W58RGZ26B0016-0002.pdf

PDF 21 KB Posted

Attached to
Overhaul of RADIATOR, GEARBOX Amendment 0002
Solicitation number
W58RGZ-26-B-0016_Amendment-0002
Issued by

About this file

This is Amendment 0002 to Solicitation W58RGZ-26-B-0016, a firm fixed price service contract issued by Army Contracting Command-Redstone for the inspection and overhaul of RADIATOR, GEARBOX components for UH-60 helicopters. The amendment extends the solicitation expiration date to September 15, 2026 at 6:00 PM CST and adds Maintenance Engineering Order (MEO) B5277 to the existing MEOs table (B4649, B4946, B5269, C4598A, T1356E).

The contract requires the contractor to furnish all services, facilities, labor, parts, materials, equipment, and tools necessary to disassemble, inspect, and overhaul the components (NSN 1615-01-158-9514, Part Number 70361-03004-103) to return them to serviceable condition meeting Army Regulation 70-62 airworthiness standards. The planned 5-year overhaul quantity is minimum 132 to maximum 450 units (398 US/52 FMS), with first-year quantities of 132 US/0 FMS, distributed across years 2-5 at 67 US/13 FMS and 66 US/13 FMS. Input is 30 days after order receipt, with serviceable assets returned to DODAAC W62G2T, Plant 7011, RIC AQ5. Key requirements include government-furnished property (GFP) management via the PIEE system, annual GFP inventories, Item Unique Identification (IUID) per MIL-STD-130N, Product Verification Audits, compliance with packaging standards MIL-STD-2073-1E and MIL-STD-129R, and submission of required data reports including Physical Inventory (CDRL A001), Overhaul Plan Documentation (CDRL A003), and shipping discrepancies per DI-MGMT-80503.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0002 2026AUG12

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

AYSIA L. YOUNG

EMAIL: AYSIA.L.YOUNG.CIV@ARMY.MIL

W58RGZ-26-B-0016

2026JUN30

X

X 2026SEP15 06:00pm

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 5

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: AYSIA L. YOUNG

Buyer Office Symbol/Telephone Number: CCAM-SPE-GP/(520)851-9942

Type of Contract 1: Firm Fixed Price

Kind of Contract: Service Contracts

*** End of Narrative A0000 ***

A-1. The purpose of Amendment (0002) to Solicitation W58RGZ-26-B-0016 is to update the expiration date and Statement of Work.

A-2. The solicitation will now expire on 15 September 2026, 6:00 PM CST.

A-3. A Maintenance Engineering Order (MEO) has been added into the MEOs table. The added MEO is listed as B5277.

A-4. All other terms and conditions remain the same.

*** END OF NARRATIVE A0003 ***

2 5

W58RGZ-26-B-0016

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

NSN: 1615-01-158-9514

Part Number: 70361-03004-103

1. The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data necessary to accomplish the inspection and overhaul for the RADIATOR, GEARBOX for the UH-60 (hereinafter "the component") that is required to return the component to a serviceable condition sufficient to meet the standard of continued airworthiness in accordance with (IAW) Army Regulation

(AR) 70-62. Upon completion of the overhaul, the components shall be packaged IAW the contract and shipped to the destination(s) specified in each individual delivery order.

2. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the component to the extent necessary to determine if the component is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer and shall discontinue the overhaul until given further instructions or the authorization for disposition of the component by the PCO.

3. In the event the PCO determines that certain items should be scrapped, the Contractor shall scrap such items at the fixed unit price in Section B. IAW Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.245-7005 Management and Reporting of Government

Property, included in the contract, the Contractor shall complete the Plant Clearance Inventory Schedule using the Plant Clearance capability of the GFP Module of the Procurement Integrated Enterprise Environment (PIEE), an electronic equivalent of the Standard Form

1428, Inventory Disposal Schedule. Users shall register for access and obtain training on the PIEE home page "https://wawf.eb.mil/piee-landing". Such scrapped components shall count toward the quantities ordered and the Government can replace any components scrapped by the Contractor.

4. The Government has an adequate Depot Maintenance Work Requirement (DMWR) for this effort, DMWR- 1-1615-291, dated 14 OCTOBER 2022, Maintenance Engineering Orders (MEOs) B4649, B4946, B5269, B5277, C4598A, T1356E and a Technical Data Package List.

5. Critical Safety Item (CSI): The RADIATOR, GEARBOX is not a CSI.

6. Upon receipt of the components, Contractor shall inspect containers for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Components received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved GFP procedures. Components received improperly packaged, damaged with corrosion/deterioration, or those with shipping discrepancies shall be reported IAW DI-MGMT-80503 (See section B, Contract Data Requirements List Exhibit A, CDRL

A002).

7. GFP Attachment: The components being provided to the Contractor are identified and tracked as GFP. The Contractor shall maintain a system of internal controls to manage (control, use, preserve, protect, and maintain) GFP in its possession IAW Federal Acquisition

Regulation (FAR) 52.245-1, and its property management system shall satisfy the requirements of this clause. The Contractor shall record the acquisition, receipt, shipment, consumption, disposal of GFP, and any transfer to another contract utilizing the GFP Module in PIEE, https://piee.eb.mil, as required by the DFARS Procedures, Guidance, and Information (PGI) 245.103-72 Government-furnished Property

Attachments to Solicitations and resultant contracts. GFP training and guidance is located at the Department of Defense (DoD)

Procurement Toolbox at https://dodprocurementtoolbox.com/.

8. Contractor shall comply with U.S. Army Technical Manual (TM) 1-1500-345-23, Painting and Marking of Army Aircraft, or most recent version, if painting is required in the performance of the contract.

9. Contractor shall submit required data IAW the CDRL, DD Form 1423, Exhibit A electronically to the addresses indicated on the DD

Form(s) 1423.

3 5

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

10. Product Verification Audit (PVA): The Contractor shall conduct the PVA IAW the detailed instructions as specified in Section E of the solicitation and resultant contract. The requirement for PVA may be waived, in whole or in part, by the Government, provided that sufficient information is provided to determine whether the request is to be approved. All waiver requests require a PVA Waiver

Worksheet to be completed and submitted to the Government along with all supporting documentation. The worksheet will be provided by the PCO upon request. To substantiate or clarify information provided, the Government may request additional information. Submission of the PVA waiver request to the Government does not guarantee that the waiver will be granted.

11. There is no Army Maintenance Management System- Aviation (TAMMS-A) requirement for the contract effort.

12. Product Quality Deficiency Reports (PQDRs): When requested, the Contractor shall assist the cognizant Contract Administration Office in evaluating PQDRs and exhibits for defects reported on components overhauled under the contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the Contractor's Quality Program. The Contractor shall utilize the Product Data Reporting and Evaluation Program

(PDREP) to submit a PQDR at "https://www.pdrep.csd.disa.mil/pdrep_files/report_tools/pqdr.htm IAW AR 702-7-1, Reporting of Product

Quality Deficiencies within the U.S. Army.

13. The items the Contractor shall overhaul are identified below:

Input NSN P/N

1615-01-158-9514 70361-03004-103

Output NSN P/N

1615-01-158-9514 70361-03004-103

14. The overhaul planned quantity for 5 years is Minimum 132, Maximum 450 (398 US QTY/ 52 FMS QTY). Input will be 30 days after receipt of order. Output shall be as specified in the solicitation and resultant contract schedule. Serviceable assets shall be returned to

Department of Defense Activity Address Directory (DODAAC) W62G2T, Plant 7011, and Routing Identifier code (RIC) AQ5.

1st year qty 132(US)/0(FMS) 4th year qty 66(US)/13(FMS)

2nd year qty 67(US)/13(FMS) 5th year qty 66(US)/13(FMS) rd year qty 67(US)/13(FMS)

15. Transactional Inventory Procedures - The Contractor shall prepare the following reports:

a. The Contractor shall complete and retain a signed copy of DD Form 1348-1A, receipt for repairable on all shipments. The Contractor shall complete the DD Form 1348-1A and include a signature to evidence shipment and receipt. Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:

https://www.dla.mil/Disposition-Services/DDSR/Turn-In/1348-Help/

The Contractor shall prepare this form and include the following corresponding receipt information:

(1) Document Number - (Positions 30-44)

(2) National Stock Number (NSN) - (Positions 8-22)

(3) Condition Code - (Position 71)

(4) Unit Price - (Positions 74-80)

(5) Total Price - (Block 1)

(6) Actual Quantity Received - (Block 10)

(7) Nomenclature - (Block 17)

(8) Signature and Date - (Blocks 22 and 23)

For questions with the above information, please contact: "mailto:usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil"

b. The Contractor shall perform an annual inventory of all GFP, including items for overhaul and any contractor-acquired property such as containers during the period of performance of the contract. This shall include any subcontractor inventories where GFP has been provided by the Government for overhaul. Contractor shall provide all results, findings, and corrective actions of any annual physical inventories to the Government IAW FAR Clause 52.245-1(f)(1)(iv), Physical Inventory. The Contractor shall prepare a physical inventory report IAW DI-MGMT-80441D (Exhibit A, CDRL A001).

c. The Contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Attachment 0001

4 5

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

"Contractor Overhaul TAV-C Requirements and TAV-C Portal End User Standard Operating Procedures (SOP)".

16. Foreign Military Sales (FMS): Contractor shall always segregate US quantities and FMS quantities and must keep segregated at all times in transit and in storage and shall flow down this requirement to all subcontractors.

17. Item Unique Identification (IUID): The Contractor shall apply IUID IAW Military Standard (MIL-STD) MIL-STD-130N, AR 700-145, Item

Unique Identification, and DA PAM 700-145, IUID Procedures, DFARS 211.274-2(a) Policy for item unique identification, which requires in paragraph (a) that IUID is required "For all delivered items, including items of contractor-acquired property delivered on line items

(see PGI 245.402-71 for guidance when delivery of contractor acquired property is required)" All registered Unique Item Identifiers

(UIIs) shall be maintained as received and any UIIs created for component received without one, shall follow any published documentation, such as DMWRs or Maintenance Engineering Orders (MEO). In the absence of these documents, Contractors must strictly adhere to the procedures outlined in the MIL-STD-130N. "Maintaining a UII as received" means the construction of the UII string shall not change; however, the UII can and will receive updates to the associated data, such as Marks, PN Rollovers, within the DoD IUID

National Registry. Any questions about the IUID program should be directed toward the AMCOM IUID helpdesk at 256-425-8566 or

"mailto:usarmy.redstone.amcom.mbx.immc-sim-iuid@army.mil".

18. Shipping Containers and Shipment: Contractor shall utilize the packaging requirements contained in "Attachment 0002, M&O Packaging

Requirements." If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be

Contractor-furnished property. The method of shipment must include tracking of all packages for maintaining government property accountability and visibility. Contractor must comply with MIL-STD-2073-1E, DoD Standard Practice for Military Packaging and MIL-STD-

129R, DoD Standard Practice for Military Marking for Shipment and Storage. The Contractor shall package electronic parts susceptible to static discharge damage IAW ANSI/ESD S20.20-2021 Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding

Electrically Initiated Explosive Devices).

19. Overhaul Plan Documentation: The Contractor shall provide overhaul plan documentation to include all legacy (existing) technical information, procedures, and processes (e.g., Overhaul travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration approved documentation) that the Contractor utilized or shall utilize in the overhaul of the item. The documentation may be in contractor format. The Contractor shall provide documentation IAW DI-MISC-80508B (Exhibit A, CDRL A003).

20. NOTE - Applicable Technical Documents: The applicable documents referenced in this Statement of Work (SOW) are listed on the

Contract Document Summary List (DSL) attached to the solicitation and resultant contract. The DSL lists the referenced documents by document ID, title, date, and category. The document versions specified on the DSL take precedence over the generic references (those without the revision letters) cited in the SOW.

*** END OF NARRATIVE C0001 ***

5 5

SECTION A
SECTION C

File details come from the government source that posted it. Updated .