The file's text, extracted by GovTribe without its formatting.
CONTRACTORS ARE ENCOURAGED TO OFFER SUGGESTIONS, COMMENTS, OR ALTERNATIVES TO THE DOCUMENTS CITED HEREIN. TAILORING, CATEGORY OF APPLICATION, REVISION LEVELS, AND THE DOCUMENTS CITED ARE ALL CANDIDATES.
Definition of Document Categories:
1. Category 0 (Cat. 0). The requirements contained in the directly cited document are non-mandatory and are for reference or information only.
2. Category 1 (Cat. 1). The requirements contained in the directly cited document are contractually applicable to the extent specified. All requirements contained in reference and subsequently referenced documents are contractually for information only unless otherwise specified in the solicitation, contract, or contract modification.
3. Category 2 (Cat. 2). The requirements contained in the directly cited document are contractually applicable to the extent specified. All requirements contained in referenced documents are also imposed to the extent specified. All requirements contained in subsequently referenced documents are contractually for information only unless otherwise specified in the solicitation, contract or contract modification.
Definitions of DD Form 1423:
Blocks 10,11,12, and 13: “Submit” means to deliver to the Government as specified in the shipping instructions for data which are located in section F of the contract.
Block 14: Regular/Repro Copies
Regular Copy - Blueline, Blackline, Xerographic (originals of reports, plans, or routine data also fall into this definition).
Repro Copy - Multilith, Vellum, photographic negatives, etc. (Originals of drawings, engineering change proposals (ECPs), engineering release records (ERRs), or technical publications).
Note: Type of electronic media, e.g., diskette, CD-ROM, may be designated in Block 16.
CONTRACTUAL REQUIREMENTS OF DATA ITEM DESCRIPTION (DID)
Preparation Instructions/Requirements: This section contains the only portion of the DID that represents a contractual requirement imposed on the contractor. All other sections are for Government use and for reference and information only.
ALL REFERENCES TO SOURCE DOCUMENTS IN BLOCK 10 OR THE REQUIREMENTS SECTION OF THE DID ARE USED FOR REFERENCE AND INFORMATION ONLY.
CONTROLLED UNCLASSIFIED INFORMATION
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A001 |
| Record of Meeting/Minutes |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-ADMN-81505 |
| SOW 4.0, 4.2 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and robert.e.leonard4.ctr@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
Block 10: Required after each start of work meeting and program management review.
Block 12: First submission required 15 days after meeting.
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| Test Procedure |
| Acceptance Test Procedures |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-NDTI-80603A |
| SOW 5.3 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ONE/R |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and kellie.a.bennefield.civ@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
Block 12: First submission required 45 days prior to start of First Article Inspection/Test.
Block 13: Subsequent submissions within 15 days after receipt of Government comments.
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| Contractor Validation Plan |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-MISC-80759A |
| SOW 5.3 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ONE/R |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and kellie.a.bennefield.civ@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
Block 12: First submission required 45 days prior to Pilot Line Validation (PLV).
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A004 |
| First Article Qualification Test Plan and Procedures |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-NDTI-81307A |
| SOW 5.6 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ONE/R |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and kellie.a.bennefield.civ@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
Block 12: First submission required 45 days prior to start of First Article Inspection/Test.
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A005 |
| Test/Inspection Report |
| First Article Inspection/Test Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-NDTI-80809B |
| SOW 5.6 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ONE/R |
| 30 DATC |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and kellie.a.bennefield.civ@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A006 |
| Test Plan |
| Requalification Plan |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-NDTI-80566A |
| SOW 5.8 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and kellie.a.bennefield.civ@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
Block 10: Required when changes to a qualified baseline are reviewed by the Government and determined to be substantial enough to warrant re-qualification.
Block 12: First submission required 45 days prior to re-qualification.
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A007 |
| Test/Inspection Report |
| Re-qualification Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-NDTI-80809B |
| SOW 5.8 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| 30 DATC |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and kellie.a.bennefield.civ@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
Block 10: Required when changes to a qualified baseline are reviewed by the Government and determined to be substantial enough to warrant re-qualification.
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A008 |
| Engineering Change Proposal (ECP) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-SESS-80639E |
| SOW 6.1 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and steven.w.sanders3.ctr@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
Block 10: Required prior to the implementation of any change.
Block 12: First submission required 30 days prior to implementation of any ECP/VECP
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A009 |
| Notice of Revision (NOR) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-SESS-80642E |
| SOW 6.1, 6.1.3 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and steven.w.sanders3.ctr@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
Block 10: NORs are required with delivery of any ECPs/VECPs.
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A010 |
| Engineering Release Record (ERR) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-SESS-80463E |
| SOW 6.1, 6.1.2 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and steven.w.sanders3.ctr@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
Block 10: ERRs are required with delivery of any ECPs/VECPs.
Block 13: Subsequent submissions within 15 days after receipt of Government comments
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A011 |
| Request for Variance (RFV) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-SESS-80640E |
| SOW 6.1.4 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and steven.w.sanders3.ctr@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
Block 10: RFVs are required for any delivery of items non-conforming to baseline requirements.
Block 12: First submission required within 10 days of contractor determination that a departure from baseline requirements is necessary.
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A012 |
| Technical Report – Study/Services |
| Configuration Status Accounting (CSA) Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-MISC-80508B |
| SOW 6.2 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| SEMIA |
| 90DACA |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and steven.w.sanders3.ctr@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 13: Subsequent submissions shall begin 6 months after initial submission.
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A013 |
| Technical Report – Study/Services |
| Shipping Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-MISC-80508B |
| SOW 7.5 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and robert.e.leonard4.ctr@army.mil .
Block 8: Government review and approval/disapproval NLT 15 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
Block 10: Required for each shipment.
Block 11: First submission shall be within 10 days of first shipment.
Block 13: Subsequent submissions shall be within 10 days of each subsequent shipment.
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A014 |
| Hazardous Materials Management Program (HMMP) Plan |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-MGMT-81398D |
| SOW 8.1 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ONE/R |
| 60DACA |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and kellie.a.bennefield.civ@army.mil .
Block 8: Government review and approval/disapproval NLT 30 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 13: Subsequent submissions shall be required if the plan is changed.
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
ACE
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A015 |
| Hazardous Materials Management Program (HMMP) Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-MISC-81397D |
| SOW 8.1 |
| SFAE-SDR-AW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ANNLY |
| BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
A
16.REMARKS
Contractor format is acceptable, except Microsoft Office products shall be used for draft deliverable. Final may be in pdf or Microsoft Office products.
Submission shall be in electronic format to CDRLVUE. Email to jeffrey.r.timmick.mil@army.mil and kellie.a.bennefield.civ@army.mil .
Block 8: Government review and approval/disapproval NLT 45 days after receipt. Contractor turnaround NLT 15 Days after receipt of Government comments.
Block 9: See Enclosure 1.
Block 12: First submissions shall be no later than 4 months after contract award.
Block 13: Subsequent submissions shall be within 45 days of the reporting period end date.
| G. PREPARED BY Anita Bennefield |
| H. DATE |
| I. APPROVED BY Kent Wieter |
J. DATE
DISTRIBUTION STATEMENTS: All newly created technical documents to be delivered under this contract shall be marked IAW DoD Directive 5230.24 with the appropriate distribution statements as specified in block 9 of the respective DD Form 1423.
Distribution Statement A: Approved for public release; distribution is unlimited.
Distribution Statement B: Distribution authorized to U.S. Government Agencies only, to protect information not owned by the U. S. Government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U. S. Government, date of determination (insert contract award date). Other requests for this document shall be referred to:
Product Manager (PM) Air Warrior (AW)
ATTN: SFAE-SDR-AW
6726 Odyssey Drive Huntsville, AL 35806-3306.
Distribution Statement C: Distribution authorized to U.S. Government Agencies and their contractors for administrative or operational use, as of (insert contract award date). Other requests shall be referred to:
Product Manager (PM) Air Warrior (AW)
ATTN: SFAE-SDR-AW
6726 Odyssey Drive Huntsville, AL 35806-3306.
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only, for administrative or operational use, as of (insert contract award date). Other requests shall be referred to:
Product Manager (PM) Air Warrior (AW)
ATTN: SFAE-SDR-AW
6726 Odyssey Drive Huntsville, AL 35806-3306.
EXPORT CONTROL: All documents that are determined to contain export-controlled technical data shall be marked with a WARNING for dissemination IAW provisions of DoD Directive 5230.25 as follows:
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et.seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.