PEO-STRI-08-W059
W900KK-09-R-0025
12 March 2009
Version 1.3.1
PEO-STRI-08-W059
W900KK-09-R-0025
12 March 2009
Version 1.3.1
STATEMENT OF WORK
FOR THE
COMMON ARMY RANGES AND TARGET SYSTEMS (CARTS)
INDEFINITE DELIVERY/INDEFINITE QUANTITY (ID/IQ) CONTRACT
Prepared by:
Program Executive Office Simulation, Training and Instrumentation (PEO STRI)
12350 Research Parkway
Orlando, Florida 32826-3276
REVISION LOG
| Date |
| Version |
| Author |
| Section |
| Revision Description |
| 19 June |
| Draft |
| JT |
| N/A |
| Initial Draft |
| 3 Sept |
| Initial |
| JT |
| N/A |
| Initial Release |
| 12 Sept |
| Ver 1.0 |
| JT |
| N/A |
| 22 Jan 09 |
| Ver 1.1 |
| JT |
| Multi |
| Re-baseline to reflect only FASIT Devices and Engineering and Integration activities within CARTS; removed small business endeavors |
| 26 Jan 09 |
| Ver 1.2 |
| JT |
| Header |
| Updated Solicitation Number |
| 9 Mar 09 |
| Ver 1.3 |
| JT |
| 3.3 |
3.4 Added section to align to LOT III for Silhouette procurement and development Added section to align to LOT IV for Non-Permanent Training Facilities
| 12 Mar 09 |
| V1.3.1 |
| JT |
| 3.3 |
| Changed Paragraph Title |
Added verbiage to clarify scope
TABLE OF CONTENTS
11.0. Scope.
11.1. CARTS IDIQ Goals.
12.0. Applicable Documents.
12.1. Department of Defense Directives.
22.2. Availability of Department of Defense Directives.
22.3. Other Government Documents, Drawings, and Publications.
22.4. Availability of Other Government Documents, Drawings and Publications.
22.5. Non-Government Publications.
22.6. Availability of Non-Government Standards and Other Publications.
32.7. Order of Precedence.
33.0. Requirements.
33.1. Range Devices.
33.1.1. Presentation Devices.
33.1.2. Range Effects Devices.
33.1.3. Engagement Scoring Devices.
33.1.4. Precision Engagement Targets.
43.1.5. Common Instrumentation Communication.
43.1.5.1. Range Interface Module.
43.1.5.2. Personal Area Network.
43.1.5.3. Range Communication Network.
43.1.6. Handheld Devices.
43.1.6.1. Handheld Target Controller.
43.1.6.2. Handheld Target Terminal.
43.1.7. Power Distribution Module.
43.1.8. Common Moving Target Rails.
53.2. Range Systems, Engineering, and Integration.
53.2.1. Minor Range Construction/Modification.
53.2.1.1. Modifications.
53.2.1.2. Non-Tactical Targets and Training Enablers.
53.2.2. Integration and Installation.
53.2.2.1. Communication Network System.
53.2.2.2. Audio/Video/Digital Data.
53.2.2.2.1. Video (Interior and Exterior).
63.2.2.2.2. Audio (Interior and Exterior).
63.2.2.2.3. Recording System.
63.2.2.2.4. Editing System.
63.2.2.2.5. After Action Review.
63.2.2.2.6. Central Control System/Software.
63.2.2.3. Range Subject Matter Expertise.
73.2.2.4. Visual Recognition Skills.
73.2.2.5. Experimentation Support.
73.2.2.6. Scenario Generation.
73.2.3. Technical/Conceptual Studies and Support.
73.2.3.1. Technical Studies/Analyses.
73.2.3.2. Feasibility and Cost Benefit Analyses.
73.2.3.3. Range Redesign/Modification Analysis.
73.2.3.4. Rapid Prototyping/Research and Development.
73.2.3.5. Advanced Concept Demonstration.
83.3. Target Silhouettes.
83.3.1. Representation Devices.
83.3.2. Rapid Prototyping/Research and Development.
83.4. Non-Permanent Live Fire Training Facilities.
83.4.1. Live Fire Facilities.
83.4.2. Non-permanent Training Mock-ups.
83.4.3. Weather Protection.
83.4.4. Safety.
83.5. Program Management.
83.5.1 Integrated Product Team (IPT).
93.5.1.1. Engineering, Management and Integration Tasks.
93.5.1.2. Associate Contractor Agreements (ACA).
93.5.2. Program Reviews.
93.5.2.1. Technical Design Review (TDR).
93.5.2.2. Test Readiness Review (TRR).
93.5.2.3. Technical Interchange Meetings (TIMs).
93.5.3. Program Schedule.
103.5.4. Visitor Support.
103.5.5. Exhibition Support.
103.5.6. Contract Invoicing and Payment.
103.6. System Engineering.
103.6.1. Live Training Transformation (LT2).
103.6.2. System Baseline.
103.6.1.1. Requirements Traceability.
103.6.1.2. Hardware and Software Integration.
113.6.3. Allocated Baseline Maturation.
113.6.4. Safety Assessment and Health Hazard Analysis.
113.6.4.1. Health Hazard Assessment.
113.6.5. Information Assurance.
113.6.5.1. Automated Information System (AIS) Security.
123.6.5.2. Information Assurance Vulnerability Alert (IAVA).
123.6.5.3. Information Assurance Training.
123.6.5.4. Department of Defense Certification and Accreditation Process (DIACAP) Support.
123.6.6. Electronic and System Protection.
123.6.6.1. Surge Protection.
123.6.6.2. Grounding.
123.6.6.3. Lightning Protection.
123.6.6.4. Electromagnetic Environmental Effects (E3).
123.6.7. Site Preparation.
123.6.7.1. On-Site.
133.6.7.2. On-Site Range Effort.
133.6.8. Engineering Change Proposal (ECP).
133.6.9. Quality Assurance (QA).
133.6.10. System Verification.
133.6.10.1. Early System Integration Platform and Demonstration.
143.6.10.2. Test and Verification.
143.6.10.3. On-Site Acceptance.
143.6.10.4. Information Assurance Verification.
143.6.11. Software Engineering.
143.6.11.1. Software Design.
153.6.11.1.1. Software Requirements and Architecture Development and Review.
153.6.11.1.2. Software Design and Implementation.
153.6.11.1.3. Software Development Test.
153.6.11.2. Virus Software.
153.6.12. Interface Control.
153.6.13. Configuration Management.
163.6.13.1. Physical Configuration Audit (PCA).
163.6.14. Product Definition Data (PDD).
163.6.15. Telecommunication System Engineering Plan (TSEP).
163.6.16. Production Planning.
163.7. Consolidated Product-line Management.
163.7.1. Interface to Consolidated Product-line Management (CPM).
163.7.2. CPM Software Support.
173.7.3. System Problem Reporting.
173.7.4. Coordination for Configuration Changes.
173.7.4.1. ECP Implementation.
173.7.4.2. Class 2 ECP Tracking.
173.7.5. Document Maintenance.
173.7.6. Baseline Management.
173.7.7. Product Maturation.
173.7.8. Product Reinvention.
183.8. Logistics.
183.8. Logistic Management.
183.8.1. Maintenance Support Strategy.
183.8.1.1. Maintenance Concept.
183.8.1.2. Supportability Analysis and Logistics Management Information.
193.8.1.3. Spares and Repair Parts.
193.8.1.4. Tools and Test Equipment
193.8.1.5. Common and Bulk Items
193.8.2. Technical Publications.
193.8.2.1. Validation.
203.8.2.2. Publications In Process Review’s (IPRs).
203.8.3. Training Course.
203.8.3.1. Training and Training Products.
203.8.3.2. Instructor and Operator Training.
203.8.3.3. Maintenance Training.
203.8.3.4. Training Classes.
203.8.3.5. Location of Training.
203.8.3.6. Training Facility and Equipment.
213.8.3.7. Course Completion Criteria.
213.8.3.8. Certificate of Training Completion.
213.8.4. Unique Identification (UID) of Tangible Items.
STATEMENT OF WORK
FOR THE
COMMON ARMY RANGES AND TARGET SYSTEMS
INDEFINITE DELIVERY/INDEFINITE QUANTITY CONTRACT
(CARTS ID/IQ)
1.0. Scope.
The CARTS ID/IQ contracts will provide for the basic production, engineering studies, designs, construction, integration services, logistics support and technical data for the Department of Defense, and other Government agencies including state/local government entities for the procurement, development, and/or fielding of range instrumentation systems/infrastructures and Future Army System of Integrated Targets (FASIT) and non-FASIT target systems and components. This Statement of Work delineates the types of work efforts to be included in the CARTS ID/IQ contracts. This Statement of Work is broken down into several key conceptual areas:
a. Production: This allows for the fabrication and purchase of individual FASIT and non-FASIT components (presentation devices, special engagement devices, range effects devices, engagement scoring devices, representation devices, and auxiliary range items) to support the requirements of a training range.
b. Systems Engineering/Integration: These efforts allow for the installation and integration of the FASIT and non-FASIT components into integrated systems, technical studies and prototyping of conceptual designs, and minor construction/modification of range facilities in support of FASIT and non-FASIT component fielding and integration. These efforts range from the installation of basic training ranges to advanced simulation and instrumentation equipment to experimentation support of training ranges.
c. Logistics and Technical Data: These efforts include all aspect of life cycle product support, to include new equipment training, mission support, technical data packages, spares, and consumables.
The general concept for the CARTS ID/IQ is to provide a contractual vehicle to support the fabrication, integration, deployment, and maintenance of components in support of training ranges, both as integral components of larger ranges, or integrated entireties of smaller ranges.
1.1. CARTS IDIQ Goals.
The goals for the CARTS ID/IQ contracting effort are to:
· Assist customers in obtaining operations or supporting their training range objectives
· To create common architecture and components that allows cross integration (both with respect to logistic support and commonality and compatibility between fielded systems)
· To produce common products that are supportable in the long term
· To produce common products that are supported through a common source
2.0. Applicable Documents.
The following documents of issue shown on the Document Summary List (DSL) form a part of this SOW to the extent specified herein. In the event of a conflict between documents referenced herein and the contents of this SOW, the contents of the SOW shall be the governing requirement.
2.1. Department of Defense Directives.
DIACAP
Interim Department of Defense (DOD) Certification and Accreditation (C&A) Process (DIACAP) Guidance
DOD 8570.01 M
Information Assurance Workforce Improvement Program
DODD 8500.1
Information Assurance
DODI 8500.2
Information Assurance (IA) Implementation
2.2. Availability of Department of Defense Directives TC "2.2 Availability of Department of Defense Directives" \f C \l "1" .
Copies are available on the WWW at URL: http://www.dtic.mil/whs/directives/
2.3. Other Government Documents, Drawings, and Publications.
AR 25-2
Information Management
ICD.FASIT.SYS
FASIT System Devices Interface Control Document
ICD.FASIT.AUDIO
FASIT Audio Devices Interface Control Document
ICD.FASIT.ESD
FASIT Engagement Scoring Devices Interface Control Document
ICD.FASIT.PD
FASIT Presentation Devices Interface Control Document
ICD.FASIT.RIM
FASIT Range Interface Module Interface Control Document
ICD.FASIT.RD
FASIT Representation Devices Interface Control Document
JTA-A
Joint Technical Architecture – Army
LT2-MGMT-04-0001
Live Training Transformation (LT2) Product Line Management Concept of Operations (PLM CONOPS)
MIL-DTL-31000
Technical Data Packages
MIL-STD-40051-2
Preparation of Digital Technical Information for Page-Based Technical Manuals
MIL-PRF-49506
Logistics Management Information
MIL-STD-130
Unique Identification (UID) of Tangible Items
PRF-PT-00468
Performance Specification for the Future Army System of Integrated Targets (FASIT)
PRF-PT-00474
Performance Specification for the Future Army System of Integrated Targets (FASIT) Silhouettes
TC 25-8
Training Circular, Army Training Ranges
2.4. Availability of Other Government Documents, Drawings and Publications.
Copies of the documents are available form NAVAIR Training Systems Division; Code 25351D, 12350 Research Parkway, Orlando, FL 32826, or may be available at: http://assist.daps.dla.mil/quicksearch/
2.5. Non-Government Publications.
ANSI/NFPA 70
National Electric Code
NFPA 780
Installation of Lightning Protection Systems
2.6. Availability of Non-Government Standards and Other Publications.
Copies are available on the WWW at URL: http://www.nssn.org/search.html
2.7. Order of Precedence.
In the event of a conflict between the text of this SOW and the references cited herein, the text of the SOW takes precedence. Nothing in this SOW, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
3.0. Requirements.
3.1. Range Devices.
This section describes the work efforts to be completed for the various training range components that will be procured under this ID/IQ contract. These items are advanced range and target devices used within the construct of the non-instrumented training ranges to provide threat and battle-space realism cues, provide instrumented feedback and control, provide communication infrastructure and bridges (long and short distances respectively), and target position device infrastructure management. In general these devices will be compliant to the Future Army System of Integrated Targets (FASIT) standards and specifications. By exception case only, non-FASIT devices may be procured.
3.1.1. Presentation Devices.
You shall design, fabricate, integrate, and validate advanced instrumented and interactive systems, either stationary or mobile, for the evaluation of Live Fire, Force-on-Force, Force-on-Target, and non-lethal training events. The presentation devices will incorporate the following attributes: movement, raise/lower, audio communication, thermal signature controls, animation controls (swivel engagement system), shoot-back capability (e.g., MILES), direction controls (pre-programmable), and hit detection (mortal/non-mortal). The Presentation Devices shall be compliant to the FASIT Performance Specifications and FASIT ICDs.
3.1.2. Range Effects Devices.
You shall design, fabricate, integrate, and validate range effects devices to enhance training realism for the evaluation of Live Fire, Force-on-Force, Force-on-Target, and non-lethal training events. These devices range from, but are not limited to, smoke, smell, illumination, muzzle flash simulation, audio, MILES Shootback, MILES Shoot-thru-walls, in-door tracking, and flash/bang (non-pyrotechnic solution) simulations. The design shall ensure that all applicable U.S Army safety requirements are met. The fielded systems shall have all required safety documentation available and approved prior to installation. The Range Effects Devices shall be compliant to the FASIT Performance Specifications or other requirements document, and the FASIT or other applicable ICDs.
3.1.3. Engagement Scoring Devices.
You shall design, fabricate, integrate, and validate engagement scoring devices (non-contact hit sensor) for infantry targets, armor targets, aerial ground targets, and facade(s) to provide location of and the type of round for the evaluation of Live Fire, Force-on-Target, and non-lethal training events. The engagement scoring devices shall be programmable to respond to pre-programmed limits (i.e., respond/react to an applied stimulus). The design shall ensure that all safety requirements are met. The fielded systems shall have all required safety documentation available prior to installation. The Engagement Scoring Devices shall be compliant to the FASIT Performance Specification and FASIT ICDs.
3.1.4. Precision Engagement Targets.
You shall design, fabricate, integrate, and validate Precision Engagement systems for the evaluation of Live Fire, Force-on-Target, and non-lethal training events. The Precision Engagement Targets devices shall incorporate the attributes of the Presentation Devices and the ability to differentiate between mortal and non-mortal hit detection and present behaviors commensurate with the engagement results. The Precision Engagement Targets shall be programmable to respond to pre-programmed limits (i.e., respond/react to an applied stimulus). The design shall ensure that all safety requirements are met and have all required safety documentation available prior to installation. The Precision Engagement Targets shall be compliant to the FASIT Performance Specification and FASIT ICDs.
3.1.5. Common Instrumentation Communication.
You shall design, fabricate, integrate, and validate the modular elements for a holistic communication architecture, to include range interface modules, short range communication modules, and long range TCP/IP compliant (wired or wireless) communication modules per the requirements of the FASIT Performance Specification or as otherwise required.
3.1.5.1. Range Interface Module.
You shall design, fabricate, integrate, and validate the modular elements for a Range Interface Module (RIM), to include network bridging, analog controls, and audio outputs, per the requirements of the FASIT Performance Specification. The RIM shall allow for the modular addition of a GPS system.
3.1.5.2. Personal Area Network.
You shall design, fabricate, integrate, and validate the modular elements for a Personal Area Network (PAN) for utilization within a target position, per the requirements of the FASIT Performance Specification. The PAN shall act as an extension of the TCP/IP network within the target position. The PAN shall include complimentary elements in both the RIM and on the device being controlled.
3.1.5.3. Range Communication Network.
You shall fabricate, integrate, and validate the modular elements for a Range Communication Network for utilization on defined training ranges/areas, per the requirements of the FASIT Performance Specification. The Range Communication Network shall provide TCP/IP network within the target position. The Range Communication Network shall include complimentary elements in both the RIM and on the device being controlled.
3.1.6. Handheld Devices.
3.1.6.1. Handheld Target Controller.
You shall design, fabricate integrate, and validate a modular handheld target and training range device controller. The Handheld Controller shall be capable of issuing simple command sets to the targets and other training range devices located on a range via the defined FASIT or applicable ICDs. The Handheld controller shall be a one-way communication mechanism to the devices on the range; however, device status updates from the UTC to the handheld controller are not precluded.
3.1.6.2. Handheld Target Terminal.
You shall design, fabricate integrate, and validate a modular handheld target and training range device terminal. The Handheld Terminal shall be capable of issuing the complete command set to the targets and other training range devices and shall provide the functionality of the Universal Target Controller. The Handheld Target Terminal shall be a bi-directional communication device and support situational awareness of the range. The Handheld Terminal shall be capable of running both the TRACR and UTC software.
3.1.7. Power Distribution Module.
You shall design, fabricate, integrate, and validate a modular and scaleable Power Distribution Module. The Power Distribution Module shall draw power from the standard target position outlets, and support the power requirements of all devices specified for a target position for a defined range. The Power Distribution Module shall be such as to withstand the environmental conditions on the training range, to include thermal stabilization associated with power transformation. The Power Distribution Module shall be compliant to the FASIT Performance Specification.
3.1.8. Common Moving Target Rails.
You shall design, fabricate, install, and verify modular and scalable common moving target rail modules for the Moving Armor Targets (MATs) and Moving Infantry Targets (MITs) as defined in the FASIT Performance Specification. The common moving target rail systems shall be able to support the moving and silhouette weights as defined in the FASIT Performance Specification, and shall be such as to withstand the environmental conditions on the training range.
3.2. Range Systems, Engineering, and Integration.
These efforts are for the oversight, engineering, and management of the design, development, integration, fabrication, installation, verification, training, and logistics for the procurement of entire systems. These efforts may include minor range construction or refurbishment. These include all activities to integrate and assemble the hardware and software to achieve a fully functional system, with all support systems, that performs and operates in accordance with the requirements of the delivery order.
You shall procure and acquire materials, fabricate, install, integrate, test and verify performance, and document the range system allocated baseline training instrumentation systems in fulfillment of the requirements defined in the FASIT or other applicable Specification defined in the Delivery Order. While individual efforts may vary, Training Circular (TC) 25-8 provides training range type descriptions and definitions that shall be utilized in these tasks. You shall define and maintain a system baseline for the fielded and tested system; this baseline shall be established prior to the start of testing and be maintained through system acceptance. You shall ensure all interfaces are compliant to the applicable FASIT Interface Control Document(s) for the class and type of product procured.
TC "3.3.1.2 Hardware and Software Integration" \f C \l "1"
3.2.1. Minor Range Construction/Modification.
3.2.1.1. Modifications.
You shall design and modify existing range complexes, target emplacements, and buildings to support the training and mission needs. Range complexes, target emplacements, and Buildings can be modified to accommodate current and anticipated training requirements and can be provided with equipment that interfaces with existing data collection systems. All installed items and modifications will be as unobtrusive as design permits. This includes the necessary efforts to redesign and/or modify the interior of buildings to accommodate AAR theaters (sound soaks, lighting, tiered seating, etc.).
3.2.1.2. Non-Tactical Targets and Training Enablers.
You shall design, fabricate, integrate, and validate Non-Tactical Targets and Training Enablers. These devices shall represent a class of components as tactical training devices, aides and simulators which are key elements of the training ranges, but which are not directly engaged as targets. This class of components shall include, but is not limited to, urban clutter, room debris, and open range artifacts.
3.2.2. Integration and Installation.
For an integration and installation effort, you shall be required to complete the following tasks as required by the individual delivery order. Refer to paragraph 3.6.1 of this Statement of Work for additional guidance with respect to the identification of material solutions and reliance on LT2 Common Components.
3.2.2.1. Communication Network System.
You shall design, install, or upgrade a communication network system (fiber optic backbone, towers, antennas, etc.) that provides the ability to attach all required instrumentation equipment (to include, but not limited to: video, audio, instrumentation control, and HLA data) into a seamless controllable network. The network shall fully support all devices attached to it, without degrading the data throughput or the performance of any individual device. The network shall allow for legacy equipment, multiple protocols, overhead, flexibility of growth, and open-system architecture.
3.2.2.2. Audio/Video/Digital Data.
3.2.2.2.1. Video (Interior and Exterior).
You shall design and install video systems to provide the capability to monitor player activities under the following conditions: day or night operations, inside or outside, clear or obscured conditions, and in sub-zero or desert environments.
3.2.2.2.2. Audio (Interior and Exterior).
You shall design and install audio systems to provide one-way or two-way communication for building interiors, within a limited range on the exterior of the buildings, and within a range complex or target emplacement. These systems have the capability of providing audio to selected areas within the range facility, complex or target emplacement. Quantities and types of audio equipment can be investigated and designed to support the environment and the type of training required.
3.2.2.2.3. Recording System.
You shall design and install video/audio capturing, recording and storage capability to allow for the real-time multi-channel, simultaneous storage and retrieval of data collected. Redundant storage system should be used; this can include redundant arrays of independent disks (RAID) or other appropriate means. Systems should include both automated and manual modes of operation. Access to data should be available to all portions of the integrated system, in near real-time. An offline archiving storage capability can be provided for long-term storage of audio/video data.
3.2.2.2.4. Editing System.
You shall design and install equipment, software, and accessories to support the editing, copying, and/or duplication of analog and digital video/audio sources. Equipment profile will be based on mission needs.
3.2.2.2.5. After Action Review.
You shall design, develop, and install an integrated AAR system to prepare, present, record, and archive all facets of an After Action Review session. The AAR system shall provide a seamlessly integrated multimedia presentation of video, audio, computer graphics, and any other appropriate AAR materials. This system will have the capability to record the AAR session, and generate a polished and finished Take-Home-Package (THP) in any common multimedia format. The THP will include all AAR products. AAR archiving is an option available to this system. Some features include AAR generation, non-linear video editing/post-production, audio editing, map and chart plotting, slide creation, presentation, 3-D visualization/models, AAR Theater recording of live video and audio, control of theater lighting, and preparation of the take home package (THP).
3.2.2.2.6. Central Control System/Software.
When applicable, you shall design, develop, modify and integrate an exercise command and control system, to include instrumentation control per the applicable FASIT or other ICD, data collection and analysis capability, battlefield interfaces, scenario planning and linkage to After Action Review capability. It is noted that the Government plans on utilization of Government developed and owned central control system/software, vice development of a new system, however, there may be cases where the this paragraph is applicable.
3.2.2.3. Range Subject Matter Expertise.
You shall assist the Government with inspections, construction change requests or requests for information, meetings, and inter-agency coordination in the subject areas of target interface/data communications and live-training and training requirements throughout the project's construction and target installation phases. Work under this effort shall include, but not be limited to: range configuration identification/description, design review support, standard range design implementation guidance, instrumentation and infrastructure design support, target layout and emplacement verification and construction inspections. This support will require travel, meeting attendance, training analysis and functional reviews of range design documentation, safety considerations review and live fire-training assessments. Projects associated with the functional support are based on the Army Master Range Plan (AMRP) and the Contemporary Operating Environment projects requiring immediate support. You shall maintain documentation logs/records and trip reports for all activities completed in support of these tasks detailing actions taken, results, and other pertinent information associated with the tasks.
You shall provide range operations expertise and support to ensure the definition, management, and operations of a facility to the required training standards and site Standard Operating Procedures. These tasks shall include such endeavors as data entry into the Range Data Editor (RDE), Scenario Development Tool (SDT) operation, and range scheduling and asset entries into Range Facility Management Support System (RFMSS).
3.2.2.4. Visual Recognition Skills.
You shall design, develop, and integrate a visual recognition training skill system to support, monitor, test and evaluate visual recognition skills and capabilities, to include electronic Identify Friend-Foe (IFF), into the target systems and components as necessary.
3.2.2.5. Experimentation Support.
You shall provide the required mission operation support labor, engineering services, interface controls and modifications, hardware/software systems, data collection units, system configuration changes, and any required additional training to support identified experimentation requests.
3.2.2.6. Scenario Generation.
You shall conduct Scenario Generation efforts to support Mission/Exercise Planning & Rehearsal.
3.2.3. Technical/Conceptual Studies and Support.
3.2.3.1. Technical Studies/Analyses.
Studies shall be performed to determine new training requirements based on the impact of changes in the design/changes of military equipment, doctrine, and tactics, impact of new technologies, and linkages of Live, Virtual, and Constructive Simulations. These studies may include, but not be limited to, RF analyses, communication network modeling, and HLA interfaces.
3.2.3.2. Feasibility and Cost Benefit Analyses.
Studies shall be performed to determine the technical feasibility of proposed solution to fulfill training requirements; to perform trade-off analyses and determinations; and to perform cost benefit analyses (efficiency and effectiveness). These studies will include, but not limited to, the examination of dual use capabilities, both in the tactical and training environments.
3.2.3.3. Range Redesign/Modification Analysis.
You shall conduct analyses to determine all required modifications and additions to existing/additional target emplacements, range complexes/lanes and buildings to enhance training capabilities. Suitability/Potential of target emplacements, range complexes/lanes and buildings for Live Fire or Force-on-Force use also can be determined. Perform analysis to determine all required modifications and additions to a range site in order to enhance current training capabilities. These analyses should include provisions for the examination of process and improvements (less expensive solutions and increased building durability). This design analysis can serve to identify deficiencies that might exist in the current site to support planned training and any future enhancements/improvements.
3.2.3.4. Rapid Prototyping/Research and Development.
Prototyping facilities may be constructed and/or relocated depending on program requirements. New products and technologies can be developed, integrated, and demonstrated under this function. This function can include such efforts as replication of non-lethal weapons in a Force-on-Force environment, or the utilization and replication of breaching tools in the real training environment.
3.2.3.5. Advanced Concept Demonstration.
You shall provide the required mission operation support labor, engineering services, interface controls and modifications, hardware/software systems, data collection units, system configuration changes, and any required additional training to support identified experimentation requests planned for a developed range environment. It is expected that the experimentation goals and data requirements will be provided, and this effort will entail ensuring that given the instrumentation on site, that the system/people will be capable of conducting a successful testing event.
3.3. Advanced Target Silhouettes.
This area is intended for new target silhouette development, and is not intended as a mechanism to purchasing existing/NSN target silhouettes.
3.3.1. Representation Devices.
You shall design, fabricate integrate, and validate advanced silhouettes to provide realistic portrayals of friendly, neutral, and combatant entities for the evaluation of Live Fire, Force-on-Target, and non-lethal training events. The representation devices will incorporate 2D or 3D profile targets representing visual, infrared, and thermal signature of friendly, neutral, and combatant entities to support Live Fire, Force-on-Target, and non-lethal training events. The representation devices shall be capable of stimulating radar signatures/emission (millimeter wave), and other multi-spectrum effects commensurate with those of the represented entity. The particular requirements shall be defined within individual Deliver Orders placed under contract.
3.3.2. Rapid Prototyping/Research and Development.
Prototyping efforts may be required depending on program, range, or doctrine requirements. New products and technologies shall be developed, integrated, and demonstrated under this function. This function can include, but not limited too, such efforts as replication of accurate thermal signatures, Recognition of Combat Vehicles, Combat Identification, improved/alternate manufacturing techniques, and technology integration into silhouette forms.
3.4. Non-Permanent Live Fire Training Facilities.
3.4.1. Live Fire Facilities.
You shall design and fabricate temporary/non-permanent, deployable, and reconfigurable training facilities designed to support training of pistol, 7.62-mm, and 5.56-mm and below exercises. These facilities include unique training venues to enhance/focus the training received. The design/fabrication may be provided with equipment that interfaces with existing data collection systems. All installed items and modifications will be as unobtrusive as design permits. Additionally, these faculties may include breachable doors and openings.
3.4.2. Non-permanent Training Mock-ups.
You shall design and fabricate additional temporary/non-permanent training facilities designed to supplement the existing capabilities. These facilities include unique training venues to enhance/focus the training received. These facilities may include such items as train cars, airplanes, ships, or huts. The design/fabrication shall be provided with equipment that interfaces with existing data collection systems. All installed items and modifications will be as unobtrusive as design permits.
3.4.3. Weather Protection.
You shall design the temporary/non-permanent, deployable, and reconfigurable training facilities such that the as fielded systems are weather resistant, and have adequate protection from mildew, mold, and rot. You shall ensure that any water intrusion due to open doors and windows has a drainage path. You shall ensure that all access points (windows, doors, etc) into the facilities are adequately protected from water and vermin intrusion.
3.4.4. Safety.
You shall ensure the design and implementation of any temporary/non-permanent, deployable, and reconfigurable training facilities complies with all safety requirements (paragraph 3.6.4) and regulations (ventilation, sharp corners, floor coverage, etc).
3.5. Program Management.
You shall provide overall program management and administrative support to ensure the requirements of the contract are accomplished. You shall monitor and track key cost, schedule performance, and supportability metrics on a monthly basis, and notify the government of any issues and concerns that arise. Metrics are to be tracked for the program as a whole (per contract) as well as per site when appropriate. You shall track and maintain resources to ensure overall programmatic performance.
3.5.1 Integrated Product Team (IPT) TC "3.2.2. Integrated Product Teams (IPTs)" \f C \l "1" .
You shall participate as an Integrated Product Team member for the Target System and Components and Live Training Transformation (LT2) efforts. You shall participate in joint IPT meetings that will incorporate both FASIT and LT2 IPTs.
3.5.1.1. Engineering, Management and Integration Tasks.
You shall provide the requisite engineering and management support to complete the required tasks of the individual delivery orders associated with the product line engineering and management. These tasks shall encompass the ancillary efforts associated with the development, dissemination, engineering, management, and maintenance of the product line architecture, components, and documentation. These tasks shall also include the works efforts associated with the engineering, management, and tracking of fielded target systems and components.
3.5.1.2. Associate Contractor Agreements (ACA).
You shall initiate and implement ACAs as needed to instantiate/fulfill contract requirements, especially between the devices and integration activities.
3.5.2. Program Reviews TC "3.2.3. Program Reviews" \f C \l "1" .
You shall attend and conduct the program reviews. The reviews shall provide a forum for IPT members to clarify integration, installation, and management issues. You shall document action items, coordinate resolutions, and track action items until closure.
3.5.2.1. Technical Design Review (TDR) TC "3.2.3.1 Preliminary Design Review (PDR)" \f C \l "1" .
You shall conduct, as appropriate, a Technical Design Review (TDR) to demonstrate the technology of the target system and components. A TDR shall be conducted for each site/range to be fielded, with meetings synergized for maximum efficiency. The TDR shall be a formal technical review of the basic design approach, the allocated baseline, and changes made to the allocated baseline. The TDR shall cover the progress and technical adequacy of the selected design approach. The TDR shall allow the Government to evaluate the technical risk associated with the selected design approach. The TDR shall include a subsystem block and functional diagram, design standards and logistical considerations (including training and manuals), and interference analysis. You shall as required conduct a limited verification demonstration to verify the system’s ability to fulfill operational requirements. The demonstration shall allow the government to verify the operational status of the system. The demonstration shall allow early system feedback and highlight areas of performance concerns. The TDR and demonstration shall be conducted prior to system installation and integration. Live fire and range distances do not have to be fully replicated for this demonstration. The TDR shall be satisfied upon successful demonstration of the range system technologies.
3.5.2.2. Test Readiness Review (TRR) TC "3.2.3.2 Test Readiness Review (TRR)" \f C \l "1" .
Prior to the start of system acceptance testing at each range/site, you shall present evidence that documentation is complete, test facilities are ready, prior test(s) were successful or open issues have been addressed. There shall be reasonable confidence that the target system and components to be tested can satisfactorily pass the test and enter the next test phase. This review shall determine what actions are required to ensure resources, training, and test hardware will be in place to support the successful conduct of the test, and to ensure that test and evaluation planning, documentation, design maturity and configuration, and data systems has been adequately addressed.
3.5.2.3. Technical Interchange Meetings (TIMs) TC "3.2.3.3 Technical Interchange Meetings (TIMs)" \f C \l "1" .
You shall support TIMs. A TIM shall address specific topics or issues, address status of development or test activities between management reviews, address the functions of an established working group, or coordinate and provide guidance for engineering data or technical publications.
3.5.3. Program Schedule TC "3.2.4. Program Schedule" \f C \l "1" .
You shall develop and maintain a schedule that shows planned efforts to achieve each significant accomplishment and events relating to the program.
3.5.4. Visitor Support TC "3.2.5 Visitor Support" \f C \l "1" .
You shall host very important person visits and arrange for and provide demonstrations of system performance, program progress, and other system characteristics when notified by the Procuring Contracting Officer (PCO).
3.5.5. Exhibition Support TC "3.2.6 Exhibition Support" \f C \l "1" .
You shall support and attend various exhibitions and conferences as appropriate (AUSA, Capital Hill, I/ITSEC). You shall provide program management and technical support to these conferences. You shall provide, as required, technical solutions and representations that demonstrate the performance and capabilities of the target system and components being fielded.
3.5.6. Contract Invoicing and Payment TC "3.2.5 Contract Invoicing and Payment" \f C \l "1" .
You shall document and track the status of all appropriated funds associated with the contract to include payments, cancellations and invoices against each contract line item and sub-line item.
3.6. System Engineering.
You shall provide an overall system engineering approach and activities necessary to maintain the allocated baseline and to deploy a complete and functional system. System engineering includes all planning, organizing, and control to ensure that the operational needs and requirements are delineated as functional requirements. You shall include into the Systems Engineering process considerations for supportability, maintenance concepts, obsolescence, and total ownership cost management (reduction). The system engineering approach shall be one of an incremental build. Each build shall add functionality to the previous build, so that the final build shall be one that is tested and verified at acceptance testing. Systems integration includes the integration of technical components, organizational components, and verification (acceptance testing). The area of system integration may make use of technical laboratories, prototype systems, and pilot systems. The development of these systems shall include all necessary safety, reliability/maintainability engineering, Manpower and Personnel Integration (MANPRINT), pollution prevention, and human factor considerations. You shall employ a quality engineering program to measure and track key processes and establish metrics and process controls.
3.6.1. Live Training Transformation (LT2) TC "3.3.2 Live Training Transformation (LT2)" \f C \l "1" .
The LT2 Product Line Management Concept of Operations is intended to ensure an integrated and compatible line of Live Training products that maximize use of common components. You shall establish an LT2 Portal account. You shall assess and review the common components and products available for use/reuse. You shall assess your products for applicability for inclusion into the LT2 Common Components. You shall develop, manage, and submit component agreements as required.
3.6.2. System Baseline TC "3.3.1. System Baseline" \f C \l "1" .
You shall define, maintain, and integrate the allocated baseline to meet the requirements of the contract. You shall track the requirements in an automated management tool from requirements development through final acceptance.
3.6.1.1. Requirements Traceability TC "3.3.1.1 Requirements Traceability" \f C \l "1" .
You shall track and account for all requirements (including derived requirements) through the use of a requirement traceability matrix implemented using a commercially available database tool. The requirements traceability database shall provide traceability from the requirement design criteria source data to the system test procedure. You shall maintain and update the requirements traceability database throughout the contract.
3.6.1.2. Hardware and Software Integration TC "3.3.1.2 Hardware and Software Integration" \f C \l "1" .
You shall perform all activities to integrate and assemble the hardware and software to achieve a fully functional system, with all support systems, that performs and operates in accordance with the system specification and contractor generated specifications. You shall verify the complete integration of the hardware and software of each hardware and software subsystem and the overall system through the utilization of formalized test procedures.
3.6.3. Allocated Baseline Maturation TC "3.3.3 Allocated Baseline Maturation" \f C \l "1" .
You shall define and maintain an Allocated Baseline. You shall support an integration and interface verification process for the Allocated Baseline through the systems engineering efforts. You shall focus on the high-risk areas of integration and interface establishment. This process shall ensure baseline maturation to maintain concurrency of the Allocated Baseline to contemporary technology and solutions. This process shall allow the demonstration of the suitability of the solution and the evaluation of performance as part of the Allocated Baseline. You shall demonstrate the modifications to the Allocated Baseline throughout the program. You shall utilize these efforts to obtain early evaluation feedback.
3.6.4. Safety Assessment and Health Hazard Analysis TC "3.3.4. Safety Assessment and Health Hazard Analysis" \f C \l "1" .
You shall analyze the final design and conduct a safety assessment and health hazard analysis. The entire system shall be considered for these analyses. The analysis shall include a description of all identified risks, hazards, and environmental concerns, and the means to reduce these risks to acceptable levels.
3.6.4.1. Health Hazard Assessment TC "3.3.4.1 Health Hazard Assessment" \f C \l "1" .
You shall identify all potential health hazards and recommend engineering controls, equipment and protective procedures to reduce the associated risk to an acceptable level. You shall assess system, facility, and personnel protective equipment design requirements to allow safe operation and maintenance. When feasible engineering designs are not available to reduce hazards to acceptable levels, you shall develop alternative protective measures. You shall address the hazardous materials listed in the Environmental Protection Agency's (EPA) toxics release inventory and the list of Class I and Class II stratospheric ozone depleting substances (ODSs), as listed in 29 Code of Federal Regulations (CFR) 1910.1200.
3.6.5. Information Assurance.
You shall develop and maintain an information assurance process to guide management and design actions, document decisions, specify and track Information Assurance requirements, document certification efforts, identify possible solutions and maintain operational systems security. You shall conduct an assessment of the current system environment and the supporting infrastructure for security vulnerabilities and weaknesses. You shall continually evaluate the security of the system, both physical and logical, identifying exposures and providing protective options for reducing security risk.
You shall implement protective measures to address identified vulnerabilities and weaknesses. You shall integrate protective mechanisms into the system and applications to provide identification and authentication, access control, accountability, availability, confidentiality, privacy, data integrity, and non-repudiation.
3.6.5.1. Automated Information System (AIS) Security TC "3.3.5. Automated Information System (AIS) Security" \f C \l "1" .
You shall consider and integrate a holistic approach to AIS and data security that protects against unauthorized (accidental or intentional) disclosure, modification, or destruction. The AIS security shall consider the following:
a. All hardware and software functions, characteristics, and features.
b. Operational procedures.
c. Accountability procedures.
d. Access controls, remote computers, and terminal facilities.
e. Management constraints.
f. Physical structures and devices.
g. Personnel and communication controls.
The security system shall provide an adequate level of protection for the AIS and data contained in the AIS. An adequate system ensures a security approach commensurate with the risk and magnitude of harm resulting from the loss, misuse, or unauthorized access to or modification of information. The AIS security system and approach shall include controls that are part of the day-to-day operations of the system, and are compliant with AR25-2, DODD 8500.1, and DODI 8500.2.
3.6.5.2. Information Assurance Vulnerability Alert (IAVA) TC "3.3.5.1 Information Assurance Vulnerability Alert (IAVA)" \f C \l "1" .
You shall implement processes and ensure compliance to the IAVA requirements throughout the development, integration, fielding, and verification of the system. You shall ensure and record the implementation of the IAVA requirements. You shall acknowledge IAVAs within five days of an alert and comply with IAVAs within thirty days of alert.
3.6.5.3. Information Assurance Training.
You shall develop and provide operator and maintenance training with respect to the nature, personnel, and criticality of the protective mechanisms in place to secure the AIS assets. This shall include the methods, skills, use and mechanisms to maintain the level of security of the AIS. The training shall be geared toward the audience and their rolls and responsibilities with respect to the system’s operation and maintenance (i.e., system administrator, network administrator, hardware maintain, etc).
3.6.5.4. Department of Defense (DOD) Certification and Accreditation (C&A) Process (DIACAP) Support TC "3.3.5.2 DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Support" \f C \l "1" .
You shall provide assistance in the development of the documentation required to achieve accreditation and certification (DIACAP Package). You shall assist the government during the definition, verification, and validation phases of the certification and accreditation process. The DIACAP Package is a collection of documents generated through DIACAP implementation. The DIACAP Package includes documents defined within the PEO STRI Basic Accreditation Manual; such as the System Identification Profile (SIP), the DIACAP Implementation Plan (DIP), Information Security Plan (ISP), Configuration Management Plan (CMP), Continuity of Operation Plan (COOP) and other artifacts associated with the implementation of IA Controls. The information from the DIACAP Package shall be made available to support the system’s C&A.
3.6.6. Electronic and System Protection TC "3.3.6. Electronic and System Protection" \f C \l "1" .
3.6.6.1. Surge Protection TC "3.3.6.1. Surge Protection" \f C \l "1" .
You shall integrate and install appropriate surge protection devices into the range systems baselines. The surge protection shall be sized and appropriate for all of the equipment utilized.
3.6.6.2. Grounding TC "3.3.6.2. Grounding" \f C \l "1" .
You shall evaluate the existing grounding systems employed at the training facility location.
This is the start of the file's text. The full file is on GovTribe.