W5J9JE-16-R-0001.pdf
PDF 567 KB Posted
- Solicitation number
- W5J9JE-16-R-0001
About this file
FY16 Transatlantic Afghanistan Rapid Construction (TARC) Solicitation - W5J9JE-16-R-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W5J9JE-16-R-0001-0002.pdf | ||
| TARC_MATOC_-_Solicitation_Amendment_-_W5J9JE-16-R-0001-0001.pdf | ||
| Exp_Overview_Sheet_-_Prime_Design_Exp_Form_-_USACE_PPQ.docx | DOCX document | |
| Corporate_Certificate.pdf | ||
| ATTACHMENT_A_-_Financial_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Transatlantic Afghanistan District
RFP No. W5J9JE-16-R-0001
FY16 Transatlantic Afghanistan Rapid Construction (TARC)
Design-Build Phase-1 Solicitation
1 February 2016
! ! ! C A U T I O N TO O F F E R O R S! ! !
1. BUSINESS HOURS:
Transatlantic Afghanistan District Corps of Engineers:
| 7:00 | A.M. | to | 4:30 | P.M., | Saturday | ‐Thursday. |
| 7:00 | A.M. | to | 10:30 | A.M, | Fridays |
2. AVAILABILITY OF FUNDS:
| Funds | are | not | presently | available | for | this | acquisition. | No | contract | award | will | be |
| made | until | appropriated | funds | are | made | available | from | which | payment | for | ||
| contract | purposes | can | be | made. |
| BEFORE | SIGNING | AND | EMAILING | THIS | OFFER, | PLEASE | TAKE | NOTE | OF | THE | |
| FOLLOWING, | AS | FAILURE | TO | PERFORM | ANY | ONE | OF | THESE | ACTIONS | MAY | |
| CAUSE | YOUR | OFFER | TO | BE | REJECTED |
3. AMENDMENTS:
| Have | you | acknowledged | receipt | of | all | amendments? | If | in | doubt | as | to | the |
| number | of | amendments | issued, | please | contact | the | representative | listed | on | |||
| the | Information | Page. |
4. AMENDED SECTIONS:
| If | any | of | the | amendments | furnished | amended | sections, | the | amended | sections | must | be | used |
| in | submitting | your | offer. |
5. MISTAKE IN OFFER:
Have you reviewed your offer price for possible errors in calculation or work left out?
6. OFFER ACCEPTANCE PERIOD:
| The | minimum | offer | acceptance | period | is | specified | in | block | 13D | of | SF1442. | Please | ensure | ||
| that | you | allow | at | least | the | stated | number | of | calendar | days | for | the | Government | to | accept |
| your | offer. |
Transatlantic Afghanistan Rapid Construction ("TARC") $250,000,000 MATOC
Description: Design-Build and Site-Adapt construction Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Aw ard Task Order Contract (MATOC) to support construction projects in the TAA AOR; the 34 Afghanistan provinces.
Section 886 Limited Competition: This procurement limits competition to products, services, and sources from Afghanistan as authorized by Section 886 of Public Law 110-181. Disclosure of the magnitude of each construction project w ill be determined per task order. Offerors must be registered in JCCS (https://w w w .jccs.gov/OLVRAC/bta_jccs_login/aspx); SAM (https://w w w .sam.gov) and AISA http://w w w .aisa.org.af.
N. L. LITTLE 079-343-4105
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
01-Feb-2016
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________task orders
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________02 Mar 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
TRANSATLANTIC AFGHANISTAN ENGINEER - TAA
DISTRICT (TAA), US ARMY CORPS OF ENGINEERS
CETAA-CT, BAGRAM AE 09354
W5J9JE
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:30 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
540-665-2758FAX:TEL: 079-343-4105 TEL: FAX:
W5J9JE-16-R-0001 85
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 01 10 - Table of Contents
TABLE OF CONTENTS
PHASE I REQUEST FOR
PROPOSAL
FY16 Transatlantic Afghanistan
Rapid Construction (TARC)
DIVISION 00 - PROPOSAL REQUIREMENTS, CONTRACT FORMS AND
CONDITIONS
Sections
00 11 00 SF1442
00 21 00 Instructions, Conditions and Notices to Offerors
00 22 10 Phase 1 of 2 Phase Design-Build Selection Procedures
00 22 20 Phase 2 of 2 Phase Design-Build Selection Procedures and Basis of Award
00 45 00 Representations and Certifications
00 72 00 Contract Clauses
00 73 00 Special Contract Requirements
DIVISION 01 - GENERAL REQUIREMENTS - (To be added in Phase 2 via amendment)
RETURN THE FOLLOWING WITH YOUR PHASE ONE PROPOSAL:
SF1442
Phase 1 Technical Proposal – and all other submission requirements identified in section 00
22 10 Phase 1 of 2 Phase Design‐Build Selection Procedures
Corporate Certificate
End of Table of Contents
Section 00 11 00 - Standard Form (SF) 1442 and CLIN Schedule
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 250,000,000 Dollars, U.S.
TARC $250M MATOC
FFP
Transatlantic Afghanistan Rapid Construction vehicle Indefinite Delivery/Indefinite Quantity(IDIQ) Multiple Award Task Order Contract (MATOC)
This MATOC will be used to award task orders for design-build and site-adapt construction projects in the TAA AOR, which includes all 34 provinces of Afghanistan. 100% of these projects are to be to be performed in Afghanistan, for construction projects.
The duration of this multiple year contract shall not exceed 5 years; 1 year base, and 4 options with a period of 1 year each. All contract requirements will be completed in accordance with the Scope of Work.
FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
1001 UNDEFINED Dollars, OPTION Option Year 1
Transatlantic Afghanistan Rapid Construction vehicle Indefinite Delivery/Indefinite Quantity(IDIQ) Multiple Award Task Order Contract (MATOC)
UNIT UNIT PRICE MAX AMOUNT
2001 UNDEFINED Dollars, OPTION Option Year 2
Transatlantic Afghanistan Rapid Construction vehicle Indefinite Delivery/Indefinite Quantity(IDIQ) Multiple Award Task Order
UNIT UNIT PRICE MAX AMOUNT
3001 UNDEFINED Dollars, OPTION Option Year 3
Transatlantic Afghanistan Rapid Construction vehicle Indefinite Delivery/Indefinite Quantity(IDIQ) Multiple Award Task Order
UNIT UNIT PRICE MAX AMOUNT
4001 UNDEFINED Dollars, OPTION Option Year 4
Transatlantic Afghanistan Rapid Construction vehicle Indefinite Delivery/Indefinite Quantity(IDIQ) Multiple Award Task Order
Section 00 21 00 - Instructions, Conditions and Notices to Offerors
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 CONTRACT COST CEILING LIMITATION FOR DESIGN AND CONTRUCTION COSTS
1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.4 OFFEROR'S QUESTIONS AND COMMENTS
1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.7 PRE-PROPOSAL CONFERENCE
1.8 ACCURACY IN PROPOSALS
1.9 PROPOSAL SUBMITTALS
1.10 PROPOSAL FORMAT
1.11 JOINT VENTURE PROPOSAL REQUIREMENTS
1.12 REQUIRED REGISTRATIONS
1.13 DEFINITIONS
1.14 PROVISIONS
1.0. GENERAL INFORMATION
The purpose of this Multiple Award Task Order Contract (MATOC) is to provide rapid Design-Build and Site-Adapt construction services in Afghanistan. The work completed under this MATOC will cover a wide range of construction and services, including but not limited to, design-build/site-adapt, incidental demining, site assessments, general building renovation, bridges, other civil work type projects, and road and pavement repair.
This MATOC is being implemented to streamline the procurement process, assist in the rapid award of construction projects within Afghanistan to support the evolving needs of the Afghan Government, and to continue to increase and satisfy capacity development of the Afghanistan construction industry. Pursuant to Public Law 110-181 Section 886, competition will be limited to Afghan firms.
Performance Period: The MATOC will have a base period of one (1) year and four
(4) one-year options.
Maximum MATOC Capacity: Not-to-exceed $250,000,000.00 for the life of the
MATOC.
Minimum Guarantee: The minimum guarantee amount is $10,000.00 for each indefinite-delivery/indefinite-quantity (ID/IQ) contract award. In the event that no task orders are awarded under a contract, the minimum guarantee will be paid at the end of that contract’s period of performance.
Task Order Limitations: Competitively awarded task orders valued from a minimum of $30,000 to a maximum value of the current trade agreements to construction contracts, which is currently $7,358,000. This value is revised by the U.S. Trade Representative approximately every two (2) years and can be referenced under FAR 25.402.
Number of Awards: The Government intends to advance fifteen (15) to twenty (20) offerors from Phase One to Phase Two, from which it anticipates awarding eight (8) to twelve (12) indefinite-delivery/indefinite-quantity (ID/IQ) contracts to form the “MATOC pool”. However, the government reserves the right to advance offerors and award to more, less, or none at all from both phases. More or fewer offerors may remain in the pool through on ramping and off ramping procedures. At any time after initial awards, the government may conduct an open season to add additional MATOC awardees. The need for additional MATOC awardees is dependent upon various factors, to include, a lack of adequate task order competition, original awardees exiting the pool, the need to enhance the pool of expertise for new task orders, or other causes that determine an open season is in the best interest of the government.
Currency: All task orders will be awarded, invoiced, and paid in accordance with
DFARS clause 252.232-7014 – Notification of Payment in Local Currency (Afghanistan).
This MATOC will be used to award task orders for design-build and site-adapt construction projects in the Transatlantic Afghanistan (TAA) Area of Responsibility (AOR), which includes all 34 provinces of Afghanistan.
Subsequent to award of a MATOC pool, this solicitation will result in award of an initial task order for the seed project to one of the MATOC awardees. Award of the initial seed project will be made to the offeror whose proposal is determined to represent the best overall value to the Government.
1.1. GENERAL DESCRIPTION OF WORK
The scopes of work for task orders issued under this contract include, but is not limited, to the following types of work:
New construction that may include:
o Incidental de-mining, o Site Assessments, o General Building Renovation, o Road and Pavement Repair, o Soil Remediation (collapsible soil) o Incidental Environmental Remedial Work
Site-adapt projects are defined as:
Offerors shall construct all features of contract work (architectural, structural, civil, mechanical, plumbing, electrical, etc.) in complete accordance with contract plans and specifications furnished by the Government. If the Site Investigation and Geotechnical Report indicate foundation design, filter compatibility, or drainage as shown in the standard drawings is inadequate, all necessary information (design analysis, plans and specifications) shall be submitted for review and approval to the Government. The Government shall be informed of this change to coordinate a contract modification. If changes to the foundation design or drainage are required, all other features of work shall be accomplished in strict compliance with the drawings, details and specifications provided in the contract, unless changes are requested under the changes clause.
Design-build projects are defined as:
Offerors shall submit complete design analysis, plans and specifications for all design submittal stages required by the contract. Design submittal content shall include field testing, laboratory testing, design analysis, and plans and specifications for: geotechnical report; existing topographic survey; final grading/drainage plans; electrical distribution system; and all other site work features not included in the furnished plans and specifications.
1.2. CONTRACT COST CEILING LIMITATION FOR DESIGN AND CONSTRUCTION COSTS
Contract Ceiling: The $250,000,000.00 MATOC ceiling shall be shared amongst all awardees as determined by the Government. The MATOC ceiling may not result in equal distribution amongst all awardees due to the fair opportunity process described in FAR part 16.505(b), Ordering.
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Federal Business Opportunities website at:
www.fbo.gov under solicitation W5J9JE-16-R-0001.
It shall be the offeror’s responsibility to check the website for any amendments. The offeror shall submit in its proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation. A list of interested vendors (potential offerors and subcontractors) is available on the Federal Business Opportunities web site (registration required) with the solicitation announcement.
1.4. OFFEROR'S QUESTIONS AND COMMENTS
Bidder Inquiries in ProjNet
Inquiries regarding the solicitation shall be submitted as follows:
1. All inquiries regarding this solicitation are to be submitted via Bidder Inquiry. Telephone and email inquiries will not be accepted. Bidder Inquiry is a web-based program that allows offerors to post questions regarding the solicitation and view all questions by other offerors and responses by USACE. Bidder Inquiry can be accessed through ProjNet at https://www.projnet.org/projnet/.
a) Offerors shall only submit one question per inquiry. All inquiries containing multiple questions will be rejected.
b) Offerors will receive an acknowledgement of their question(s) via email, followed by an answer to their question(s) after it has been processed by our technical team.
Offerors may view all bidder inquiries through ProjNet.
c) Inquiries must be submitted up to seven days prior to the proposal due date. Offerors will not be able to submit inquiries after this date as the ProjNet system must be shut down.
2. To submit and review bid inquiries, prospective offerors will need to use the Bidder
Inquiry Key presented below and follow the instructions listed below the key for access.
The Bidder Inquiry Key for Phase One: J9VIJA-5I6JQC The Bidder Inquiry Key for Phase Two: TBD at Phase Two
3. Specific Instructions for ProjNet Bid Inquiry Access:
a) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
b) Identify the Agency. This should be marked as USACE.
c) Key. Enter the Bidder Inquiry Key listed above.
d) Email. Enter the email address you would like to use for communication.
e) Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
f) Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret
Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
g) Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
4. Submit questions or review questions and answers. An offeror who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer is then available for all other offerors to review.
5. For specific step-by-step for POSTING YOUR INQUIRIES, see the Reference link on the
Contract Viewer.
6. For questions about the ProjNet-®, please contact the Call Center help desk toll free at 1- 800-428-HELP, which operates from 8AM to 5PM (Central US time zone). ProjNet-® questions can also be emailed to the helpdesk at staff@rcesupport.com.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals
Administrative questions and/or comments relative to these documents should be submitted via ProjNet-®
The POC’s for this solicitation are as follows:
Contract Specialist – Ms. N. L. Little U.S. Army Corps of Engineers, Transatlantic (TAA) District Phone: 540-722-6078 Email: natanielle.l.little@usace.army.mil
Contracting Officer – Mr. Frank Sanchez U.S. Army Corps of Engineers, Transatlantic (TAA) District Phone: 540-723-4862 Email: frank.sanchez.jr@usace.army.mil
Note: All questions and/or comments should reach the above referenced Contracting Specialist via ProjNet-® no later than seven (7) calendar days before proposal due date , in order that they may be given consideration or actions taken prior to receipt of offers.
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE
The Small Business size standard for NAICS code 237990 Other Heavy & Civil Engineering Construction is $36.5 million
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.7. PRE-PROPOSAL CONFERENCE
The Government may hold a pre-proposal conference during Phase Two at the project site.
1.8. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).
1.9. PROPOSAL SUBMITTALS
Offerors shall submit their Phase One proposal via email. The Government will not evaluate any material that exceeds the page limits. PHASE ONE DOES NOT INVOLVE PRICING SUBMISSION. All information shall be confined to the appropriate tab, segregating factor submission requirements together. The offeror shall confine submissions to essential matters, sufficient to define the proposal and provide an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of each proposal.
Offerors shall submit the SF 1442, completed and signed by a person authorized by the offeror.
1.10. PROPOSAL FORMAT
General Submission Requirements: All proposals shall be submitted and formatted in accordance with the proposal instructions provided below and in each individual evaluation factor.
a. Each volume shall be clearly identified. All pages of each volume shall be appropriately numbered and identified by solicitation number in the header and/or footer. Proposal documents shall be in PDF format and shall use the following page setup parameters:
i. Margins – Top, Bottom, Left, Right - 1”
ii. Gutter – 0”
iii. From Edge – Header, Footer - 0.5”
b. Page Limitations:
I. Past Performance (Phase One) 15 pages II. Specialized Experience (Phase One) 15 pages
III. Organizational Management & Execution Plan (Phase One) 15 pages IV. Technical Approach for Design-Build Projects (Phase One) 10 pages V. Technical Approach to the Seed Project (Phase Two) 15 pages
VI. Price and Related Information (Phase Two) 10 pages
c. Page Size, Width – 8.5”, Height – 11”, or A4 size.
d. Title page, cover letter, index, and other title sheets will not count towards the total page count. Necessary charts and graphics may not be larger than 8.5" x 11". Charts and graphics should only contain the minimal text required to interpret the graphic (such as a concise caption or a map legend).
e. The following additional restrictions apply: A standard, 12-point minimum font size applies. Arial or Times New Roman fonts are required. Tables and illustrations may use a reduced font size of not less than 8-point and may be landscape oriented. The use of hyperlinks in proposals is prohibited.
f. All price/cost breakdown information included to aid in the price/cost evaluation, shall be submitted in the format provided in Microsoft Office Excel compatible Read/Write format and viewable in Microsoft Office Excel 2010 or later. Files shall not contain classified data.
(i) The offeror’s name, address, and a telephone number should appear in the lower left corner of the title page of any document/volume to be evaluated. Title pages will not be counted toward page limits.
(ii) Volume number, section and date submitted should appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).
g. Electronic Format: Offerors should provide documents in read-only format, using .PDF files. All cost breakdown information to aid in the price evaluation shall be submitted in Microsoft Office Excel Read/Write format and viewable in Microsoft Excel 2010 or later.
Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked. Files shall not contain classified information or data.
h. Number of copies: Submit one copy in electronic format by email.
1.11. JOINT VENTURES AND SUBCONTRACTORS PROPOSAL REQUIREMENTS
Joint Ventures: A joint venture is defined as a legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements, such as “teaming agreements” or “strategic alliances”, which are not recognized as bona fide joint ventures for the purposes of this solicitation.
Offerors proposing as joint ventures shall provide evidence that the joint venture as a legal entity has been duly formed. Joint ventures shall include a copy of the legal joint venture agreement signed by an authorized officer from each of the firms comprising the joint venture with the chief executive of each entity identified. The government will not evaluate the capability of any firms that are not included in the joint venture agreement.
If submitting a proposal as a joint venture, the experience and past performance of each joint venture partner can be submitted for the joint venture entity. The experience for each joint venture partner will be considered the experience of the joint venture entity. Page and project form limits apply to the joint venture as a whole, i.e., a submission limitation of three (3) projects under the experience factor is not an allowance of three (3) projects for each of the joint venture partners. Prospective offerors that submit proposals may not change their firm (including LOC’s and proposed sub-contractors) or their joint venture firms, if selected for award. If the offeror proposes to change subcontractors or letters of commitment after award, the offeror may not change subcontractors or letters of commitment without the contracting officer’s approval.
Approval will not be given unless the contracting officer considers the proposed substitute to be equal in all respects to the originally proposed subcontractor and that the substitution is in the best interests of the government.
Subcontractors: The government recognizes that completion of a project is often a team effort.
Therefore, if an offeror wishes to be credited with the experience and past performance of a subcontractor (i.e., a firm that is not a member of the joint venture), a firm, unequivocal letter of commitment signed by the subcontractor must be submitted. The letter of commitment must be submitted even if the firm is in some way related to a joint venture partner (for example, the subcontractor is a subsidiary of a joint venture partner, or a subsidiary of a firm to which a joint venture partner is also a subsidiary). If such a letter of commitment is not submitted, the experience and past performance of subcontractor firms will not be considered. If the offeror’s proposal includes the use of subcontractors, the offeror may not change subcontractors without the contracting officer’s approval. If the offeror proposes to change subcontractors or letters of commitment after award, the offeror may not change subcontractors or letters of commitment without the contracting officer’s approval. Approval will not be given unless the contracting officer considers the proposed substitute to be equal in all respects to the originally proposed subcontractor and that the substitution is in the best interests of the government.
1.12. REQUIRED REGISTRATIONS
Failure to have an active and completed registration in any one of the following databases at the time of Phase One proposal submission may determine an offeror’s proposal as non-responsive and removed from competition. Information contained within an offeror’s registration must be current and valid. The responsibility of maintaining current information contained in an offeror’s registration rests solely on the offeror.
a. System for Award Management (SAM): http://www.sam.gov/
b. Joint Contingency Contracting System (JCCS): https://www.jccs.gov/
c. Afghan Investment Support Agency (AISA) License: http://www.aisa.org.af/
If an offeror is a joint venture (JV), the JV entity must have a valid registration representing the
JV as one business/firm/entity. This is applicable to SAM, JCCS, and AISA. The government will not accept separate registrations and licenses for each separate entity representing the JV.
1.13. DEFINITIONS
1. Rating The rating for all technical factors except past performance will be expressed as an adjectival assessment of Outstanding, Good, Acceptable, Marginal, or Unacceptable.
The following rating definitions will be utilized in the technical evaluation:
COMBINED TECHNICAL/RISK RATING
ADJECTIVE DEFINITION AND CRITERIA
Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
Good Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths.
Risk of unsuccessful contract performance is high.
Unacceptable Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable.
Performance Risk Factor Rating Definitions. A relevancy rating of Very Relevant, Relevant, Somewhat Relevant, Not Relevant (each defined below) will be assigned to each offeror’s past performance submission.
Past Performance Relevancy Ratings
Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
The relevancy rating will assist the SSEB in determining the confidence rating for past performance. A confidence rating of Substantial Confidence, Satisfactory Confidence, Limited Confidence, No Confidence, Unknown/Neutral Confidence (each defined below) will be assigned to the Performance Risk Factor. Offerors that have no relevant performance record will be given a neutral/unknown risk rating for this factor:
Performance Confidence Assessments
Rating Description
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral)No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
2. Significant Strength. A significant strength appreciably enhances the merit of a proposal or appreciably enhances the probability of successful contract performance.
3. Strength. Any aspect of a proposal that, when judged against a stated evaluation criterion, enhances the merit of the proposal or increases the probability of successful performance of the contract.
4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance.
5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.
6. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
7. Uncertainties. Any aspect of the proposal for which the intent of the offeror is unclear because there may be more than one way to interpret the offer or because inconsistencies in the offer indicate that there may be an error, omission, or mistake. Examples include a mistake in calculation or measurement and contradictory statements.
8. Clarifications. Clarifications are limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. If award will be made without conducting discussions, offerors may be given the opportunity to clarify certain aspects of their proposal (e.g., relevance of past performance information, and adverse past performance information to which the offeror has not previously had an opportunity to respond) or to resolve minor or clerical errors.
9. Communications. Communications between the Government and offerors, after receipt of proposals and before establishment of the competitive range, are exchanges leading to establishment of the competitive range (if such communications are required).
Communications shall be limited to:
Offerors whose past performance information is the determining factor preventing them from being included in the competitive range. Such communications shall address adverse past performance information to which an offeror has not had a prior opportunity to respond; and
Offerors (other than those discussed above) whose exclusion from, or inclusion in, the competitive range is uncertain.
Communications may be conducted to enhance Government understanding of proposals; allow reasonable interpretation of the proposal; or facilitate the Government's evaluation process.
Communications cannot be used to cure proposal deficiencies or material omissions, materially alter the technical or price elements of the proposal, and/or otherwise revise the technical or price elements of the proposal. Such communications may be considered in rating proposals for the purpose of establishing the competitive range, if required. Communications shall not provide an opportunity for the offeror to revise its proposal, but may address ambiguities in the proposal or other concerns (e.g., perceived deficiencies, weaknesses, errors, omissions, or mistakes, and information relating to relevant past performance.
1.14 PROVISIONS
Can be found subsequent to Section 00 22 20
Section 00 22 10 - Phase 1 of a 2 Phase-Design Build Selection Procedures
SECTION 00 22 10
PHASE ONE OF A TWO-PHASE DESIGN-BUILD SELECTION
PROCEDURES
1.0 OVERVIEW
2.0 GENERAL INSTRUCTIONS
3.0 PHASE ONE PROPOSAL SUBMISSION INSTRUCTIONS AND EVALUATION
FACTORS
4.0 TAB A – STANDARD FORM 1442 AND PROPOSAL DATA SHEET
5.0 TAB B – FACTOR 1 – PAST PERFORMANCE
6.0 TAB C – FACTOR 2 – SPECIALIZED EXPERIENCE
7.0 TAB D – FACTOR 3 – ORGANIZATIONAL MANAGEMENT & EXECUTION PLAN
8.0 TAB E – FACTOR 4 – TECHNICAL APPROACH FOR DESIGN-BUILD PROJECTS
PHASE ONE – SECTION 00 22 10 ATTACHMENTS
A – EXPERIENCE OVERVIEW SHEET
B – EXPERIENCE FORM
C – USACE PAST PERFORMANCE QUESTIONNAIRE (PPQ)
D – CORPORATE CERTIFICATE
E – FINANCIAL QUESTIONNAIRE
This procurement is being conducted using formal source selection procedures. The Government intends to advance fifteen (15) to twenty (20) offerors from Phase One to Phase Two, from which it anticipates awarding eight (8) to twelve (12) indefinite-delivery/indefinite-quantity (ID/IQ) contracts to form the “MATOC pool”. However, the government reserves the right to advance offerors and award to more, less, or none at all from both phases.
Proposals for Phase One and Phase Two will be evaluated in accordance with FAR 15.101-1, Tradeoff Process, according to the factors and subfactors identified in the solicitation.
2.0 GENERAL INSTRUCTIONS
All of the submission items to be evaluated pertain to the prime offeror, whether a single contractor entity, partnership, or a joint venture. The government will consider information provided concerning principal or primary subcontractors; however, unless a letter of commitment is provided establishing the likelihood that those subcontractors will actually be available for task order execution, then that submitted information will largely be diminished in the evaluation and selection process.
Subject to the provisions contained herein, the most highly qualified offerors in Phase One will be selected and requested to submit Phase Two proposals. In determining the most highly qualified offerors, the government will evaluate Phase One proposals to determine offerors who are responsible in accordance with FAR Subpart 9.1; who are responsive to the solicitation requirements; and whose proposal, judged by an overall assessment of the evaluation criteria and other considerations specified in this solicitation, meets the technical standards for non-price factors.
Note that the Government will not evaluate any material that exceeds the page limits indicated in Section 00 21 00 and/or evaluation factors below. Phase One does not involve pricing submission.
3.0 PHASE ONE PROPOSAL SUBMISSION INSTRUCTIONS AND EVALUATION
FACTORS
There will be an evaluation of the performance capability proposals for conformance with the minimum Phase One RFP criteria, and the extent to which the proposals exceed those criteria.
While there is implicit intent to keep an offeror’s proposal effort to a minimum, proposals must provide adequate detail for evaluators to determine how the offeror’s proposal meets or exceeds the evaluation criteria.
There will be an evaluation of all proposals by a Technical Evaluation Team (TET). The TET’s duty is the assignment of a fair, unbiased technical rating for each proposal based solely on the merits of the proposal. Proposals that do not conform to the terms and conditions contained in the solicitation will be eliminated from the competition and will not be eligible to proceed to Phase Two.
With the submission of Attachement E – there will be an evaluation of the offerors financial responsibility. In accordance with DFAR 232-072 Finanicial responsibility of contractors; the contracting officer will use the policies and procedures therein to determine the financial capability of all offerors.
Selection without Discussions: It is the intent of the Government to make a selection for Phase Two based upon initial offers, without further discussions or additional information. Therefore, submit your proposal on the most favorable terms from a technical standpoint. Do not assume you will have an opportunity to clarify, discuss or revise your proposal. If selection is not possible from initial offers, discussions will be conducted.
There will be an evaluation of each proposal using Evaluation Factors. The evaluation method is the tradeoff process in accordance with FAR 15.101-1. The offeror’s proposal shall contain a response to the evaluation factors, and shall be in the format prescribed herein, as well as in Section 00 21 00 – Instructions to Offerors.
PHASE I FACTORS
FACTOR 1 – Past Performance.
FACTOR 2 – Specialized Experience.
FACTOR 3 – Organizational Management & Execution Plan.
Subfactors for Factor 3:
i. Key Personnel
ii. Organization
iii. Management Approach and Controls
FACTOR 4 – Technical Approach for Design-Build Projects.
NON-EVALUATION SUBMISSIONS:
Tab A 1: SF 1442 – Solicitation, Offer, and Award
Tab A 2: Representations, Certifications and Other Statement of Offerors
Tab A 3: Completed Financial Questionnaire (Attachment E)
RELATIVE IMPORTANCE OF PHASE 1 EVALUATION FACTORS:
FACTOR NUMBER DESCRIPTION RELATIVE IMPORTANCE
FACTOR 1 Past Performance Factor 1 is equal to Factors 2 & 4
FACTOR 2 Specialized Experience Factor 2 is equal to Factors 1 & 4
FACTOR 3 Organizational Management & Execution Plan Factor 3 is more important than
Factors 1, 2, & 4 combined
FACTOR 4 Technical Approach for Design-Build Projects Factor 4 is equal to Factors 1 & 2
FACTOR 3
SUBFACTORS
DESCRIPTION RELATIVE IMPORTANCE
Subfactor i. Key Personnel All three subfactors are equal to each other Subfactor ii. Organization Subfactor iii. Management Approach and Controls
4.0 TAB A 1 – STANDARD FORM 1442
Submit the SF 1442, completed and signed by a person authorized by the Offeror. If the Offeror is a Joint Venture (JV), include a copy of the JV Agreement. JV Agreements must clearly indicate the percentages of the JV participants, in particular the percent of the controlling party, and a clear delineation of responsibilities and authorizes between the JV parties. If the Offeror is a Limited Liability Company, include a copy of the Articles of Organization and Operating Agreement.
If the Offeror has teaming agreements and/or letters of commitment, please include under this Tab.
5.0 FACTOR 1 - PAST PERFORMANCE
5.1 SUBMISSION REQUIREMENTS
Past performance is an indicator of an offeror’s ability to perform the contract successfully. The offeror and the design firm (or offeror alone if design is be self-performed) shall provide customer reference name(s), company affiliation, current (or last known) phone numbers, and email addresses. Offerors are to use a Past Performance Questionnaire (PPQ) (Attachment C) for submission of its past performance information.
If an offeror has multiple divisions or units, it shall limit the projects submitted to those performed by the division, unit, or team member submitting the offer. The Government may contact and interview the points of contact provided by the offeror, and reserves the right to interview other individuals with relevant information.
A relevant project is defined as: Design-build and site-adapt construction of:
housing/barracks; dining facilities; equipment/vehicle maintenance facilities; operations facility; administrative/ headquarters facilities; command and control facilities;
communications centers; fire stations; waste management complexes; training facilities;
medical facilities (clinics/hospitals); fuel storage facilities; fuel distribution and storage systems; munitions storage; power plants; utilities infrastructure; reception, staging and onward integration (RSOI), facilities/areas; airfields and airfield support facilities; and water treatment facilities.
Recent is defined as: Projects cited shall be currently well underway or construction substantially completed (fully designed and at least 50% construction progress completed) within eight (8) years preceding the date of this solicitation.
The offeror shall briefly provide information on problems encountered on identified projects and any corrective action. For the design firm’s past performance to be considered, the offeror shall include a letter of commitment from that firm, unconditionally committing the design firm’s performance for task order execution should an award be made to the offeror.
5.2 EVALUATION CRITERIA
The Government will complete a performance risk assessment based upon the quality of the offeror’s past performance as it relates to the probability of successful accomplishment of the required effort. Performance risks are those associated with an offeror’s likelihood of success in performing the solicitation’s requirements as indicated by that offeror’s record of past performance. The Government will consider the recency and relevancy of the performance information, source of the information, context of the data, and general trends in offeror performance. The offeror and proposed design firm (if applicable) will be assessed in their totality to derive the offeror’s Past Performance rating.
Customers/references may be asked to comment on items such as quality of design or construction; timeliness; management of the work; subcontractor management, including timely payment to subs or suppliers; safety; relations between customer and designer or offeror; level of support for such things as as-built documentation; O&M manuals;
training; correcting design or construction errors; warranty work; etc. The Government will not release the Past Performance Evaluation – Telephone Interview Forms to the offeror at any time, in order for the Government to solicit candid, unbiased interview comments.
The Government will provide greater weight consideration on performance with documented successful outcomes of design-build construction projects which can be verified, for example, by telephone interviews with points of contact identified in the proposal, CPARS/FAPIIS or other agency performance databases, offeror furnished references, or personal knowledge from Government personnel.
The Government may base its judgment about the quality of an offeror’s past performance on (1) records of objective measurements and subjective ratings of specified performance attributes, if available, and (2) statements of opinion about the quality of specific aspects of an offeror’s performance, or about the quality of an offeror’s overall performance. The Government may use data provided in the offeror's proposal and data obtained from any other sources.
The Government’s evaluation is not limited to past performance information on the cited example projects. The Government may elect to consider data obtained from sources other than those identified by the offeror.
Since the Government may not necessarily obtain information on all of the listed contract references and/or may not contact all of the identified POCs provided by the offeror, it is incumbent upon the offeror to explain the relevance of the data provided.
An offeror may not establish past performance based on the past performance of its proposed key personnel. Offerors that have no past performance record will be given an “Unknown Risk” rating. If the Government does not obtain past performance information and cannot establish a past performance record for the offeror through other sources, past performance will be rated neither favorably nor unfavorably. The performance risk will be considered “unknown” or “neutral” IAW FAR 15.305(a)(2)(iv).
The evaluation team shall use terms described in Table 1 below to assess past performance for relevancy:
Table 1. Past Performance Relevancy Ratings
Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
The Government will review this past performance information and determine the quality and usefulness as it applies to performance confidence assessment. In conducting a performance confidence assessment, each offeror shall be assigned one of the ratings in Table 2.
Table 2. Performance Confidence Assessments
Rating Description
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Table 2. Performance Confidence Assessments
Limited Confidence
Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral)
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
6.0 FACTOR 2 - SPECIALIZED EXPERIENCE
6.1 SUBMISSION REQUIREMENTS
The offeror’s experience will be examined for size, scope, and complexity of work performed in the design-build and site-adapt construction of large projects ($2,000,000 or more), in geographically disbursed locations performed in remote, rugged, or austere environments, to include combat theaters of operation. The successful offeror should possess demonstrated experience performing design-build and site-adapt construction projects, including new construction, and the alteration, renovation, conversion, and/or reconfiguration of existing facilities, including vertical and horizontal construction.
Relevant types of projects include, but are not limited to: design-build and site-adapt construction of: housing/barracks; dining facilities; equipment/vehicle maintenance facilities; operations facilities; administrative/headquarters facilities; command and control facilities; communications centers; fire stations; waste management complexes;
training facilities; medical facilities (clinics/hospitals); fuel storage facilities; fuel distribution and storage systems; munitions storage; power plants; utilities infrastructure;
reception, staging and onward integration (RSOI), facilities/areas; airfields and airfield support facilities; and water treatment facilities.
The offeror shall provide information about projects delineating the project name, major feature (building, runway, etc.), overall contract value (US dollars), overall contract value the entity was responsible for (dollars or percent), location of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .