W58RGZ26B0024.pdf

PDF 201 KB Posted

Attached to
Solicitation for Overhaul of the Hydraulic Valve
Solicitation number
W58RGZ-26-B-0024
Issued by

About this file

This is a Solicitation/Contract/Order for Commercial Items (Standard Form 1449) and Invitation for Bids (IFB) for the overhaul of Hydraulic Valves for the UH-60 Blackhawk helicopter. The solicitation is issued by the Army Contracting Command-Redstone Arsenal with a solicitation number W58RGZ-26-B-0024, and bids are due October 20, 2026, at 2:00 p.m. local time. This is a 100% Small Business Set Aside with NAICS code 332911 (Plumbing Fixture Fitting & Trim Manufacturing) and a size standard of 750 employees; only bidders registered under this NAICS code in SAM.gov are eligible, and non-compliant bids will be deemed non-responsive. The resulting contract will be a five-year Firm-Fixed-Price Indefinite Delivery Indefinite Quantity (IDIQ) contract using sealed bidding procedures under FAR Part 14, with a minimum estimated quantity of 40 units and maximum of 232 units (including 32 units for Foreign Military Sales in years 2-5).

The contract includes five contract line items (CLINs): CLIN 0001 for a Product Verification Audit (PVA) to be completed within 90 days of receiving reparables; CLINs 0002AA and 0003AA for overhaul of the Hydraulic Valve (NSN 4810-01-096-1056, Part Number 70652-02450-109) for U.S. and FMS customers respectively, with firm fixed-price unit rates required for each of the five one-year ordering periods; CLIN 0004AA for scrap disposition at fixed unit prices; and CLIN 0005AA for contractor-furnished containers. The overhaul work must comply with Depot Maintenance Work Requirement (DMWR) 1-1560-293 dated February 27, 2026, and includes mandatory and non-mandatory parts, labor, preservation, packaging, and marking to return units to serviceable condition. The contractor must submit a Maintenance and Overhaul Plan within 30 days of award, prepare three assets for PVA, maintain Government Furnished Property accounting through the PIEE system, comply with Item Unique Identification (IUID) requirements per MIL-STD-130N, and provide required data items including Government Property Inventory Reports and Reports of Shipping and Packaging Discrepancies. Payment will be made via Wide Area Workflow (WAWF), with deliveries on FOB Origin basis and inspection/acceptance at origin. The Government intends to award only one contract and the bid validity period is 120 days unless extended by the bidder.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

Offeror To Complete Block 12, 17, 23, 24, & 30

1. Requisition Number Page Of

2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date

7. For Solicitation Information Call:

A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time

9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:

Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program

Hubzone Small Business EDWOSB

Service-Disabled Veteran-Owned Small Business NAICS:

Email: 8(A) Size Standard:

11. Delivery For FOB Destination Unless Block Is Marked

12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating

See Schedule 14. Method Of Solicitation RFQ IFB RFP

15. Deliver To Code 16. Administered By Code

Telephone No.

17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code

Telephone No.

17b. Check If Remittance Is Different And Put Such Address In Offer

18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

(Use Reverse and/or Attach Additional Sheets As Necessary)

25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)

27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.

27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.

28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.

Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:

30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)

30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed

Authorized For Local Reproduction Previous Edition Is Not Usable

Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212

W58RGZ-26-B-0024 2026SEP14

MAGGIE G. BEVIS (520)674-7832

MAGGIE.G.BEVIS.CIV@ARMY.MIL

2026OCT20 02:00pm

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280 X

X 100

332911

X

X DOA1

X

SEE SCHEDULE

SEE SCHEDULE

X X

X 1

1 81

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

32a. Quantity In Column 21 Has Been

Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________

32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative

32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative

32g. E-Mail of Authorized Government Representative

33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final

38. S/R Account No. 39. S/R Voucher Number 40. Paid By

41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)

42c. Date Rec’d (YY/MM/DD) 42d. Total Containers

Standard Form 1449 (Rev. 2/2012) Back

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: MAGGIE G. BEVIS

Buyer Office Symbol/Telephone Number: CCAM-AVA-B/(520)674-7832

Type of Contract 1: Firm Fixed Price

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

1. This action will result in a five (5) year Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to

FAR 52.216-22 using Sealed Bidding procedure under FAR Part 14. This is a 100% Small Business Set Aside. The applicable North American

Industry Classification Systems (NAICS) code for this effort is 332911 and the size standard is 750 employees. Only bidders with NAICS code 332911 registered in Sam.gov are eligible to submit a bid. If a bidder that is not registered as a small business under NAICS Code

332911 submits a bid, the bid will be deemed non-responsive and shall not be considered for award.

Input NSN: 4810-01-096-1056

Output NSN: 4810-01-096-1056

Input Part Number (P/N): 70652-02450-109

Output part Number (P/N): 70652-02450-109

Minimum Estimated Quantity: 40

Maximum Estimated Quantity: 232*

*Maximum estimated quantity includes the foreign military sales (FMS) quantity of 32 each.

2. This solicitation is for an Invitation For Bids (IFB) for resulting contract award to the responsible bidder whose bid, conforming to the invitation for bids, will be the most advantageous to the Government considering only price and price-related factors included herein IAW FAR Part 14, Sealed Bidding.

3. The HYDRAULIC VALVE for the UH-60 Blackhawk is NOT identified as a Critical Safety Item (CSI).

4. There is a Depot Maintenance Work Requirement for the overhaul of this item: DMWR-1-1560-293, dated 27 February 2026, no change number.

5. The Foreign Military Sales (FMS) Customer and geographical location(s) for deliveries, inspection and acceptance points are unknown at this time.

6. No Government Furnished Material (GFM) other than the reparables and reusable containers, will be provided.

7. Access to DLA FedMall (formerly known as E-MALL) is NOT authorized.

8. The Government is only obligated to purchase the minimum quantity. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of a delivery order and not by the contract itself.

9. Shipping instructions will be provided in each individual delivery order.

10. The yearly estimated quantities listed herein do not commit the Government to ordering that or any quantity above the minimum quantity.

11. The Government has segregated the estimated quantities into five ordering periods. However, this does not preclude exercising the

Government's right under FAR 52.216-19 by ordering the maximum quantity specified in FAR 52.216-19(b)(1) at any time during the five-year ordering period.

Ordering Period 1 will be from date of contract award through 365 days after contract award (DACA).

Ordering Period 2 will be from 366 DACA through 730 DACA.

Ordering Period 3 will be from 731 DACA through 1,095 DACA.

Ordering Period 4 will be from 1,096 DACA through 1,460 DACA.

Ordering Period 5 will be from 1,461 DACA through 1,825 DACA.

12. The following websites are provided for the purpose of containing/reviewing various Army Publications and Technical

Manuals/Bulletins:

a. Technical Manuals and Bulletins - https://ent.ldac.army.mil/etmapp/#/etm/home

2 81

W58RGZ-26-B-0024

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

b. DA Pamphlets, Army Regulations, and forms https://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

If you have any problems obtaining this information, contact the following email address:

usarmy.redstone.amcom.list.immcpubepco@army.mil

13. The Government intends to award only one contract as a result of this solicitation.

14. The bidder's bid must be valid for 120 days from the date for receipt of bids specified in Block 8, unless a longer period is inserted in the bidder's quote.

15. Bidders shall complete Attachment 0006, Sealed Bidding Pricing Template, and submit to the email of maggie.g.bevis.civ@army.mil or electronically to the DoD SAFE site with submission of Bid. Failure to complete Attachment 0006 in its entirety may cause the bid to be non-responsive and therefore ineligible for consideration for award.

16. The Government will not be required to obtain the contractor's signature prior to the issuance of an order.

17. The contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions Attachment 0007 - Contractor

Overhaul TAV-C Requirements.

18. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:

NAME:

TELEPHONE NUMBER:

FAX NUMBER:

E-MAIL ADDRESS:

19. TECHNICAL DATA CAN ONLY BE DISTRIBUTED TO CONTRACTORS WHO HAVE A CURRENT, APPROVED DD 2345, MILITARY CRITICAL TECHNICAL DATA

AGREEMENT ON FILE WITH DEFENSE LOGISTICS INFORMATION SERVICES (DLIS). TECHNICAL DATA THAT IS EXPORT-CONTROLLED MUST BE MARKED WITH AN

EXPORT CONTROL WARNING NOTICE. THIS STATEMENT IDENTIFIES TECHNICAL DATA WHICH THE DOD WILL WITHHOLD FROM PUBLIC RELEASE USING AUTHORITY

IN 10 U.S.C.130, THE GOVERNMENT'S RIGHT TO USE, MODIFY, REPRODUCE, PERFORM, DISPLAY, OR DISCLOSE SUCH TECHNICAL IS RESTRICTED FOR THE

CONTRACTOR/ITS SUBSIDIARIES/OR SUB-CONTRACTORS AT EVERY LEVEL. ANY REPRODUCTION OF TECHNICAL DATA OR PORTIONS THEREOF MARKED WITH THESE

LEGENDS MUST ALSO REPRODUCE THESE LEGENDS ON SUCH TECHNICAL DATA. CONTRACTORS WANTING TO OBTAIN ACCESS TO THE UNCLASSIFIED TECHNICAL

DATA DRAWINGS MUST HAVE JOINT CERTIFICATION PROGRAM (JCP) CERTIFICATION. INSTRUCTIONS FOR OBTAINING JCP CERTIFICATION CAN BE FOUND AT:

HTTPS://PUBLIC.LOGISTICSINFORMANTIONSERVICE.DLA.MIL/PUBLICHOME/JPC/DEFAULT.ASPX

To obtain Army Regulations, Technical Manuals, and Technical Bulletins, the following website is provided for your convenience:

https://armypubs.army.mil/

The DMWR and applicable MEOs associated with this requirement are classified as Controlled and are subject to military export controls.

Interested contractors who wish to obtain access to the secure DMWR and/or applicable MEOs via SAM.gov MUST meet the following prerequisites:

1. Entities or individuals must respond with a current Department of Defense Form 2345 (DD-2345), Militarily Critical Technical Data

Agreement, and all attachments. Only the designated Data Custodian listed on Block 3A of your DD Form 2345 is authorized to request export-controlled files.

2. Entities or individuals wishing to obtain any Government-owned technical data must respond with a PDF of its complete Cybersecurity

Maturation Model Certification (CMMC) status entered in the Supplier Performance Risk System (SPRS) (https://piee.eb.mil). Provide a printout of your current CMMC certification from the PIEE SPRS module which shows your CMMC level.

NOTE: Do NOT submit requests for technical data via email. All requests must be processed through the SAM.gov system. No exceptions.

NOTE: The Government will verify your JCP and CMMC status. Upon verification, the Contracting Officer will approve your request, and

SAM.gov will notify you that the files are ready for direct download.

NOTE: Failure to submit the request through the registered JCP Data Custodian account will result in an immediate denial of access.

THE SOLICITATION PERIOD WILL NOT BE EXTENDED AS A RESULT OF LATE REQUEST FOR TECHNICAL DATA.

20. The Contractor is required to submit a M&O Plan in accordance with Exhibit A, CDRL A003 and Section C Statement of Work. The documentation shall be submitted within 30 days after contract award.

21. A PVA is required for the effort.

3 81

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

22. The contractor is instructed to put the following words in the remarks column of the DD 250/WAWF: "Repair and Return Process D6M".

23. The contractor may be required to submit certified cost or pricing data if only one bid is received IAW DFARS Clause 252.215-7008, entitled "Only One Offer."

24. The contractor must be able to independently obtain all of the mandatory replacement parts necessary to Overhaul the Hydraulic

Valve, as identified in the DMWR. A contractor's failure to deliver in accordance with the schedule of any order due to an inability to obtain mandatory replacement parts will result in the Government terminating the contract for default.

25. Army Contract Writing System (ACWS) Transition Information for Bidders

The Army Contracting Enterprise (ACE) is in the process of deploying new solicitation and contract writing software to Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software suite will soon replace most existing Army contract writing systems, including the system used to create and release this Solicitation.

b. During this transition period, Bidders are hereby advised:

The Contracting Office may use any combination of contract writing systems to create and release documents related to this solicitation

(e.g. solicitation amendments and awards, if any). Due to this:

This solicitation may contain different offer submission instructions than other solicitations released by the same Contracting Office

(e.g. requiring offer submission via the PIEE Solicitation Module vs. e-mail). Bidders should review all offer submission instructions contained in the solicitation documents and direct any questions or concerns to the Contract Specialist or Contracting Officer.

ii. If the Contracting Office switches contract writing systems prior to award, documents you receive from the Contracting Officer or view on SAM.gov or other forums may appear noticeably different than the initial solicitation or previous solicitations or awards from the same Contracting Office. This is normal and expected.

iii. A change between contract writing systems may cause important information concerning solicitation response (amendments) or accepted terms (awards) to take on different formatting or appear in different parts of later documents issued. Offerors shall review all documents carefully to locate this important information and direct any questions or concerns to the Contract Specialist or Contracting

Officer.

2. The Government does not intend to use the transition between contract writing systems to effect any changes to solicitation or award terms and conditions without accompanying document narratives explicitly stating such changes are deliberate and desired. While the

Contract Specialist and Contracting Officer will take care to minimize or eliminate any inadvertent changes when adapting to the new contract writing software, you, as the Bidder, may still be the first to spot such errors. Therefore, Bidders shall:

Notify the Contracting Officer immediately if any observed changes, removals, or additions affect your award eligibility, violate or alter existing quote/proposal terms, or could affect Contract performance post-award.

ii. Take special care to ensure all fill-in Clauses are populated and remain populated across documents received from the Contracting

Office throughout the Solicitation and Award process.

iii. Contact the Contracting Officer listed on the first page of the solicitation or solicitation amendment for guidance if you notice or suspect any inadvertent change has occurred between document issuances.

3. The Contracting Officer will correct problems affecting award documents (if any) via bilateral modification, at no cost to the

Contractor. Any such modification will reconcile the award with the latest version of this solicitation reflecting deliberate action by the Contracting Officer (e.g. the first issuance if no amendments, or the latest amendment with accompanying narratives), inclusive of any documented pre-award negotiations or accepted supplemental offer terms.

4. In the unlikely event a network disruption, contract writing system error, or financial system error threatens timely award of the requirement set forth in this solicitation, the Contracting Officer:

May elect to use alternative mechanisms to obligate funds and allow work or deliveries to legally begin to the benefit of, and with legal protection for, both parties.

ii. Will incorporate the latest version of this Solicitation into such mechanisms to serve as a framework for contract execution until any such system problems are resolved.

iii. Will ensure any action taken does not conflict with the stated offer evaluation and award methodology of this requirement.

iv. Will issue a complete, properly-formatted award accurately reflecting this requirement and all applicable terms and conditions once systems return to normal.

4 81

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE A0001 ***

Due to a system error, the reference to clause 252.204-7012 in Section I of this contract does not indicate the correct, latest versions. Notwithstanding the reference in Section I, the intent is to use the current version of this clause as follows:

(a) DFARS Clause 252.204-7012, SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (DEVIATION 2026-O0025) (JUN 2026)

*** END OF NARRATIVE A0002 ***

5 81

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PVA

0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________

SERVICE REQUESTED: PVA

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN represents the Product Verification Audit

(PVA) for the Hydraulic Valve, output NSN: 4810-01-

096-1056, as shown in CLINs 0002 and 0003.

This is a Firm Fixed Price CLIN.

Bidder is required to fill in a proposed firm fixed unit price for the PVA:

PVA shall be in accordance with The "Product

Verification Audit (PVA) Statement of Work" in

Narrative E0001.

PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the

Government Quality Office for scheduling of the PVA by email to the following address:

usarmy.redstone.devcom-avmc.mbx.amr-mqcontracts@ army.mil

With copy emailed to the Contract Specialist at:

maggie.g.bevis.civ@army.mil

The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.

NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:

maggie.g.bevis.civ@army.mil

PVA requires approval prior to Government acceptance of contract deliverable assets.

Failure to pass the PVA may lead to Termination for

Cause of the contract.

Payment Instructions: The Contractor will be paid for the PVA by utilizing the Wide Area Work Flow (WAWF) site. The Contractor must enter code W58H0Z when

6 81

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

submitting the PVA invoice, making it to the attention of Lindy Pinchon. The Contracting Officer will approve the PVA invoice.

(End of narrative C001)

Deliveries or Performance _________________________

0002 HYDRAULIC VALVE

NSN: 4810-01-096-1056

Mfr CAGE: 81996

Mfr Part Number: 70652-02450-109

0002AA OVERHAUL HYDRAULIC VALVE (US) $ $ _____________________________ ______________ __________________

COMMODITY NAME: HYDRAULIC VALVE

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0002AA are:

Ordering Period 1: 40 each minimum qty

Ordering Period 2: 40 each estimated qty

Ordering Period 3: 40 each estimated qty

Ordering Period 4: 40 each estimated qty

Ordering Period 5: 40 each estimated qty

Funds for the ordering period 1 quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the firm fixed price contract.

(End of narrative B001)

INPUT:

NSN: 4810-01-096-1056, P/N: 70652-02450-109

OUTPUT:

NSN: 4810-01-096-1056, P/N: 70652-02450-109

Overhaul shall be in accordance with the Statement of Work.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the Statement Of Work (SOW).

7 81

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

BIDDER IS REQUIRED TO FILL IN PROPOSED UNIT PRICE:

YEAR 1- U/P $_____________ (FFP) Min Qty 40 ea

YEAR 2- U/P $_____________ (FFP) Est Qty 40 ea

YEAR 3- U/P $_____________ (FFP) Est Qty 40 ea

YEAR 4- U/P $_____________ (FFP) Est Qty 40 ea

YEAR 5- U/P $_____________ (FFP) Est Qty 40 ea

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

LEVEL PRESERVATION: Military

LEVEL PACKING: B

For packaging instructions refer to section J

Attachment 0001, M&O Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's required delivery schedule.

(End of narrative F001)

0003 HYDRAULIC VALVE

NSN: 4810-01-096-1056

Mfr CAGE: 81996

Mfr Part Number: 70652-02450-109

8 81

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0003AA OVERHAUL HYDRAULIC VALVE (FMS) $ $ ______________________________ ______________ __________________

COMMODITY NAME: HYDRAULIC VALVE

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0003AA are:

Ordering Period 1: 0 each minimum qty

Ordering Period 2: 8 each estimated qty

Ordering Period 3: 8 each estimated qty

Ordering Period 4: 8 each estimated qty

Ordering Period 5: 8 each estimated qty

This CLIN will be used only if an FMS customer requires this item. If no FMS customers are identified, the US Army Requirer may utilize the

FMS quantity.

(End of narrative B001)

INPUT:

NSN: 4810-01-096-1056, P/N: 70652-02450-109

OUTPUT:

NSN: 4810-01-096-1056, P/N: 70652-02450-109

Overhaul shall be in accordance with the Statement of Work.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the Statement Of Work (SOW).

BIDDER IS REQUIRED TO FILL IN PROPOSED UNIT PRICE:

YEAR 1- U/P $_____________ (FFP) Min Qty 0 ea, FMS

YEAR 2- U/P $_____________ (FFP) Est Qty 8 ea, FMS

YEAR 3- U/P $_____________ (FFP) Est Qty 8 ea, FMS

YEAR 4- U/P $_____________ (FFP) Est Qty 8 ea, FMS

YEAR 5- U/P $_____________ (FFP) Est Qty 8 ea, FMS

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

9 81

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

LEVEL PRESERVATION: Military

LEVEL PACKING: B

For packaging instructions refer to section J

Attachment 0001, M&O Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's required delivery schedule.

(End of narrative F001)

0004 SCRAP

0004AA SCRAP $ ______ __________________

SERVICE REQUESTED: SCRAP

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for assets which are physically unrepairable (i.e., scrap) from CLINs 0002AA and

0003AA.

The Government's estimated quantity per ordering period is 10 each. The estimated quantity of 10 is for proposal evaluation purposes only.

Bidder is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $____________ EACH

Ordering Period 2 $____________ EACH

10 81

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Ordering Period 3 $____________ EACH

Ordering Period 4 $____________ EACH

Ordering Period 5 $____________ EACH

Scrapped assets from CLINs 0002AA and/or 0003AA shall be in accordance with the Statement of Work.

As applicable on delivery orders issued, units determined to be scrapped in accordance with

Section C shall be reflected as an increase in CLIN

0004AA with a corresponding decrease in quantity and funds in CLINs CLINs 0002AA and/or 0003AA, as applicable.

In the event the Procuring Contracting Officer

(PCO) determines that certain items shall be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.

The Government may, at its discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.

Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.

(End of narrative C001)

Deliveries or Performance _________________________

0005 CONTAINERS

0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: CONTAINERS

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for contractor furnished containers for CLINs 0002AA and/or 0003AA.

The Government estimates that a quantity of 10 each will be required for each of the ordering periods.

The estimated quantity of 10 is for proposal

11 81

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

evaluation purposes only.

Bidder is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $____________ EACH

Ordering Period 2 $____________ EACH

Ordering Period 3 $____________ EACH

Ordering Period 4 $____________ EACH

Ordering Period 5 $____________ EACH

The contractor shall provide the container in accordance with Attachment 0001 - M&O Packaging

Requirements and the Statement of Work and reusable containers.

The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.

The Contractor, IAW the Statement of Work, shall submit a Report of Discrepancy (ROD) SF Form 364 through the DCMA QAR for verification within 7 working days to the address shown on Data Item

A002. Assets received with an unserviceable container, or without a container, require prior approval of the PCO before containers can be purchased.

(End of narrative C001)

Deliveries or Performance _________________________

0006 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________

This CLIN is "Not Separately Priced" (NSP). Pricing for data shall be included in the unit prices of

CLINs 0002AA and 0003AA.

The Contractor shall provide Data Items A001 - A003 in accordance with the Contract Data Requirements

List, Exhibits A, B, and C.

(End of narrative A001)

12 81

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

A001 GOVERNMENT PROPERTY INVENTORY REPORT $ ** NSP ** ____________________________________ __________________

SERVICE REQUESTED: DATA ITEM A001

DATA ITEM A001 - DI-MGMT-80441D - Government Property

Inventory Report

Contractor shall provide initial inventory data no later than 365 days after receipt of initial delivery of Government-furnished Property for overhaul.

Contractor shall provide subsequent inventory data annually thereafter.

(End of narrative C001)

Deliveries or Performance _________________________

A002 REPORT OF SHIPPING AND PACKAGING DISCREPANCY $ ** NSP ** ____________________________________________ __________________

SERVICE REQUESTED: DATA ITEM A002

DATA ITEM A002 - DATA ACQUISITION DOCUMENT NUMBER: DI-

MGMT-80503

Submission of the report shall occur within 10 days of discovering the discrepancy. Refer to attachments

0003 (Standard Form 364) and 0004 (Report of

Discrepancy Guidance) for completing the Report of

Discrepancy.

(End of narrative C001)

Deliveries or Performance _________________________

A003 MAINTENANCE AND OVERHAUL (M&O) PLANNING _______________________________________

DOCUMENTATION $ ** NSP ** _____________ __________________

SERVICE REQUESTED: DATA ITEM A003

DATA ITEM A003 - DATA ACQUISITION DOCUMENT NUMBER :

DI-MGMT-82455

Data Item A003 refers to the M&O Plan, as required by

CLIN 0001. The M&O Plan shall be submitted to this office within 30 days after contract award date. PVA

13 81

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

cannot occur until the M&O Plan is submitted and approved.

Once the Government has approved the Contractor's plan, if the Contractor makes a change to the plan that affects a Critical Safety Item Critical

Characteristic, the Contractor shall submit the revised plan to the Government within 10 calendar days for review and approval.

Note: A copy of the plan shall be forwarded to the contract specialist at:

maggie.g.bevis.civ@army.mil

(End of narrative C001)

Deliveries or Performance _________________________

14 81

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

1. The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data, necessary to accomplish the inspection and overhaul for the HYDRAULIC VALVE for the UH-60(hereinafter "the component") that is required to return the component to a serviceable condition sufficient to meet the standard of continued airworthiness in accordance with (IAW) Army Regulation (AR) 70-

62. Upon completion of the overhaul, the components shall be packaged IAW this contract and shipped to the destination(s)specified in each individual delivery order.

FOR PURPOSES OF THIS CONTRACT, "OVERHAUL" IS CONSIDERED "REMANUFACTURING", which entails:

(1) major overhaul of an item, piece of equipment, or material which is degraded, scheduled for overhaul or inoperable, and under which all the following conditions exist:

-The item or equipment is required to be completely or substantially torn down into individual component parts.

-Substantially all the parts are reworked, rehabilitated, inspected altered and/or replaced.

-The parts are reassembled to furnish a totally rebuilt item or piece of equipment.

-Manufacturing processes like those which were used in the manufacturing of the item or piece of equipment are utilized.

-The disassembled components, if usable (except for situations where the number of items or pieces of equipment involved are too few to make it practicable) may be commingled with existing inventory and, as such, lose their identification with respect to a particular piece of equipment.

-The items or equipment overhauled are restored to original life expectancy.

-Such work is performed in a facility owned or operated by the contractor and/or subcontractor.

(2)Major modification of an item, piece of equipment, or material which is wholly or partially obsolete, and under which all the following conditions exist:

-The item or equipment is required to be completely or substantially torn down.

-Outmoded parts are replaced.

-The item or equipment is rebuilt or reassembled.

-The contract work results in the furnishing of a substantially modified item in a usable and serviceable condition.

-The work is performed in a facility owned or operated by the contractor and/or subcontractor.

2. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the component to the extent necessary to determine if the component is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer and shall discontinue the overhaul until given further instructions or the authorization for disposition of the component by the PCO.

3. In the event the PCO determines that certain items should be scrapped, the Contractor shall scrap such items at the fixed unit price in Section B. IAW Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.245-7005, Management and Reporting of Government

Property, included in this contract, the Contractor shall complete the Plant Clearance Inventory Schedule using the Plant Clearance capability of the Government Furnished Property (GFP) Module of the Procurement Integrated Enterprise Environment (PIEE), an electronic equivalent of the Standard Form 1428, Inventory Disposal Schedule. Users shall register for access and obtain training on the PIEE home page https://wawf.eb.mil/piee-landing. Such scrapped components shall count toward the quantities ordered and the Government can replace any components scrapped by the Contractor.

4. The Government has an adequate Depot Maintenance Work Requirement (DMWR) for this effort and applicable Maintenance Engineering

Orders (MEOs):

DMWR: 1-1560-293, Change # 0, Date 27 Feb 2026

MEOs: B5284, C4598A, T1356E

5. The HYRDAULIC VALVE is not a Critical Safety Item (CSI).

6. Upon receipt of the components, Contractor shall inspect containers for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Components received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved GFP procedures. Components received improperly packaged, damaged with corrosion/deterioration, or those with shipping discrepancies shall be reported IAW DI-MGMT-80503 (See section B, Contract Data Requirements List [CDRL] A002).

7. Government Furnished Property (GFP): The components being provided to the Contractor are identified and tracked as GFP. The

Contractor shall maintain a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) GFP in its possession IAW Federal Acquisition Regulation (FAR) 52.245-1, and its property management system shall satisfy the requirements of this clause. The Contractor shall record the acquisition, receipt, shipment, consumption, disposal of GFP, and any transfer to another

15 81

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

contract utilizing the GFP Module in PIEE, https://piee.eb.mil, as required by the DFARS Procedures, Guidance, and Information (PGI)

245.103-72 Government-furnished Property Attachments to Solicitations and resultant contracts. GFP training and guidance is located at the Department of Defense (DoD) Procurement Toolbox at https://dodprocurementtoolbox.com/.

8. Contractor shall comply with the most recent revision of the U.S. Army Technical Manual (TM) 1-1500-345-23, Painting and Marking of

Army Aircraft, if painting is required in the performance of this contract.

9. Contractor shall submit required data IAW the CDRL, DD Form 1423, Exhibit A electronically to the addresses indicated on the DD

Form(s) 1423.

10. Product Verification Audit (PVA): The Contractor shall conduct the PVA IAW the detailed instructions as specified in Section E of the solicitation and resultant contract. The requirement for PVA may be waived, in whole or in part, by the Government, provided that sufficient information is provided to determine whether the request is to be approved. All waiver requests require a PVA Waiver

Worksheet to be completed and submitted to the Government along with all supporting documentation. The worksheet will be provided by the

PCO upon request. To substantiate or clarify information provided, the Government may request additional information. Submission of the

PVA waiver request to the Government does not guarantee that the waiver will be granted.

11. There is no Army Maintenance Management System - Aviation (TAMMS-A) requirement for this this contract effort.

12. Product Quality Deficiency Reports (PQDRs): When requested, the Contractor shall assist the cognizant Contract Administration Office in evaluating PQDRs and exhibits for defects reported on components overhauled under this contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the Contractor's Quality Program. If a deficiency is discovered on a component provided as Government Furnished

Material (GFM) that has not been identified as part of the overhaul process and cannot be repaired by the contractually authorized technical data, the Contractor shall contact the contracting office to determine if a Product Quality Deficiency Report (PQDR) is required. If required, the contractor shall coordinate with the cognizant DCMA office to have a PQDR submitted or the Contractor shall utilize the Product Data Reporting and Evaluation Program (PDREP) to submit a PQDR at https://www.pdrep.csd.disa.mil/pdrep_files/report_tools/pqdr.htm IAW AR 702-7-1, Reporting of Product Quality Deficiencies within the

U.S. Army.

13. The items the Contractor shall overhaul are identified below:

Input NSN Input P/N

4810-01-096-1056 70652-02450-109

Output NSN Output P/N

4810-01-096-1056 70652-02450-109

14. The overhaul planned quantity for 5 years is Minimum 40, with an estimated Maximum of 232. Input will be 30 days after receipt of order. Output shall be as specified in the solicitation and resultant contract schedule. Serviceable assets shall be returned to

Department of Defense Activity Address Directory (DODAAC) W45H08, Plant 7015, and Routing Identifier Code (RIC) B17.

US Quantities:

1st year qty 40

2nd year qty 40

3rd year qty 40

4th year qty 40

5th year qty 40

FMS Quantities:

1st year qty 0

2nd year qty 8

3rd year qty 8

4th year qty 8

5th year qty 8

15. Transactional Inventory Procedures - The Contractor shall prepare the following reports:

a. The Contractor shall complete and retain a signed copy of DD Form 1348-1A, receipt for repairable on all shipments. The Contractor shall complete the DD Form 1348-1A and include a signature to evidence shipment and receipt. Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:

https://www.dla.mil/Disposition-Services/DDSR/Turn-In/1348-Help/

The Contractor shall prepare this form and include the following corresponding receipt information:

16 81

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(1) Document Number - (Positions 30-44)

(2) National Stock Number (NSN) - (Positions 8-22)

(3) Condition Code - (Position 71)

(4) Unit Price - (Positions 74-80)

(5) Total Price - (Block 1)

(6) Actual Quantity Received - (Block 10)

(7) Nomenclature - (Block 17)

(8) Signature and Date - (Blocks 22 and 23)

For questions with the above information, please contact: usarmy.redstone.amcom.mbx.alcontract-admin-branch@army.mil

b. The Contractor shall perform an annual inventory of all GFP, including items for overhaul and any contractor-acquired property such as containers during the period of performance of this contract. This shall include any subcontractor inventories where GFP has been provided by the Government for overhaul. Contractor shall provide all results, findings, and corrective actions of any annual physical inventories to the Government IAW FAR Clause 52.245-1(f)(1)(iv), Physical Inventory. The Contractor shall prepare a physical inventory report IAW DI-MGMT-80441D (Exhibit A, CDRL A001).

c. The Contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Attachment 0007

"Contractor Overhaul TAV-C Requirements and TAV-C Portal End User Standard Operating Procedures (SOP)".

16. Foreign Military Sales (FMS): Contractor shall always segregate US quantities and FMS quantities and must keep segregated at all times in transit and in storage and shall flow down this requirement to all subcontractors.

17. Item Unique Identification (IUID): The Contractor shall apply IUID IAW Military Standard (MIL-STD) MIL-STD-130N, AR 700-145, Item

Unique Identification, and DA PAM 700-145, IUID Procedures, DFARS 211.274-2 Policy for item unique identification, which requires in paragraph (a)(3)(i) that IUID is required "regardless of value for any DoD serially managed item (reparable or nonrepairable) or subassembly, component, or part embedded within a subassembly, component, or part." All registered Unique Item Identifiers (UIIs) shall be maintained as received and any UIIs created for component received without one, shall follow any published documentation, such as

DMWRs or Maintenance Engineering Orders (MEO). In the absence of these documents, Contractors must strictly adhere to the procedures outlined in the MIL-STD-130N. "Maintaining a UII as received" means the construction of the UII string shall not change; however, the

UII can and will receive updates to the associated data, such as Marks, PN Rollovers, within the DoD IUID National Registry. Any questions about the IUID program should be directed toward the AMCOM IUID helpdesk at 256-425-8566 or usarmy.redstone.amcom.mbx.immsim-iuid@army.mil"usarmy.redstone.amcom.mbx.immsim-iuid@army.mil

18. Shipping Containers and Shipment: Contractor shall utilize the packaging requirements contained in "Attachment 0001, M&O Packaging

Requirements." If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be

Contractor-furnished property. The method of shipment must include tracking of all packages for maintaining government property accountability and visibility. Contractor must comply with MIL-STD-2073-1E, DoD Standard Practice for Military Packaging and MIL-STD-

129R, DoD Standard Practice for Military Marking for Shipment and Storage. The Contractor shall package electronic parts susceptible to static discharge damage IAW ANSI/ESD S20.20-2021 Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding

Electrically Initiated Explosive Devices). If TAMMS-A is required, each individual repaired item must include a copy of all forms required by The Army Maintenance Management System Aviation (TAMMS-A).

19. Overhaul Plan Documentation: The Contractor shall provide overhaul plan documentation to include all legacy (existing) technical information, procedures, and processes (e.g., Overhaul/Repair travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration approved documentation) that the Contractor utilized or shall utilize in the overhaul of the item. The documentation may be in contractor format. The Contractor shall provide documentation IAW DI-MGMT-82455 (CDRL A003).

20. NOTE - Applicable Technical Documents: The applicable documents referenced in this Statement of Work (SOW) are listed on the

Contract Document Summary List (DSL) attached to the solicitation and resultant contract. The DSL lists the referenced documents by document ID, title, date, and category. The document versions specified on the DSL take precedence over the generic references (those without the revision letters) cited in the SOW.

21. Special Equipment Requirements: Tool Identification List in DMWR 1-1560-293 WP 0053

17 81

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE C0001 ***

18 81

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996

3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

5 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2000 or equivalent with prior approval from the Procurement Contracting officer.

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

6. PRODUCT VERIFICATION AUDIT (PVA) CONTRACT REQUIREMENTS

Purpose: This PVA requirement establishes/assigns responsibilities for insertion of PVA procedures into overhaul work directives, maintenance data packages, and contract documents along with procedures and instructions to be applied in performing PVAs during overhaul, maintenance, modification kit installation, rework, remanufacture, manufacturing, and new procurement contracts. The PVA candidate(s) are used to evaluate that the contractor's processes and procedures are adequate to ensure component integrity.

(A) The Contractor shall perform and present for acceptance THREE units as specified in the resultant contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, new manufacture technical requirements or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. PVA actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the

Systems Readiness Directorate (SRD). Like or similar items may be grouped for these purposes provided concurrence is obtained from SRD

Quality Management Division. The contractor may be directed by the Procuring Contracting Officer (PCO) to increase or decrease the scope of a PVA pursuant to the "Changes" clause of the contract for non-commercial items. If however, this procurement is for a commercial item, the contractor and the Contracting Officer (CO) will need to enter into a bilateral contract modification to increase or decrease the scope of a PVA.

(B) The Contractor shall,

(1) With the concurrence of SRD Quality Management Division (QMD), schedule and perform PVA as required by the terms of the contract or as otherwise required.

(2) Notify PCO with information copy to the SRD QMD, ATTN, "usarmy.redstone.devcom-avmc.mbx.qs-contracts@army.mil" of the date the

PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United States, notification shall be provided at least

95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.

(3) Provide technical personnel tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.

(C) The PVA candidate will be selected by the SRD PVA Team Chairman at random from the three (3) tendered candidates for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.

(1) Alternate Procedure. Normally, three assets are required to be completed at time of PVA. If in the PVA Team Chairman's judgment it is in the best interest of the Government, an alternative approach may be taken due to circumstances such as shortage of overhaul assets, shortage of replacement parts, time constraints, or other considerations. At the PVA Team Chairman's discretion, only one PVA candidate may be required to be completed while the other two assets can be in various stages of overhaul as agreed upon (prior to the beginning of the PVA) between the PVA Team Chairman and the facility to be audited. For instance, one asset could be disassembled and ready for Overhaul Inspection Procedures, while the other may be prepared for a critical process such as acceptance testing. (This approach is particularly helpful if the critical process is performed by a subcontractor.) For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.

19 81

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(D) The item selected for PVA will be inspected for adherence to preservation, packaging, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.

(E) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to maintain, overhaul, repair, or manufacture the item being audited for adequacy and conformance to the contractual requirements.