Document in support of W81K0022Q0059

RESPONSE(S) TO REQUESTS FOR INFORMATION

7500 FAST DX Maintenance

William Beaumont Army Medical Center, Fort Bliss, TX

(a) The following request for information/point for clarification was received before the deadline of 11:59 PM Central Time, 31 March 2022:

(1) Question: “Are two (2) 2PMs per year required or one (1) PM per year required?

Should the referenced CVC be performed during each PM performed during the 12 month PoP?”

Response: Only one (1) Preventative Maintenance (PM) inspection and one (1) Calibration Verification Check (CVC) are required during each respective 12-month period. The PM inspection and CVC shall be performed by the Contractor at the same time.

//NOTHING FOLLOWS//