A07-W81XWH-18-R-0058_Attch-6-ISO_13485_Checklist_for_TCR_7Dec2017_LA.RTF
ISO Standard Dec 7, 2017 RTF text file 1 MB Posted
- Attached to
- Temporary Corneal Repair
- Solicitation number
- W81XWH18R0058
- Issued by
-
Department of the Army Medical Command
About this file
W81XWH-18-R-0058_Attch-6-ISO 13485 Checklist for TCR 7Dec2017_LA
Text of this file
ISO 13485/21CFR820 Compliance Checklist Page 10 of 10
ISO 13485 Compliance Checklist FDA-ISO QMS Audit Checklist
Item Subsystem / Assessment Detail FDA / ISO reference Compliant?
If no, provide explanation The Quality Manual defines scope of QMS, procedures (or reference to) within QMS, and description of the interaction of processes within QMS
ISO 13485:2012: 4.1, 4.2.2
There are criteria and methods in place to monitor and control processes for effectiveness ISO 13485:2012: 4.1(c), 4.2.1(d), 8.4
Management Reviews are established and conducted at least annually ISO 13485:2012: 5.1(d), 5.6;
21 CFR 820.5, 820.20(c)
Management reviews examine suitability and effectiveness of quality systems, improvements needed because of customer requirements, and resource needs ISO 13485:2012: 4.1(f), 5.6.1, 5.6.3, 6.1, 8.4;
21 CFR 820.20(c)
Management reviews and addresses audit results, customer feedback, process performance, CAPAs, previous management reviews, changes to QMS, recommendations for improvement, and new or revised regulatory requirements.
ISO 13485:2012: 5.6.2
There is an established Quality Manual and Quality System Procedures and Instructions that are appropriate ISO 13485:2012: 4.1(a), 4.2.1(b), (c)
21 CFR 820.5, 820.20(c), (e), 820.22 (d)
There is an established Quality Plan ISO 13485:2012: 4.2.1(d), 5.4 21 CFR 820.20(d)
Quality Planning addresses QMS needs and Quality Objectives
ISO 13485:2012: 5.4.2;
21 CFR 820.20(a), (d)
There is a Quality Policy and Quality Objectives ISO 13485:2012: 4.2.1(a), 5.1(b), (c), 5.3, 5.4.1;
21 CFR 820.20(a), (d)
There are established Quality Audit procedures and audits are conducted
ISO 13485:2012: 4.2, 8.2.2;
21 CFR 820.20(c), 820.22
The quality audits examine compliance and effectiveness ISO 13485:2012: 4.1(f), 4.2.1(d), 8.2.2;
21 CFR 820.22
The auditors are trained
ISO 13485:2012 8.2.2
The audits are conducted by objective parties
ISO 13485:2012: 8.2.2
The quality audits are linked to CAPA
ISO 13485:2012: 8.2.2;
21 CFR 820.22, 820.100
There is an organizational structure of the company and resources are available to support QMS processes ISO 13485:2012: 4.1(d), 5.1(e), 5.5.1, 5.5.2, 6.1, 6.2;
21 CFR 820.20(b), 820.25
There is a defined a management representative with executive responsibility for implementing and reporting quality management system
ISO 13485:2012: 5.1, 5.5.1, 5.5.2, 6.1, 6.2;
21 CFR 820.20(b)(3), 820.25
Appropriate responsibilities, authority, and resources are in place for quality system activities ISO 13485:2012: 5.1(e), 5.5.1, 5.5.2, 6.1, 6.2 21 CFR 820.5(b)(1)-(2), 820.20(b), 820.25
There are established procedures for identifying training needs;
ensure personnel are trained to perform assigned responsibilities
ISO 13485:2012: 6.2
21 CFR 820.25(b)
Executive management ensures adequate and effective quality system is implemented. Management is committed to and communicates importance of meeting customer requirements, regulatory requirements, and QMS.
ISO 13485:2012: 5.1(a), 5.2, 5.5.3
Design & Development / Design Controls (main subsystem) Compliant?
If no, provide explanation Products are subject to design controls
ISO 13485:2012: 7.1, 7.3
21 CFR 820.30(a)
There are established and applied design control and risk management procedures
ISO 13485:2012: 7.3
21 CFR 820.30(a) -(j)
Design and development stages are identified; there are documented review, verification, validation, and design transfer activities at each stage; The responsibilities for design and development are defined
ISO 13485:2012: 7.3.1
21 CFR 820.30
There are procedures for updating the design & development plan and it is reviewed and approved
21 CFR 820.30(b)
There are established design input requirements, that are reviewed, and approved; customer requirements are captured; inputs include functional, performance, safety, and statutory and regulatory requirements
ISO 13485:2012: 7.2.1, 7.3.2
21 CFR 820.30(c)
Incomplete, ambiguous, and/or conflicting design requirements are addressed
ISO 13485:2012: 7.3.2
21 CFR 820.30(c)
Design & development outputs are established, verifiable, reviewed, and approved ISO 13485:2012: 7.3.3(a), (c) 21 CFR 820.30(d)
Design & development outputs are appropriate for purchasing, production, and servicing ISO 13485:2012: 7.3.3(b)
Essential design & development outputs are identified ISO 13485:2012: 7.3.3(d);
Acceptance criteria is referenced by design & development outputs and was defined prior to design verification and design validation activities ISO 13485:2012: 7.3.3(c), 7.3.5 21 CFR 820.30(d) & (f)
Design verification confirm design outputs meet design input requirements
ISO 13485:2012: 7.3.5
21 CFR 820.30(f)
Design validation results prove device meets predetermined user needs and intended uses
ISO 13485:2012: 7.3.6
21 CFR 820.30(g)
Design validation does not leave unresolved discrepancies
If required by national or regional regulations, there should be clinical evaluations and/or evaluation of device performance
If device contains software, the software must be validated
ISO 13485:2012: 7.3.1, 7.3.6
21 CFR 820.30(g), 820.75
Initial production units (or equivalents) are used for design validation
Risk management activities were performed
ISO 13485:2012: 7.1
ISO 14971:2012
Design changes are controlled and validated (or where appropriate, verified)
ISO 13485:2012: 7.3.1, 7.3.5, 7.3.7
21 CFR 820.30(i), 820.70(b), 820.75(c)
Design changes are reviewed for effect on components and product previously made
ISO 13485:2012: 7.3.1, 7.3.5, 7.3.7
21 CFR 820.30(i), 820.70(b)
Design reviews are conducted at appropriate stages of design & development
ISO 13485:2012: 7.2.2, 7.3.1, 7.3.4
21 CFR 820.30(e)
Design review attendees are appropriate for stage and included independent reviewer
ISO 13485:2012: 7.3.1, 7.3.4
21 CFR 820.30(e)
The design must be correctly transferred to production
21 CFR 820.30(h)
The Device History File must contain design control documentation 21 CFR 820.30(b) - (j)
Corrective & Preventive Actions (CAPA) (main subsystem)
If no, provide explanation CAPA procedures comply with regulatory requirements
ISO 13485:2012: 8.5
21 CFR 820.100(a)
Non-conforming product and CAPA procedures determine the need for investigation and notification
ISO 13485:2012: 8.3, 8.5;
21 CFR 820.90(a), 820.100(a)(2)
Non-conforming product and CAPA procedures define responsibilities for review and disposition
ISO 13485:2012: 8.3, 8.5;
21 CFR 820.90(b)(1)
Procedures for rework, retesting, and re- evaluation of nonconforming product exist and are followed
21 CFR 820.90(b)(2)
Appropriate records of quality problems have been created and used
21 CFR 820.100(a)(1)
Trend analysis data indicates quality problems; determine if data used for CAPA decisions.
ISO 13485:2012: 8.1, 8.2.3, 8.4, 8.5
21 CFR 820.100(a)(1), 820.250
CAPA data is complete, accurate, and timely; compare results across multiple data sources to identify quality problems
ISO 13485:2012: 8.4, 8.5
21 CFR 820.100(a)(1)
Appropriate statistical techniques are implemented
ISO 13485:2012: 8.1, 8.2.3, 8.4
21 CFR 820.100(a)(1), 820.250
Device failure investigations determine root cause
21 CFR 820.100(a)(2)
Failure investigations are commensurate with risks
21 CFR 820.100(a)(2), 820.90(b)
Controls exist to prevent non-conforming product from being released
ISO 13485:2012: 8.3
21 CFR 820.90(b)
Appropriate actions are taken for quality problems
ISO 13485:2012: 8.2.3, 8.5.2, 8.5.3
21 CFR 820.100(a)(3), 820.100(a)(5), 820.100(a)(4), 820.100(b)
CAPA actions are effective, verified, validated, documented, and implemented appropriately
ISO 13485:2012: 8.5
21 CFR 820.100(a)(4), 820.100(a)(5), 820.100(b)
CAPAs and nonconformities are disseminated to personnel responsible for ensuring quality and prevention of problems
ISO 13485:2012: 8.3, 8.5
21 CFR 820.100(a)(6)
Quality issues and CAPAs are disseminated for Management Review
ISO 13485:2012: 5.6.3, 8.3, 8.5
21 CFR 820.100(a)(6), 820.100(a)(7)
Firm has procedures for handling complaints and investigation of advisory notices / recalls; ensure provisions exist to feed in CAPA system
ISO 13485:2012: 7.2.3, 8.2.1
21 CFR 820.100, 820.198
Medical Device Reporting (MDR)
If not, provide explanation MDR procedures comply with regulatory requirements
ISO 13485:2012: 8.5.1
21 CFR 803.17
Firm maintains MDR event files that comply with regulatory requirements
21 CFR 803.18
Appropriate MDR information is identified, reviewed, reported, documented, and filed
21 CFR 803, 820.198(d)
Firm is effective in identifying MDR reportable events
21 CFR 803
Firm has established procedures for receiving, reviewing, and evaluating complaints
ISO 13485:2012: 7.2.3, 8.2.1, 8.5.1
21 CFR 820.198(a) - (c) verify firm maintains complaint files and that they are reasonably accessible
21 CFR 820.198(a), (f), (g)
Complaints are evaluated to determine if an event should be a MDR
21 CFR 803, 820.198(a)(3)
Complaint investigations include the device name, date of complaint, device identification number, contact information of complainant, details of complaint, date and results of investigation, any corrective actions, and replies to complainant
21 CFR 820.198(e)
Reports of Corrections & Removals (C&R)
If no, provide explanation C&R procedures comply with regulatory requirements
21 CFR 806
There are records of corrections and/or removals of product
Reporting requirements are implemented
Are there C&R actions not identified or initiated by firm?
There are files of non-reportable corrections and removals
21 CFR 806.20
Production & Process Controls (main subsystem) (P&PC)
If no, provide explanation Product realization processes are planned; risk management occurs throughout product realization
ISO 13485:2012: 7.1
ISO 14971:2000
21 CFR 820.70
Planning of product realization is consistent with requirements of other processes of QMS
ISO 13485:2012: 7.1
21 CFR 820.30, 820.50, 820.80, 820.181
Requirements have been defined for suppliers, contractors, and consultants; ensure suppliers, contractors, and consultants are selected on ability to meet requirements
ISO 13485:2012: 7.1, 7.4.2
21 CFR 820.50(a)
Firm maintains records of acceptable suppliers, contractors, and consultants
ISO 13485:2012: 7.4.1
21 CFR 820.50(a)(3)
There is data supporting supplier requirements is maintained; verify that suppliers, contractors, and consultants agree to notify firm of changes in products and/or services
ISO 13485:2012: 7.4
21 CFR 820.40, 820.50(a)(3),(b)
There are procedures for identifying product during all stages of receipt, production, distribution, and installation are in place
ISO 13485:2012: 7.5.3;
21 CFR 820.60
Firm maintains procedures and records for traceability of each unit, lot, or batch of finished devices and components NOTE: may not be required for all devices
ISO 13485:2012: 7.5.3.2;
21 CFR 820.65
Be able to provide a process for an auditor to review
All processes are controlled and monitored
ISO 13485:2012: 7.5, 7.6, 8.2.3, 8.2.4, 8.4
21 CFR 820.50, 820.70(a), 802.70(e), 820.70(f)-(h), 820.72, 820.75(b), 820.80
The equipment has been adjusted, validated and/or calibrated, and maintained; DQIQOQPQ documentation
ISO 13485:2012: 7.5
21 CFR 820.70(g)(3), 820.72(a), 820.70(g)(1) control and oversight activities must be identified; There must be procedures for control of inspection, measuring , test equipment, and calibration
ISO 13485:2012: 7.6, 8.4
21 CFR 820.50(a)(2), 820.72
There are established procedures for production and process changes; ensure changes are verified or validated, as needed
ISO 13485:2012: 7.3.7, 7.5.2
21 CFR 820.70(b), 820.75(c)
Be able to provide a device history record (DHR) for an auditor to review; DHR must identify rejects and/or non-conformances
21 CFR 820.70
Defects, rejects, non-conformances, and removal of materials must be handled properly
21 CFR 820.50, 820.70(h), 820.90, 820.100
Processes that cannot be fully verified by an auditor must be fully validated
ISO 13485:2012: 7.5.2
21 CFR 820.75(a)
Automated or software driven processes are validated for intended uses
ISO 13485:2012: 7.5.2.1
21 CFR 820.70(i)
Validations are documented and conducted by qualified personnel 21 CFR 820.75(b)(1)
Personnel records must document personnel are trained per manufacturing processes and aware of potential defects
ISO 13485:2012: 6.2.2
21 CFR 820.20(b)(2), 820.25, 820.70, 820.70(d), 820.75(b)(1) ensure that monitoring and control methods, data, date performed, individuals performing the process, and the major equipment used is documented
ISO 13485:2012: 7.1, 8.4
21 CFR 820.75(b)(2)
Determine linkages to other processes and document
ISO 13485:2012: 4.1, 4.2
21 CFR 820.20, 820.25, 820.30, 820.40, 820.72, 820.90, 820.100, 820.180
The infrastructure and work environment are appropriate and controlled
ISO 13485:2012: 6.3, 6.4
21 CFR 820.70(c), (f), (g)
There are documented maintenance schedules, routine inspections, and adjustments to equipment
ISO 13485:2012: 7.6
21 CFR 820.70(g)
There are procedures in place for contamination control and cleanliness
ISO 13485:2012: 7.5.1.2.1
21 CFR 820.70(e)
There are procedures for verification of purchased products
ISO 13485:2012: 7.4.3, 8.4
21 CFR 820.50(a)(2), 820.80(b)
There are procedures that define receiving, in-process, and final acceptance activities.
ISO 13485:2012: 7.5.5, 8.4
21 CFR 820.80(a) - (d)
Receiving, in-process, and final acceptance activity records must be available for review
ISO 13485:2012: 8.4;
21 CFR 820.80(e)
There are procedures for acceptance status of product
ISO 13485:2012: 7.1, 8.2.4
21 CFR 820.86
Procedures define labeling activities, including integrity, inspection, storage, operations, and control numbers
ISO 13485:2012: 7.5.5;
21 CFR 820.120
Product packaging and shipping containers adequately protect device during processing, storage, handling, shipping, and distribution
ISO 13485:2012: 7.5.5;
21 CFR 820.130
There are procedures to prevent mix-ups, damage, deterioration, contamination, or other adverse effects to product during handling
ISO 13485:2012: 7.5.5
21 CFR 820.140, 820.150
There are procedures for product distribution; confirm distribution records include name and address of consignee, identification and quantity shipped, date of shipment, and identification numbers
21 CFR 820.160
There are installation and inspection procedures (if applicable);installation records are maintained
ISO 13485:2012: 7.5.1.2.2
21 CFR 820.170
There is a servicing procedure (if applicable); verify servicing records are maintained
ISO 13485:2012: 7.5.1.2.3
21 CFR 820.200
Firm identifies, verifies, protects, and safeguards customer property under its care
ISO 13485:2012: 7.5.4
Sterilization Process Controls
If no, provide explanation There are sterilization process procedures and the sterilization process is validated
ISO 13485:2012: 7.5.2.2
21 CFR 820.75(a), (c)
There are sterilization control and monitoring activities; processes, equipment, and calibration are current
ISO 13485:2012: 7.5.1.3
21 CFR 820.50, 820.70(a), (c),(e), (f), (g), (h), 820.72, 820.75(b), 820.80
Documented sterilization failures (DHR) must be integrated with CAPA system 21 CFR 820.75(b)
Sterilization failures must be handled properly 21 CFR 820.70(g)(3), 820.72(a), 820.70(g)(1)
Personnel records must document that personnel are qualified and trained with implemented sterilization activities (on the job training, training assessment test, annual assessment of skills, etc.)
21 CFR 820.25, 820.70(d), 820.75(b)
Automated or software driven sterilization processes are controlled and validated 21 CFR 820.70(i)
Purchasing Controls (main subsystem for virtual manufacturers)
If no, provide explanation There supplier evaluation procedures
21 CFR 820.50
Suppliers are evaluated for ability to meet specified requirements
ISO 13485:2012: 7.4.1;
21 CFR 820.50(a)(1)
There are adequate specifications of materials and/or services provided by supplier and confirmation documentation
ISO 13485:2012: 7.4.2
21 CFR 820.50(b)
Purchasing information identifies requirements for approval of product, procedures, processes, and equipment, requirements for personnel qualification, and QMS requirements
ISO 13485:2012: 7.4.2
Supplier evaluation records are maintained and current
21 CFR 820.50(a)(3)
There are procedures for verification and acceptance of purchased materials and/or services
ISO 13485:2012: 7.4.3
21 CFR 820.50(a)(2), 820.80(a), 820.80(b)
Documentation & Records
If no, provide explanation There are procedures for identification, storage, protection, retrieval, retention time, control, approval, distribution, disposition, and changes of documents and records
ISO 13485:2012: 4.2.3, 4.2.4
21 CFR 820.40, 820.180
Documents and changes are approved prior to use
ISO 13485:2012: 4.2.3
21 CFR 820.40
Documents and records are legible and identifiable; There is a Good Documentation Practices SOP.
ISO 13485:2012: 4.2.3(e), 4.2.4
Documents of external origin are identified with controlled distribution ISO 13485:2012: 4.2.3(f)
Firm maintains a quality system record (QSR) which includes or refers to location of procedures ISO 13485:2012: 4.2.3(f)
21 CFR 820.20, 820.40, 820.186
Documents and records are retained for required length of time (this includes retention of obsolete controlled documents and records)
ISO 13485:2012: 4.2.1, 4.2.3, 4.2.4
21 CFR 820.100(b), 820.180(b), 820.181, 820.184, 820.186, 820.198(a), 820.200(d)
Change control records are reviewed and approved by the same reviewers that performed original review and approval
ISO 13485:2012: 4.2.3, 7.3.7
21 CFR 820.40(b)
Change records include a description of change, justification of change, identification of affected documents, approval signatures, approval date, and effective date
ISO 13485:2012: 7.3.7
21 CFR 820.40(b)
Documents are available at point of use and obsolete document are not in use ISO 13485:2012: 4.2.3(d)(g) 21 CFR 820.40(a)
Firm maintains DMRs for each type of device
ISO 13485:2012: 4.2.1
21 CFR 820.181
DMRs contain or make reference to device specifications, production process specifications, quality assurance procedures and specifications (including acceptance criteria), packaging and labeling specifications (including acceptance criteria), and installation, maintenance, and servicing procedures
ISO 13485:2012: 4.2.1
21 CFR 820.181(a)(e)
DHRs are maintained and devices are manufactured according to DMR; Realization processes and product must meet requirements
ISO 13485:2012: 7.1, 8.2.4
21 CFR 820.184
DHRs contain or make reference to dates of manufacture, quantity manufactured, quantity released for distribution, acceptance records demonstrating the device was manufactured per DMR, primary identification label and labeling used for each unit, and device identification and/or control numbers used.
ISO 13485:2012: 8.2.4
21 CFR 820.184(a)-(f)
Firm maintains records for education, training, skills, and experience of resources ISO 13485:2012: 6.2.2(e)
Firm maintains purchasing and supplier records
ISO 13485:2012 7.4.3
Sterilization process parameters and records are maintained for each batch; sterilization validation records are maintained
ISO 13485:2012: 7.5.1.3, 7.5.2.2
Technical Files (main subsystem)
If no, provide explanation There are technical file procedures ISO 13485:2012: 4.2.1d
21 CFR 820.180, 820.181, 820.184, 820.186
Documents must ensure planning, operation, and control of technical file processes ISO 13485:2012: 4.2.1d
21 CFR 820.180, 820.181, 820.184, 820.186
Documents must be able to be reviewed by an auditor
Documentation addresses a general description of product, intended use(s), contraindications, and any variants, accessories, or other devices used in combination with product
ISO 13485:2012: 7.1, 7.2, 7.3.3
21 CFR 820.30(d), 820.30(g), 820.30(f), 820.181, 820.50, 820.75
Design specifications, standards applied, and results of risk analysis are present in the technical file
There are procedures in place to ensure that all principal requirements have been fulfilled review techniques used to verify design and validate product(s) clinical data
Documentation must define sterilization method and validation
Documentation must include instruction manual(s) and labeling
Major subcontractors have been documented
ISO 13485:2012: 7.1, 7.2, 7.3.3;
Who attaches ISO 13485
| Agency | Files |
|---|---|
| Department of the Army Medical Command | 1 |
Other files
| File | Type | Posted |
|---|---|---|
| A07-W81XWH-18-R-0058-04-Solicitation-Amendment.docx | DOCX document | |
| A07-W81XWH-18-R-0058-03-Solicitation-Amendment.docx | DOCX document | |
| A07-W81XWH-18-R-0058-02-Solicitation-Amendment.docx | DOCX document | |
| A07-W81XWH-18-R-0058-01-Solicitation-Amendment.docx | DOCX document | |
| A07-W81XWH-18-R-0058_Attch-1-Small_Business_Utilization.docx | DOCX document | |
| A07-W81XWH-18-R-0058-Solicitation-.docx | DOCX document | |
| A07-TCR_Exhibit-C_CDRL-A003_V2.pdf | ||
| A07-W81XWH-18-R-0058_Attch-5-Technology_Readiness_Assessment_Deskbook.pdf | ||
| A07-W81XWH-18-R-0058_Attch-3_Cost-Template.xls | XLS spreadsheet | |
| A07-W81XWH-18-R-0058_Attch-4-Emergency_War_Surgery_Chapter_2.pdf | ||
| A07-W81XWH-18-R-0058_Attch-2_OCI-Certification.docx | DOCX document | |
| A07-TCR_Exhibit-B_CDRL-A002_V2.pdf | ||
| A07-TCR_Exhibit-A_CDRL-A001_V2.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.