W58RGZ26B0016.pdf
PDF 12 MB Posted
- Attached to
- Overhaul of RADIATOR, GEARBOX
- Solicitation number
- W58RGZ-26-B-0016
About this file
This is a Solicitation/Contract/Order for Commercial Items (Standard Form 1449) for a five-year Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) contract using sealed bidding procedures under FAR Part 14.
The Army Contracting Command–Redstone seeks a responsible bidder to overhaul and repair RADIATOR, GEARBOX components for UH-60 Blackhawk helicopters. The contract is a 100% Small Business Set-Aside restricted to bidders registered under NAICS code 336413 with a size standard of 1,250 employees. The National Stock Number (NSN) is 1615-01-158-9514 with part number 70361-03004-103. Minimum estimated quantity is 132 units; maximum is 450 units (398 U.S./52 Foreign Military Sales). The five-year ordering periods include estimated annual quantities: Year 1: 132 units minimum; Years 2-5: 67, 67, 66, and 66 units respectively. Bids are due August 3, 2026, at 6:00 PM, with bid opening the following day at 10:00 AM CST via Microsoft Teams. Award will be made to the responsive and responsible bidder with the lowest total price based on a pricing template. The contract requires a Product Verification Audit within 90 days of receipt, submission of three audit-ready assets, a Maintenance and Overhaul Plan within 30 days of award, compliance with Cybersecurity Maturity Model Certification (CMMC) Level 2 minimum, a subcontracting plan, and compliance with Total Asset Visibility–Contractor reporting requirements. Bids must remain valid for 120 days and be submitted electronically to Aysia L. Young, Contract Specialist, at aysia.l.young.civ@army.mil with copy to edward.a.peterson4.civ@army.mil.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W58RGZ-26-B-0016 2026JUN30
AYSIA L. YOUNG (520)851-9942
AYSIA.L.YOUNG.CIV@ARMY.MIL
2026AUG03 06:00pm
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280 X
X 100
336413
X
X DOA1
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 70
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: AYSIA L. YOUNG
Buyer Office Symbol/Telephone Number: CCAM-SPE-GP/(520)851-9942
Type of Contract 1: Firm Fixed Price
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
A-1. This action will result in a five (5) year Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to FAR 52.216-22 using Sealed Bidding procedure under FAR Part 14. This is a 100% Small Business Set Aside. The applicable North
American Industry Classification Systems (NAICS) code for this effort is 336413 and the size standard is 1,250 employees. Only bidders with NAICS code 336413 registered in Sam.gov are eligible to submit a bid. If a bidder that is not registered as a small business under
NAICS Code 336413 submits a bid, the bid will be deemed non-responsive and shall not be considered for award.
Input NSN: 1615-01-158-9514
Output NSN: 1615-01-158-9514
Input Part Number (P/N): 70361-03004-103
Output part Number (P/N): 70361-03004-103
Minimum Estimated Quantity: 132
Maximum Estimated Quantity: 450 (398 US / 52 FMS)
A-2. This solicitation is for an Invitation For Bids (IFB) for resulting contract award to the responsible bidder whose bid, conforming to the invitation for bids, will be the most advantageous to the Government considering only price and price-related factors included herein IAW FAR Part 14, Sealed Bidding.
A-3. The RADIATOR, GEARBOX for the UH-60 Blackhawk is NOT identified as a Critical Safety Item (CSI).
A-4. There is a Depot Maintenance Work Requirement for the overhaul of this item: DMWR-1-1615-291, date: 10/14/2022.
A-5. The Foreign Military Sales (FMS) Customer and geographical location(s) for deliveries, inspection and acceptance points are unknown at this time.
A-6. No Government Furnished Material (GFM) other than the reparables and reusable containers, will be provided.
A-7. Access to DLA FedMall (formerly known as E-MALL) is NOT authorized.
A-8. The Government is only obligated to purchase the minimum quantity. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of a delivery order and not by the contract itself.
A-9. Shipping instructions will be provided in each individual delivery order.
A-10. The yearly estimated quantities listed herein do not commit the Government to ordering that or any quantity above the minimum quantity.
A-11. The Government intends to award only one contract as a result of this solicitation.
A-12. The bidder's bid must be valid for 120 days from the date for receipt of bids specified in Block 8, unless a longer period is inserted in the bidder's quote.
A-13. Bidders shall complete Attachment 0006, RADIATOR, GEARBOX, Pricing Template, and submit to the email of aysia.l.young.civ@army.mil or electronically to the DoD SAFE site with submission of Bid. Failure to complete Attachment 0006 in its entirety may cause the bid to be non-responsive and therefore ineligible for consideration for award.
A-14. The Government will not be required to obtain the contractor's signature prior to the issuance of an order.
A-15. The contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions Attachment 0001 -
Contractor Overhaul TAV-C Requirements.
A-16. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:
NAME:
2 70
W58RGZ-26-B-0016
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
TELEPHONE NUMBER:
FAX NUMBER:
E-MAIL ADDRESS:
A-17. To obtain Army Regulations, Technical Manuals, and Technical Bulletins, the following website is provided for your convenience:To obtain Depot Maintenance Work Requirements (DMWRs) and Maintenance Engineering Orders (MEOs), provide your current DD 2345, Militarily
Critical Technical Data Agreement obtained from the Defense Logistics Agency's Joint Certification Program (JCP) and all attachments to the following email address, email:usarmy.redstone.amcom.list.immc-pub-epco@army.mil, along with a printout of your current Cyber
Security Maturation Model Certification (CMMC) certification in the Procurement Integrated Enterprise Environment (PIEE) Supplier
Performance Risk System (SPRS) module which shows that you have the same level or higher required by this solicitation in DFARS
Provision 252.204-7025. The CMMC level must be at least CMMC level 2 self assessment.Please notify the Contract Specialist, Aysia Young, at aysia.l.young.civ@army.mil when this request is made. Solicitation period will not be extended as a result of late requests for technical data.
A-18. The Contractor is required to submit a M&O Plan in accordance with Exhibit A, CDRL A003 and Section C Statement of Work. The documentation shall be submitted within 30 days after contract award.
A-19. A PVA is required for the effort.
A-20. A sub contracting plan is required to be submitted with a signed copy of the solicitation.
*** END OF NARRATIVE A0001 ***
3 70
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________
SERVICE REQUESTED: PVA
This CLIN represents the Production Verification
Audit (PVA) for the RADIATOR, GEARBOX as shown in
CLINs 0002AA and 0003AA.
The PVA shall be in accordance with the Section E, PVA Requirements.
The PVA shall be conducted within 90 days after receipt of reparables.
The contractor shall prepare three (3) assets for
PVA.
The contractor is required to notify the Government
Quality Office for scheduling of the PVA to the following email address:
usarmy.redstone.devcom-avmc.mbx.amr-mq-contracts
@army.mil
With copy emailed to the Contract Specialist at:
aysia.l.young.civ@army.mil
The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.
Note: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:
aysia.l.young.civ@army.mil
PVA requires approval prior to Government acceptance of contract deliverable assets.
Failure to pass the PVA may lead to termination for
Default of the contract.
Payment Instructions: The Contractor will go into
Wide Area Work Flow (WAWF) to receive payment for the
PVA. The Contractor shall use DODAAC W58H0Z when submitting the PVA invoice in WAWF, making it to the attention of Edward A. Peterson. The Contracting
Officer will approve the PVA invoice.
4 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative D001)
For packaging instructions refer to Section J, Attachment 0002, M&O Packaging Requirements.
(End of narrative D002)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0002 RADIATOR, GEARBOX (US)
0002AA OVERHAUL RADIATOR, GEARBOX (US) $ $ _______________________________ ______________ __________________
COMMODITY NAME: RADIATOR, GEARBOX (US)
CLIN CONTRACT TYPE:
Firm Fixed Price
Estimated yearly quantities for CLIN 0002AA are:
Ordering Period 1: 132 each minimum qty
Ordering Period 2: 67 each estimated qty
Ordering Period 3: 67 each estimated qty
Ordering Period 4: 66 each estimated qty
Ordering Period 5: 66 each estimated qty
(End of narrative B001)
INPUT:
NSN: 1615-01-158-9514, P/N: 70361-03004-103
OUTPUT:
NSN: 1615-01-158-9514, P/N: 70361-03004-103
The overhaul shall be in accordance with the
Statement of Work.
This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, 5 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the Statement Of Work (SOW).
BIDDER IS REQUIRED TO FILL IN PROPOSED UNIT PRICE:
YEAR 1- U/P $_____________ (FFP) Min Qty 132 ea
YEAR 2- U/P $_____________ (FFP) Est Qty 67 ea
YEAR 3- U/P $_____________ (FFP) Est Qty 67 ea
YEAR 4- U/P $_____________ (FFP) Est Qty 66 ea
YEAR 5- U/P $_____________ (FFP) Est Qty 66 ea
INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS
CLIN.
(End of narrative C001)
Packaging and Marking _____________________
For packaging instructions refer to Section J, Attachment 0002, M&O Packaging Requirements.
Contract must comply with MIL-STD-2073-1 Codes, Appendix, J, DOD Standard Practice for Military
Packaging and MIL-STR-129 R, DOD Standard Practice for Military Marking from Shipment and Storage, notwithstanding the packaging instructions in
Section J Attachment 0002 references merely MIL-STD-
2073-1 and MIL-STD-129 with no reference to the latest versions.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0003 RADIATOR, GEARBOX (FMS)
The maximum FMS Quantity is 52; however, if no FMS customers require this item, the United States Army
Requirer may utilize the FMS Quantity.
6 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative A001)
0003AA OVERHAUL RADIATOR, GEARBOX (FMS) $ $ ________________________________ ______________ __________________
COMMODITY NAME: RADIATOR, GEARBOX (FMS)
CLIN CONTRACT TYPE:
Firm Fixed Price
Estimated yearly quantities for CLIN 0003AA are:
Ordering Period 1: 0 each minimum qty
Ordering Period 2: 13 each estimated qty
Ordering Period 3: 13 each estimated qty
Ordering Period 4: 13 each estimated qty
Ordering Period 5: 13 each estimated qty
(End of narrative B001)
INPUT:
NSN: 1615-01-158-9514, P/N: 70361-03004-103
OUTPUT:
NSN: 1615-01-158-9514, P/N: 70361-03004-103
The overhaul shall be in accordance with the
Statement of Work.
This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the Statement Of Work (SOW).
BIDDER IS REQUIRED TO FILL IN PROPOSED UNIT PRICE:
YEAR 1- U/P $_____________ (FFP) Est Min Qty 0 ea
YEAR 2- U/P $_____________ (FFP) Est Qty 13 ea
YEAR 3- U/P $_____________ (FFP) Est Qty 13 ea
YEAR 4- U/P $_____________ (FFP) Est Qty 13 ea
YEAR 5- U/P $_____________ (FFP) Est Qty 13 ea
INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS
CLIN.
7 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative C001)
Packaging and Marking _____________________
For packaging instructions refer to Section J, Attachment 0002, M&O Packaging Requirements.
Contract must comply with MIL-STD-2073-1 Codes, Appendix, J, DOD Standard Practice for Military
Packaging and MIL-STR-129 R, DOD Standard Practice for Military Marking from Shipment and Storage, notwithstanding the packaging instructions in
Section J Attachment 0002 references merely MIL-STD-
2073-1 and MIL-STD-129 with no reference to the latest versions.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0004 SCRAP
0004AA SCRAP $ ______ __________________
SERVICE REQUESTED: SCRAP
This CLIN is for assets which are beyond economical repair (i.e., scrap) from CLINs 0002AA and 0003AA.
The Government's estimated quantity per ordering period is 10 each. The estimated quantity of 10 is for proposal evaluation purposes only.
Bidder is required to fill in a proposed firm fixed unit price for each ordering period:
Ordering Period 1 $__________10 EACH
Ordering Period 2 $_________ 10 EACH
8 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Ordering Period 3 $________ 10 EACH
Ordering Period 4 $_________ 10 EACH
Ordering Period 5 $_________ 10 EACH
Scrapped assets from CLINs 0002AA and/or 0003AA shall be in accordance with the Statement of Work.
As applicable on delivery orders issued, units determined to be scrapped in accordance with
Section C Statement of Work shall be reflected as an increase in CLIN 0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA and/or 0003AA, as applicable.
In the event the Procuring Contracting Officer
(PCO) determines that certain items shall be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.
The Government may, at its discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0005 CONTAINERS
0005AA CONTAINERS $ ___________ __________________
SERVICE REQUESTED: CONTAINERS
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is for contractor furnished containers for CLINs 0002AA and/or 0003AA.
9 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SEE ATTACHMENT 0002 FOR CONTAINER SPECIFICATIONS
"Contractor must comply with MIL-STD-2073-1E w/change 4, DOD Standard Practice for Military
Packaging and MIL-STD-129R, DOD Standard Practice for Military Marking for Shipment and Storage, notwithstanding any instructions in Attachment
0002.
The Government estimates that a quantity of 10 EACH will be required for each of the ordering periods.
The estimated quantity of 10 is for proposal evaluation purposes only.
Bidder is required to fill in a proposed firm fixed unit price for each ordering period:
Ordering Period 1 $__________10 EACH
Ordering Period 2 $__________10 EACH
Ordering Period 3 $__________10 EACH
Ordering Period 4 $__________10 EACH
Ordering Period 5 $__________10 EACH
The contractor shall provide the container in accordance with Attachment 0002 - M&O Packaging
Requirements and the Statement of Work and reusable containers.
The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.
The Contractor, IAW the Statement of Work, shall submit a Report of Discrepancy (ROD) SF Form 364 through the DCMA QAR for verification within 7 working days to the address shown on Data Item
A002. Assets received with an unserviceable container, or without a container, require prior approval by the PCO before containers can be purchased.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0006 CONTRACT DATA REQUIREMENT LIST (CDRL) _____________________________________
10 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
THIS CLIN IS "NOT SEPARATELY PRICED" (NSP).
PRICING FOR DATA SHALL BE INCLUDED IN THE UNIT
PRICE OF CLINS 0002AA AND 0003AA.
The Contractor shall provide Data Items A001 -
A003 in accordance with the Contract Data
Requirement List, Exhibit A.
(End of narrative A001)
A001 GOVERNMENT PROPERTY INVENTORY REPORT $ ** NSP ** ____________________________________ __________________
SERVICE REQUESTED: DI-MGMT-80441D
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A002 REPORT OF SHIPPING (ITEM) AND PACKAGING $ ** NSP ** _______________________________________ __________________
SERVICE REQUESTED: DI-MGMT-80503
CLIN CONTRACT TYPE:
Firm Fixed Price
Submission of the Report of Shipping and Packaging
Discrepancy (ROD) shall occur within 10 days of discovery of the discrepancy.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A003 MAINTENANCE AND OVERHAUL (M&O) PLANNING _______________________________________
DOCUMENTATION $ ** NSP ** _____________ __________________
11 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: DI-MGMT-82455
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
12 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
NSN: 1615-01-158-9514
Part Number: 70361-03004-103
1. The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data necessary to accomplish the inspection and overhaul for the RADIATOR, GEARBOX for the UH-60 (hereinafter "the component") that is required to return the component to a serviceable condition sufficient to meet the standard of continued airworthiness in accordance with (IAW) Army Regulation
(AR) 70-62. Upon completion of the overhaul, the components shall be packaged IAW the contract and shipped to the destination(s) specified in each individual delivery order.
2. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the component to the extent necessary to determine if the component is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer and shall discontinue the overhaul until given further instructions or the authorization for disposition of the component by the PCO.
3. In the event the PCO determines that certain items should be scrapped, the Contractor shall scrap such items at the fixed unit price in Section B. IAW Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.245-7005 Management and Reporting of Government
Property, included in the contract, the Contractor shall complete the Plant Clearance Inventory Schedule using the Plant Clearance capability of the GFP Module of the Procurement Integrated Enterprise Environment (PIEE), an electronic equivalent of the Standard Form
1428, Inventory Disposal Schedule. Users shall register for access and obtain training on the PIEE home page "https://wawf.eb.mil/piee-landing". Such scrapped components shall count toward the quantities ordered and the Government can replace any components scrapped by the Contractor.
4. The Government has an adequate Depot Maintenance Work Requirement (DMWR) for this effort, DMWR- 1-1615-291, dated 14 OCTOBER 2022, Maintenance Engineering Orders (MEOs) B4649, B4946, B5269, T1356E and a Technical Data Package List.
5. Critical Safety Item (CSI): The RADIATOR, GEARBOX is not a CSI.
6. Upon receipt of the components, Contractor shall inspect containers for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Components received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved GFP procedures. Components received improperly packaged, damaged with corrosion/deterioration, or those with shipping discrepancies shall be reported IAW DI-MGMT-80503 (See section B, Contract Data Requirements List Exhibit A, CDRL
A002).
7. GFP Attachment: The components being provided to the Contractor are identified and tracked as GFP. The Contractor shall maintain a system of internal controls to manage (control, use, preserve, protect, and maintain) GFP in its possession IAW Federal Acquisition
Regulation (FAR) 52.245-1, and its property management system shall satisfy the requirements of this clause. The Contractor shall record the acquisition, receipt, shipment, consumption, disposal of GFP, and any transfer to another contract utilizing the GFP Module in PIEE, https://piee.eb.mil, as required by the DFARS Procedures, Guidance, and Information (PGI) 245.103-72 Government-furnished Property
Attachments to Solicitations and resultant contracts. GFP training and guidance is located at the Department of Defense (DoD)
Procurement Toolbox at https://dodprocurementtoolbox.com/.
8. Contractor shall comply with U.S. Army Technical Manual (TM) 1-1500-345-23, Painting and Marking of Army Aircraft, or most recent version, if painting is required in the performance of the contract.
9. Contractor shall submit required data IAW the CDRL, DD Form 1423, Exhibit A electronically to the addresses indicated on the DD
Form(s) 1423.
13 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
10. Product Verification Audit (PVA): The Contractor shall conduct the PVA IAW the detailed instructions as specified in Section E of the solicitation and resultant contract. The requirement for PVA may be waived, in whole or in part, by the Government, provided that sufficient information is provided to determine whether the request is to be approved. All waiver requests require a PVA Waiver
Worksheet to be completed and submitted to the Government along with all supporting documentation. The worksheet will be provided by the PCO upon request. To substantiate or clarify information provided, the Government may request additional information. Submission of the PVA waiver request to the Government does not guarantee that the waiver will be granted.
11. There is no Army Maintenance Management System- Aviation (TAMMS-A) requirement for the contract effort.
12. Product Quality Deficiency Reports (PQDRs): When requested, the Contractor shall assist the cognizant Contract Administration Office in evaluating PQDRs and exhibits for defects reported on components overhauled under the contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the Contractor's Quality Program. The Contractor shall utilize the Product Data Reporting and Evaluation Program
(PDREP) to submit a PQDR at "https://www.pdrep.csd.disa.mil/pdrep_files/report_tools/pqdr.htm IAW AR 702-7-1, Reporting of Product
Quality Deficiencies within the U.S. Army.
13. The items the Contractor shall overhaul are identified below:
Input NSN P/N
1615-01-158-9514 70361-03004-103
Output NSN P/N
1615-01-158-9514 70361-03004-103
14. The overhaul planned quantity for 5 years is Minimum 132, Maximum 450 (398 US QTY/ 52 FMS QTY). Input will be 30 days after receipt of order. Output shall be as specified in the solicitation and resultant contract schedule. Serviceable assets shall be returned to
Department of Defense Activity Address Directory (DODAAC) W62G2T, Plant 7011, and Routing Identifier code (RIC) AQ5.
1st year qty 132(US)/0(FMS) 4th year qty 66(US)/13(FMS)
2nd year qty 67(US)/13(FMS) 5th year qty 66(US)/13(FMS) rd year qty 67(US)/13(FMS)
15. Transactional Inventory Procedures - The Contractor shall prepare the following reports:
a. The Contractor shall complete and retain a signed copy of DD Form 1348-1A, receipt for repairable on all shipments. The Contractor shall complete the DD Form 1348-1A and include a signature to evidence shipment and receipt. Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:
https://www.dla.mil/Disposition-Services/DDSR/Turn-In/1348-Help/
The Contractor shall prepare this form and include the following corresponding receipt information:
(1) Document Number - (Positions 30-44)
(2) National Stock Number (NSN) - (Positions 8-22)
(3) Condition Code - (Position 71)
(4) Unit Price - (Positions 74-80)
(5) Total Price - (Block 1)
(6) Actual Quantity Received - (Block 10)
(7) Nomenclature - (Block 17)
(8) Signature and Date - (Blocks 22 and 23)
For questions with the above information, please contact: "mailto:usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil"
b. The Contractor shall perform an annual inventory of all GFP, including items for overhaul and any contractor-acquired property such as containers during the period of performance of the contract. This shall include any subcontractor inventories where GFP has been provided by the Government for overhaul. Contractor shall provide all results, findings, and corrective actions of any annual physical inventories to the Government IAW FAR Clause 52.245-1(f)(1)(iv), Physical Inventory. The Contractor shall prepare a physical inventory report IAW DI-MGMT-80441D (Exhibit A, CDRL A001).
c. The Contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Attachment 0001
14 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
"Contractor Overhaul TAV-C Requirements and TAV-C Portal End User Standard Operating Procedures (SOP)".
16. Foreign Military Sales (FMS): Contractor shall always segregate US quantities and FMS quantities and must keep segregated at all times in transit and in storage and shall flow down this requirement to all subcontractors.
17. Item Unique Identification (IUID): The Contractor shall apply IUID IAW Military Standard (MIL-STD) MIL-STD-130N, AR 700-145, Item
Unique Identification, and DA PAM 700-145, IUID Procedures, DFARS 211.274-2(a) Policy for item unique identification, which requires in paragraph (a) that IUID is required "For all delivered items, including items of contractor-acquired property delivered on line items
(see PGI 245.402-71 for guidance when delivery of contractor acquired property is required)" All registered Unique Item Identifiers
(UIIs) shall be maintained as received and any UIIs created for component received without one, shall follow any published documentation, such as DMWRs or Maintenance Engineering Orders (MEO). In the absence of these documents, Contractors must strictly adhere to the procedures outlined in the MIL-STD-130N. "Maintaining a UII as received" means the construction of the UII string shall not change; however, the UII can and will receive updates to the associated data, such as Marks, PN Rollovers, within the DoD IUID
National Registry. Any questions about the IUID program should be directed toward the AMCOM IUID helpdesk at 256-425-8566 or
"mailto:usarmy.redstone.amcom.mbx.immc-sim-iuid@army.mil".
18. Shipping Containers and Shipment: Contractor shall utilize the packaging requirements contained in "Attachment 0002, M&O Packaging
Requirements." If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be
Contractor-furnished property. The method of shipment must include tracking of all packages for maintaining government property accountability and visibility. Contractor must comply with MIL-STD-2073-1E, DoD Standard Practice for Military Packaging and MIL-STD-
129R, DoD Standard Practice for Military Marking for Shipment and Storage. The Contractor shall package electronic parts susceptible to static discharge damage IAW ANSI/ESD S20.20-2021 Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding
Electrically Initiated Explosive Devices).
19. Overhaul Plan Documentation: The Contractor shall provide overhaul plan documentation to include all legacy (existing) technical information, procedures, and processes (e.g., Overhaul travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration approved documentation) that the Contractor utilized or shall utilize in the overhaul of the item. The documentation may be in contractor format. The Contractor shall provide documentation IAW DI-MISC-80508B (Exhibit A, CDRL A003).
20. NOTE - Applicable Technical Documents: The applicable documents referenced in this Statement of Work (SOW) are listed on the
Contract Document Summary List (DSL) attached to the solicitation and resultant contract. The DSL lists the referenced documents by document ID, title, date, and category. The document versions specified on the DSL take precedence over the generic references (those without the revision letters) cited in the SOW.
*** END OF NARRATIVE C0001 ***
15 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996
3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
5 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2000 or equivalent with prior approval from the Procurement Contracting officer.
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E-6. PRODUCT VERIFICATION AUDIT (PVA) CONTRACT REQUIREMENTS
Purpose: This PVA requirement establishes/assigns responsibilities for insertion of PVA procedures into overhaul work directives, maintenance data packages, and contract documents along with procedures and instructions to be applied in performing PVAs during overhaul, maintenance, modification kit installation, rework, remanufacture, manufacturing, and new procurement contracts. The PVA candidate(s) are used to evaluate that the contractor's processes and procedures are adequate to ensure component integrity.
(A) The Contractor shall perform and present for acceptance THREE units as specified in the resultant contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, new manufacture technical requirements or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. PVA actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the
Systems Readiness Directorate (SRD). Like or similar items may be grouped for these purposes provided concurrence is obtained from SRD
Quality Management Division. The contractor may be directed by the Procuring Contracting Officer (PCO) to increase or decrease the scope of a PVA pursuant to the "Changes" clause of the contract for non-commercial items. If however this procurement is for a commercial item, the contractor and the Contracting Officer (CO) will need to enter into a bilateral contract modification to increase or decrease the scope of a PVA.
(B) The Contractor shall,
(1) With the concurrence of SRD Quality Management Division (QMD), schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify PCO with information copy to the SRD QMD, ATTN, "usarmy.redstone.devcom-avmc.mbx.qs-contracts@army.mil" of the date the
PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United States, notification shall be provided at least
95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
(C) The PVA candidate will be selected by the SRD PVA Team Chairman at random from the three (3) tendered candidates for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
(1) Alternate Procedure. Normally, three assets are required to be completed at time of PVA. If in the PVA Team Chairman's judgment it is in the best interest of the Government, an alternative approach may be taken due to circumstances such as shortage of overhaul assets, shortage of replacement parts, time constraints, or other considerations. At the PVA Team Chairman's discretion, only one PVA candidate may be required to be completed while the other two assets can be in various stages of overhaul as agreed upon (prior to the beginning of the PVA) between the PVA Team Chairman and the facility to be audited. For instance, one asset could be disassembled and ready for Overhaul Inspection Procedures, while the other may be prepared for a critical process such as acceptance testing. (This approach is particularly helpful if the critical process is performed by a subcontractor.) For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
16 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(D) The item selected for PVA will be inspected for adherence to preservation, packaging, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(E) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to maintain, overhaul, repair, or manufacture the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
(F) Disassembly for overhauled items will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality
Assurance Representative (QAR), and the SRD PVA Team Chairman and team personnel.
(G) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) shall be conducted of all physical characteristics, to include but not limited to any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings, Depot
Maintenance Work Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in the resultant contract.
(H) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shot peening, heat treating, etc.) performed by subcontractors may also be audited. Contractor shall be able to demonstrate that all testing/ inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents and are approved and controlled by management.
(I) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for Government acceptance including preservation, packaging, marking, and update of historical records and all applicable documentation.
(J) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the SRD PVA Team Chairman's discretion, examination of representative assemblies may be used as evidence of compliance to specification requirements. The SRD PVA Team Chairman will determine the scope and detail of the PVA process. The SRD PVA Team Chairman may delegate follow-up actions to the DCMA QAR, when it is determined to be prudent to the
PVA.
(K) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the PVA is completed, the SRD PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant
DCMA QAR and PM Representative. The context of the audit findings and corrective actions will be discussed, and any disputes will be resolved. Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established
(i.e. workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to ensure compliance with requirements.
(L) All defects will be recorded on an SRD PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each finding to the contractor quality assurance element and the cognizant DCMA QAR and PM Representative. This will allow immediate actions to begin in the resolution of the defect. Corrective actions, as well as actions taken to prevent recurrence, shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor quality manager or designated representative and the SRD PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects:
(1) Observation: In the event an observation is discovered, the contractor is not required to provide a written response but is encouraged to do so.
(2) Minor: In the event a minor defect is discovered, the following actions shall be taken:
(a) The contractor shall isolate the cause of the defect and initiate corrective actions.
(b) All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
(c) In the event a minor defect is a recurrent deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
(3) Major: In the event a major defect is discovered, the following actions shall be taken:
17 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(a) The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA
Chairman.
(b) The contractor shall provide the DCMA QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
(c) The contractor shall determine impact of the defect on products previously delivered under the resultant contract, if any, and initiate corrective action to address those units at no additional cost to the US Government.
(d) The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
(e) The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
(f) The contractor shall assure the cognizant DCMA QAR and the SRD PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the DCMA QAR and the SRD PVA Team Chairman within 24 hours after the verbal response.
(4) Critical: In the event a critical defect is discovered, the following actions shall be taken:
(a) All actions outlined in paragraph 3 above shall be completed.
(b) Upon request, the contractor shall provide the SRD technical information necessary for the issuance of a Safety of Flight
Message or Aviation Safety Action Message to the field (if necessary).
(c) Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality assurance process discrepancies that affect the outcome of product(s)outside the scope of the PVA will require the cognizant DCMA QAR to issue a Corrective Action Request.
(M) Finding Definitions:
Minor Finding: A defect or a departure from established processes or standards that may result in failure or reduced usability of the product, or a process noncompliance that holds the potential of causing a defect in the future.
Major Finding: A defect, other than critical, that will likely result in failure or reduce the usability of the product for its intended purpose.
Critical Finding: A defect that would result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the product or a defect likely to prohibit the performance of a major end item or major part thereof. This classification requires immediate cessation of Government acceptance/release of product until corrective actions are acceptable to the contracting officer.
Observation: A condition or circumstance that is noted during the PVA that does not currently meet the defect criteria. This category may also be used as suggestions for continuous improvement.
(N) Upon completion of the disassembly and/or testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy to the PVA Team Chairman that such a defect does not exist in the other two PVA candidates prior to acceptance, and an effective corrective action has been initiated to preclude re-occurrence of the defect.
(O) If there are failures during the PVA, the Contractor shall repeat any or all tests, per Government request. If deemed in the best interests of the Government, contract termination may be initiated. Upon request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. These actions must be coordinated with the cognizant DCMA QAR.
The Government shall take action within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(P) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after official PVA approval from Contracting Officer, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted.
18 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Notification is required 10 business days prior to shipment of the next delivery.
(Q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon receipt of the official PVA approval via the Contracting Officer. The Contractor SHALL NOT retain the PVA item approved under the resultant contract to serve as the manufacturing standard of acceptance.
(R) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of the resultant contract.
(…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .