Solicitation_Attachment_2_Experience_Info.docx

DOCX document 33 KB Posted

Attached to
ANA-18-088 Design Build of Afghan Air Force (AAF) Aviation Enhancement Kandahar, Operations (OPS), Afghanistan
Solicitation number
W5J9JE18R0021
Issued by

About this file

Experience Information Sheet

View the file

Other files

File Type Posted
W5J9JE18R0021-0001.pdf PDF
Solicitation_Attachment_3_PPQ.docx DOCX document
Solicitation_Attachment_1_Experience_Overview.docx DOCX document
W5J9JE18R0021_Kandahar_OPS_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

EXPERIENCE INFORMATION SHEET

PROJECT NO. _____, Page 1 Maximum of 5 projects, more than 5 will not be evaluated.

Project Name and Location:

Name of Firm that performed this work (should be the Offeror or one of the offeror’s subcontractors)

Name, email and phone number of English speaking POC:

Experience:

1. The location work was performed: _______________________________________________________________

2. Date work was begun: ________________________ Date work was completed: ________________________

3. The final cost of this project: $________________________________________________________________

4. Is this project more than 80% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 80% complete for any reason, rating may be lower

5. Provide detailed information of the construction work performed (refer to the categories under Evaluation of Factor 1 – Experience, Evaluation Criteria.) Include explanations of any performance problems, issues, or conflicts and the resolution. Offerors are encouraged to provide pictures or other descriptive information. Work in more than one category may receive a higher rating. Offerors should provide specific details as to how their projects meet one or more of the following categories:

Design and construction of Pre-Engineered Hangars;

Construction of Barracks Construction of life support facilities

(Continue typing or add additional sheet if required to provide more information)

EXPERIENCE INFORMATION SHEET

PROJECT NO. _____ Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.

Sub-Contractor: A contractor that performed part of the project work, but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Committed Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Committed Subcontractor’s experience the project.

6. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ____ Joint Venture ____ Committed Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.

c. If work was performed as a Committed Subcontractor, explain how the work performed as a Committed Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:

e. Ensure you provide a letter signed by both the Offeror and the Committed Subcontractor in order to take credit for the project work. Besides the signed letter, no additional information is required other than what is on Page 1 of this form.

Attachment (2) – Experience Information Sheet

File details come from the government source that posted it.