A03-QASP_Pharmacological_Studies_on_Anti-Parasitic_Drugs.docx

DOCX document 27 KB Posted

Attached to
Pharmacological studies on anti-parasitic drugs
Solicitation number
W81XWH-19-Q-0177
Issued by

About this file

QASP

View the file

Other files

File Type Posted
EXHIBIT_3.docx DOCX document
A03_CDRL-A001_Pharmacological_Studies_on_Anti-Parasitic_Drugs.pdf PDF
EXHIBIT_2.docx DOCX document
A02-PWS_Pharmacological_Studies_on_Anti-Parasitic_Drugs.docx DOCX document
W81XWH-19-Q-0177.pdf PDF
A03_DiD_Technical_Report_Studies.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

Version – June 2010

For Experimental Therapeutics Research Support Contract Number: < upon award, enter contract number> Contract Description: Task Order Support for Experimental Therapeutics Research Contractor’s name: < upon award, enter contractor name > (hereafter referred to as the contractor).

1. PURPOSE.

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored.

· How monitoring will take place.

· Who will conduct the monitoring.

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

The following FAR clauses may apply depending on contract type:

52.212-4 Contract Terms and conditions – Commercial Items

2. GOVERNMENT ROLES AND RESPONSIBILITIES.

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned KO: Jennifer Jackson Organization or Agency: United States Army Medical Research Acquisition Activity (USAMRAA) Telephone: 301-619-2054 Email: Jennifer.c.jackson.civ@mail.mil

b. Contract Specialist (KS) - The KS acts as an acquisition consultant and serves as liaison between USAMRAA and the requesting program office.

Assigned KS: John Fitzsimmons Telephone: (301) 619-8435 Email: john.l.fitzsimmons8.civ@mail.mil

c. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.

Assigned COR: TBD Telephone:

Email:

3. CONTRACTOR REPRESENTATIVES:

The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract. <Communication should occur with them during QASP development. It will help if they review the draft QASP and accept the final version.>

a. Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>

b. Task Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>

c. Other Contractor Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>

4. PERFORMANCE STANDARDS.

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

The Performance Requirements Summary Matrix, shown in Table 1 below and in the Performance Work Statement, includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).

5. INCENTIVES.

The Government shall use past performance as an incentive. Incentives shall be based on exceeding, meeting, or not meeting performance standards.

6. METHODS OF QA SURVEILLANCE.

Various methods exist to monitor performance. The COR shall use the surveillance methods listed in the Performance Requirements Summary Matrix in the administration of this QASP.

Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the COD KS, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.

Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the KO’s actions.

8. RATINGS.

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

EXCEPTIONAL:Performance significantly exceeds contract requirements to the Government’s benefit.
SATISFACTORY:Performance meets contractual requirements.

UNSATISFACTORY: Performance does not meet contractual requirements.

9. DOCUMENTING PERFORMANCE.

a. ACCEPTABLE PERFORMANCE.

The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.

b. UNACCEPTABLE PERFORMANCE.

When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative. A CDR template is attached to this QASP.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.

10. FREQUENCY OF MEASUREMENT.

a. Frequency of Measurement.

During contract/order performance, the COR shall take periodic measurements, as specified in the Method of Surveillance column of the Performance Standards Summary Matrix, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The COR shall meet with the contractor monthly to assess performance and shall provide a written assessment.

Prepared by:

Signature – Contracting Officer’s Representative

Table 1 – Performance Requirements Summary Matrix

PWS Ref.
Performance Objective
Acceptable Quality Level
Performance Measurement
Method of Surveillance
Incentive
6.5
Reporting deliverables containing all required information are completed and submitted on time
>95% of the time
Percent of time performance objective is met
Receipt and review of reporting deliverables

Frequency: On the due date of each report as outlined in the deliverables table.

Past Performance

6.2, 6.3, 6.4

All animal study tasks are performed in full compliance with all regulatory compliance and in accordance to the animal models
>95% of the time
Percent of time performance objective is met
Monitored via research reports and monthly reports

Frequency: Monthly Past Performance

16.11.3
iWATCH Training - Contractor provides iWATCH training to all personnel.
>90%
Percent of contractor personnel who have completed iWATCH training within 30 DACA
Review of Training report from the contractor.
Past Performance
16.11.2
Installation Access - Contractor follows installation access procedures.
< 1 incident per month
Sum of all incidents in which contractor personnel did not follow installation access procedures
Direct observation by COR and installation security.
Past Performance
16.11.5
OPSEC SOP – Contractor submits OPSEC SOP that meets minimum quality standards.
< 90 calendar days after contract award
Number of calendar days after contract award that the contractor submits the OPSEC SOP to the COR
COR receipt of OPSEC SOP
Past Performance
16.11.7
Information Assurance Training
< 30 calendar days
Number of calendar days after contract award in which the contractor submits training certifications for all personnel
COR receipt of all certifications
Past Performance

PERFORMANCE REPORT

1. CONTRACT NUMBER: <insert number>

2. Prepared by: (Name of COR) <insert name>

3. Date and time of observation:

4. Observation:

<Examples of items to include in a report are:

- Method of surveillance.

- How frequently you conducted surveillance.

- Surveillance results.

- Number of observations.>

Prepared by: <Enter COR’s name>

_____________________________________________
Signature – Contracting Officer’s RepresentativeDate

CONTRACT DISCREPANCY REPORT (CDR)

1. Contract Number: <insert number>

2. TO: (Contractor Task Manager or on-site representative) <insert name>

3. FROM: (Name of COR) <insert name>

4. Date and time observed discrepancy:

5. DISCREPANCY OR PROBLEM:

<Describe in detail. Identify any attachments.>

5. Corrective action plan:

A written corrective action plan < is / is not > required.

< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this

CDR. >

Prepared by: <Enter COR’s name>

_____________________________________________
Signature – Contracting Officer’s RepresentativeDate

Received by:

_____________________________________________
Signature - Contractor Task Manager or on-site representativeDate

< The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.>

File details come from the government source that posted it.