Solicitation No. W5J9JE-18-R-0001
US Army Corps of Engineers Afghanistan Engineer District
AFGHAN NATIONAL POLICE (ANP)
Ministry of Interior (MoI) Complex
Female Police Town Phase II Kabul Province, Afghanistan Project No. ANP-17-001
Site Adapt Project Specifications And Drawings
Proposal Requirements, Contract Forms, Conditions of the Contract
Final
February 2018
This page was intentionally left blank for duplex printing.
W5J9JE-18-R-0001
Table of Contents - Page 1
TABLE OF CONTENTS
SPECIFICATIONS FOR:
Ministry of Interior (MoI) Complex, Female Police Town Phase II
KABUL, AFGHANISTAN
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
Section Title
00 10 00 Solicitation 00 21 00 Instructions 00 22 00 Supplementary Instructions 00 45 00 Representatives and Certifications 00 70 00 Conditions of the Contract 00 72 00 Contract Conditions 00 73 00 Supplementary Conditions
APPENDIX A-1 TECHNICAL SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
Section Title
01 00 00 General Requirements 01 11 00 Summary of Work 01 11 05 Design Requirements 01 32 17 Network Analysis Schedule 01 33 00 Submittal Procedures 01 33 00a Submittal Procedures Attachment 01 33 10 Submittal Procedures for Design-Build Project 01 35 13 Special Project Requirements 01 35 26 Government Safety Requirements 01 35 26a Government Safety Requirements Attachment 01 35 53 Site Security 01 42 00 Sources for Reference Publications 01 42 15 Metric Measurement 01 45 00 Contractor Quality Control 01 45 05 Quality Control System (QCS) 01 57 20 Environmental Protection 01 78 00 Closeout Submittals 01 78 23 Operation and Maintenance Data
DIVISION 03 - CONCRETE
03 11 13.00 10 Structural Cast-In-Place Concrete Forming 03 15 00.00 10 Concrete Accessories
(CONTINUED)
Table of Contents - Page 2
03 20 00.00 10 Concrete Reinforcing 03 30 00.00 10 Cast-In-Place Concrete 03 35 00.00 10 Concrete Finishing 03 39 00.00 10 Concrete Curing
DIVISION 04 - MASONRY
04 20 00 Unit Masonry 04 57 13.00 10 Masonry Wood Stove and Propane Cooking Stove
DIVISION 05 - METALS
05 30 00 Steel Decks 05 40 00 Cold-Formed Metal Framing 05 50 13 Miscellaneous Metal Fabrications 05 51 33 Metal Ladders 05 52 00 Metal Railings
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry 06 20 00 Finish Carpentry
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 53 Elastomeric Sheet Water Proofing 07 21 13 Board and Block Insulation 07 24 00 Exterior Insulation and Finish Systems 07 41 13 Metal Roof Panels 07 60 00 Flashing and Sheet Metal 07 84 00 Firestopping 07 92 00 Joint Sealants
DIVISION 08 - OPENINGS
08 11 13 Steel Doors and Frames 08 33 13 Coiling Counter Doors 08 51 13 Aluminum Windows 08 62 23.00 23 Tubular Daylighting Device 08 71 00 Door Hardware 08 81 00 Glazing
Table of Contents - Page 3
DIVISION 09 - FINISHES
09 22 00 Supports for Plaster and Gypsum Board 09 22 37.00 10 Lathing and Plastering 09 23 00 Gypsum Plastering 09 30 00 Tile 09 51 00 Acoustical Ceilings 09 65 00 Resilient Flooring 09 84 20 Acoustical Wall Panels and Ceiling Hung Treatments 09 90 00 Paints and Coatings
DIVISION 10 - SPECIALTIES
10 10 00 Visual Communications Specialties 10 14 00.20 Interior Signage 10 21 13 Toilet Compartments 10 28 13 Toilet Accessories 10 44 16 Fire Extinguishers 10 51 13 Metal Lockers 10 73 43.00 23 Prefabricated Metal Shelters (Bus Stop)
DIVISION 11
11 41 11 Refrigerated and Frozen Food Storage Equipment 11 66 23.00 23 Gymnasium Equipment and Bleachers
DIVISION 12 – FURNISHINGS
12 21 00 Window Blinds 12 32 00 Manufactured Wood Casework 12 36 00 Countertops 12 51 00.00 23 Furniture, Fixtures, and Equipment (FF&E) Requirements
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 Metal Building Systems 13 48 00 Seismic Protection for Miscellaneous Equipment
DIVISION 21 - FIRE SUPPRESSION
21 12 00 Standpipe Systems 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection
Table of Contents - Page 4
DIVISION 22 - PLUMBING
22 00 00 Plumbing, General Purpose 22 07 19.00 40 Plumbing Piping Insulation
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems 23 05 93.00 10 Testing, Adjusting, and Balancing For HVAC 23 11 25 Facility Gas Piping
DIVISION 26 - ELECTRICAL
26 00 00.00 20 Basic Electrical Materials and Methods 26 05 00.00 40 Common Work Results for Electrical 26 05 48.00 10 Seismic Protection for Electrical Equipment 26 08 00 Apparatus Inspection and Testing 26 12 19.10 Three-Phase Pad-Mounted Transformers 26 20 00 Interior Distribution System 26 23 00.00 40 Switchboards 26 28 01.00 10 Coordinated Power System Protection 26 41 00.00 20 Lightning Protection System 26 42 13.00 20 Cathodic Protection by Galvanic Anodes 26 51 00 Interior Lighting 26 56 00 Exterior Lighting
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 Interior Fire Alarm and Mass Notification System
DIVISION 31 - EARTHWORK
31 00 00 Earthwork
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 16 Aggregate Base Course 32 12 10 Bituminous Tack and Prime Coats 32 12 16 Hot-Mix Asphalt (HMA) For Roads 32 15 00 Aggregate Surface Course 32 16 13 Concrete Sidewalks 32 17 23 Pavement Markings 32 31 13 Chain Link Fences and Gates 32 31 13.53 High-Security Chain Link Fences and Gates
Table of Contents - Page 5
DIVISION 33 - UTILITIES
33 11 00 Water Distribution 33 30 00 Sanitary Sewers 33 71 01 Overhead Transmission and Distribution 33 71 02 Underground Electrical Distribution 33 77 36.00 40 Medium-Voltage Utility Fuses
APPENDIX A-2 Technical References
APPENDIX B Drawings (Provided Under Separate Cover)
-- END OF TABLE OF CONTENTS --
This page was intentionally left blank for duplex printing.
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
W5J9JE18R0001
TRANSATLANTIC AFGHANISTAN ENGINEER-TAA
DISTRICT (TAA), US ARMY CORPS OF ENGINEERS
CETAA-CT, BAGRAM AE 09354
ANP WPP MoI WOMEN'S POLICE TOWN PHASE 2
FULL AND OPEN PROCUREMENT: This solicitation is open to all contractors. Offerors shall submit a completed copy of their Domestic Investment License issued by the Afghanistan Investment Support Agency (AISA) (http://www.aisa.org.af/english/applications.html) or Ministry of Commerce & Industries (MOCI) (http://www.moci.org.af/) with their proposal. Offerors must be registered in Joint Contingency Contracting System (JCCS) (https://www.jccs.gov/OLVRAC/bta_jccs_login/aspx) and System Award Management (SAM) (https://www.sam.gov).
NOTE: IAW AFARS 5132.702(a)(ii)(B), "Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available."
SEE ITEM 7
JOHN SOLOMON 079-343-4105
ANP 17-001
1 10514 MAR 2018
13 April 2018
10:00 am
52.211-10 n2taakmr Typewritten Text 30% Performance & 30% Payment n2taakmr Typewritten Text n2taakmr Typewritten Text
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
BASE BID ITEMS
FFP
DESIGN PROGRAM, PRIMARY FACILITY, AND SUPPORTING FACILITIES
(FACILITIES OUTSIDE THE (5) FOOT BUILDING ENVELOPES) IN
ACCORDANCE WITH THE SOLICITATIONS, SPECIFICATIONS, PLANS,
AND DRAWINGS ATTACHED.
FOB: Destination
NET AMT
0002 1 Job
OPTION OPTION 1
FFP
FAMILY HOUSING BUILDING - NORTH IN ACCORDANCE WITH THE
SOLICITATIONS, SPECIFICATIONS, PLANS, AND DRAWINGS
ATTACHED.
0003 1 Job
OPTION OPTION 2
FFP
FAMILY HOUSING BUILDING - SOUTH IN ACCORDANCE WITH THE
SOLICITATIONS, SPECIFICATIONS, PLANS, AND DRAWINGS
0004 1 Job
OPTION OPTION 3
FFP
PRIMARY SCHOOL IN ACCORDANCE WITH THE SOLICITATIONS,
SPECIFICATIONS, PLANS, AND DRAWINGS ATTACHED.
0005 1 Job
OPTION OPTION 4
FFP
PERIMETER SECURITY & VISITOR CONTROL CENTER IN ACCORDANCE
WITH THE SOLICITATIONS, SPECIFICATIONS, PLANS, AND DRAWINGS
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-AUG-2018 TO
17-JAN-2021
N/A TRANSATLANTIC AFGHANISTAN
ENGINEER - TAA
DISTRICT (TAA), US ARMY CORPS OF
ENGINEERS
CETAA-CT, BAGRAM AE 09354
079-343-4105
W5J9JE
0002 POP 01-AUG-2018 TO
17-JAN-2021
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY FULL TEXT
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
(End of clause)
BID SCHEDULE
BID SCHEDULE
(ALL AMOUNTS SHOULD BE ROUNDED TO THE NEAREST DOLLAR)
PROJECT: ANP 17-001, Ministry of Interior Complex, Female Police Town II, Kabul Province, Afghanistan
SOLICITATION NUMBER: W5J9JE-18-R-0001
BASE CLIN ITEMS
DESIGN PROGRAM
CLIN
NO.
DESCRIPTION QTY UNIT UNIT PRICE TOTAL AMOUNT
0001 Site Survey/A-E Design 1 JOB 0002 Geotechnical Investigation
JOB
0003 As-Built Drawings (Closeout)
PRIMARY FACILITY
0004 Daycare Facility with Playground
Area
0005 Daycare Facility with Playground Area – Furniture, Fixtures, and
Equipment (FF&E)
SUPPORTING FACILITIES (FACILITES OUTSIDE THE (5) FOOT BUILDING ENVELOPES)
0006 Site Demolition 1 JOB 0007 Site Grading 1 JOB 0008 Site Pavement 1 JOB 0009 Fencing and Walls 1 JOB 0010 FORCE PRO (Guard Shacks, Drop
Arms, & Canopies)
0011 Guard Shack - Furniture, Fixtures, and Equipment (FF&E)
0012 Site Electrical 1 JOB 0013 Site Water 1 JOB 0014 Site Sewer 1 JOB 0015 Site Communications 1 JOB 0016 Mobilization 1 JOB 0017 Demobilization 1 JOB 0018 Bonding 1 JOB
TOTAL BASE CLINS
BID SCHEDULE (CONTINUED)
OPTION 1: FAMILY HOUSING BUILDING - NORTH
NO.
DESCRIPTION QTY UNIT UNIT PRICE TOTAL AMOUNT
OPTION CLINS
0019 Family Housing Building North
0020 Furniture, Fixtures, and
0021 Associated Site Work 1 JOB 0022 Mobilization 1 JOB 0023 Demobilization 1 JOB 0024 Additional Bonding 1 JOB
TOTAL OPTION 1 (CLINS 0019-0024)
OPTION 2: FAMILY HOUSING BUILDING – SOUTH
DESCRIPTION QTY UNIT UNIT PRICE TOTAL AMOUNT
0025 Family Housing Building South
0026 Furniture, Fixtures, and
0027 Associated Site Work 1 JOB 0028 Mobilization 1 JOB 0029 Demobilization 1 JOB 0030 Additional Bonding 1 JOB
TOTAL OPTION 2 (CLINS 0025-0030)
OPTION 3: PRIMARY SCHOOL
0031 Primary School 1 JOB 0032 Furniture, Fixtures, and
0033 Site Work 1 JOB 0034 Playground Area Near School
0035 Youth Soccer Field between Daycare and School
0036 Mobilization 1 JOB 0037 Demobilization 1 JOB 0038 Additional Bonding 1 JOB
TOTAL OPTION 3 (CLINS 0031-0038)
OPTION 4 : PERIMETER SECURITY & VISITOR CONTROL CENTER
0039 Visitor Control Center 1 JOB
0040 Furniture, Fixtures, and
1 JOB
0041 Site Work 1 JOB 0042 Perimeter Security Building (3
Guard Towers)
0043 Site Parking 1 JOB 0044 Mobilization 1 JOB 0045 Demobilization 1 JOB 0046 Additional Bonding 1 JOB
TOTAL OPTION 4 (CLINS 0039-0046)
TOTALS
TOTAL BASE CLINS 0001-0018
TOTAL OPTIONAL CLINS 0019-0046
TOTAL BASE PLUS OPTIONAL CLINS 0001-0046
PROPOSAL SCHEDULE NOTES
1. Offeror shall submit prices on all items. Each item is described in Section 01 11 00 SUMMARY OF WORK.
2. All amounts shall be rounded to the nearest dollar.
-END OF SECTION-
Section 00 21 00 - Instructions
INSTRUCTIONS
SOLICITATION PROVISIONS INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
A. GENERAL INFORMATION
| This | solicitation | is | for | a | firm‐fixed | price | contract | to | acquire | construction | services | for | the | procurement, | |||||
| management, | and | construction | efforts | providing | a | complete | and | usable | facilities | consisting | of | Entry | Control | ||||||
| Points, | Visitor’s | Center, | guard | towers, | two | (2) | five | story | Family | Housing | Buildings, | a | primary | schools, | daycare | ||||
| center | and | associated | utilities | and | supporting | structures. | The | project | will | be | constructed | in | accordance | with | |||||
| construction | and | safety | standards | as | outlined | in | EM | 385‐1‐1. | |||||||||||
| In | accordance | with | Federal | Acquisition | Regulation | (FAR) | Part | 15, | award | of | a | contract | shall | be | made | to | the | ||
| responsible | offeror | whose | overall | proposal | is | determined | to | be | the | most | advantageous | to | the | Government. | |||||
| Pricing | shall | be | evaluated | for | completeness | and | reasonableness. | Non‐pricing | features | of | each | proposal | shall | ||||||
| be | evaluated | against | the | solicitation | requirements, | assessing | their | strengths | and | significant | strengths, | ||||||||
| weaknesses | and | significant | weakness, | as | well | as | associated | risks | and | deficiencies | of | each | proposal | in | light | of | |||
| the | non‐pricing | evaluation | criteria | that | is | also | described | herein. | Non‐pricing | features | of | an | offeror’s | proposal | |||||
| shall | be | evaluated | in | such | a | manner | as | to | assess | the | value | of | those | features | as | compared | to | the | proposed |
| prices | or | costs | to | the | Government. | Implicit | in | this | process | is | the | Government’s | willingness | to | accept | other | |||
| than | the | lowest | priced | offer | if | the | added | benefits | of | a | higher | priced | offer | outweigh | the | additional | cost | or | price |
| involved. | Non‐price | factors, | when | combined, | are | significantly | more | important | than | price. | |||||||||
| Magnitude | of | Construction: | The | estimated | cost | of | this | project | is | over | $10 | million. |
The Primary NAICS code is 236220 with a small business size of $36.5 million.
B. PROPOSAL REQUIREMENTS, CONTENT, AND FORMAT
| The | Government | will | not | reimburse | any | costs | incurred | or | associated | with | preparation | and | submission | of | any | |||
| responses | to | this | solicitation. | Oral | explanations | or | instructions | to | offerors | are | not | binding. | Any | information | ||||
| given | to | an | offeror | which | impacts | the | solicitation | and/or | offer | will | be | given | in | the | form | of | a | written |
| amendment | to | the | solicitation. | Any | and | all | amendments | to | the | solicitation | will | be | issued | electronically | via | |||
| email. | It | is | the | offeror’s | responsibility | to | acknowledge | any | and | all | amendments | in | its | proposal | submission. |
| Offerors | should | not | modify | the | terms | and | conditions | of | the | solicitation | in | either | the | technical | or | price | |
| proposal | or | add | conditions | or | qualifications | to | their | offers. | Should | an | offeror | include | terms | and | conditions | ||
| that | conflict | with | the | terms | and | conditions | of | the | solicitation, | that | offeror | may | be | determined | to | be | ineligible |
| for | award. | Any | questions | related | to | specific | terms | and | conditions | contained | within | the | solicitation | should | be | ||
| resolved | prior | to | submission | of | an | offer. | Notwithstanding | the | above, | the | offeror | must | clearly | describe | in | its | |
| price | proposal | any | modifications | to | the | contractual | and/or | technical | terms | and | conditions | of | the | solicitation | |||
| contained | in | its | offer. |
| References | to | “confidential” | projects | cannot | be | submitted | to | demonstrate | capability | unless | all | of | the | ||||
| information | required | for | evaluation | as | specified | herein | can | be | provided | to | the | Government | as | part | of | the | |
| offeror’s | technical | proposal. | Offerors | that | include | information | in | their | proposals | that | they | do | not | want | |||
| disclosed | to | the | public | for | any | purpose, | or | used | by | the | Government | except | for | evaluation | purposes, | must | |
| clearly | mark | their | proposals | in | accordance | with | the | instructions | at | FAR | Clause | 52.215‐1, | Instructions | to | |||
| Offerors‐Competitive | Acquisition, | paragraph | (e), | Restriction | on | Disclosure | and | Use | of | Data. | Use | of | the | words | |||
| “will”, | “shall”, | or | “must” | indicates | a | mandatory | requirements | for | which | failure | to | comply, | at | the | time | and | date |
| for | submission | of | proposals, | may | result | in | the | offeror’s | proposal | being | disqualified | from | consideration | for | |||
| award, | or | a | deficiency | or | weakness | being | assessed | for | the | factor. | The | Government | may | elect | to | initiate | |
| discussions | with | some | or | all | of | the | offerors, | thereby | providing | a | means | by | which | appropriate | corrections | by | |
| the | offeror(s) | involved | can | be | made. | Failure | to | comply | with | non‐pricing | or | pricing | requirements | that | are | ||
| annotated | with | the | words | “should”, | or | “may” | can | result | in | a | lowering | of | an | offeror’s | non‐pricing | ratings, | and |
| may | have | a | significant | effect | upon | an | offeror | being | selected | for | the | contract | award. | Time | periods, | if | stated | as | a |
| number | of | days, | are | calendars | days | unless | otherwise | specified. |
1. REQUIRED REGISTRATIONS
| Failure | to | have | an | active | and | completed | registration | in | any | one | of | the | following | databases | may | determine | an | |
| offeror | ineligible | for | award | and | removed | from | competition. | A | successful | offeror | with | incomplete | or | expired | ||||
| registrations | at | the | time | of | award | may | not | be | eligible | for | a | contract. | In | such | instances, | the | Government | will |
| award | to | the | next | successful | offeror | who | is | eligible | for | award. | The | Government | reserves | the | right | to | ||
| determine | an | offeror | non‐responsible | at | any | time | after | receipt | of | proposal | if | the | offeror | is | found | to | be | |
| ineligible | for | installation | access | in | accordance | with | CENTCOM | Clause | 5152.225‐5916, | Mandatory | Eligibility | |||||||
| for | Installation | Access. |
| Information | contained | within | an | offeror’s | registration | must | be | current | and | valid. | The | responsibility | of |
| maintaining | current | information | contained | in | an | offeror’s | registration | rests | solely | on | the | offeror. |
a. System for Award Management (SAM): http://www.sam.gov/
b. Joint Contingency Contracting System (JCCS): https://www.jccs.gov/
c. Still valid Afghan Investment Support Agency (AISA) License will be accepted:
| http://www.aisa.org.af/ | or | newly | acquired | Ministry | of | Commerce | and | Industries | (MOCI) |
| Entrepreneurial | License | http://moci.gov.af/. |
| If | an | offeror | is | a | joint | venture | (JV), | the | JV | entity | must | have | a | valid | registration | representing | the | JV | as | one |
| business/firm/entity. | This | is | applicable | to | SAM, | JCCS, | and | AISA | and | MOCI. | The | Government | will | not | accept | |||||
| separate | registrations | and | licenses | for | each | separate | entity | representing | the | JV. |
| An | offeror’s | subcontractors | are | required | to | be | registered | and | active | in | JCCS. | In | accordance | with | CENTCOM | ||
| Clause | 5152.225‐5916, | Mandatory | Eligibility | for | Installation | Access, | offerors | are | required | to | submit | a | listing | ||||
| of | all | proposed | subcontractors, | at | all | tiers, | to | the | contracting | officer | with | the | submission | of | their | proposal, | |
| and | provide | updates | during | the | life | of | the | contract | when | subcontractors | are | added | or | removed. | If | no | |
| subcontractors | are | expected | to | perform | during | the | life | of | the | contract, | a | bidder | must | submit | a | negative | |
| response | to | the | contracting | officer | within | its | proposal. | Subcontractors | at | every | tier | are | held | to | the | same | |
| installation | access | requirements, | as | noted | above, | as | prime | contractors. |
2. PROPOSAL CONTENT
| Offerors | are | required | to | submit | proposals | with | at | least | the | minimum | content | specified | herein. | Proposals | ||
| without | the | minimum | content | may | be | determined | ineligible | for | award | and | removed | from | the | competition. | ||
| The | Government | will | not | make | assumptions | concerning | intent, | capabilities, | or | experiences. | Clear | |||||
| identification | of | proposal | details | shall | be | the | sole | responsibility | of | the | offeror. | The | Government | may | reject | |
| incomplete | proposals | after | initial | evaluation | without | further | consideration. | All | information | intended | to | be | ||||
| evaluated | as | part | of | the | technical | proposal | must | be | submitted | within | the | technical | proposal. | Do | not | cross‐ |
| reference | pricing | information | into | the | technical | proposal | or | vice | versa. | Do | not | include | references | to | material | |
| or | information | not | found | within | its | respective | volumes. | Information | submitted | in | the | wrong | volumes | could | ||
| lead | to | an | offeror’s | proposal | being | determined | unacceptable | if | materially | incomplete | in | any | aspect. |
| COVER | PAGE: | A | cover | page | shall | appear | at | the | beginning | of | each | volume | and, | at | a | minimum, | shall | consist | of |
| the | following | information: |
i. Solicitation number
| ii. Offeror’s | name, | physical | mailing | addresses, | telephone | number, | and | address | of | the | |
| official | having | the | authority | to | bind | the | offeror | contractually. |
| iii. Offeror’s | DUNS | Number, | CAGE | Code, | AISA | License | or | MOCI | License, | JCCS | ID | Number, | and | Tax |
| ID | (TIN) |
| TABLE | OF | CONTENTS: | A | table | of | contents | shall | be | placed | in | each | volume | and | shall | identify | major | areas | by |
| title, | page | numbers, | and | volume | location. |
| BID | GUARANTEE: | The | bid | guarantee | required | must | be | supported | by | a | surety | or | irrevocable | letter | of | credit | ||
| in | the | amount | of | thirty | percent | (30%) | of | proposed | price | but | shall | not | exceed | $3 | million. | |||
| VOLUME | I, | TECHNICAL | PROPOSAL: | The | information | required | within | an | offeror’s | technical | proposal | is | ||||||
| described | under | Basis | of | Award | and | Evaluation | Factors. | Do | not | submit | pricing | information | in | the | technical |
proposal.
i. Technical evaluation Factors
| FACTOR | 1: | SPECIALIZED | EXPERIENCE | |
| FACTOR | 2: | PRELIMINARY | PROJECT | SCHEDULE |
| FACTOR | 3: | KEY | PERSONNEL |
| VOLUME | II, | PRICE | PROPOSAL: | The | information | required | within | an | offeror’s | price | proposal | is | described |
| under | Evaluation | Factors. | Within | an | offeror’s | price | proposal, | the | following | must | be | submitted: |
| i. | Signed | Solicitation, | Offer, | and | Award | (SF | 1442) | with | blocks | 14‐20c | completed, | including | ||
| acknowledgment | of | all | amendments. |
ii. Completed SF 1442, Section 00 11 00 CLIN Schedule
iii. Completed Cost Breakdown spreadsheet in an Excel format. Ensure figures and totals match
| Section | 00 | 11 | 00 | CLIN | Schedule. | The | cost | breakdown | spreadsheet | should | provide | costs | in | connection | with | |
| the | base | bid | items | and | optional | items | to | include | i.e., | labor, | materials, | equipment, | indirect | costs, | direct | costs, |
| and | etc. |
iv. Completed Corporate Certificate/Authority to Bind Partnership (Attachment A)
| If | the | offeror | is | a | corporation, | completed | Corporate | Certificate; | OR | ||||||
| If | the | offeror | is | a | partnership, | completed | Authority | to | Bind | Partnership | and | a | copy | of | the |
| Partnership | Agreement; | or | ||||||||||||
| If | the | offeror | is | a | joint | venture, | completed | Corporate | Certificate | for | each | member | of | the |
joint venture and a copy of the Joint Venture Agreement.
v. Completed Representation and Certifications (Section 00 45 00)
vi. Completed Financial Standing Questionnaire (Attachment B)
vii. Copy of valid AISA license or MOCI license
| viii. | Copy | of | Bid | Guarantee | in | the | amount | thirty | (30%) | percent | of | the | proposal | amount | but | |||
| shall | not | exceed | $3 | million. |
| Offerors | shall | verify | that | the | information | for | all | forms | submitted | are | current, | correct, | and | complete, | including |
| names | of | points | of | contact, | addresses, | and | telephone | numbers. |
| The | Government | will | not | evaluate | any | material | that | exceeds | the | page | limits | specified | within | each | evaluation | |
| factor. | Elaborately | prepared | proposals | are | not | required, | and | any | material | in | excess | of | what | is | requested, | |
| such | as | corporate | marketing | information, | will | not | be | considered. |
| Failing | to | submit | or | completely | fill | out | attachments | properly | may | result | in | rejection | of | the | offer | without |
| further | evaluation. | Therefore, | offerors | are | urged | to | follow | instructions | and | raise | questions | through | inquiries | |||
| if | instructions | are | not | understood. |
3. PROPOSAL FORMAT
| a. | Proposals | must | be | typed | and | submitted | in | English. | Proposals | submitted | in | a | language | other | than | ||
| English | will | be | rejected | and | will | not | be | considered. | Letters | of | Commitment | and | JV | partner | agreements, | if | not |
| written | in | English, | must | be | accompanied | by | an | English | translated | copy | with | a | signed | statement | by | the | |
| authorized | representative | of | each | JV | partner | that | the | English | translation | is | true | and | correct. |
| b. | An | offeror’s | proposal | shall | be | in | an | Adobe | portable | document | format | (PDF) | with | the | exception | of | |
| the | Cost | Breakdown | spreadsheet, | which | shall | be | in | an | Excel | format. | An | offeror’s | technical | proposal | and | price | |
| proposal | shall | be | submitted | as | two | separate | volumes | files). |
c. Proposals must be sized to print on 8 1/2” x 11” paper (11” X 17” for drawings). Margins shall be
| no | smaller | than | a | half | inch | (1/2”), | font | face | shall | be | Times | New | Roman | or | Arial, | and | font | size | shall | be | no | |
| smaller | than | 10 | point | font. | Page | is | defined | as | a | single | sheet | of | paper | with | text | on | one | side. | Pages | furnished | ||
| for | organizational | purposes | only, | such | as | a | cover | page | or | a | table | of | contents, | are | not | included | in | the | page | |||
| limitation. | Joint | venture | agreements | and | letters | of | commitment | are | also | not | included | in | page | limitations. |
d. Offerors shall place the following notification on the bottom of each page of their proposals:
| “SOURCE | SELECTION | INFORMATION | – | SEE | FAR | 2.101 | AND | 3.104. | DO | NOT | DISCLOSE | ANY | SOURCE |
| SELECTION | INFORMATION | TO | ANY | UNAUTHORIZED | PERSON.” |
| e. | Schedules | – | should | be | prepared | using | Primavera | 6 | and | supplied | in | the | .xer | format. | |
| 4. | PROPOSAL | SUBMISSION | INSTRUCTIONS |
| Electronic | proposals | submitted | via | AMRDEC | at | https://safe.amrdec.army.mil/safe/ | is | the | required | method | of | ||||||
| transmission | and | will | be | the | only | form | of | submission | accepted. | It | is | the | offeror’s | responsibility | to | ensure | its |
| proposal | is | received | by | the | Government | by | the | date | and | time | of | the | proposal | deadline, | e.g., | undeliverable | |
| messages | due | to | an | offeror’s | proposal | size | is | not | the | responsibility | of | the | Government. |
Proposals are due no later than what is stated in Block 13 of the SF1442 to the following email addresses:
| Kimberly | M. | Robinson | John | Solomon | ||
| Contracting | Officer | Contract | Specialist | |||
| Office: | (540)‐723‐4884 | Office: | (540)‐722‐6078 | |||
| Kimberly.M.Robinson@usace.army.mil | John.S.Solomon@usace.army.mil |
| Late | Proposals: | Any | proposal, | modification, | or | revision | received | by | the | Government | after | the | exact | time | ||||||
| specified | for | receipt | of | offers | is | “late” | and | will | not | be | considered | unless | it | is | received | before | award | is | made, | |
| the | contracting | officer | determines | that | accepting | the | late | offer | would | not | unduly | delay | the | acquisition, | and | |||||
| (1) | if | it | was | transmitted | through | an | electronic | commerce | method | authorized | by | the | solicitation, | and | it | was | ||||
| received | at | the | initial | point | of | entry | to | the | Government | infrastructure | not | later | than | 4:00 | p.m. | one | working | |||
| day | prior | to | the | date | specified | for | receipt | of | proposals; | or | (2) | there | is | acceptable | evidence | to | establish | that | it | |
| was | received | at | the | Government | installation | designated | for | receipt | of | offers | and | was | under | the | Government's | |||||
| control | prior | to | the | time | set | for | receipt | of | offers; | or | (3) | it | is | the | only | proposal | received. | However, | a | late |
| modification | of | an | otherwise | successful | proposal | that | makes | its | terms | more | favorable | to | the | Government | will | |||||
| be | considered | at | any | time | it | is | received | and | may | be | accepted. |
C. SOLICITATION INQUIRIES
| All | inquiries | regarding | this | solicitation | are | to | be | submitted | via | ProjNet. | Telephone | and | inquiries | will | not | |
| be | accepted. | ProjNet | is | a | web‐based | program | that | allows | offerors | to | post | questions | regarding | the | solicitation | |
| and | view | all | questions | by | other | offerors | and | responses | by | the | Government. |
| 1. | Offerors | shall | only | submit | one | question | per | inquiry. | All | inquiries | containing | multiple | questions | ||
| will | be | rejected. |
2. Offerors will receive an acknowledgement of their question(s) via email, followed by an answer to their question(s) after it has been processed. Offerors may view all inquiries through ProjNet.
3. Inquiries must be submitted ten (10) days prior to the proposal due date. Offerors will not be able to submit inquiries after this date.
4. To submit and review inquiries, offerors will need to use the inquiry key presented below and follow the instructions listed below the key for access.
5. The Inquiry Key is: 45HQ3T‐7WVDVA
| a. From | the | ProjNet | home | page | link: | https://www.projnet.org/projnet/ | click | on | Quick | Add | on |
| the | upper | right | side | of | the | screen. |
b. Identify the Agency: This should be marked as USACE.
c. Key: Enter the Inquiry Key listed above.
d. Email: Enter the email address you would like to use for communication.
e. Click Continue. A page will then open saying that a user account was not found, and it will ask you to create one using the provided form.
f. Enter your first name, last name, company, city, state, phone, email, secret question, secret
| answer, | and | time | zone. | Make | sure | to | remember | your | secret | question | and | answer, | as | they | will | be | used | from |
| this | point | on | to | access | the | ProjNet | system. |
g. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
h. Submit questions or review questions and answers. An offeror who submits a question will
| receive | an | automated | notification | that | its | question | has | been | received. | When | an | answer | is | posted | to | a | |
| question, | the | question | and | answer | are | then | available | for | all | other | offerors | to | review. |
| D. | DEBRIEFING | OF | UNSUCCESSFUL | OFFERORS | |||||||||||||
| Unsuccessful | offerors | will | be | notified | in | accordance | with | FAR | Subpart | 15.5. | An | unsuccessful | offeror | may | |||
| request | a | pre‐award | debriefing | or | a | delayed | debriefing | after | award | by | submitting | a | written | request | to | the | |
| contracting | officer | within | three | (3) | days | after | receipt | of | the | notice | excluding | the | offeror | from | the | competition | |
| and | award. | Offerors | are | entitled | to | no | more | than | one | debriefing | for | each | proposal. | No | debriefing | will | be |
| provided | for | those | offerors | found | non‐responsible | as | a | result | of | their | base | access | ineligibility | as | the | ||
| determination | may | be | made | in | advance | of | the | offeror’s | technical | proposal | being | reviewed. |
E. BASIS OF AWARD
| Subject | to | the | provisions | contained | herein, | award | will | be | made | to | one | (1) | offeror | who | is | deemed | responsible |
| in | accordance | with | the | FAR. | In | determining | the | most | highly | qualified | offeror, | the | Government | will | evaluate | ||
| proposals | to | determine | the | offeror | who | is | responsible | in | accordance | with | FAR | Subpart | 9.1; | who | is | responsive |
| to | the | solicitation | requirements; | and | whose | proposal, | judged | by | an | overall | assessment | of | the | evaluation | ||
| criteria | and | other | considerations | specified | in | this | solicitation, | meets | the | technical | standards | for | price | and | ||
| non‐price | factors | the | best | value | and | is | determined | overall | to | be | the | most | advantageous | to | the | Government, |
| price | and | other | factors | considered. |
| The | technical | evaluation | team, | using | reasoned | judgment, | shall | evaluate | the | experience | and | technical | factors | ||
| by | identifying | significant | strengths, | strengths, | significant | weakness, | weaknesses | and | deficiencies | in | each | ||||
| offeror’s | proposal | and | assigning | a | combined | technical/risk | rating | as | follows: | outstanding | with | very | low | risk, | |
| good | with | low | risk, | acceptable | with | moderate | risk, | marginal | with | high | risk, | or | unacceptable | encompassing | a |
| proposal | that | is | not | awardable. |
| A | strength | in | the | proposal | is | defined | as: | an | aspect | of | an | offeror's | proposal | that | has | merit | or | exceeds | specified |
| performance | or | capability | requirements | in | a | way | that | will | be | advantageous | to | the | Government | during | |||||
| contract | performance. |
| A | significant | strength | in | the | proposal | is: | an | aspect | of | an | offeror's | proposal | that | has | appreciable | merit | or |
| exceeds | specified | performance | or | capability | requirements | in | a | way | that | will | be | advantageous | to | the | |||
| Government | during | contract | performance. |
| A | weakness | in | the | proposal | is | defined | as: | a | flaw | in | the | proposal | that | increases | the | risk | of | unsuccessful |
| contract | performance. |
A significant weakness in the proposal is: a flaw that appreciably increases the risk of unsuccessful contract performance.
| A | deficiency | in | the | proposal | is | defined | as: | A | material | failure | of | a | proposal | to | meet | a | Government | requirement |
| or | a | combination | of | significant | weaknesses | in | a | proposal | that | increases | the | risk | of | unsuccessful | contract | |||
| performance | to | an | unacceptable | level. |
A risk as it pertains to source selection is the potential for unsuccessful contract performance.
| There | may | be | contained | within | the | evaluation | factors | certain | mandatory | or | minimum | requirements | to | be | met |
| for | evaluation. | There | are | also | contained | within | the | described | factors | certain | documents | for | submission. |
| Failure | to | satisfy | any | mandatory | or | minimum | requirement | may | result | in | a | determination | that | an | offer | is | |
| unacceptable. | A | final | determination | that | an | offer | is | unacceptable | means | that | an | award | to | the | offeror | involved | |
| cannot | be | made. |
| The | Government | intends | to | award | a | contract | without | discussions, | but | reserves | the | right | to | hold | discussions | if | ||
| the | Government | determines | that | to | do | so | would | be | in | its | best | interests. | Therefore, | an | offeror’s | initial | proposal | |
| should | contain | the | offeror’s | best | terms | from | a | technical | and | pricing | standpoint. | The | Government | reserves | the | |||
| right | to | conduct | discussions | if | it | is | determined | by | the | contracting | officer | to | be | necessary | or | if | requested | by |
| the | source | selection | authority | (SSA). |
| F. | EVALUATION | FACTORS | ||||||||||||||
| All | of | the | submission | items | to | be | evaluated | pertain | to | the | offeror, | whether | a | single | contractor | entity, |
| partnership, | or | a | joint | venture. |
| Joint | Ventures: | A | joint | venture | is | defined | as | a | legal | business | entity | formed | between | two | or | more | companies | |
| to | undertake | the | performance | activities | of | a | contract | together. | Offerors | proposing | as | joint | ventures | shall | ||||
| provide | evidence | that | the | joint | venture | as | a | legal | entity | has | been | duly | formed. | Joint | ventures | shall | include | a |
| copy | of | the | legal | joint | venture | agreement | signed | by | an | authorized | officer | from | each | of | the | firms | comprising | |
| the | joint | venture, | with | the | chief | executive | of | each | entity | identified. | The | Government | will | not | evaluate | the | ||
| capability | of | any | firms | that | are | not | included | in | the | joint | venture | agreement. |
| Prospective | Offerors | that | submit | proposals | may | not | change | their | joint | venture | firms, | if | selected | for | award. | |
| Joint | Ventures | must | be | properly | registered | in | the | in | accordance | with | the | Required | Registrations | section | as | a |
| Joint | Venture. |
| Subcontractors: | If | the | offeror’s | proposal | includes | the | use | of | subcontractors, | the | offeror | may | not | change | |||||
| subcontractors | without | the | contracting | officer’s | approval. | If | the | offeror | proposes | to | change | subcontractors | |||||||
| after | award, | the | offeror | may | not | change | subcontractors | or | letters | of | commitment | without | the | contracting | |||||
| officer’s | approval. | Approval | will | not | be | given | unless | the | contracting | officer | considers | the | proposed | substitute | |||||
| to | be | equal | or | better | in | all | respects | to | the | originally | proposed | subcontractor | and | that | the | substitution | is | in | the |
| best | interests | of | the | Government. | |||||||||||||||
| Relative | importance | of | evaluation | factors: | For | evaluation | purposes, | the | specialized | experience | and | ||||||||
| preliminary | project | schedule | factors | are | more | important | than | key | personnel. | Specialized | experience | ||||||||
| and | preliminary | project | schedule | are | considered | equal | in | importance | for | evaluation | purposes. | Non‐ | |||||||
| pricing, | when | combined, | are | significantly | more | important | that | price. | |||||||||||
| FACTOR | 1: | SPECIALIZED | EXPERIENCE |
| Factor | 1 | is | more | important | than | Factor | 3 | but |
| equally | important | as | Factor | 2 |
| FACTOR | 2: | PRELIMINARY | PROJECT | SCHEDULE Factor | 2 | is | equally | important | as | Factor | 1 | and | more | |
| important | than | Factor | 3. |
FACTOR 3: KEY PERSONNEL Factor 3 is less important than Factor 1 and Factor
| FACTOR | 4: | PRICE | Non‐price | factors, | when | combined, | are | significantly | |
| more | important | than | price. |
| NON‐PRICING | (TECHNICAL) | EVALUATION | FACTORS | |
| FACTOR | 1: | SPECIALIZED | EXPERIENCE | |
| FACTOR | 2: | PRELIMINARY | PROJECT | SCHEDULE |
| FACTOR | 3: | KEY | PERSONNEL | |
| FACTOR | 1: | SPECIALIZED | EXPERIENCE |
Proposal Submission Requirements:
| The | Offeror | shall | provide | a | narrative | that | outlines | how | its | experience | on | prior | projects | will | positively | impact |
| its | performance | of | the | work | contemplated | by | this | solicitation. | Specifically, | the | Offeror | should | explain | how | its | |
| prior | experience | handling | those | construction | challenges | that | are | frequently | prevalent | in | Afghanistan | will | ||||
| enable | it | to | successfully | perform | the | requirements | of | the | solicitation. |
The Offeror’s narrative must discuss its experience in addressing the following challenges:
| Hiring | qualified | laborers | and | maintaining | a | qualified | workforce. | |||
| Application | of | United | States | and | foreign | laws | that | affect | contract | performance. |
| Procurement | and | shipping | of | long | lead | items. | ||||
| Obtaining | access | to | work | locations, | such | as | obtaining | base | access. | |
| Coordination | with | host | nation | authorities | during | contract | performance. | |||
| Compliance | with | contractual, | administrative, | and | other | Combating | Trafficking | in | Persons |
requirements.
Coordination with multiple contractors on site.
| Failure | to | address | all | of | the | above | challenges | may | result | in | a | deficiency | or | weakness | being | assessed |
| for | this | factor. |
| The | Offeror | may | also | address | its | experience | in | areas | other | than | the | areas | outlined | above, | so | long | as | such |
| experience | demonstrates | how | the | Offeror’s | prior | experience | will | enable | it | to | successfully | perform | the | |||||
| requirements | of | the | solicitation, | in | the | construction | environment | of | Afghanistan. | As | part | of | its | narrative, | the |
| Offeror | should | address | those | process | improvements | or | innovative | techniques | it | created | or | established | to |
| address | those | construction | challenges. |
| The | Offeror | may | highlight | any | experience | that | it | has | gained, | regardless | of | the | date | of | the | project | on | which | this |
| experience | was | gained | or | such | project’s | similarity | to | the | scope, | magnitude, | or | location | of | the | work | ||||
| contemplated | by | this | solicitation. | For | purposes | of | this | portion | of | the | evaluation, | the | focus | is | on | the | Offeror’s | ||
| prior | experience | in | dealing | with | construction | challenges. |
| If | the | Offeror | is | a | JV, | the | Offeror | may | provide | experience | on | projects | performed | by | the | JV | and | projects |
| performed | by | any | JV | partner. |
| For | each | project | specifically | identified | in | the | Offeror’s | narrative, | the | Offeror | shall | provide | a | completed | |||||
| “Attachment | C” | worksheet. | All | information | items | shown | on | Experience | Form | (Attachment | C) | must | be | ||||||
| provided. | For | JVs, | a | strength | may | be | given | where | the | JV | partners | were | the | same | as | the | JV | Offeror. |
| The | prior | experience | narrative | will | be | limited | to | five | pages | in | length. | Attachment | C | will | not | be | included | in | the | |
| five | page | limitation. | Any | pages | over | the | page | limit | will | not | be | reviewed. |
Proposal Evaluation Procedures:
| The | Government | will | evaluate | the | Offeror’s | narrative | for | the | degree | to | which | the | Offeror | possesses |
| experience | that | will | enable | it | to | successfully | perform | the | work | contemplated | by | the | solicitation. |
| The | Government | will | not | accept | the | experience | of | the | Offeror’s | subcontractor(s). | All | experience | presented |
| must | be | the | Offeror’s. |
| The | Government | will | evaluate | the | experience | presented | and | its | application | to | the | work | required | by | the |
| solicitation, | to | determine | whether | the | experience | offered | appreciably | increases | the | likelihood | of | the | Offeror | ||
| successfully | performing | the | work | contemplated | by | the | solicitation. |
Adjectival Ratings and Definitions:
| An | offeror’s | experience | shall | be | evaluated | using | a | combined | technical/risk | rating | which | includes | |||
| consideration | of | risks | in | conjunction | with | a | proposal’s | strengths, | weaknesses, | and | deficiencies. | Combined | |||
| technical/risk | evaluations | shall | utilize | the | combined | technical/risk | ratings | as | follows: | outstanding | with | very | |||
| low | risk, | good | with | low | risk, | acceptable | with | moderate | risk, | marginal | with | high | risk, | or | unacceptable, |
| encompassing | a | proposal | that | is | not | awardable. |
| The | evaluation | of | the | Offeror’s | proposal | for | Specialized | Experience | will | be | evaluated | in | its | entirety | to | result | in |
| an | assignment | of | a | single | Technical | Approach | rating. | The | following | ratings | focus | on | the | strengths, | |||
| deficiencies, | weaknesses, | risks, | and | uncertainties | identified | in | the | Offeror’s | proposal. |
Combined Technical/Risk Ratings
COLOR
RATING
ADJECTIVAL
RATING
DESCRIPTION
Blue
Outstanding
| Proposal | indicates | an | exceptional | approach | and | understanding | of | the |
| requirements | and | contains | multiple | strengths, | and | risk | of | unsuccessful |
| performance | is | low. |
Purple
Good
| Proposal | indicates | a | thorough | approach | and | understanding | of | the | ||
| requirements | and | contains | at | least | one | strength, | and | risk | of | unsuccessful |
| performance | is | low | to | moderate. |
Green
Acceptable
| Proposal | meets | requirements | and | indicates | an | adequate | approach | and | |
| understanding | of | the | requirements, | and | risk | of | unsuccessful | performance | is |
| no | worse | than | moderate. |
Yellow
Marginal
| Proposal | has | not | demonstrated | an | adequate | approach | and | understanding | of |
| the | requirements, | and/or | risk | of | unsuccessful | performance | is | high. |
Red
Unacceptable
| Proposal | does | not | meet | requirements | of | the | solicitation, | and | thus, | contains |
| one | or | more | deficiencies, | and/or | risk | of | unsuccessful | performance | is | |
| unacceptable. | Proposal | is | unawardable. |
| Risk | is | defined | as | follows: |
| Adjectival | Rating | Description |
| Low | Proposal | may contain | weakness(es) which | have little | potential | to | ||
| cause | disruption | of | schedule, | increased | cost | or | degradation | of |
| performance. | Normal | contractor | effort | and | normal | Government | ||
| monitoring | will | likely | be | able | to | overcome | any | difficulties. |
| Moderate | Proposal | contains | a significant | weakness | or combination | of | |||
| weaknesses | which | may | potentially | cause | disruption | of | schedule, | ||
| increased | cost | or | degradation | of | performance. | Special | contractor | ||
| emphasis | and | close | Government | monitoring | will | likely | be | able | to |
| overcome | difficulties. |
| High | Proposal | contains | a significant | weakness | or combination | of | |||||
| weaknesses | which | is | likely | to | cause | significant | disruption | of | schedule, | increased | |
| cost | or | degradation | of | performance. | Is | unlikely | to | overcome | any | difficulties, | |
| even | with | special | contractor | emphasis | and | close | Government | monitoring. |
| Unacceptable | Proposal | contains | a material | failure or a combination | of | significant | |||
| weaknesses | that | increases | the | risk | of | unsuccessful | performance | to | an |
| unacceptable | level. |
FACTOR 2: PRELIMINARY PROJECT SCHEDULE
Proposal Submission Requirements:
| Offerors | shall | provide | a | preliminary | project | schedule, | in | a | Gantt | chart | format, | that | is | task | oriented | and | |||
| indicates | the | number | of | calendar | days | from | notice | to | proceed | (NTP) | to | when | milestones | are | to | be | achieved. | ||
| This | factor | evaluates | the | offeror’s | proposed | schedule | of | meeting | the | period | of | performance | of | 900 | calendar | ||||
| days | from | NTP, | as | defined | in | the | solicitation. | ||||||||||||
| Using | the | anticipated | NTP | date | of | 01 | August | 2018, | the | schedule | must | clearly | identify | the | critical | path | and, | at | a |
| minimum, | the | following: |
__Pre‐construction submittals __Mobilization
| __Permit | activities, | to | include | site/base | access |
| __Design | submittal | for | approval | ||
| __Procurement | of | long | lead | items | |
| __Start | of | construction | |||
| __Site | preparation | ||||
| __Construction | phasing | of | each | facility/site | |
| __Construction | completion | ||||
| __Identify | any | proposed | phased | turnovers |
__Demobilization
| The | schedule | shall | clearly | define | start | and | end | dates | of | events | and | any | float | time. | A | narrative | description | |
| (limited | to | 10 | pages) | of | each | major | activity | milestones | shall | be | included | with | the | project | schedule. | Cost | ||
| loading | of | activities | is | not | to | be | shown | in | this | schedule. | The | successful | offeror’s | preliminary | project | schedule | ||
| may | be | incorporated | into | the | resultant | contract | at | the | discretion | of | the | contracting | officer. | The | Government | |||
| will | not | review | any | information | provided | after | the | 10th | page. | |||||||||
| The | Offeror | may | demonstrate | a | further | understanding | of | the | project | requirements | by | including | additional | |||||
| activities | and | milestones | not | listed | above. |
| The | Offeror | should | format | its | proposed | schedule | as | a | time | scaled | network | diagram | Critical | Path | Method |
| (CPM) | Schedule, | in | accordance | with | specification | 01 | 32 | 17.00 | 20 | NETWORK | ANALYSIS | SCHEDULES. |
| The | offeror | should | include | with | its | proposed | preliminary | schedule | an | accompanying | schedule | narrative | that | ||||||
| demonstrate | s | the | Offeror’s | understanding | of | the | solicitation | requirements. | In | its | schedule | narrative, | the | ||||||
| Offeror | should | explain | the | work | milestone | and | in | which | the | Offeror | identifies | and | addresses | constrains. | The | ||||
| Schedule | narrative | should | demonstrate | the | Offeror’s | understanding | of | the | solicitation | requirements. | The | ||||||||
| Offeror’s | narrative | should | also | include, | but | not | be | limited | to | an | explanation | of | (a) | the | Offeror’s | plans | to | ||
| procure | its | construction | material | along | with | key | long | lead | procurement | items; | (b) | constraints | on | the | |||||
| schedule | presented | (such | as | if | the | Offeror | plans | to | utilize | multiple | crews, | or | more | than | one | shift, | or | work | an |
| extended | workweek | to | meet | the | required | construction | completion | date, | weather, | material | availability, | etc.); | |||||||
| and | (c) | the | integration | of | local | labor | and | subcontractor | firms. | The | schedule | should | be | at | a | minimum | in | ||
| compliance | with | the | stated | Period | of | Performance. | Offeror | may | submit | a | schedule | that | has | a | reduced | period | |||
| of | performance | than | stated | in | the | solicitation. | This | reduce | period | of | performance | maybe | provide | Offeror | a | ||||
| higher | adjectival | rating | if | deemed | in | conformance | with | the | solicitation | requirements. | The | successful | offeror’s | ||||||
| preliminary | project | schedule | showing | a | reduced | period | of | performance | shall | be | incorporated | into | the | ||||||
| resultant | contract. |
| Resource | loading | of | activities | is | not | permitted. | After | contract | award, | the | awardee | shall | submit | a | Baseline |
| Schedule | in | accordance | with | Specifications | 01 | 32 | 17.00 | 20 | NETWORK | ANALYSIS | SCHEDULES. | ||||
| Proposal | Evaluation | Procedures: |
| The | Government | will | evaluate | the | Offeror’s | preliminary | project | schedule | and | narrative | for | how | well | the | ||||
| Offeror | satisfies | the | RFP | requirements | with | regard | to | proposed | activities. | The | evaluation | will | also | consider | ||||
| how | well | the | Offeror | addresses | constraints | on | the | performance | of | the | work. | The | Government | will | evaluate | |||
| the | Offeror’s | proposed | preliminary | project | schedule | to | determine | the | extent | to | which | the | Offeror | satisfies | the | |||
| contract | duration | requirements | as | set | forth | in | the | RFP, | and | will | consider | the | Offeror’s | proposed | activity | |||
| durations, | and | logic | sequence | of | the | activities. | The | Government | will | also | evaluate | the | offerors | proposal | to | |||
| determine | the | extent | to | which | construction | phasing | and | logic | demonstrate | understanding | of | the | project | |||||
| requirements. | The | Government | will | consider | the | extent | to | which | the | proposed | preliminary | project | schedule | |||||
| is | realistic | and | obtainable. | The | Government | will | also | evaluate | the | extent | to | which | the | critical | path | is | clearly |
identified.
| Greater | weight | will | be | given | to | Offerors | whose | schedules | provide | detail | beyond | identifying | and | including | the |
| major | construction | milestones | and | project | elements, | in | the | pre‐NTP | and | contraction. | Examples | of | additional | ||
| detail | include | identifying | procurement | activities, | interim | milestones; | major | and | secondary | features | of | work, |
etc.
RATINGS AND DEFINITIONS
| An | offeror’s | preliminary | project | schedule | shall | be | evaluated | using | a | combined | technical/risk | rating | which |