This is a solicitation for the overhaul and upgrade of the Power Unit, Aircraft for the UH-60 helicopter. The Army Materiel Command Contracting Command Redstone Arsenal is seeking bids for a firm-fixed price indefinite delivery/indefinite quantity contract for a base year plus four option years. The contractor will be required to overhaul a minimum of 60 units in the first year with a maximum of 360 units over the life of the contract. The contractor must also conduct a product verification audit on three units and provide total asset visibility and Army maintenance management system reporting. Bids are due by December 7, 2023. Pricing is required for the overhaul and any scrap units. The contractor must meet all packaging, shipping, quality assurance, and technical data requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0006 2023DEC04

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

ERICA BURNETTE

EMAIL: ERICA.N.BURNETTE.CIV@ARMY.MIL

W58RGZ-23-B-0052

2023AUG18

X

X 2023DEC06 05:00pm

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 18

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: ERICA BURNETTE

Buyer Office Symbol/Telephone Number: CCAM-AL-B/(256)955-0134

Type of Contract 1: Firm Fixed Price

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

W58RGZ-23-B-0052_________________

A-1. This is a Full and Open Competition and will be procured with Sealed Bidding Procedures IAW FAR Part 14. The applicable North

American Industry Classification Systems (NAICS) code is 333611 and the size standard is 1,500 employees. Only bidders with NAICS code

333611 registered in Sam.gov are eligible to submit a bid. If a bidder who does not have NAICS code 333611 submits a bid, the quote will be deemed non-responsive and the bid will not be considered for award. In addition, the awardee of the resultant contract must be registered with NAICS code 333611 at the time of award. This effort will be a full and open competitive requirement.

A-2. This will be a 5 year Firm-Fixed Price (FFP) Maintenance and Overhaul (M&O) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to Federal Acquisition Regulation (FAR) 52.216-22 using Sealed Bidding procedures under FAR Part 14.

A-3. The Power Unit, Aircraft is not a Critical Safety Item (CSI). There is an adequate Depot Maintenance Work Requirement (DMWR): DMWR-

1-2835-214, Revision date: 11/26/2021, Change#: 0.

A-4. Reserved.

A-5.The FMS Customer and geographical location(s) for deliveries are unknown at this time.

A-6. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of delivery orders and not by the contract itself.

A-7. The minimum quantity of 60 each (Overhaul US quantity) shall be obligated on the first delivery order, to be issued simultaneously with the award of the contract. Any additional quantities ordered will be priced at the Firm Fixed unit price in effect during the ordering period in which they are ordered and will not exceed the maximum quantity of 360(Overhaul US quantity) each including 60 each for FMS.

A-8. The Government will not be required to obtain the contractor's signature prior to the issuance of an order.

A-9. The Government intends to award only one Firm-Fixed Price Indefinite Delivery, Indefinite Quantity (IDIQ) contract as a result of this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be the most advantageous to the

Government, considering only price and the price-related factors included in the invitation.

A-10. The Government has segregated the estimated quantities into five ordering periods. However, this does not preclude exercising the

Government's right under FAR 52.216-19 by ordering the maximum quantity specified in FAR 52.216-19(b)(1) at any time during the five year ordering period.

Ordering Period 1 will be from date of contract award through 365 days after contract award (DACA).

Ordering Period 2 will be from 366 DACA through 730 DACA.

Ordering Period 3 will be from 731 DACA through 1,095 DACA.

Ordering Period 4 will be from 1,096 DACA through 1,460 DACA.

Ordering Period 5 will be from 1,461 DACA through 1,825 DACA.

A-11. Please insert your firm fixed unit prices for the 1st, 2nd, 3rd, 4th, and 5th ordering periods in the spaces provided under each

CLIN/SubCLIN.

A-12. The offer acceptance period is 120 days from the date for receipt of offers specified in Block 8.

A-13. No Government Furnished Material (GFM) will be provided.

A-14. Electronic submissions for bids are authorized and is the only method of submission. Proposals should be emailed to erica.n.burnette.civ@army.mil and lindy.l.pinchon.civ@army.mil. Facsimile submissions are not authorized.

A-15. The Government will not accept hard copies of bids delivered by mail or hand.

A-16. Overhaul shall be performed IAW DMWR-1-2835-214, Revision date: 11/26/2021, Change#: 0.

2 18

W58RGZ-23-B-0052

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A-17. There are no critical characteristics for this item.

A-18. Reserved.

A-19. The contractor may be required to submit certified cost or pricing data if only one offer is received IAW DFARS Clause 252.215-

7008, entitled "Only One Offer."

A-20. The contractor is instructed to put the following words in the remarks column of the DD 250/WAWF: "Repair and Return Process

D6M".

A-21. Access to DLA FeDMAIL (formally known as EMAIL)is NOT authorized. ____

A-22. The National Defense Authorization Act for Fiscal Year 1993, Public Law 102-484, Section 326, prohibits use of Ozone Depleting

Chemicals (ODC) in Department of Defense contracts awarded on or after 1 June 1993, unless appropriated authority is granted.

A-23. The following websites are provided for the purpose of obtaining/reviewing various Army publications and technical manuals/bulletins:

A. https://logsa.army.mil/etms/online.cfm - Technical Manuals and Bulletins

B. http://www.pubs.army.mil/ - DA Pamphlets and Army Regulations

A-24. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: _________________________________________

TELEPHONE NUMBER: _____________________________

FAX NUMBER: ___________________________________

E-MAIL ADDRESS: _______________________________

A-25. TECHNICAL DATA CAN ONLY BE DISTRIBUTED TO CONTRACTORS WHO HAVE A CURRENT DD 2345, MILITARY CRITICAL TECHNICAL DATA AGREEMENT ON

FILE WITH DEFENSE LOGISTICS INFORMATION SERVICES (DLIS). TECHNICAL DATA THAT IS EXPORT-CONTROLLED MUST BE MARKED WITH AN EXPORT CONTROL

WARNING NOTICE. THIS STATEMENT IDENTIFIES TECHNICAL DATA WHICH THE DOD WILL WITHHOLD FROM PUBLIC RELEASE USING AUTHORITY IN 10

U.S.C.130, THE GOVERNMENT'S RIGHT TO USE, MODIFY, REPRODUCE, PERFORM, DISPLAY, OR DISCLOSE SUCH TECHNICAL IS RESTRICTED

FOR THE CONTRACTOR/ITS SUBSIDIARIES/OR SUB-CONTRACTORS' AT EVERY LEVEL. ANY REPRODUCTION OF TECHNICAL DATA OR PORTIONS THEREOF MARKED

WITH THESE LEGENDS MUST ALSO REPRODUCE THESE LEGENDS ON SUCH TECHNICAL DATA. CONTRACTORS WANTING TO OBTAIN ACCESS TO THE UNCLASSIFIED

TECHNICAL DATA DRAWINGS MUST HAVE JOINT CERTIFICATION PROGRAM (JCP) CERTIFICATION. INSTRUCTIONS FOR OBTAINING JCP CERTIFICATION CAN BE

FOUND AT:

HTTPS://PUBLIC.LOGISTICSINFORMANTIONSERVICE.DLA.MIL/PUBLICHOME/JPC/DEFAULT.ASPX

If you would like to request a copy of the Depot Maintenance Work Requirement (DMWR) and or applicable Maintenance Engineering Orders

(MEOs) please submit your request via e-mail to: usarmy.redstone.amcom.list.immc-pub-epco@army.mil along with a completed form DD2345. __________________________________________________

If after three business days of submitting this request there is no response, the Contractor may forward the email request to contract specialist for further inquiry.

SOLICITATION PERIOD WILL NOT BE EXTENDED AS A RESULT OF LATE REQUEST FOR TECHNICAL DATA.

A-26. The Contractor shall comply with the Total Asset Visibility- Contractor (TAV-C) reporting requirements, as outlined in Attachment

0009 - Contractor Repair TAV-C Requirements.

3 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE A0001 ***

The purpose of Amendment 0006 is to update the following:

A-1. The solicitation close date is revised from 5 December 2023 to 7 December 2023.

A-2. The procurement has changed from upgrade/overhaul to overhaul only. All references to upgrade CLINs 0002AB/0003AB are removed from the solicitation.

A-3. Input NSN: 2835-01-373-4275 Output NSN: 2835-01-373-4275.

A-4. The quanties for the solicitation will remain the same 60/min 360/ max.

A-5. CLIN quantity for 0002AA is 300 ea and for CLIN 0003AA is 60 each.

A-6. Upgrade CLIN's 0002AB and 0003AB have been removed.

A-7. The pricing template (attachment 0012) has been updated from upgrade/overhaul to reflect only overhaul quantities.

A-8. All other term and conditions remain unchanged.

*** END OF NARRATIVE A0007 ***

4 18

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PVA

0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________

SERVICE REQUESTED: PVA

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN represents the Product Verification Audit

(PVA) for the Power Unit,Aircraft as shown in CLINs

0002AA and 0003AA.

INPUT NSN & P/N:________________

2835-01-373-4275

3800480-2

OUTPUT NSN & P/N: ____

2835-01-373-4275

3800480-2

This is a Firm Fixed Price CLIN.

Bidder is required to fill in a proposed firm fixed unit price for the PVA:

PVA shall be in accordance with The "Product

Verification Audit (PVA) Statement of Work".

PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the

Government Quality Office for scheduling of the PVA by email to the following address:

usarmy.redstone.devcom-avmc.mbx.amr-mq-contracts@army.mil

With copy emailed to the Contract Specialist at:

erica.n.burnette.civ@army.mil usarmy.redstone.acc.list.acc-rsa-mo-post-award@army.mil

The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.

5 18

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

NOTE: A copy of the cover letter for the report shall be e-mailed to the Contract Specialist at:

erica.n.burnette.civ@army.mil usarmy.redstone.acc.list.acc-rsa-mo-post-award@army.mil

PVA requires approval prior to Government acceptance of contract deliverable assets.

Failure to pass the PVA may lead to Termination for____________________________________________________

Default of the contract.________________________

Payment Instructions: The Contractor will be paid for_____________________ the PVA by utilizing the Wide Area Work Flow (WAWF) site. The Contractor must enter code W58H0Z when submitting the PVA invoice, making it to the attention of Lindy Pinchon. The Contracting Officer will approve the PVA invoice.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

0002 POWER UNIT, AIRCRAFT

NSN: 2835-01-373-4275

0002AA OVERHAUL POWER UNIT, AIRCRAFT(US) $ $ _________________________________ ______________ __________________

COMMODITY NAME: POWER UNIT, AIRCRAFT

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0002AA are:

Ordering Period 1: 60 each minimum qty

Ordering Period 2: 60 each estimated qty

Ordering Period 3: 60 each estimated qty

Ordering Period 4: 60 each estimated qty

Ordering Period 5: 60 each estimated qty

Funds for the ordering period 1 quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the firm fixed price contract.

(End of narrative B001)

INPUT:

6 18

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

NSN: 2835-01-373-4275, P/N: 3800480-2

OUTPUT:

NSN: 2835-01-373-4275, P/N: 3800480-2

Overhaul shall be in accordance with the

Statement of Work.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the

Statement Of Work (SOW).

BIDDER IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Min Qty 60 ea

YEAR 2- U/P $_____________ (FFP) Est Qty 60 ea

YEAR 3- U/P $_____________ (FFP) Est Qty 60 ea

YEAR 4- U/P $_____________ (FFP) Est Qty 60 ea

YEAR 5- U/P $_____________ (FFP) Est Qty 60 ea

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C002)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SECTION J MIL-STD -STD-129

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Packaging and Marking: Contractor must comply with

MIL-STD-2073-1E with change 4, DOD Standard Practice for Military Packaging, and MIL STD 129R, Military

Marking for Shipment and Storage, notwithstanding any language in Attachment 0001 to the contrary.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in Section F for the Government's Required Delivery Schedule.

(End of narrative F001)

7 18

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0003 POWER UNIT, AIRCRAFT

NSN: 2835-01-373-4275

0003AA OVERHAUL POWER UNIT, AIRCRAFT (FMS) $ $ ___________________________________ ______________ __________________

COMMODITY NAME: POWER UNIT, AIRCRAFT

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0003AA and

0003AB are:

Ordering Period 1: 0 each minimum qty

Ordering Period 2: 15 each estimated qty

Ordering Period 3: 15 each estimated qty

Ordering Period 4: 15 each estimated qty

Ordering Period 5: 15 each estimated qty

This CLIN will be used only if a FMS Customer requires this item. If no FMS Customers are identified, the US Army requirer may utilize the

FMS quantity.

(End of narrative B001)

INPUT NSN:

2835-01-373-4275

INPUT P/N:

3800480-2

OUTPUT NSN: 2835-01-373-4275

OUTPUT P/N: 3800480-2

Overhaul shall be in accordance with Section C entitled 'Statement of Work'.

This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in Section C, Statement of Work.

Bidder is required to fill in proposed firm fixed unit Price:

Ordering Period 1- $_________ EST Qty 0 ea

Ordering Period 2- $_________ EST Qty 15 ea

Ordering Period 3- $_________ EST Qty 15 ea

8 18

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Ordering Period 4- $_________ EST Qty 15 ea

Ordering Period 5- $_________ EST Qty 15 ea

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD 129R WITH CHANGE 3 MARKINGS APPLY

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Packaging and Marking: Contractor must comply with

MIL-STD-2073-1E with change 4, DOD Standard Practice for Military Packaging, and MIL STD 129R, Military

Marking for Shipment and Storage, notwithstanding any language in Attachment 0001 to the contrary.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in Section F for the Government's Required Delivery Schedule.

(End of narrative F001)

0004 SCRAP

0004AA SCRAP $ ______ __________________

SERVICE REQUESTED: SCRAP

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for assets which are Beyond

Economical Repair (i.e., scrap) from CLINs

0002AA, and 0003AA.

Bidder is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $____________ 10 EACH EST

Ordering Period 2 $____________ 10 EACH EST

9 18

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Ordering Period 3 $____________ 10 EACH EST

Ordering Period 4 $____________ 10 EACH EST

Ordering Period 5 $____________ 10 EACH EST

(End of narrative B001)

Scrapped assets from CLINs 0002AA and 0003AA shall be in accordance with the Statement of

Work.

As applicable on delivery orders issued, units determined to be scrapped in accordance with

Section C shall be reflected as an increase in

CLIN 0004AA with a corresponding decrease in quantity and funds in CLINs CLINs 0002AA and

0003AA

as applicable.

In the event the Procuring Contracting Officer

(PCO) determines that certain items shall be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.

The Government may, at it's discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.

Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

FOB POINT: ORIGIN

Refer to the Narrative entitled "Delivery Schedule" and "Delivery of Additional Quantities" in Section F for the Government's Required Delivery Schedule.

(End of narrative F001)

0005 SHIPPING CONTAINERS

10 18

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: SHIPPING CONTAINERS

CLIN CONTRACT TYPE:

Firm Fixed Price

These prices apply to US and FMS reusable containers.

Bidder is required to fill in proposed firm-fixed unit price for all 5 ordering periods:

Ordering Period 1 $________ EST Qty 10 ea ________

Ordering Period 2 $________ EST Qty 10 ea ________

Ordering Period 3 $________ EST Qty 10 ea ________

Ordering Period 4 $________ EST Qty 10 ea ________

Ordering Period 5 $________ EST Qty 10 ea ________

The contractor shall provide containers IAW

Attachment 0001, M&O Packaging Requirements and the

Statement of Work and reusable containers.

The Government cannot determine, at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.

Supplemental Information:

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

0006 CONTRACTOR DATA REQUIREMENTS LIST _________________________________

This CLIN is "Not Separately Priced" (NSP). Pricing for data shall be included in the unit prices of

CLINs 0002AA and 0003AA.

11 18

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

The Contractor shall provide Data Items A001 - A004 in accordance with the Contract Data Requirements

List, Exhibits A thru D.

(End of narrative A001)

12 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

\*\'02\'00.;\'01;\'03(\'01);\'02;\*

SECTION C-1-DESCRIPTION /SPECIFICATION/ WORK STATEMENT

STATEMENT OF WORK

NSN: 2835-01-337-3670 and 2835-01-373-4275

PRID: DT193-1

P/N:3800480-1 and 3800480-2

STATUS: R

1. The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data, necessary to accomplish the inspection and overhaul for the POWER UNIT, AIRCRAFT for the UH-60 (hereinafter the component) that is required to return the component to a serviceable condition sufficient to meet the standard of continued airworthiness in accordance with (IAW) Army Regulation

(AR) 70-62. Upon completion of the overhaul, the overhauled components shall be packaged IAW with this contract and shipped to the destination(s) specified in each individual delivery order.

2. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the component to the extent necessary to determine if the component is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the

Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer and shall discontinue the overhaul until given further instructions or the authorization for disposition of the component by the PCO.

3. In the event the PCO determines that certain items should be scrapped, the Contractor shall scrap such items at the fixed unit price in Section B. IAW Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.245-7004 Reporting, Reutilization, and Disposal

(Deviation 2022-O0006), included in this contract, the Contractor shall complete the Plant Clearance Inventory Schedule using the Plant

Clearance capability of the GFP Module of the Procurement Integrated Enterprise Environment (PIEE), an electronic equivalent of the

Standard Form 1428, Inventory Disposal Schedule. Users shall register for access and obtain training on the PIEE home page https://wawf.eb.mil/piee-landing . Such scrapped components shall count toward the quantities ordered and the Government can replace any components scrapped by the Contractor.

4. The Government has an adequate Depot Maintenance Work Requirement (DMWR) for this effort, DMWR-1-2835-214, Revision Date 11/26/2021

5. Critical Safety Item (CSI): The Power Unit, Aircraft is not a CSI.

6. Upon receipt of the components, Contractor shall inspect containers for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Components received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved GFP procedures. Components received improperly packaged, damaged with corrosion/deterioration, or those with shipping discrepancies shall be reported IAW DI-MGMT-80503 (See Section B, Contract Data Requirements List [CDRL] A002).

7. GFP Attachment: The components being provided to the Contractor are identified and tracked as GFP. The Contractor shall maintain a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) GFP in its possession IAW Federal

Acquisition Regulation (FAR) 52.245-1, and its property management system shall satisfy the requirements of this clause. The Contractor shall record the acquisition, receipt, shipment, consumption, disposal of GFP, and any transfer to another contract utilizing the GFP

Module in PIEE, https://piee.eb.mil , as required by the DFARS Procedures, Guidance, and Information (PGI) 245.103-72 Government-furnished Property Attachments to Solicitations and resultant contracts. GFP training and guidance is located at the Department of

Defense (DoD) Procurement Toolbox at https://dodprocurementtoolbox.com/ .

8. Contractor shall comply with U.S. Army Technical Manual (TM) 1-1500-345-23, Painting and Marking of Army Aircraft, or most recent version, if painting is required in the performance of this contract.

9. Contractor shall submit required data IAW the CDRL's, DD Form 1423, Exhibit A - D electronically to the addresses indicated on the DD

Form(s) 1423.

10. Product Verification Audit (PVA): The Contractor shall conduct the PVA IAW the detailed instructions as specified in Section E of the solicitation and resultant contract.

11. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall complete the forms and records as specified in

Department of the Army Pamphlet (DA PAM) 738-151 and TM 1-1500-328-23 as detailed in the attached TAMMS-A instructions. The U.S. Army

Aviation Missile Command (AMCOM) TAMMS-A Customer Support Office is reachable via email at "<"mailto:usarmy.redstone.amcom.mbx.g3m-snrr@army.mil ">". The Contractor shall prepare TAMMS-A data IAW DI-SESS-81758A and the TAMMS-A instructions attached to __ the solicitation and resultant contract (CDRL A004).

12. Product Quality Deficiency Reports (PQDRs): When requested, the Contractor shall assist the cognizant Contract Administration

Office in evaluating PQDRs and exhibits for defects reported on components overhauled under this contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies

13 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

shall be an integral part of the Contractors Quality Program. The Contractor shall utilize the Product Data Reporting and Evaluation

Program (PDREP) to submit a PQDR at https://www.pdrep.csd.disa.mil/pdrep_files/report_tools/pqdr.htm IAW AR 702-7-1, Reporting of Product Quality Deficiencies within the U.S. Army.

13. The items the Contractor shall overhaul are identified below:

Input NSN_________ P/N ___

2835-01-373-4275 3800480-2

Output NSN__________ P/N ___

2835-01-373-4275 3800480-2

14. The overhaul planned quantity for 5 years is Minimum 60, Maximum 360. Input will be 30 days after receipt of order. Output shall be as specified in the solicitation and resultant contract schedule. Serviceable assets shall be returned to Department of Defense Activity

Address Directory (DODAAC) W25G1U, Plant 7002.

1st year qty 60 4th year qty 75

2nd year qty 75 5th year qty 75

3rd year qty 75

15. Transactional Inventory Procedures - The Contractor shall prepare the following reports:

a. The contractor shall complete and retain a signed copy of DD Form 1348-1A, receipt for repairable on all shipments. The Contractor shall complete the DD Form 1348-1A and include a signature to evidence shipment and receipt. Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:

https://www.dla.mil/Disposition-Services/DDSR/Turn-In/1348-Help/

The Contractor shall prepare this form and include the following corresponding receipt information:

(1) Document Number - (Positions 30-44)

(2) National Stock Number (NSN) - (Positions 8-22)

(3) Condition Code - (Position 71)

(4) Unit Price - (Positions 74-80)

(5) Total Price - (Block 1)

(6) Actual Quantity Received - (Block 10)

(7) Nomenclature - (Block 17)

(8) Signature and Date - (Blocks 22 and 23)

For questions with the above information, please contact: "<"mailto:usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil ">"

b. The Contractor shall perform an annual inventory of all GFP, including items for overhaul and any contractor-acquired property such as containers during the period of performance of this contract. This shall include any subcontractor inventories where GFP has been provided by the Government for overhaul. Contractor shall provide all results, findings, and corrective actions of any annual physical inventories to the Government IAW FAR Clause 52.245-1(f)(1)(iv), Physical Inventory. The Contractor shall prepare a physical inventory report IAW DI-MGMT-80441D (CDRL A001).

c. The Contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Attachment 0010

"Contractor Overhaul TAV-C Requirements and TAV-C Portal End User Standard Operating Procedures (SOP)".

16. Foreign Military Sales (FMS): Contractor shall always segregate US quantities and FMS quantities and must keep segregated at all times in transit and in storage and shall flow down this requirement to all subcontractors.

17. The replacement cost is $94,227.00 for the component. When price of overhaul exceeds $61,247.55, a review of disposition will be made by the Government.

18. Item Unique Identification (IUID): The Contractor shall apply IUID IAW Military Standard (MIL-STD) MIL-STD-130, AR 700-145, Item

Unique Identification, DA PAM 700-145, IUID Procedures and DFARS 211.274-2, Policy for item unique identification, which requires in paragraph (a)(3)(i) that IUID is required regardless of value for any DoD serially managed item (reparable or nonrepairable) or subassembly, component, or part embedded within a subassembly, component, or part. All registered Unique Item Identifiers (UIIs) shall be maintained as received and any UIIs created for component received without one, shall follow any published documentation, such as

DMWRs or Maintenance Engineering Orders (MEO). In the absence of these documents, Contractors must strictly adhere to the procedures outlined in the MIL-STD-130N. Maintaining a UII as received means the construction of the UII string shall not change; however, the UII can and will receive updates to the associated data, such as Marks, PN Rollovers, within the DoD IUID National Registry. Any questions about the IUID program should be directed toward the AMCOM IUID helpdesk at 256-425-8566 or

"<"mailto:usarmy.redstone.amcom.mbx.immc-sim-iuid@army.mil ">".

19. Shipping Containers and Shipment: Contractor shall utilize the packaging requirements contained in Attachment 0001, M&O Packaging

14 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Requirements. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be

Contractor-furnished property. The method of shipment must include tracking of all packages for maintaining government property accountability and visibility. Contractor must comply with MIL-STD-2073-1E, DoD Standard Practice for Military Packaging and MIL-STD-

129R, DoD Standard Practice for Military Marking for Shipment and Storage notwhitstanding any language in Attachment 0001 to the contrary. The Contractor shall package electronic parts susceptible to static discharge damage IAW ANSI/ESD S20.20-2021 Protection of

Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices). If TAMMS-A is required, each individual repaired item must include a copy of all forms required by The Army Maintenance Management System Aviation (TAMMS-A).

20. Overhaul Plan Documentation: The Contractor shall provide overhaul plan documentation to include all legacy (existing) technical information, procedures, and processes (e.g., Overhaul/Repair travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration approved documentation) that the Contractor utilized or shall utilize in the overhaul of the item. The documentation may be in contractor format. The Contractor shall provide documentation IAW DI-MISC-80508B (CDRL A003).

21. NOTE - Applicable Technical Documents: The applicable documents referenced in this Statement of Work (SOW) are listed on the

Contract Document Summary List (DSL) attached to the solicitation and resultant contract. The DSL lists the referenced documents by document ID, title, date, and category. The document versions specified on the DSL take precedence over the generic references (those without the revision letters) cited in the SOW.

*** END OF NARRATIVE C0001 ***

15 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

F-10. DELIVERY SCHEDULE _________________

(a) The Contractor agrees to accept the MINIMUM quantity of reparables immediately upon issuance of a contract/delivery order(s).

The Government will ship the reparables assests to the contractor for the PVA in accordance to the following schedules:

(1) Shipment by Government:

No. of Days After Award

ITEM NO. QTY of Contract/Order _______ ___ _________________

3 30

0002AA 57 180

ITEM NO. QTY No. of Days After Receipt of Assests________ ___ ____________________________________

3 120

0002AA

5 270

5 300

5 330

5 360

5 390

5 420

5 450

5 480

5 520

5 550

5 580

5 610

*The delivery schedule for all data and reports is as specified on Exhibits A-D.

DELIVERY OF ADDITIONAL QUANTITIES_________________________________

Additional quantities of Item 0002AA and 0003AA up to the maximum quantity specified in Section B, if and when ordered in accordance __________ ______ with delivery order procedures, shall be delivered at a maximum monthly rate of 5 each per month commencing 150 days after receipt of reparables.

(End of Clause)

F-11. DEPARTMENT OF DEFENSE ACTIVITY ADDRESS CODE ___________________________________________

(a) This contract will require government property to be provided to the contractor. Shipments of government property to contractors cannot be accomplished without an assigned contractor Department of Defense Activity Address Code (DODAAC).

(b) The DODAAC will be a unique code assigned specifically to each contract/delivery order to be effective for the term of the contract/delivery order and will expire upon completion of the contract/delivery order.

(c) To facilitate the assignment of the DODAAC, the contractor must provide the following information:

(1) Mailing address (including 9 digit zip code):

(2) Freight address:

16 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(3) Contractor and Government Entity (CAGE) Code where the government property is to be delivered:

(4) Standard Point Location Code (SPLC):

(d) The contractor awarded this contract will be notified of the DODAAC when assigned, (approximately 30 days after award). No government property will be provided prior to the assignment of the DODAAC.

(End of clause)

F-12. ACCELERATED DELIVERY ____________________

The Government normally desires maximum acceleration of deliveries provided such acceleration is at no additional cost to the

Government. However, prior to acceleration of delivery, approval must be obtained from the Procuring Contracting Officer. Acceleration in the delivery of end items will not be acceptable to the Government unless all other scheduled deliveries relating to contract items such as provisioning, technical documentation, drawings, publications, overpack kits, etc., are accelerated by an equal period of time.

(End of clause)

*** END OF NARRATIVE F0001 ***

17 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0012 PRICING TEMPLATE_W58RGZ-23-B-0052_01_DECEMBER_2023 003

18 18

SECTION A
SECTION B
SECTION C
SECTION F
SECTION J

File details come from the government source that posted it. Updated .