A.07.23_W5J9JE18R0017.pdf
PDF 1 MB Posted
- Solicitation number
- W5J9JE-18-R-0017
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24.02_W5J9JE18R0017-0002.pdf | ||
| A.07.24.01_W5J9JE18R0017_Amend_0001.pdf | ||
| A.07.23.06_Sol_Att_6_Price_Schedule.xlsx | XLSX spreadsheet | |
| A.07.23.08_Sol_Att_8_Corporate_Cert_or_Authority_to_Bind_Part_Agreet.docx | DOCX document | |
| A.07.23.04_Sol_Att_4_KeyPersonnel_Resume.docx | DOCX document | |
| A.07.23.03_Sol_Att_3_PPQ.docx | DOCX document | |
| A.07.23.02_Sol_Att_2_Experience_Info.docx | DOCX document | |
| A.07.23.01_Sol_Att_1_Experience_Overview.docx | DOCX document | |
| A.07.23.05_Sol_Att_5_Letter_of_Commitment.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Afghan National Detention Facility & Prison – Parw an (ANDFP-P) Parw an Province, Afghanistan
This is a TWO-PHASE DESIGN-BUILD PROCUREMENT solicited IAW FAR 36.3. Not more than f ive offerors may be selected for Phase II unless approved by the Head of the Contracting Activity, or his/her designee.
The follow ing construction projects are included in the ANDF&P-P Guard Life Support Area (LSA) & Barracks AND Modular Detainee Housing Unit (MDHU) & Kitchen.
SECTION 00 00 00 Procurement and Contract Requirements SECTION 00 10 00 Solicitation Contract Line Item Number (CLIN) Schedule SECTION 00 21 00 Instructions - Proposal Submission & Evalution Criteria SECTION 00 45 00 Representations and Certif ications SECTION 00 70 00 Conditions of the Contract – Contract Clauses SECTION 00 71 00 Definitions SECTION 00 73 00 Supplementary Conditions
IAW AFARS 5132.702(a)(ii)(B), "Funds are not presently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available."
IAW DFARS 236.204 Disclosure of the Magnitude of the Construction Projects, the estimated value of construction is betw een $25,000,000 and $100,000,000.
OKSANA STREKHA
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
30-Jul-2018
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________976 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________30 Aug 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
TRANSATLANTIC AFGHANISTAN ENGINEER - TAA
DISTRICT (TAA), US ARMY CORPS OF ENGINEERS
CETAA-CT, BAGRAM AE 09354
W5J9JE
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
540-665-2758FAX:TEL: 540-662-5665 TEL: FAX:
W5J9JE18R0017 100
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W5J9JE18R0017
Section 00 00 00 - Procurement and Contracting Requirements
SOLICITATION INFORMATION
POINTS OF CONTACT:
• CONTRACT SPECIALIST: Oksana Strekha at Oksana.Strekha@usace.army.mil
• CONTRACTING OFFICER: Erica Taylor at Erica.j.taylor@usace.army.mil
• CONTRACTING DIVISION: TAA.CONTRACTING@USACE.ARMY.MIL
REQUESTS FOR INFORMATION:
• Phase I Requests for Information Shall Be Submitted Not Later Than 13 August 2018 at 14:00 Afghanistan local time to the above Points of Contact.
• Phase II Requests for Information Due Dates will be detailed In the Phase II Commencement amendment/letter.
SITE VISIT CONFERENCE:
The US Army Corps of Engineers intends to host a Site Visit during Phase II. The exact time and place is yet to be determined (TBD). The Site Visit information will be issued via amendment as soon as the information is known. Only two people per Offeror are allowed to attend the Site Visit. All interested attendees must pre-register for the event no later than TBD by emailing Contracting Officer Ms. Erica Taylor at erica.j.taylor@usace.army.mil AND Contract Specialist Ms. Oksana Strekha at oksana.strekha@usace.army.mil.
ADMINISTRATIVE MATTERS:
• EMAIL SUBJECT LINES MUST REFERENCE: W5J9JE18R0017
• THIS OFFICE DOES NOT ACCEPT FAXES.
PROJECT INFORMATION
PROJECT INFORMATION
Afghan National Detention Facility & Prison – Parwan (ANDFP-Parwan) Parwan Province, Afghanistan
This project will accommodate growth requirements at the Afghan National Detention Facility & Prison – Parwan by construction of critical facilities and infrastructure to increase the capacity of detainees and prisoners, along with providing a new Guard LSA & barracks area. In addition to the required facilities listed below, work shall include site improvements, grading and drainage, existing road and ditch maintenance, new roads, sidewalks, new wells, water distribution, wastewater distribution, electrical power generation (MDHU back-up generators), electrical distribution, propane distribution, perimeter fence, and all other incidental requirements for a complete and usable facility. The following construction projects are included in the ANDF&P- P:
• Guard Life Support Area (LSA) & Barracks
• Modular Detainee Housing Unit (MDHU) & Kitchen
Guard Life Support Area (LSA) & Barracks Design and construction of the new LSA which will consist of facilities to support roughly 2,000 personnel (breakdown: 116 Officers, 419 NCOs, 1,367 Soldiers/Enlisted). Facilities include 10 mailto:Oksana.Strekha@usace.army.mil mailto:Erica.j.taylor@usace.army.mil mailto:TAA.CONTRACTING@USACE.ARMY.MIL mailto:erica.j.taylor@usace.army.mil mailto:oksana.strekha@usace.army.mil enlisted barracks, 3 Officer Barracks, 5 NCO Barracks, a DFAC (2,000 personnel/meal x 3 meals/day), Small Arms Storage, Weapons Storage, and 4 laundry facilities. Although this is a design/build contract, standard designs will be provided for all of these facilities. The contractor, as the Designer of Record, will be responsible for reviewing all designs and making necessary design changes in accordance with the specs and will ensure all code compliance.
Modular Detainee Housing Unit (MDHU) & Kitchen The Modular Detainee Housing Unit (MDHU) expansion will include the design and construction of 15 new MDHUs to match the existing design. The Contractor will also have to relocate the existing prison perimeter wall (T-walls) and construct a new perimeter wall around the newly constructed MDHU’s. In order to support these additional detainees a kitchen will need to be designed and constructed in the expansion area for the MDHUs. The kitchen will consist of approximately 80 propane stoves to support meals for 11,000 personnel for 3 meals per day (total of 33,000 meals per day). The kitchen shall include appropriate amount of chiller space, dry material storage and shelving and food storage area, food preparation area, food cooking area and food distribution area for 33,000 meals per day. The kitchen will require a triple layer fencing with privacy screens and concertina wire around the kitchen and secured propane storage to match existing and adhere with existing force protection standards at the prison and connect to the existing secured walkway.
Security fencing around this area shall include gates for food delivery access to the kitchen. The kitchen will also require a secured propane storage area and a 6M high interlocking Alaska Barrier security wall between the new kitchen area and the expansion MDHU recreation areas to avoid prisoners’ interaction with kitchen staff.
Section 00 01 10 - Table of Contents
TABLE OF CONTENTS
00 10 00 TABLE OF CONTENTS
SECTION 00 00 00 Procurement and Contract Requirements SECTION 00 10 00 Solicitation Contract Line Item Number (CLIN) Schedule SECTION 00 21 00 Instructions - Evaluation Criteria & Submission Requirements SECTION 00 45 00 Representations and Certifications - Clauses SECTION 00 70 00 Conditions of the Contract – Contract Clauses SECTION 00 71 00 Definitions SECTION 00 72 00 General Conditions - Special Contract Requirements SECTION 00 73 00 Supplementary Conditions
SOLICITATION ATTACHMENTS
ATTACHMENT 1 - Experience Overview Sheet ATTACHMENT 2 - Experience Information Sheet ATTACHMENT 3 - USACE Past Performance Questionnaire ATTACHMENT 4 - Key Personnel Resume ATTACHMENT 5 - Letter of Commitment ATTACHMENT 6 - Electronic Pricing Schedule EXCEL Format ATTACHMENT 8 - Corporat Certificate or Authority to Bind Partnership Certificate
PHASE II ONLY: The following specifications will be provided during Phase II.
The following AFGHAN NATIONAL DETENTION FACILITY & PRISON - PARWAN (ANDFP-P)
LSA & MDHU EXPANSION DESIGN/BUILD PROJECT SPECIFICATIONS AND DRAWINGS
(VOLUMES 1 AND 2) are attached to and hereby incorporated by reference:
01 10 10 SCOPE OF WORK
01 10 15 TECHNICAL REQUIREMENTS
01 10 40 SECURITY
01 10 41 SECURITY PLAN FORMAT
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 16.00 10 DESIGN DATA
01 35 13 SPECIAL PROJECT REQUIREMENTS
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 METRIC MEASUREMENTS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20 ENVIRONMENTAL PROTECTION
01 58 00 PROJECT IDENTIFICATION
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
APPENDIX A PROJECT SPECIFIC DRAWINGS
APPENDIX B STANDARD DESIGN FACILITIES (STANDARD DESIGN DRAWINGS)
APPENDIX C TECHNICAL SPECIFICATIONS (DIVISIONS 03-33)
APPENDIX D USACE CERTIFIED TESTING LABORATORIES
APPENDIX E HYDROGEOLOGIC ASSESSMENT
APPENDIX G LIFE SAFETY PLAN DRAWING MARK-UPS
APPENDIX H FURNITURE, FIXTURES, AND EQUIPMENT (FFE) REQUIREMENTS
Section 00 10 00 - Solicitation
PRICE SCHEDULE
PRICE IS SUBMITTED IN PHASE II.
DO NOT SUBMIT PRICE UNTIL INSTRUCTED TO DO SO BY
THE CONTRACTING OFFICER.
SEE ATTACHMENT 6: PRICE SCHEDULE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
PARWAN PRISON: BASE BID
FFP
This is a firm fixed price design build contract. The contractor shall provide all materials, resources, personnel, management, security, transportation etc. necessary to execute this contract in accordance with the Statement of Work, Special Project Requirements, Specifications and Drawings, Contract Clauses and other contractual documents, as applicable. The successful offeror's proposal will be incorporated by reference to the extent it does not conflict with the solicitation or contract requirements.
BASE BID: The following base items are included in this CLIN.
Mobilization/Demobilization Security and Site Access Site Survey Geotechnical Investigation Architectural and Engineering Demolition Site Grading and Drainage Gravel Access Roads Concrete Sidewalks Gravel Sidewalks Water Supply System Electrical Frequency Converter for Water Supply System Water Distribution System Sanitary Collection System Electrical Distribution System Communications Outside Plant System As-Built Drawings FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job
PARWAN PRISON: LSA / GSU
FFP
GUARD LIFE SUPPORT AREA (LSA) / GARRISON SUPPORT UNIT (GSU):
The following base items are included in this CLIN.
Officer Barracks NCO Barracks Enlisted Barracks Laundry Facility Dining Facility (DFAC) Small Arms Storage Weapons Storage Electrical Frequency Converters for Guard LSA - GSU FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job
PARWAN PRISON: MDHU
FFP
MODULAR DETAINEE HOUSING UNITS (MDHU) - EXPANSION 1: The following base items are included in this CLIN:
Modular Detainee Housing Units Modified Kitchen Propane Storage Propane Distribution System Electrical Frequency Converters for MDHU – Expansion 1
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1001 1 Job
OPTION OPTION 1: WATER WELL
FFP
The Government reserves the right to exercise this option at award or within 180 calendar days after Notice to Proceed.
1002 1 Job
OPTION OPTION 2: CCTV SYSTEM
FFP
The Government reserves the right to exercise this option at award or within 180
1003 1 Job
OPTION OPTION 3: DEMOLITION POWER PLANT
FFP
The Government reserves the right to exercise this option at award or within 180
1004 1 Job
OPTION OPTION 4: FFE FOR GUARD LSU/GSU
FFP
The Government reserves the right to exercise this option at award or within 180
1005 1 Job
OPTION OPTION 5: FFE FOR DFAC
FFP
The Government reserves the right to exercise this option at award or within 180
1006 1 Job
OPTION OPTION 6: FFE FOR MDHU - EXP 1
FFP
The Government reserves the right to exercise this option at award or within 180
1007 1 Job
OPTION OPTION 7: FFE FOR MOD KITCHEN
FFP
The Government reserves the right to exercise this option at award or within 180
2001 1 Job
OPTION OPTION: GUARD LIFE SUPPORT AREA
FFP
This option CLIN includes the following options from the Price Schedule:
Option 8 – Officer Barracks Option 9 – NCO Barracks Option 10 – Enlisted Barracks Option 11 – Laundry Facility Option 12 – Electrical Frequency Converters for Guard LSA – 2nd Kandak Option 13 – FFE for Guard LSA – 2nd Kandak
2002 1 Job
OPTION OPTION: MDHU – EXPANSION 2
FFP
This option CLIN includes the following options from the Price Schedule:
Option 14 – Modular Detainee Housing Units Option 15 – Electrical Frequency Converters for MDHU – Expansion 2 Option 16 – FFE for MDHU – Expansion 2
2003 1 Job
OPTION OPTION: LSA - 3RD KANDAK
FFP
OPTION: GUARD LIFE SUPPORT AREA (LSA) – 3rd KANDAK This option CLIN includes the following options from the Price Schedule:
Option 17 – Officer Barracks Option 18 – NCO Barracks Option 19 – Enlisted Barracks Option 20 – Laundry Facility Option 21 – Electrical Frequency Converters for Guard LSA – 3rd Kandak Option 22 – FFE for Guard LSA – 3rd Kandak Option 23 - Demolition – B-Huts
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2004 1 Job
OPTION OPTION: MDHU EXPANSION 3
FFP
OPTION: MDHU – EXPANSION 3
This option CLIN includes the following options from the Price Schedule:
Option 24 – Modular Detainee Housing Units Option 25 – Electrical Frequency Converters for MDHU – Expansion 3 Option 26 – FFE for MDHU – Expansion 3 FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2005 1 Job
OPTION OPTION: PERIMETER SECURITY
FFP
OPTION: PERIMETER SECURITY
This option CLIN includes the following options from the Price Schedule:
Option 27 - Perimeter Wall and Access Gates Option 28 - Guard Tower Option 29 - Gate House Option 30 – Electrical Frequency Converters for Perimeter Security
Section 00 21 00 - Instructions
SUBMISSION REQUIREMENTS
SOURCE SELECTION
A. INSTRUCTIONS TO PROPOSERS
INTRODUCTION: The Offeror’s proposal shall be submitted via AMRDEC. The solicitation shall provide AMRDEC instructions and receipt date for proposal submittal. Offerors are cautioned that “parroting” of the Technical requirements or the SOW with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
1. PROPOSAL SUBMISSION REQUIREMENTS
The Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of proposal details shall be the sole responsibility of the Offeror. The proposal shall meet the following basic requirements:
a. The proposal shall be typed and submitted in English and easy to read.
b. The proposal shall be organized, concise, and shall be clearly identified and tabbed. Each factor shall be described in a separate tabbed section.
c. The proposal shall be identified by the solicitation number, volume number, and name, address, and telephone number of the prime Offeror on the cover.
d. The proposal shall contain a table of contents and include at the bottom left side of each page the volume and page number.
e. Offerors shall verify that the information for all forms submitted is current, correct, and complete including name(s) of the point(s) of contact (POCs), email address(es), and telephone number(s), for the non-price factors.
f. Offerors shall submit a signed Offer, Standard Form (SF) 1442 for this solicitation, including verification of all amendments received.
g. Proposals shall completely and adequately address the requirements of this solicitation.
Offerors are reminded that elaborate corporate marketing information, formatting, special reproduction techniques, etc., are not necessary.
h. Contractors are cautioned against submitting conditional proposals that change or modify the terms and conditions of the contract. Conditional proposals may be determined unacceptable.
i. Failing to submit attachments or failing to complete the proposal properly may result in rejection of the offer without further evaluation. Therefore, Offerors are urged to follow instructions and speak with the Contracting Officer if instructions are not understood.
2. PROPOSAL SUBMISSION REQUIREMENTS PHASE II
In addition to the Proposal Submission Requirements for Phase I, Phase II proposals shall meet the additional following basic requirements:
a. Volume I: Shall contain information related to the three non-price elements of Factor 4.
Offerors shall verify that the information for all forms submitted is current, correct, and complete including name(s) of the point(s) of contact (POCs), email address(es), and telephone number(s), for the each project.
b. Volume II: Offerors shall submit a signed Offer, Standard Form (SF) 1442 for this solicitation, including verification of all amendments received, and Executed Bid Bond (SF-24).
Proposal Expenses and Pre-Contract Costs: The request for proposal (RFP) solicitation does not commit the Government to pay any costs incurred in the preparation and submission of a proposal or for any other costs incurred by any firm submitting a proposal in response to this solicitation.
3. JOINT VENTURE PROPOSAL
If submitting a proposal as a Joint Venture, the experience and past performance of each of the Joint Venture Partners can be submitted for the Joint Venture Entity. The experience for each Joint Venture Partner should be clearly described.
The proposal may receive a higher rating if the proposal contains evidence of the Joint Venture Entity working successfully together previously on relevant projects.
An Offeror that is part of a Joint Venture must submit a legally binding Joint Venture Agreement. The Government will not evaluate the capability of any Offerors that are not included in the Joint Venture agreement. Joint Ventures must include a copy of the legal joint venture agreement signed by an authorized officer from each of the firms comprising the Joint Venture with the chief executive of each entity identified and must be translated into English, if the original agreement is in a language other than English.
If submitting a proposal as a joint venture, the experience and past performance of each of the joint venture partners can be submitted for the joint venture entity. The experience for each joint venture partner will be considered the experience of the joint venture entity. Joint ventures shall submit the following additional documentation regarding their business entities:
a. A copy of their joint venture agreement in English.
b. A detailed statement outlining the following in terms of percentages, where appropriate.
c. The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing. The joint venture agreement must show that joint venture members are jointly and severally liable for any obligations under the contract.
d. The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the joint venture and perform the duties necessary to complete the work.
e. The structure of the joint venture and decision-ranking responsibilities of the joint venture parties in terms of who will control the manner and method of performance of the work.
f. The bonding responsibilities of the joint venture parties.
g. Identification of the key personnel having authority to legally bind the joint venture to subcontracts and state who will provide or contract for the labor and materials for the joint venture.
h. Identification of party maintaining the joint venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the joint venture.
i. Identification of party furnishing the facilities, such as office supplies and telephone service.
j. Identification of party having overall control of the joint venture. Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual joint venture parties and identify the party, or hired as employees of the joint venture. Include this information as a part of Phase I.
k. A complete and legally binding document with all the information required under this section titled “Joint Ventures” shall be included. The JV agreement submitted to the Government shall be the only valid JV agreement for purposes of performance under this contract or any responsibilities of the JV under the contract. Any changes to the JV agreement must be submitted to the Contracting Officer and is subject to approval by the Government prior to execution of the change.
4. KEY SUBCONTRACTORS
If an Offeror wishes to be credited with the experience or past performance of a Key Subcontractor, a letter of commitment signed by the Key Subcontractor AND the prime contractor shall be submitted.
The commitment letter shall be submitted even if the firm is in some way related to the prime contractor (for example, the Key Subcontractor is a subsidiary of the prime contractor, or a subsidiary of a firm to which the prime contractor is also a subsidiary). If a letter of commitment is not submitted, the experience will not be considered. Include this information as part of Volume I (See Attachment 5, Letter of Commitment).
5. PROPOSAL FORMAT
Proposals shall be submitted in the following format:
Phase I:
Factor 1 – Specialized Experience Factor 2 – Past Performance Factor 3 – Management Plan
This volume shall also include the following:
• Attachment 1: Experience Overview Sheet (Factor 1),
• Attachment 2: Experience Information Sheet (Factor 1),
• Attachment 3: USACE Past Performance Questionnaire (Factor 2),
• Attachment 4: Key Personnel Resume (Factor 4)
• Attachment 5: Letter(s) of Commitment for Key Personnel and Committed Subcontractors;
• Joint Venture Agreement (if applicable) and Authority to Bind the Parties (Attachment 8);
Phase II Volume 1:
Factor 4 – Design and Construction Approach
Phase II Volume 2:
Factor 5 - Price
This volume shall also include the following:
• Attachment 6: Price Schedule in Excel
• Price Proposal Breakdown
• Signed Amendments
6. AMRDEC SAFE
The U.S. Army Aviation and Missile Research Development and Engineering Center Safe Access File Exchange (AMRDEC SAFE)
Proposals shall be submitted utilizing the AMRDEC SAFE Application, https://safe.amrdec.army.mil/safe. The AMRDEC SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE.
Authentication is handled via email. Anyone has access to SAFE, and the application is available for use by anyone.
a. The AMRDEC SAFE application can be accessed via https://safe.amrdec.army.mil/safe.
b. There are two options to proceed from the SAFE homepage:
o Proceed as Guest - Select this option if you do not have a CAC.
c. After selecting one of the options above, the page will be redirected to the package upload form. Fill in all the required input fields:
o Your Name - Your name;
o Your Email address - Your email address;
o Confirm Your Email Address - Re-enter your email address;
o Description of File(s) - Enter W5J9JE18R0017-COMPANY NAME:
o File(s) - Click the "Browse" button to select your file(s). You may add up to 25 files per package, so long as the total file size does not exceed 2GB;
• File names shall be titled:
1. Phase I: W5J9JE18R0017-CompanyName
2. Phase II, Volume 1: W5J9JE18R0017.Vol1-Company Name
3. Phase II, Volume 2: W5J9JE18R0017.Vol2-Company Name o Deletion Date - Select the Maximum date for the package to be deleted from SAFE. The maximum (which is also the default) is two weeks (14 days) from today;
o Provide an email address to give access to Erica.j.Taylor@usace.army.mil and Oksana.Strekha@usace.army.mil .
Attachment 7: Financial Disclosure Form https://safe.amrdec.army.mil/safe/Welcome.aspx https://safe.amrdec.army.mil/safe/Welcome.aspx mailto:Erica.j.Taylor@usace.army.mil mailto:Oksana.Strekha@usace.army.mil o Grant access to these people - This is the list of people you have granted access to the package. To remove a recipient, highlight their name and click the "Remove" button;
o Caveats - Default is "None";
o Encrypt email message when possible - Attempt to encrypt the package's notification email to each recipient;
o Notify me when files are downloaded - You (the sender) will receive a notification via email when a recipient downloads the package;
o Require CAC for pickup - Require the recipient to be logged in with a valid US
DoD-issued CAC to download the file(s). Recipients without a CAC will not be able to download the package.
d. Clicking the "Submit" button will upload the files and submit the package. Guest users will need to check their email to verify their email address before the recipients will be notified. No additional action is required by CAC users.
e. After the package has been uploaded (and verified, if proceeding as a guest), each recipient will receive a link to the package download page as well as a password. These passwords are unique for each recipient (not the package), and will be disabled once SAFE detects that the user successfully downloaded each file within the package. Forwarding recipient and sender notification emails to anyone except the AMRDEC WEB Team is strictly forbidden.
Proposal submission shall be submitted via AMRDEC by the date and time indicated on the SF 1442, or as amended. No facsimiles or regular e-mail submissions of proposals, with the exception of Attachment Three (3), Past Performance Questionnaires, are permitted:
Proposal Receipt Confirmation Points of Contact:
E-mail: Oksana.Strekha@usace.army.mil Telephone: (540) 722-1039
E-mail: Erica.J.Taylor@usace.army.mil Telephone: (540) 722-4868
When the word ‘Offeror’ is encountered throughout this Section, it is intended to mean a company seeking to do business with the Government that submits a proposal in response to this solicitation.
When the word “Government” is encountered throughout this Section, it is intended to mean U.S. Army Corps of Engineers.
Late Proposals: Any proposal, modification, or revision received by the Government after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the contracting officer determines that accepting the late offer would not unduly delay the acquisition, and (1) if it was transmitted through an electronic commerce method authorized by the solicitation, and it was received at the initial point of entry to the Government infrastructure not later than 4:00 p.m. one working day prior to the date specified for receipt of proposals; or (2) there is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or (3) it is the only proposal received. However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government will be considered at any time it is received and may be accepted
7. ADDITIONAL INFORMATION
mailto:Erica.J.Taylor@usace.army.mil
The Offeror should not modify the terms and conditions of the solicitation, nor add conditions or qualifications to his proposal based on an assumption or based on his own modification of the terms and/or conditions of the solicitation. Should the Offeror include terms and conditions that conflict with the terms and conditions of the solicitation, that Offeror’s proposal may be determined to be ineligible for further evaluation or for award. Any questions related to specific terms and conditions contained within the solicitation should be resolved with the Contracting Officer prior to proposal submission.
References in the Offeror’s proposal to, and examples of “classified” projects or contracts, should not be included in the Offeror’s proposal unless the information is authorized to be viewed or utilized by the Government for review and evaluation. Offerors who include information in their proposals that they do not want disclosed to the public or to anyone without a need-to-know, must clearly mark their proposals in accordance with the instructions at FAR 52.215-1, paragraph (e), Restriction on Disclosure and Use of Data.
An Offeror’s initial proposal should contain the Offeror’s best terms, as discussions may not be conducted with the Offeror.
Electronic proposals submitted via email and AMRDEC are the required methods of proposal transmission and will be the only forms of submission accepted. It is the Offeror’s responsibility to ensure its proposal is received by the Government by the date and time of the proposal deadline. Undeliverable emails due to an Offeror’s proposal size is not the responsibility of the Government.
PHASE I
All proposals will be evaluated by the Source Selection Team (SST). The overarching evaluation approach for Phase I is as follows:
a. Adequacy of Response. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the solicitation.
FACTOR 1: SPECIALIZED EXPERIENCE
Submission Requirements:
For Factor 1- Specialized Experience, Offerors shall submit two attachments, Attachment 1, Experience Overview Sheet and Attachment 2, Experience Information Sheet detailing previous work experience projects meeting the requirements of this solicitation. There are no page limitations for Factor 1, Specialized Experience. However, offerors are cautioned to only submit information relevant to Factor 1, Specialized Experience.
1. Information for completing Attachment 1 and Attachment 2:
a. Offerors shall complete an Experience Overview Sheet, Attachment 1, with a total listing not-to-exceed five (5) projects that best represent the Offeror’s work experience required on this solicitation. Projects must be performed within the last six (6) years of the solicitation issue date or from the date or at least 80% complete by the Phase I proposal submission due date of this solicitation, If more than five projects are submitted, only the first five projects will be evaluated.
b. Offerors shall provide an Experience Information Sheet, Attachment 2, for each project listed on Attachment 1, Experience Overview Sheet. The Experience Information sheets must be filled out completely.
3. If a Key Subcontractor’s experience is submitted for evaluation purposes, clearly address the experience with those Key Subcontractors. If a Joint Venture, clearly address the experience of each of the Joint Venture Partners and the relationship of the JV partners on any ongoing or previous projects. The proposal may receive a higher rating if the proposal contains evidence of the Joint Venture Entity or the Prime and Key subcontractor working successfully together on relevant previous projects.
Evaluation Criteria:
Specialized Experience will be rated as one factor; there are no sub-factors. The Government will evaluate the recency, depth, and the relevancy of the experience as submitted in the offeror’s proposal. Proposals will be evaluated to determine design-build experience of the Offeror for relevant contracts and/or projects of the similar scope and complexity of the project contained in the specifications. Offerors must demonstrate that the projects are same or similar to the project described in the solicitation. Offerors are encouraged to submit the maximum number of relevant projects to increase likelihood that the above requirements are met and elements warranting higher rating are included. A proposal providing fewer than three (3) projects could receive the highest rating available, to the extent that the projects submitted are fully relevant projects.
Projects submitted that do not have the qualities considered most relevant may be considered but the offeror may receive a lower rating for this factor.
1. RECENCY: Projects considered recent shall be completed within the last six (6) years from the date of the solicitation or at least 80% complete by the Phase I proposal submission due date for this solicitation.
2. RELEVANT: Projects demonstrate examples of design and construction of infrastructure and facilities similar to those to be performed under this solicitation. Relevant Projects are/were performed in Afghanistan and meet one or more of the following criteria:
a. Projects with a cost of $25,000,000 to $100,000,000.
b. Design-build construction of new buildings;
c. Design-Build Construction of Barracks
d. Design Build Construction of Dining Facilities
e. New Installation or replacement of major building systems such as electrical, mechanical, HVAC;
f. Design Build Construction of Sanitary Collection Systems; Water Distribution
Systems; and/or Electrical Distribution Systems
3. DEPTH: The Government will evaluate the offeror’s depth of experience in the following categories. Depth is demonstrated by providing a detailed explanation as to how the project meets the requirements of the category; and how the project demonstrates experience performing construction activities anticipated under this solicitation.
a. Design-build construction of new buildings;
b. Design-Build Construction of Barracks
c. Design Build Construction of Dining Facilities
d. New Installation or replacement of major building systems such as electrical, mechanical, HVAC;
e. Design Build Construction of Sanitary Collection Systems; Water Distribution
Systems; and/or Electrical Distribution Systems
FACTOR 1, STRENGTHS, WEAKNESSES AND DEFICIENCIES:
Where experience includes the following, the proposal may be rated lower (the following list is not all encompassing, in no order of importance):
• Projects demonstrating experience working with USACE.
• Project examples that demonstrate experience working with proposed Key Subcontractors and/or the proposed JV Partners working together.
• Design-Build Construction of Barracks
• Design Build construction that included providing Furniture, Fixtures and Equipment (FF&E)
Where Factor 1, Experience includes the following, the proposal may be given rated lower (the following list is not all encompassing):
• Offeror fails to submit projects demonstrating experience in Afghanistan.
• Offeror fails to submit projects within the cost threshold
• Offeror fails to submit projects within the relevant timeline (completed within the last six years of the solicitation issue date or at least 80% complete by the Phase I submission due date).
• Experience examples that are not verifiable.
• Projects which fail to explain the depth of experience for a category which it was submitted.
• Projects older than 6 years may be considered but will be considered less relevant.
The adjectival ratings for FACTOR 1: EXPERIENCE are listed and defined below:
Technical Ratings
ADJECTIVE DEFINITION
OUTSTANDING Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
GOOD Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
ACCEPTABLE Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
MARGINAL Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
UNACCEPTABLE Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
The adjectival ratings, defined below, are not separate ratings, but will be used to define the levels of risk in the aforementioned table.
Technical Risk Ratings Adjective Definition Low Has little potential to cause disruption of schedule, increase cost or degradation of performance. Normal contractor efforts and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Can potentially cause disruption of schedule, increase cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Is likely to cause significant disruption of schedule, increase cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
FACTOR 2: PAST PERFORMANCE
SUBMISSION REQUIREMENTS:
The Past Performance Questionnaire (PPQ), Attachment 3, included in the solicitation is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal for Factor 1, Experience. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (Attachment 3), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Ms. Oksana Strekha via email at Oksana.Strekha@usace.army.mil and erica.j.taylor@usace.army.mil prior to proposal closing date.
Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Offerors may provide a completed Department of Defense, DD2626 form or a Contractor Performance Assessment Report (CPAR), in lieu of Attachment 3. CPARS evaluations and DD2626s shall be signed by all designated authorities for consideration of evaluation.
Offerors may also include performance recognition documents received within the last six (6) years, such as awards, award fee determinations, customer letters of commendation, commercial and foreign government evaluations and any other forms of performance recognition.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, JV, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror and the government is under no obligation to check other sources.
EVALUATION CRITERIA:
The Government will evaluate the Offeror’s past performance to determine how relevant project work is, as described in Factor 1 Experience, for recent projects. The Government will evaluate the Offeror’s performance to determine a confidence assessment of the Offeror’s performance. With respect to relevancy, more relevant past performance will typically be a stronger predictor of future performance and have more influence on the past performance confidence assessment than past performance of lesser relevance.
Past Performance will be evaluated for projects completed in the last 6 years from the date of this solicitation or currently ongoing (at least 80% complete).
The Offeror's past performance will be evaluated based on performance on projects submitted under Factor 1 Experience, to include the past performance of any Subcontractors or JV partners whose projects the Offeror may have submitted. Proposals will be evaluated based on the information provided and any other Past Performance information obtained by the Government.
The Government reserves the right to verify statements the Offeror makes regarding its past performance to determine whether they are substantiated.
The Government will consider past performance information in evaluating overall risk associated with a particular Offeror. When evaluating these criteria, the following will be taken into mailto:erica.j.taylor@usace.army.mil consideration for evaluation purposes:
a. The relevance of the past performance;
b. how recently the project submitted was performed;
c. trends in the Offeror’s performance;
d. evaluations, letters of appreciation, and commendations from customers; and
e. positive and/or negative comments that impact evaluation of Offeror’s past performance.
Unavailability of Past Performance Information: IAW FAR 15.305(a)(2)(iv), in the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available; the Offeror may not be evaluated favorably or unfavorably on past performance and will receive a neutral rating.
The adjectival ratings for FACTOR 2: PAST PERFORMANCE are listed and defined below:
Past Performance Relevancy Ratings:
Rating Definition Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
FACTOR 3: MANAGEMENT PLAN
SUBMISSION REQUIREMENTS:
Performance Confidence Assessments Rating Definition
Substantial Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral)
No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.
NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will not be evaluated by the Government.
The Offeror shall submit a graphical description (an organization chart) of its planned organization structure for successful execution of the contract. There is a limit of thirty (30) single spaced typed pages (A4 or letter size), using at a minimum a 12 pitch font, front and back equal two pages. If more than 30 pages are submitted, only the first 30 pages will be reviewed and evaluated. The organization chart, resumes, and letters of commitment are not considered part of the 30 pages. The organizational chart shall not be larger than 11x17 paper size. The Management Approach shall include the following:
1. ORGANIZATIONAL CHART: An organization chart (graph) that shows;
a) lines of authority and communication for the execution of the contract;
b) clearly shows the lines of authority of the Offeror’s Program Manager, Project Manager, Site Superintendent, and Site Safety and Health Officer (SSHO),
c) the organization chart shall also include all JV Partners and Key Subcontractors, when applicable; and
d) the chart shall identify all offices involved in this contract from the Offeror’s Headquarters to the Offeror’s site office(s), and how they are related; positions should be identified on the organization chart by title, and physical location.
2. ORGANIZATIONAL CHART NARRATIVE: A narrative description of the organization structure including roles, major responsibilities, and authorities of all JV Partners, Key Subcontractors, and key personnel. The position titles used in the narrative must match those used in the organization chart.
3. KEY PERSONNEL NARRATIVE: The Key Personnel required are:
A. Project Manager B. Civil Engineer C. Structural Engineer D. Contractor Quality Control Manager (CQCM)
4. PROJECT MANAGEMENT PLAN: Provide a Project Management Plan that describes how your labor, resources, subcontractors and material suppliers will be coordinated and used to ensure successful and safe completion of the project.
a) Describe how you will manage, supervise and coordinate the subcontractors' work and who in the organization will be responsible for this management and coordination.
b) Discuss how you will manage safe construction practices.
c) Describe in general terms the team’s quality control approach, corporate systems, and capabilities to maintain quality control of the construction.
d) A narrative demonstrating the offeror’s ability to comply with FAR 52.214-11
Limitations on Subcontracting.
EVALUATION CRITERIA:
Proposals will be evaluated for reasonableness, risk, and logic and the extent to which the proposal illustrates an understanding of managing the contract.