DRAFT Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice_of_Intent_to_Award_Sole_Source.docx | DOCX document | |
| LSJ_Redacted.pdf | ||
| SOURCES_SOUGHT_NOTICE.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
1. General:
Contractor shall provide scheduled and unscheduled maintenance according to the service agreement to include parts, and labor on the Alcon™ Laser equipment located at Carl R. Darnall Army Medical Center, 36065 Santa Fe Ave., Fort Hood, Texas. This NON-PERSONAL SERVICES requirement shall cover the services for the equipment listed in Table 1.
Table 1 - Equipment List
| Manufacturer |
| Model |
| Serial Number |
| Alcon Laboratories, Inc. |
| WaveLight® EX500 Excimer Laser |
| 1016-3-351 |
| Alcon Laboratories, Inc. |
| WaveLight® FS200 Femtosecond Laser |
| 1025-1-700 |
2. Scope of Work:
The contractor shall provide all necessary trained experienced personnel, labor, tools, diagnostic equipment, software updates/upgrades, material, supplies, transportation, travel costs, parts and equipment, excluding expendable items to perform repair support of the Alcon™ WaveLight® EX500 Excimer Laser and WaveLight® FS200 Femtosecond Laser equipment. Service shall consist of ONE preventive maintenance (PM) and unlimited repair calls for the Alcon™ laser equipment.
2.1. Normal Duty Hours: Monday through Friday 8:00 am. to 5:00 p.m., excluding national holidays and weekends.
2.2. Contractor shall report or telephonically notify the Medical Maintenance Branch Contracting Officer’s Representative or NCOIC, (254) 288-8810 CRDAMC 36065 Santa Fe Ave. RM 40-251 Fort Hood TX. 76544.
2.3. After Duty Hours: Contractor shall report to the Administrative Officer of the Day (AOD) at the front desk of the hospital to be escorted to the appropriate work area. There are no authorized overtime hours.
3. Personnel Qualifications:
The contractor shall provide documentation that the field service technicians are qualified and manufacture trained on the Alcon™ equipment. In addition to this training, the technicians must have proof of two years of working experience, effective with the current date. The contractor prior to service commencing shall present documented proof of successful completion of such training.
4. Contract Representative (POC) The contractor shall provide in writing on the contract start date, the name and telephone number of a primary and alternate individual to act as their representative to be responsible for the coordination of the contract with the government. The contractor’s designated representative shall be the point of contact with the government and shall have the authority to act or make decisions for the contractor on all matters pertaining to the contract. The contracting officer shall be notified in writing within 72 hours, whenever changes are made.
5. Quality Control:
5.1. The contractor shall establish and maintain a Quality Control Plan to ensure that the quality of service and material provided meet or exceed the specifications, terms and conditions of the contract. All repairs or modifications that are made shall be in compliance with the manufacturer’s specification and Food and Drug Administration guidance.
5.2. The government will establish and maintain a Quality Assurance Plan to ensure that the quality of service is being provided and meet and exceed the specifications, terms and conditions of the contract.
6. Definitions:
6.1. Scheduled Maintenance: The scheduled care and servicing of equipment for the purpose of the equipment in a serviceable condition in accordance with the manufacturer’s specifications.
6.2. Unscheduled Maintenance: Repair action necessary to return the equipment to a totally operational condition as it was designed to operate in accordance with the manufacturer’s specifications.
6.3. Quality Control Plan: The contractors’ written plan describes how he will ensure the performance of the services required by the contract are met or exceeded. At a minimum, the contractor’s Quality Control Plan will include:
1. Method for acquiring acceptable replacement parts.
2. Inspection intervals and a copy of the checklist to be used by the contractors QA Inspector.
6.4. Replacement Part: A component or module of the existing system or approved upgraded/modified system requiring replacement through a fault developed through normal use or normal wear and tear. Replacement parts do not include consumable supplies. Replacement parts include components that are installed solely for cosmetic appearance i.e. cowlings, molding, keyboard keypads (when the key designation is work off), etc.
6.5. OEM: Original Equipment Manufacturer.
7. Government Furnished Services:
7.1. Equipment: The equipment covered under this contract will be made available to the contractor for the purpose of scheduled or unscheduled service. The contractor shall obtain Contracting Officer approval for the time and duration of the service to be conducted and shipping instructions.
7.2. Property: The contractor shall not use property provided by the government for any purpose other than in the performance of this contract.
7.3. Utilities: Reasonable amounts of electric power and other utilities will be provided to the contractor to perform required services. The contractor is responsible for conserving utilities while working in the installation.
7.4. Contractor Furnished: Only the property and services referenced in paragraph 7.1 and 7.2 will be provided to the contractor to perform required services. All other property and services required in the performance of this contract shall be furnished by the contractor. For example:
7.4.1. Tools
7.4.2. Test equipment
7.4.3. Current service manuals with guaranteed ability to provide product updates, guaranteed to provide factory mandated instrument modifications, schematics, wiring diagrams and troubleshooting guides (failure to provide product updates or factory mandated modifications is grounds for contract termination).
7.4.4. All other items necessary to perform service such as common hardware, connectors, tubing and etc.
8. Replacement Parts:
The contractor shall have ready access to unique and/or high mortality replacement parts. All parts supplies shall be compatible with the Alcon™ equipment.
8.1. All replacement parts shall become the property of the government and the replaced malfunctioning part shall become the property of the contractor.
8.2. Freight, postage and storage charges associated with shipment and receipt of replacement parts and the return of work or defective parts shall be the responsibility of the contractor.
8.3. The contractor shall use only new or reconditioned parts for which the quality is equal to or better than the Original Equipment Manufacturer (OEM’s) original part. Any parts provided by the contractors that are considered by the OEM to be substandard may be replaced at the contractor’s cost. When discrepancies occur, the contracting officer will make the final determination about whether a replacement part is of equal or better quality.
8.4. The contractor shall provide all replacements and service necessary to restore the equipment to 100% operational condition as specified by the OEM.
9. Coordination for scheduled and unscheduled services:
Preventive maintenance shall be performed in accordance with the manufacturer’s specifications during the specified month. The contractor shall coordinate 15 days in advance with the Contracting Officer’s Representative/Government Point of Contact or NCOIC, Medical Maintenance Branch, (254) 288-8810/8811 for preventive maintenance, certification, and calibration. The service technician shall provide online/internet support (IF APPLICABLE) within twenty-four (24) hours of notification. Government request for remedial repairs will be placed telephonically by the contracting officer or his/her designated representative to the contractor’s POC.
The contractor’s response to requests for remedial repairs may include a telephone consultation between the equipment user/operator or Government’s Service Technician and a contractor’s FSE. The purpose of this telephone consultation shall be:
9.1. To determine the most likely cause of the problem.
9.2. To determine if resolution of the problem requires the dispatch of a FSE once determination has been made that a contractor’s FSE is required on site. The contractor’s FSE shall have 24 hours to be on-site from the time of notification by the contracting officer to the contractor and restored fully operational within 72 hours.
9.3. To identify replacement parts if any likely to be required in order to return the equipment to 100% operational condition as specified by the OEM.
9.4. The Government and the contractor will exchange hazard communication information before the commencement of any repair.
9.5. When required, the contractor will comply with the OSHA lockout/tagout standard while performing maintenance on electrical equipment.
10. Scheduled/Unscheduled Maintenance documentation:
All scheduled and unscheduled maintenance shall be documented on a service report.
This form will be furnished upon completion of service within five working days to the Medical Maintenance Branch NCOIC/Contract Officer Representative via email:
tammytha.d.scott.civ@mail.mil
10.1 Service Reports:
The contractor shall prepare a service report for each job performed. During duty hours, the service reports will be authenticated with the Medical Maintenance Branch during normal duty hours and and with the AOD after normal duty hours. The service reports shall include the following information at a minimum:
1. Government contract number
2. Equipment identification data
3. System nomenclature, room number, location, model and serial number
4. Purpose of service (scheduled service or unscheduled service call)
5. Start date/time and completion date/time
6. Description of defect and corrective action taken
7. List of parts and cost. Total cost of service to include labor and parts
8. Explanations of any deferred or delayed repair action with an estimated get well date.
10.2. Calibration Documentation; All calibration services shall be documented by the contractor on the service report and a DD 2163 Calibration/Verification Certification label is attached to the equipment if needed. The verification shall be affixed to the units with the service date, initials and date next service due annotated. If the contractor does not have labels, the medical maintenance shop will furnish the government form DD 2163 Verification/Certification.
10.3. Calibration Documentation of X-Ray systems; IF INDICATED: The contractor shall complete
DD Form 2164 in accordance with the instructions provided in TB 38-750-2. A continuation sheet shall be attached to the DD Form 2164 indicating the manufacturer, model, serial number and date of calibration in accordance with the instructions provided in TB 38-750-2. A continuation sheet shall be attached to the DD Form 2164 indicating the manufacturer, model, serial number and date of calibration expiration of all items of test and measurement equipment used to perform the calibration. Required forms and extracts from pertinent directives will be furnished to the contractor by the government.
10.4. Maintenance Logs: A maintenance log will be maintained with the service technician for the system. The log will be documented for any service performed. The log will remain on-site with the system.
10.5. Scheduled Maintenance documentation: All scheduled maintenance shall be documented on a service contract. This form will be furnished upon completion of service to the Medical Maintenance Branch NCOIC.
11. Equipment Modification/Alteration/Upgrades:
11.1. The contractor shall perform/incorporate only OEM specified modifications, alterations, and upgrades. Approval shall be obtained from the contracting officer representative (COR) prior to the contractor’s installation of the modification, alteration, or upgrade.
11.2. The contractor shall perform or cause to be performed all OEM field modifications and safety alert inspections.
11.3. The contractor shall maintain contact with the OEM to determine the requirement for field modifications and to ensure accomplishment of these field modifications are in accordance with the time schedule set forth by the OEM.
11.4. The contractor will make known to the contracting officer representative of minor or routine OEM software upgrades when they become available by the manufacturer.
11.5. Hardware and software changes not supported by the OEM are not authorized.
12. Contractor Reporting Requirements:
During normal duty hours, the contractor’s FSE shall notify the contracting officer in person upon arrival at the government site and again prior to departure. Contractor representative shall sign in and out at the Medical Maintenance Branch, room 0004, basement, Building 36000. In the event that the contractor performs service beyond the normal duty hours, he shall sign-in and out with the Administrative Officer of the Day (AOD) at the information desk located on the main floor in the front lobby.
13. Repair Parts:
All repair parts shall meet exact manufacturer’s specifications and be the most current revision level. All parts shall be new or remanufactured by the manufacturer of the instruments.
14. Services beyond the scope of the performance work statement:
The contractor shall immediately, but not later than 24 consecutive hours after discovery, notify the COR (in writing) of the existence or development of any defects in/or repairs required to the equipment covered under this contract especially which the contractor considers they are not responsible under the terms of the contract. At the same time of the notification, the contractor shall furnish the contracting officer with a written estimate of the cost to make the necessary repairs.
15. Conduct of Personnel:
The contracting Officer may require the Contractor to remove from the job site any employee working under this contract for reasons of misconduct, security, or found to be or suspected to be under the influence of alcohol, drugs or other incapacitating agent. Contractor employees shall be subject to dismissal from the premises upon determination by the Contracting Officer that such action is necessary and in the interest of the Government. In accordance with applicable directives and 18 U.S.C. 1382 (1972), the Installation Commander has the authority to bar individuals from the installation. The removal from the job site or dismissal from the premises shall not relieve the contractor of the requirement to provide sufficient personnel to perform the services as required by this work statement.
16. Security Requirements:
16.1. Contractor personnel or any representative of the contractor entering Fort Hood Army Installation shall abide by all security regulations and shall be subject to security checks.
16.2. Contractor personnel and property shall be subject to search and seizure upon entering the confines of Fort Hood Army Installation and while on the installation in accordance with AR 190-13 (The Army Physical Security Program).
16.3. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
16.4. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
16.5. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of the results reported to the COR NLT 30 calendar days after contract award.
17. Identification Badge:
Contractor personnel shall wear a vendor identification badge at all times when performing services at the Government site. Identification badges shall be worn in a clearly visible area of the Field Service Engineers (FSE’s) outer garment. The badge will be furnished at the Medical Maintenance Branch during duty hours and by the Administrative Officer of the Day (AOD) after duty hours.
Contractor Manpower Reporting
"ACCOUNTING FOR CONTRACT SERVICES-The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address “https://cmra.army.mil.” The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including sub-contractor); (6) Estimated direct labor dollars paid this reporting period (including sub-contractor); (7) Total payments (including sub-contractor); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different); (9) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (10) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest City, Country, when in an overseas location, using standardized nomenclature provided on website); (11) Presence of deployment or contingency contract language, and, (12) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). (13) As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. The contractor shall notify the Contracting Officer’s Representative (COR) by the 5th working day of November whether or not they have completed this report. If the COR is unavailable, the contractor will notify the Contracting Officer."