchase materials and maintain software licenses in support of SE/Models Generation and Capability Maintenance. The period of performance
MAX COST $ 820,000.00
4009 3 Months $____________ Transition
FFP
(IAW PWS-2016-032: 5.10.2)
Transition the entire program within the final 90 days of the contract.
4150 DO NOT PRICE
Capability Development – Customer Funding (ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.14; Development Task List – TBD) Develop new capabilities to extend program tools and processes and develop new technologies as required to meet terrain and model generation and product requirements. The period of performance will be specified in the individual task
4250 DO NOT PRICE
Synthetic Environment (SE) /Model Generation – Capacity Expansion
(ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.12)
Generate terrain databases and/or models IAW the Database Content Requirements (DCRs) in the task/order and/or Database Maintenance Requirement (DMR) in the task/order. The period of performance will be specified in the individual task
4300 DO NOT PRICE
Synthetic Environment (SE) /Model Generation – Customer Funded Efforts
(ORDERING CLIN)
CPFF
(IAW PWS-2016-032: 5.13)
Generate terrain databases and/or models IAW the Database Content Requirements (DCRs) in the task/order and/or Database Maintenance Requirement (DMR) in the task/order. The period of performance will be specified in the individual task
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
52.246-25 Limitation Of Liability--Services FEB 1997
The following have been deleted:
52.234-2 Notice of Earned Value Management System - Preaward
Integrated Baseline Review
NOV 2016
52.234-3 Notice of Earned Value Management System - Postaward Integrated Baseline Review
NOV 2016
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Number Description Page Count Attach 1 PEO-STRI-PWS-2016-032: Performance Work Statement (PWS) r1.02 89 Attach 2 Government Furnished Equipment and Information (GFE/GFI) List 249 (Distribution D*) Attach 3 Capability Development List 4
Attach 4 Deliveries Schedule 2 Attach 5 Deliveries by Customer 6 Attach 6 Base Year DCR: Ft. Drum ITE r1 kml (Distribution D*) Attach 7 Base Year DCR: Ft. Carson ITE Refresh r1 kml (Distribution D*) Attach 8 Base Year DCR: Philippines Constructive (ERF, MRF) kml (Distribution D*) Attach 9 Base Year DCR: Korea Constructive (ERF, MRF) r1 kml (Distribution D*) Attach 10 Base Year DCR: Germany Constructive (ERF, MRF) kml (Distribution D*) Attach 11 OY 1 DCR: Ft. Riley ITE Refresh r1 kml (Distribution D*) Attach 12 OY 1 DCR: NTC ITE r1 kml (Distribution D*) Attach 13 OY 1 DCR: Balkans Constructive (ERF, MRF) r1 kml (Distribution D*) Attach 14 OY 1 DCR: Saudi Arabia Constructive (ERF, MRF) r1 kml (Distribution D*) Attach 15 OY 1 DCR: Japan Constructive (ERF, MRF) kml (Distribution D*) Attach 16 OY 2 DCR: TBD ITE Refresh (Equivalent to Ft. Drum ITE) Not Used Attach 17 OY 2 DCR: TBD ITE Refresh (Equivalent to Ft. Carson ITE Refresh) Not Used Attach 18 OY 2 DCR: TBD Constructive (Equivalent to Germany Constructive)
ERF, MRF)
Not Used
Attach 19 OY 2 DCR: TBD Constructive (Equivalent to Balkans Constructive)
(ERF, MRF)
Not Used
Attach 20 OY 2 DCR: TBD Constructive (Equivalent to Saudi Arabia Constructive) (ERF, MRF)
Not Used
Attach 21 Database Maintenance Request (DMR) 1 Attach 22 Common Moving Model (CM2) List 4 Attach 23 OY 3 DCR: TBD ITE Refresh (Equivalent to Ft. Drum ITE) Not Used Attach 24 OY 3 DCR: TBD ITE Refresh (Equivalent to Ft. Carson ITE Refresh) Not Used Attach 25 OY 3 DCR: TBD Constructive (Equivalent to Germany Constructive)
(ERF, MRF)
Not Used
Attach 26 OY 3 DCR: TBD Constructive (Equivalent to Balkans Constructive)
(ERF, MRF)
Not Used
Attach 27 OY 3 DCR: TBD Constructive (Equivalent to Saudi Arabia Constructive) (ERF, MRF)
Not Used
Attach 28 OY 4 DCR: TBD ITE Refresh (Equivalent to Ft. Drum ITE) Not Used Attach 29 OY 4 DCR: TBD ITE Refresh (Equivalent to Ft. Carson ITE Refresh) Not Used Attach 30 OY 4 DCR: TBD Constructive (Equivalent to Germany Constructive)
ERF, MRF)
Not Used
Attach 31 OY 4 DCR: TBD Constructive (Equivalent to Balkans Constructive)
(ERF, MRF)
Not Used
Attach 32 OY 4 DCR: TBD Constructive (Equivalent to Saudi Arabia Constructive) (ERF, MRF)
Not Used
Attach 33 Follow-on Year 1 DCR: TBD ITE Refresh (Equivalent to Ft. Drum
ITE)
Not Used
Attach 34 Follow-on Year 1 DCR: TBD ITE Refresh (Equivalent to Ft. Carson ITE Refresh)
Not Used
Attach 35 Follow-on Year 1 DCR: TBD Constructive (Equivalent to Germany Constructive) (ERF, MRF)
Not Used
Attach 36 Follow-on Year 1 DCR: TBD Constructive (Equivalent to Balkans Constructive) (ERF, MRF)
Not Used
Attach 37 Follow-on Year 1 DCR: TBD Constructive (Equivalent to Saudi Arabia
Constructive) (ERF, MRF) Not Used
Attach 38 Follow-on Year 2 DCR: TBD ITE Refresh (Equivalent to Ft. Drum
ITE)
Not Used
Attach 39 Follow-on Year 2 DCR: TBD ITE Refresh (Equivalent to Ft. Carson ITE Refresh)
Not Used
Attach 40 Follow-on Year 2 DCR: TBD Constructive (Equivalent to Germany Constructive) (ERF, MRF)
Not Used
Attach 41 Follow-on Year 2 DCR: TBD Constructive (Equivalent to Balkans Constructive) (ERF, MRF)
Not Used
Attach 42 Follow-on Year 2 DCR: TBD Constructive (Equivalent to Saudi Arabia Constructive) (ERF, MRF)
Not Used
Attach 43 Sample Task Preliminary DCR: Midwest US ITE kml (Distribution D*) Attach 44 CVEM Status – Feb 2017: Final CVEM Contract Year (Prior to Base
Year) r8
Attach 45 SE Core Distribution Agreement (DA) 8 Attach 46 Software and/or Data Provided with Less than Government Purpose
Rights
Attach 47 SE Core Solicitation Comment/Question Form 1 Attach 48 DD254 7 Attach 49 Small Business Participation Form 1 Attach 50 Past Performance Evaluation Questionnaire Form 5 Attach 51 Pre-Award Survey of Prospective Contractor Accounting System 2 Attach 52 Total Evaluated Price Worksheet r2 1 Attach 53 Contract Work Breakdown Structure (CWBS) 2 Exhibit A A: Contract Data Requirements List (CDRL) – Management Data 10 Exhibit B B: CDRL – Synthetic Environment and Models Generation Data 5 Exhibit C C: CDRL – Engineering Data 14
* Distribution D – requires a valid Distribution Agreement (DA): Request this document from Issuing Agency (ATTN: Michelle D. Williams, Contract Specialist, Telephone number: 407-380-5296, E-mail:
michelle.d.williams1.CIV@mail.mil) with a copy of DA.
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
The following have been deleted:
52.234-2 Notice of Earned Value Management System - Preaward
Integrated Baseline Review
NOV 2016
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
SECTION L: INSTRUCTION TO OFFERORS
Section L - Instructions, Conditions and Notices to Bidders
PROPOSAL SUBMISSION
L.1.0. INTRODUCTION
L.1.1. The SE Core source selection process will utilize a written proposal including a Sample Task. The intent of Sample Task is to supplement the management and technical volumes of the written proposals to allow the offeror to demonstrate practical understanding of SE Core requirements and demonstrate effective and application of the proposed management and technical approach.
L.1.2. Hard Copy/Electronic Submission: Volumes I – VI proposals are due in one original hard copy and three electronic (via CD) copies by 1:00 PM, Eastern Time on April 24, 2017 to the POC listed in paragraph L.1.3 below. Please note that telegraphic or facsimile offers are not authorized for this solicitation. See Table L-1 for additional details pertaining to proposal submission.
In accordance with FAR 15.208(b), failure of an Offeror to submit its proposal in accordance with the date and time deadlines or the manner specified in the solicitation may result in a determination that the proposal is “late” and ineligible to be considered for award.
L.1.3. The point of contact (POC) for this solicitation for Offerors is Ms. Michelle D. Williams, Contract Specialist.
Army Contracting Command (ACC) - Orlando ATTN: Michelle D. Williams, Contract Specialist
W900KK-17-R--0015
12211 Science Drive Orlando, FL 32826-3275 Telephone number: 407-384-5296 E-mail: michelle.d.williams1.CIV@mail.mil
L.1.4. The alternate point of contract (APOC) for this solicitation for Offerors is Ms. Terri Harvey
ATTN: Terri Harvey, Contract Specialist Solicitation #W900KK-17-R-0015 12211 Science Drive Orlando, FL 32826-3275 Telephone number: 407-208-3338 E-mail: terri.l.harvey10.civ@mail.mil
L.1.5. The Procurement Contracting Officer (PCO) for this solicitation is Robert M. Minjack
ATTN: Robert Minjack, PCO Solicitation #W900KK-17-R--0015 12211 Science Drive
Orlando, FL 32826-3275 Telephone number: 407-384-3803 E-mail: robert.m.minjack.civ@mail.mil
L.1.6. All proposals must clearly and convincingly demonstrate the Offeror has a thorough understanding of the requirements and associated risks, and is able, willing, and competent to devote the resources necessary to meet the requirements and has valid and practical solutions for all requirements. Statements that the prospective Offeror understands, can, or will comply with the specifications, and statements paraphrasing the requirements or parts thereof are considered inadequate and unsatisfactory. Mere reiteration of the requirement or standard reference material is discouraged.
L.1.7. Any data previously submitted in response to another solicitation, whether submitted to ACC-
Orlando, the Program Executive Office for Simulation, Training and Instrumentation (PEO STRI) or another agency will not be considered during this proposal evaluation and source selection process. Proposal data shall not be incorporated into the proposal by referring to another proposal or other source.
L.1.8. The Offerors shall ensure that each proposal volume submitted contains the information relevant to that specific volume. The Offerors are cautioned that each volume of the proposal is evaluated standalone against the criteria set forth in Section M of the Request for Proposal (RFP) and the evaluators for one volume may be different than the evaluators of another volume. The only exceptions are that:
a) Evaluators of the Management Volume WILL have access to the Technical Volume in support of their evaluation of the Management Volume.
b) Evaluators of the Technical Volume WILL have access to the Management Volume in support of their evaluation of the Technical Volume.
L.1.9. If the data is not contained in the appropriate volume of the proposal it may not be evaluated. For example, if the Sample Task response is submitted under the Past Performance volume rather than the volume specified, the proposal may be evaluated as if no Sample Task response was submitted at all.
L.1.10. NOT USED AT THIS TIME
L.1.11. The proposal and any requested updates shall be valid for not less than 300 calendar days from the proposal due date.
L.1.12. The Government reserves the right to request additional information (for purposes of clarification only) after receipt of Offeror’s response to the RFP.
L.1.13. Proposals shall not contain classified information.
L.1.14. Security Clearance Requirements: Contractor employees working under the resultant contract must comply with the security requirements of the contract as documented in the RFP.
L.1.15. Offerors may submit a request for additional Government Technical Data as necessary to support proposal preparation. In order to obtain this Government Furnished Information (GFI) Offeror shall complete the Distribution Agreement (DA), included as Attachment 45 to the solicitation, and email to leonard.l.hobbs2.ctr@mail.mil. The email shall also include the following:
a) The Offeror’s preference for receipt of the technical data package (pick-up from Government location or Government will mail the package).
b) If the Offeror prefers the package to be mailed, include a point of contact, phone number and address to which the package will be mailed.
The Government will provide for pick-up or will mail the technical data package within five business days from receipt of email request including all of the above, to the extent practical.
L.1.16. Questions regarding this solicitation shall be submitted by electronic mail to the POC identified in paragraph L.1.3, L.1.4, and L.1.5 with the solicitation number in the subject line. The Government will answer all questions through the issuance of a solicitation amendment prior to the deadline for final proposal submissions provided those questions are received by 3:30 PM, Eastern Time on the 10th calendar day after RFP release. Questions received after this date may not be answered prior to proposal submission deadline. The Government does not anticipate that the closing date for receipt of offers will be extended. The Government will answer all questions via FedBizOpps prior to the proposal due date. The Government will post the answers, without Offeror identification, to the FedBizOpps website for this solicitation.
Offeror shall not make any changes to the solicitation. Any objections to the terms and conditions of the solicitation should be addressed to the PCO prior to the closing date and time for proposals.
If the proposal takes exceptions to the terms and conditions of the solicitation, all exceptions shall be denoted in a cover letter to the proposal; however, exceptions to the solicitation taken in the proposal may result in the offer being unacceptable.
L.1.17. The following milestones apply to this acquisition:
Release of Draft RFP 22 Nov 2016 Deadline for Submission of Questions on Draft RFP 09 Dec 2016 Release of Final RFP 14 Mar 2017 Deadline for Submission of Questions on Final RFP 24 Mar 2017 Target for Answers to Questions 03 Apr 2017 Deadline for Submission of Past Performance Questionnaires 04 Apr 2017 Proposals Due 24 Apr 2017 Contract Award 06 Nov 2017
L.2.0. PROPOSAL MAILING/DELIVERY
L.2.1. Submission of telegraphic or facsimile offers is not authorized for this solicitation. The outside shipping container shall be marked with the RFP Number. Proposals shall be mailed/delivered as follows:
ACC-Orlando ATTN: Ms. Michelle D. Williams
W900KK-17-R-0015
12211 Science Drive Orlando, FL 32826-3276
If the proposal/final proposal revision is hand carried, the Offeror shall notify the PCO and Contract Specialist by email 48 hours in advance of its intent to hand deliver its proposal. The email must include the name of the organization, the name and phone number of the individual delivering the proposal, and the make, model, and license plate number of the delivery vehicle.
L.2.2. For hand carried proposals, the Offeror shall obtain a Proposal Receipt Form from the POC identified in paragraph L.2.1 above and deliver the completed form with the proposal. The POC will date/time stamp the original of the form, annotate the number of boxes received and sign in the “Signature of Contract Specialist” portion of the form. This information will also be annotated on the copy that will be provided to the Offeror. The Contract Specialist’s signature only denotes the receipt of the sealed proposal. They are not responsible for the proposal contents inside the sealed proposal. In the event the POC in L.2.1 is unavailable to receive the Offeror’s hand carried proposal, the PCO or an authorized individual approved by the PCO will be assigned.
L.3.0. PROPOSAL FORMAT
L.3.1. Paper Copies - Binding. Offerors shall submit an original paper copy of all volumes in standard size 3-ring binders that will facilitate the insertion of change pages and additional information the Offeror may be required to provide during the source selection process.
L.3.2. Paper Copies - Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. A Table of Contents should be created using the Table of Contents feature in Microsoft (MS) Word 2013. MS Word Files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right - 1” Gutter – 0” From Edge – Header, Footer - 0.5” Page Size, Width – 8.5” Page Size, Height – 11”
The following additional restrictions apply:
Each paragraph shall be separated by at least one blank line. Page orientation shall be portrait style in an easily readable font with a size of no smaller than 10 point.
Tables or figures may be printed on fold-out sheets, which shall not exceed 11 x 17 inches. Font size for tables and figures shall be no smaller than 8-point and may use landscape orientation. Fold-out sheet count limitations for the Management and Technical Factors are provided in Table L-1.
Pages shall be numbered sequentially by volume and marked with the Offeror’s name and any applicable data use restrictions in the header/footer area of each page.
All printed pages shall contain the phrase: “SOURCE SELECTION INFORMATION" (printed or stamped) in addition to the FAR 3.104 proprietary data notice.
L.3.3. Electronic File Packaging. Offerors shall submit each proposal volume on a separate compact disc
(CD). CDs shall be appropriately marked with the Offeror’s name and address, volume identification, and distribution restrictions. All files on each CD shall be directly supported by Microsoft Office 2013 and verified to be free of any virus or malware. All files shall be clearly identified with a filename appropriate to the content (e.g., Volume-1_Management_Appendix-A).
L.4.0 PROPOSAL VOLUMES
The proposal must consist of Volumes I through VI as set forth in Table L-1.
Table L-1. Proposal Volume Organization
VOLUME
TITLE
COPIES
SIZE LIMITS
I Management 1 Paper Submission**
3 Electronic Submissions*
Volume I not to exceed 30 total pages including the Sample Task response. This total includes a maximum of 5 fold-outs.
II Technical 1 Paper Submission
3 Electronic Submissions*
Volume II not to exceed 25 pages total. This total includes a maximum of 5 fold-outs.
III Past Performance 1 Paper Submission
3 Electronic Submissions*
Volume III not to exceed 25 pages plus 2 pages for each major Subcontractor (as defined in L.7.1.1) total
(No more than 5 recent, relevant programs for the Prime Offeror and no more than 3 for each relevant Subcontractor Offeror).
IV Small Business Participation
1 Paper Submission
3 Electronic Submissions*
Volume IV
Unlimited relevant and required pages, V Cost/Price 1 Paper
3 Electronic Submissions*
Volume V
Unlimited relevant and required pages.
VI Administrative Information
1 Paper
Volume VI not to exceed 30 pages total
Small Business Subcontracting Plan will be included asas an Appendix to Volume VI, and is not considered in the 30 page count.
This piece of the volume maymay include Unlimited relevant and required pages.
VII Cross-Reference Matrix
1 Paper
Volume VII
Unlimited relevant and required pages.
*Electronic Submission shall be on an appropriately marked compact disc (CD), as per paragraph L.3.3.
**Paper submission is not required for the Sample Task Updated DCR, which will be provided electronically in Google Earth Pro™ *Keyhole Markup Language (KML).
L.4.1. Page Count: Those pages that exceed the page counts in Table L-1 for each volume or attachment will not be evaluated. PAGE COUNTS DO NOT INCLUDE THE FOLLOWING ITEMS, however, offerors are cautioned to include only necessary information required to meet RFP content requirements and support their proposal:
1. Required Appendices that are explicitly requested in the proposal instructions below, which are to be provided as Appendices the volume (e.g., Project Schedules, Staffing Plans, Updated Database Content Requirements (DCR) (provided as a Google Earth Pro™ Keyhole Markup Language (KML) electronic format only), Bill of Material and Travel for the Sample Task, Small Business Subcontracting Plan, etc.).
2. Cover Sheet, Table of Contents, Glossary, List of Figures and Tables, Lists of Acronyms (if used), section separators, and any blank pages marked “Not used”.
3. Executed Contract Attachments (e.g., completed Sections B, G, J, Attachment 46, etc.).
4. Resumes and Letters of Commitment for Key Personnel.
5. Volume Summaries. A Volume Summary shall be provided for each Volume. The
Volume Summary shall be no more than one page that shall not count against the Volume page count and will not be used for evaluation purposes.
L.4.2. Content Requirements: All information shall be confined to the appropriate volume. The Offeror shall confine submissions to essential matters, sufficient to define the proposed approach and provide adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of each proposal. Each volume of the proposal shall consist of a Table of Contents, Volume Summary, the required content, and required Appendices. The Volume Summary Section shall contain a brief abstract of the Volume. Proprietary information shall be clearly marked. Cost/Price information shall be contained ONLY in the Cost/Price Volume except for the specific cost information required in the Small Business Participation and Administrative Information. The Offeror’s Cost/Price proposal shall contain a face page containing the information specified in FAR 15.408, Table 15-2, titled “Instructions for Submitting Cost/Pricing Proposals when Cost or Pricing Data are required.”
L.4.3. Failure of an Offeror to provide all requested proposal information may result in a determination that an Offeror is ineligible to be considered for award.
L.5.0. VOLUME I – MANAGEMENT
The Offeror’s Management Volume shall address subfactors A, B and C for this factor. The Offeror should consider the relative order of importance of the subfactors.
L.5.1 Sub-factor A: Program Management: The Offeror shall clearly demonstrate their approach to effectively plan, organize, staff, control, and lead to meet contract requirements. This subfactor rating will be determined based upon evaluation of the following information which IS NOT separately rated. (PWS 5.1)
a. Project Organization. The Offeror shall describe their proposed project organization depicting and describing the Offeror’s key personnel, internal project teams, and their relationships with supporting corporate organizations, the Government, Confederate programs, and subcontractors/suppliers (PWS 5.1.16). The Offeror shall identify key personnel, as indicated in PWS 1.6.8. A one-page resume shall be provided for each of the key personnel as an Appendix to this Volume. Letters of Commitment shall be provided with the resume for all key personnel.
(PWS 1.6.8)
b. Status Reporting. The Offeror shall describe how the Government Program Office will be provided real time (weekly) visibility into status of terrain generation tasks. This shall describe and provide example graphics of the Offeror’s depiction of historical progress including planned versus actual labor, estimate to complete plans and milestones for overall database generation efforts – with a breakout of data for the most costly terrain generation tasks (e.g., vector editing, map generation, static model development, sourcing, runtime database generation, integration and testing). (Reference PWS 5.1.16, 5.5.1.4)
c. Project Schedule. The Offeror shall provide a Project Schedule for the Base Year and OY 1 for each priced CLIN – specifically including each ITE and constructive database and each database maintenance request (DMR) deliverable. Key tasks, milestones, and external dependencies shall be depicted. The required Project Schedule shall be provided as an Appendix to the Management Volume in both hard copy and Microsoft Project 2013.