Amendment 0001 Comment_Resolution_Matrix CRM Response to KTR Questions 12 Oct 23.xlsx
XLSX spreadsheet 53 KB Posted
- Solicitation number
- W81K0423R0011
- Issued by
-
Department of the Army Medical Command
About this file
This document is a comment resolution matrix for a solicitation seeking healthcare environmental cleaning services at Fort Campbell, Kentucky. The services required include cleaning of patient and non-patient care areas across multiple buildings totaling over 1.5 million square feet. Key personnel, quality control plans, and phase-in transition plans must be addressed in proposal volumes. Pricing shall be provided for monthly, annual, and option year periods for over 30 contract line items in both the SF-1449 form and a price matrix attachment. Proposals are due by noon on a specified date in the fall of 2023 and shall be submitted electronically. The award will be made to the lowest priced technically acceptable offeror.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRM
| # | Document | Question, Comment, or Concern | Resolution | |
| 1 | CBA | Addendum A is missing out of the CBA | Addendum A is attached. Exhibit K(a). | |
| 1 | List of attendees for the site visit | The attendence list will not be provided. | ||
| 1 | Attachment 4 and Attachment 4a | |||
| PWS section 1.4 | In attachment 4 and 4a, the productive hours for Service Contract direct employees are defined as 1,573 hours. Please demonstrate how these productive hours are calculated by showing individual reductions to 2,080 hours (i.e. 88 hours holidays, estimated 80 hours PTO etc.). | Contractor should be using the CBA agreement and Addendum A to determine productive hours. | ||
| 1 | Exhibit K – Collective Bargaining Agreement (CBA | CBA references Addendum A which provides exact amount by labor category and benefits to be paid under CBA. However Addendum A was not provided. Please provide Addendum A as soon as possible as this document is critical for offerors to determine pricing. | Addendum A is attached. Exhibit K(a). | |
| 1 | RFP Section D.1.j starting on page number 121 of 166 | Table 1.k provides details for organization of proposal. Volume I has a page limit of 30 pages yet it requires submission of teaming agreements. Is the teaming agreement document not counted toward the 30 page limit? Please clarify. | 30 Page limitation for Volume I, Administrative includes completed/signed SF 1449, statements of offerors, and contractor teaming arrangement (if applicable). | |
| 1 | SF1449 – Block 8 | Will the Government please advise the time zone for the noon submission deadline? | Central Daylight Time. | |
| 1 | Would the Government please advise the naming convention for all 4 volumes? | Please follow the solicitation 52.212-1. | ||
| 1 | Page 123, l.(2) | Will the Government please clarify the font size for tables? Attachment 6 is set up in Font size 10, do we need to change that to 12 to be compliant? | The text shall be Times New Roman, shall be no less than font size 12, and shall not be condensed. The Attachment may be modified to Times New Roman, font size 12. | |
| 1 | Will the Government please advise if Attachment 9 Subcontractor consent form is exempt from the 6-page limit of Volume 3? | Subcontractor consent form, if applicable, will not count toward the 6-page limit of Volume 3. | ||
| 1 | Page 123, table 1.k **Page limitations | The government refers to (see 1.m below) but paragraph m is not there. Could the Government please advise what is missing? | Reference deleted in solicitation. | |
| 1 | Page 124, 2.a.(3) provisions table | Would the Government please provide the missing provisions that need to be completed – FAR 52.204-17 and FAR 52.223-3? | The clauses are included by reference and may be obtained from https://www.acquisition.gov/. | |
| 1 | As not all Offerors were able to attend the site visit last spring, and so all Offerors remain on a level playing field, we respectfully request a site visit to BACH and the MTFs in the HSA in the immediate future. | A second site visit will not be provided. | ||
| 1 | 1.RFP Page 126, 11a (1) |
and
2. RFP Page 129, c. 1) & 2) References state:
| 1. | Team member or major subcontractor’s ISSA CIMS-GB certification may not be used to satisfy the ISSA CIMS-GB certification for a prospective prime contractor. |
| 2. | Only those subcontractors that meet the definition of a major subcontractor, as defined as performing more than 25% of any resultant contract arising from this solicitation, will be used in the offeror’s past performance assessment. (2) Past performance information may include data on efforts performed by other divisions, corporate management, and critical subcontractors or teaming arrangements |
If an offeror is proposing a 51/49% teaming arrangement with a “critical” subcontractor, it seems reasonable that the subcontractor’s CIMS-GB status should satisfy the certification requirement.
| Respectfully request that a critical subcontractor’s CIMS-GB certification satisfy the CIMS-GB requirement. | A team member or major subcontractor’s ISSA CIMS-GB certification may not be used to satisfy the ISSA CIMS-GB certification for a prospective prime contractor. | ||
| 1 | RFP Page 122, Table 1.k | Contractor Teaming Arrangements can be in excess of 50 pages. |
| Please remove Teaming Arrangements from the page limit. | 30 Page limitation for Volume I, Administrative includes completed/signed SF 1449, statements of offerors, and contractor teaming arrangement (if applicable). | ||
| 1 | RFP Page 127, c1 | References states: “For regularly scheduled services in patient and nonpatient care areas, the healthcare environmental cleaning procedures manual shall illustrate the proposed method of cleaning to include a sampling of three specific task procedures of the offeror’s choosing for Types I, II, IV, and VI only,” as well as: “For non-recurring services, the healthcare environmental cleaning procedures manual shall clearly illustrate a sampling of specific cleaning procedures which will be used to accomplish each task and the projected frequency or standard at which each specific task will be accomplished.” |
| Three tasks for four Service Types, along with the sampling of tasks for non-recurring services, will most likely exceed 100 pages. Please increase the page limit for the Procedures Manual to 150 pages. | The page count will remain 150 pages | ||
| 1 | RFP Page 122, Table 1.k | A supply and equipment list for a hospital the size of BACH can be extensive and will certainly exceed 5 pages. |
| Please increase the supply and equipment list to 15 pages. | Supply and equipment list has been revised from 5 pages to 15 pages. | ||
| 1 | RFP Page 126, 11(a) | Reference requires Contractors to address 1.19-1.19.4 (Quality Control) and 1.22 (Phase-In/Phase-Out) in Section A – General Requirements. |
However, Supplement A-2 and Supplement A-3 require a Quality Control Plan and Phase-In Plan respectively.
| If Contractors are to submit complete Quality Control and Phase-In Plans in the two supplements referenced above, please provide specific details of what additional information the Government also requires for Quality Control and Phase-In in Section A – General Requirements. | Refer to 52.212-1 and 52.212-2. | ||
| 1 | RFP Page 120, e. | Reference states: In accordance with FAR Subpart 4.8, Government Contract Files, the Government will |
retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.
However, Page 121, i states “Electronic copies of each volume shall be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated.”
Please clarify whether proposals should be submitted electronically or in hard copies. Solicitation will be revised to remove "Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals."
Electronic copies of each volume shall be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or thirdparty File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. It is the responsibility of the Offeror to confirm receipt of proposals. All proposals received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR). For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.
1 RFP Page 129, c Page 129, c has confusing instructions. Attachment 6 is noted as the Customer Reference Information Sheet; however, the file labeled Attachment 10 – Specific Relevant Contracts Sheet has a title of Attachment 6 Specific Relevant Contracts Sheet in the heading of the document.
Are Attachment 6 and Attachment 10 the same document? Are Contractors to complete both?
Please clarify. The content of .pdf, Attachment 10 Specific Relevant Contracts Sheet, has been revised from Attachment 6 to Attachment 10.
Attachment 6 - Customer Info Sheet, a Microsoft Word document and Attachment 10 Specific Relevant Contracts Sheet, an Adobe .pdf are not the same document. Contractors must complete both documents, as applicable.
1 RFP Page 129, c4 Reference states: “A narrative shall accompany each Attachment 6 Reference Customer Information Sheet, Attachment 9, Subcontractor Consent Form (if applicable)…”
| Attachment 10 is not mentioned. Are Contractors to submit an Attachment 10 for each contract reference? | Yes. Attachment 10 should be prepared for each contract reference. | ||
| 1 | RFP Page 129, c4 | Reference states: “A narrative shall accompany each Attachment 6 Reference Customer Information Sheet, Attachment 9, Subcontractor Consent Form (if applicable)…” |
| Government has not provided details as to what should be included in the narrative. Attachments 6 and 10 require extension detailed information regarding the contract reference; please provide specific details of what additional information is required in the narrative beyond what is included in Attachments 6 and 10. | Attachment 6 Reference Customer Information Sheet and Attachment 9 Subcontractor Consent Form. Please refer to 52.212-1, page 129 c. Volume III, Past Performance. paragraph (4) of solicitation for guidance. | ||
| 1 | RFP Page 129, c2 | States: “If a contractor teaming arrangement is contemplated, provide complete information as to the arrangement, including any relevant and recent past performance information on teaming arrangements with the same partner.” |
| Where should Offerors include this information? In Volume III, Factor 2 Past Performance? Or in Volume I-Administrative which includes the Contractor Teaming Arrangement? Please clarify. | Both volumes ( Volume I Adminstrative and Volume III Factor 2 Past Performance) if applicable, please follow 52.212-1. | ||
| 1 | RFP Page 130d1 | States: Pricing information shall be addressed only in Volume IV. |
Volume I-Administrative includes the SF-1449, which includes SF-1449 Continuation Sheet, Pages 3-21 which provides prices for each CLIN.
| Where do Contractors include SF1449 Continuation Sheets? In Volume I or Volume IV? Please clarify. | The KTR submit on both docments ( SF 1449 continuation sheet Item No. 0001 thru Item No. 0038) and Attachment 3. | ||
| 1 | RFP Page 130d2 | States: “The offeror shall complete Section B of the solicitation.” |
| There is no Section B of the solicitation. Please clarify. | Section B (continuation sheet of 1449) of the solicitation is pages 3 through page 21 (Item No. 0001 thru Item No. 0038). | ||
| 1 | RFP Page 130d2 | States: “The offeror shall submit prices for each CLIN on Attachment 3-Price Matrix to the solicitation.” |
| Do Offerors not complete the SF-1449 Continuation Sheet? Are Offerors to submit their price only on Attachment 3? | The KTR submit on both docments ( SF 1449 continuation sheet Item No. 0001 thru Item No. 0038) and Attachment 3. | ||
| 1 | RFP Page 130d2 | States: “The CLIN prices shall sum (roll up) to the respective CLIN prices on Attachment 3-Price Matrix, which shall be transferred to Section B of the RFP.” |
| There is no Section B of the RFP. Please clarify. | Section B (continuation sheet of 1449) of the solicitation is pages 3 through page 21 (Item No. 0001 thru Item No. 0038). | |||
| 1 | Does the Government want Offerors to submit Attachment 3-Price Matrix in an Excel format? Or pdf format? Or both? | Excel only. | ||
| 1 | CBA | The CBA references Addendum A that outlines all contributions; however, Addendum A is not included. |
| Please provide Addendum A of the CBA. | Addendum A is attached. Exhibit K(a). | |||
| 1 | Can the Government provide pictures of a typical restroom? | Yes. Picture included with amendment. | ||
| 1 | EXHIBIT E | Is there janitorial storage in every building? | In most buildings. | |
| 1 | EXHIBIT E | Is there janitorial storage on every floor of each building? | In building 650 yes, the remaining buildings are one level or have the restrooms on the main floor. | |
| 1 | Does each janitorial storage have water access? | Most have water access | ||
| 1 | What seniority level should the bidders assume when pricing? | It is incumbent upon Offerors to determine the appropriate labor mix. | ||
| 1 | Please provide a seniority list for the current contract. | It is incumbent upon Offerors to determine the appropriate labor mix. | ||
| 1 | Are there any pieces of equipment that are not permissible to use on this contract? (i.e., KiVac, Tomcat Scrubber, etc.) | There are no pieces of equipment that are restricted from use. | ||
| 1 | Is the current contractor buying Ability One products in support of this contract? | Refer to FAR Clause 52.208-9 Contractor use of Mandatory sources of supply and services. | ||
| 1 | PWS Page 17, 4.1.6 | Reference mentions a Quality Control Manager, however PWS Page 2, 1.9 does not list a Quality Control Manager as Key Personnel. |
| Is the Quality Control Manager a required position? Please clarify. | The Quality Control Manager is not listed on the present contract as key personnel. The position is required, the individual oversees the Quality Control Program and answers to corporate only regarding Quality Control concerns. | ||
| 1 | PWS, Page 29, 5.13.9.2 | Reference states that cleaning of exterior windows occurs once (1) per year but then states that requests for window cleaning more than twice (2) per year will be reimbursed. |
| Is the requirement for once (1) per year or twice (2) per year? Please clarify. | One cleaning per year. | |||
| 1 | PWS Page 21, 4.3.17 | Are there specifications (or examples) that allow the government to assess minimum requirements for disinfection solution technologies? | The Government inspects the contractors chemical dispenser, the dispenser tips and the Littmus test strips to determine the correct mixture of the solution. | |
| 1 | For a medial complex of this size and scope, we question why this project is being evaluated as Low Price Technically Acceptable. It would seem more reasonable to use the Best Value option for proposal evaluation to ensure that only an experienced and knowledgeable contractor would be providing high quality HEC services to such a large medical complex. Awarding the project to a Contractor with the low price does not guarantee quality work for the Army Medical Command. |
| Respectfully request that the Government utilize the Best Value approach for proposal evaluation. | Refer to 52.212-1 and 52.212-2. | |||
| 1 | As a site visit has yet to be scheduled, and given the strong possibility there will be even more questions after the site visit beyond the 29 we are now submitting, we respectfully request a two-week extension to the due date to November 2nd. | A second site visit will not be provided. An extension will not be provided. | ||
| 1 | Exhibit K - CBA | There is no Addendum (or other document) showing the current wage rates, benefits, etc. Please furnish. | Addendum A is attached. Exhibit K(a). | |
| 1 | Exhibit 4a - Staffing Chart | Exhibit 4a states at the top that 1 FTE (SCLS) = 1720. The bottom of exhibit 4a states that 1FTE (SCLS) = 1573. Please clarify. | input error should be 1992 non-SCLS and 1720 SCLS | |
| 1 | Exhibit 4a - Staffing Chart | Please explain the Gov. rationale in the development of 1 FTE (Non-SCLS) = 1992? | Management is not a part of the union, they receive 11 federal holidays. | |
| 1 | ITO Volume III - Factor 2 - Past Performance | Instructions say six total pages for Attachment 6 and narrative. Attachment 6, Customer Reference Information Sheet is one page. For three references this part of the submittal would take three of the six pages. File name Attachment 10, Specific Relevant Contracts Sheet (which says Attachment 6 when opened) has three pages for one reference. Please clarify how the contractor can submit all the necessary information in a maximum of six pages. | Follow the solicitation 52.212-1. | |
| 1 | ITO Volume II - Supplement C-2 | Is there a page limit on the NARRATIVE portion of the staffing plan? | No page limit. | |
| 1 | Attachment 3 - Price Matrix | Tab 0006 - Building 2434 - three steps are used for this building but the equation for "Max. Unit Price" (cell D8) shows "D7/5". This should say "D7/3". Same for the out years. | Attachment 3 - Price Matrix has been updated and included as a part of this amendment. | |
| 1 | Attachment 1 | Please provide all the relevant spec's (brands, sizes, etc.) of toilet paper, paper towels, toilet seat dispensers, hand soap, hand sanitizers. | Toilet paper dispensers: standard size in all areas; Paper Towel dispensers:mixture of "C" fold, double fold and Touchless - EnMotion: Soap and hand sanitizer dispensers - Purrell touchless additionally, Steris foam hand sanitizer; building L647 has manual soap in treatment rooms | |
| 1 | Tech Exh. D | Building 2525, Room 107, Type III - No room square footage | 54 SQFT; 1188 SQFT per month (22 days) | |
| 1 | Tech Exh. D | Numerous areas in column "Type Services" has monthly square footage instead of Type Service | Comment not specific enough. Government unable to locate section of concern. | |
| 1 | Exhibit 4a - Staffing Chart | Type I is missing Building 3603, Epperly Dental Clinic | Change this to Type IV. | |
| 1 | Exhibit 4a - Staffing Chart | Can the contractor make adjustments to the staffing chart(s)? | Errors created due to the offeror changing or adjustments to staffing chart(s) will not be corrected by the government and may render the offeror's Proposal ineligile for award and not further evaluated. | |
| 52 | XXXXX | XXXXX | XXXXX |
&"-,Bold"Project Title: HEC FT CAMPBELL, KY &"-,Bold"Comment Resolution Matrix