W58RGZ22B0004_OFFICIAL_19_AUGUST_2022.pdf

PDF 138 KB Posted

Attached to
OVERHAUL OF THE DAMPENER, UH-60 HELICOPTER
Solicitation number
W58RGZ22B0004
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W58RGZ-22-B-0004 X 2022AUG19

1 signed

/SIGNED/

2022SEP1901:00am

DOA1

2022AUG19 SEE SCHEDULE

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

ERICA BURNETTE

(256)955-0134

CCAM-AL-B

ERICA.N.BURNETTE.CIV@ARMY.MIL

1 67

X 1

X 4 X 13

X 15 X 16 X 20

X 28

X 30

X 32

X 52

X 53

X 64

X 67

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: ERICA BURNETTE

Buyer Office Symbol/Telephone Number: CCAM-AL-B/(256)955-0134

Type of Contract 1: Firm Fixed Price

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

W58RGZ-22-B-0004_________________

A-1. This is a 100% Small Business Set-Aside (SBSA). The applicable North American Industry Classification Systems (NAICS) code is

336413 and the size standard is 1,250 employees. Only bidders with NAICS code 336413 registered in Sam.gov are eligible to submit a bid. If a bidder who does not have NAICS code 336413 submits a bid, the quote will be deemed non-responsive and the bid will not be considered for award. In addition, the awardee of the resultant contract must be registered with NAICS code 336413 at the time of award.

A-2. This will be a 5 year Firm-Fixed Price (FFP) Maintenance and Overhaul (M&O) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to Federal Acquisition Regulation (FAR) 52.216-22 using Sealed Bidding procedures under FAR Part 14.

A-3. The Dampener is not a Critical Safety Item (CSI). There is an adequate Depot Maintenance Work Requirement (DMWR): DMWR-1-1650-419, Revision date: 06/21/2019, (NO REV).

A-4. No Government Furnished Material (GFM) other than the reparables will be provided.

A-5. Access to FedMall is not authorized.

A-6. The Government is only obligated to purchase the minimum quantity. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of delivery orders and not by the contract itself.

A-7. Shipping requirements will be provided in each individual delivery order.

A-8. The yearly estimated quantities listed herein do not commit the Government to ordering that or any quantity above the minimum quantity.

A-9. The minimum quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the contract. Any additional quantities ordered will be priced at the Firm Fixed unit price in effect during the ordering period in which they are ordered.

A-10. The Contractor shall furnish reusable container NSN: 8145-00-549-6647 P/N: 13414-078 in accordance with Attachment 0001 M&O

Packaging Requirements. The price for furnishing containers should be provided in Contract Line Item Number (CLIN) 0005AA.

Contractor must comply with MIL-STD-2073-1E w/change 4, DOD Standard Practice for Military Packaging and MIL STD 129R, DOD Standard

Practice for Military Marking for Shipment and Storage. DOD packaging regulations, standards, and specifications may be obtained online at https://quicksearch.dla.mil/qsSearch.aspx and available to the public.

A-11. All ordering periods are in increments of 12 months from the date of award.

Ordering Periods:_________________

The first ordering period is from date of contract award through 365 days after contract (DACA).

The second ordering period is from 366 DACA through 730 DACA.

The third ordering period is from 731 DACA through 1096 DACA.

The fourth ordering period is from 1097 DACA through 1461 DACA.

The fifth ordering period is from 1462 DACA through 1826 DACA.

Please insert your Firm Fixed unit price for the 1st, 2nd, 3rd, 4th, and 5th year in the spaces provided under each CLIN/SubCLIN.

2 67

W58RGZ-22-B-0004

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A-12. RESERVED

A-13. When applicable, the contractor is reminded to complete the FMS customer DA Form 2410 (component removal and repair overhaul record), submitted with the item for repair, in accordance with DA Pamphlet 738-751 and TB 1-1500-341-01. Upon completion of repair, if authorized, the contractor is reminded to fill out DA Form 2410 and return it to the FMS customer with the repaired asset(s), along with the FMS customer version of the DA Form 2410.

A-14. The following websites are provided for the purpose of obtaining/reviewing various DA pamphlets and Army regulations and technical manuals/bulletins:

https://liw.logsa.army.mil/etmapp/#/etm/home - Technical Manuals and Bulletins https://armypubs.army.mil/ProductMaps/PubForm/AR.aspx - DA Pamphlets and Army Regulations

A-15. The Government intends to award only one contract as a result of this solicitation.

A-16. Complete the following contractor point of contact information:

Name: ________________________________

Telephone number: ____________________

Fax number: __________________________

E-mail address: ______________________

A-17. Technical data can only be distributed to contractors who have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). Technical Data that is export-controlled must be marked with an export control warning notice. This statement identifies technical data which the DOD will withhold from public release using authority in 10 U.S.C.

Section-130. The Government's right to use, modify, reproduce, release, perform, display, or disclose such technical data are restricted for the contractor/its subsidiaries/or sub-contractors at every level. Any reproduction of technical data or portions thereof marked with these legends must also reproduce these legends on such technical data. Contractors wanting to obtain access to the unclassified technical data drawings must have Joint Certification Program (JCP) certification. Instructions for obtaining JCP certification can be found at:

https://public.logisticsinformationservice.dla.mil/publichome/jcp/default.aspx

DMWR and associated Maintenance and Engineering Orders (MEO) can be obtained by contacting the AMCOM publications office via email to

Edward McConnell at edward.n.mcconnell1.civ@army.mil and James Tietjen at james.h.tietjen.ctr@army.mil. Please notify the Contract

Specialist, Erica Burnette, at erica.n.burnette.civ@army.mil when this request is made.

Solicitation period will not be extended as a result of late requests for technical data.

A-18. The contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions Attachment 0005 -

Contractor Repair TAV-C Requirements.

*** END OF NARRATIVE A0001 ***

3 67

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PVA

0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________

SERVICE REQUESTED: PVA

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN represents the Product Verification Audit

(PVA) for the Dampener, output NSN: 1650-01-285-3024, as shown in CLINs 0002AA and 0003AA.

This is a Firm Fixed Price CLIN.

Offeror is required to fill in a proposed firm fixed unit price for the PVA:

PVA shall be in accordance with The "Product

Verification Audit (PVA) Statement of Work".

PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the

Government Quality Office for scheduling of the PVA by email to the following address:

usarmy.redstone.devcom-avmc.mbx.amr-mq-contracts@army.mil

With copy emailed to the Contract Specialist at:

erica.n.burnette.civ@army.mil usarmy.redstone.acc.list.acc-rsa-mo-post-award@army.mil

The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.

NOTE: A copy of the cover letter for the report shall be e-mailed to the Contract Specialist at:

erica.n.burnette.civ@army.mil usarmy.redstone.acc.list.acc-rsa-mo-post-award@army.mil

PVA requires approval prior to Government acceptance of contract deliverable assets.

4 67

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Failure to pass the PVA may lead to Termination for____________________________________________________

Default of the contract.________________________

Payment Instructions: The Contractor will be paid for_____________________ the PVA by utilizing the Wide Area Work Flow (WAWF) site. The Contractor must enter code W58H0Z when submitting the PVA invoice, making it to the attention of Lindy Pinchon. The Contracting Officer will approve the PVA invoice.

(End of narrative C003)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0002 DAMPENER

NSN: 1650-01-285-3024

Estimated yearly quantities for CLIN 0002AA are:

Ordering Period 1: 580 each minimum qty

Ordering Period 2: 925 each estimated qty

Ordering Period 3: 925 each estimated qty

Ordering Period 4: 925 each estimated qty

Ordering Period 5: 926 each estimated qty

Funds for the ordering period 1 quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the firm fixed price contract.

(End of narrative A001)

0002AA OVERHAUL DAMPENER (US QTY) $ $ __________________________ ______________ __________________

COMMODITY NAME: DAMPENER

CLIN CONTRACT TYPE:

Firm Fixed Price

SYSTEM: BLACKHAWK

INPUT NSN: 1650-01-285-3024

INPUT P/N: 70106-08100-046

OUTPUT NSN: 1650-01-285-3024

5 67

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

OUTPUT P/N: 70106-08100-046

Overhaul shall be in accordance with Section C entitled 'Statement of Work'.

This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.

Offeror is required to fill in proposed firm fixed unit price: US Qty 4,281 ____________

Ordering Period 1- $_________ EST Qty 580 ea

Ordering Period 2- $_________ EST Qty 925 ea

Ordering Period 3- $_________ EST Qty 925 ea

Ordering Period 4- $_________ EST Qty 925 ea

Ordering Period 5- $_________ EST Qty 926 ea

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE ATTACHMENT 001 M&O PACKAGING REQUIREMENT

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to Section J

Attachment 0001, M&O Packaging Instructions.

(End of narrative D002)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT:

Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.

(End of narrative F001)

6 67

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0003 DAMPENER

NSN: 1650-01-285-3024

Estimated yearly quantities for CLIN 0003AA are:

Ordering Period 1: 0 each minimum qty

Ordering Period 2: 214 each estimated qty

Ordering Period 3: 214 each estimated qty

Ordering Period 4: 214 each estimated qty

Ordering Period 5: 214 each estimated qty

The maximum quantity for FMS requirement is 856.

This CLIN will be used only if a FMS Customer requires this item. If no FMS Customers are identified, the US Army Requirer may utilize the

FMS quantity.

(End of narrative A001)

0003AA OVERHAUL, DAMPENER (FMS QTY) $ $ ____________________________ ______________ __________________

COMMODITY NAME: DAMPENER

CLIN CONTRACT TYPE:

Firm Fixed Price

SYSTEM: BLACKHAWK

INPUT NSN: 1650-01-285-3024

INPUT P/N: 70106-08100-046

OUTPUT NSN: 1650-01-285-3024

OUTPUT P/N: 70106-08100-046

Overhaul shall be in accordance with Section C entitled 'Statement of Work'.

This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.

Offeror is required to fill in proposed firm fixed unit Price: FMS Qty 856 ___________

Ordering Period 1- $_________ EST Qty 0 ea

Ordering Period 2- $_________ EST Qty 214 ea

Ordering Period 3- $_________ EST Qty 214 ea

7 67

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Ordering Period 4- $_________ EST Qty 214 ea

Ordering Period 5- $_________ EST Qty 214 ea

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE ATTACHMENT 0001 M&O PACKAGING REQUIREMENT

LEVEL PRESERVATION: Military

LEVEL PACKING: A

All Wood Packaging Material (WPM) must be ISPM-

15 compliant.

For packaging Instructions refer to Section J

Attachment 0001. M & O Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT:

Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.

(End of narrative F001)

0004 SCRAP

0004AA SCRAP $ ______ __________________

SERVICE REQUESTED: SCRAP

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for assets which are Beyond

Economical Repair (i.e., scrap) from CLINs

0002AA and/or 0003AA.

8 67

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $____________ EACH

Ordering Period 2 $____________ EACH

Ordering Period 3 $____________ EACH

Ordering Period 4 $____________ EACH

Ordering Period 5 $____________ EACH

(End of narrative B001)

Scrapped assets from CLINs 0002AA and 0003AA shall be in accordance with the REPORTING

REUTILIZATION, AND DISPOSAL (DEVIATION 2022-

00006)(NOV 2021) in Section C.

As applicable on delivery orders issued, units determined to be scrapped in accordance with the

SOW/Government Specifications in Section C shall be reflected as an increase in CLIN 0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA or 0003AA as applicable.

The Government may, at its discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.

Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0005 SHIPPING CONTAINERS

0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: SHIPPING CONTAINERS

CLIN CONTRACT TYPE:

9 67

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Firm Fixed Price

Contractor shall furnish containers:

NSN: 8145-00-549-6647

P/N: 13414-078

These prices apply to US and FMS reusable containers.

Offeror is required to fill in proposed firm-fixed unit price for all 5 ordering periods:

Ordering Period 1 $________ EST Qty 1 ea ________

Ordering Period 2 $________ EST Qty 1 ea ________

Ordering Period 3 $________ EST Qty 1 ea ________

Ordering Period 4 $________ EST Qty 1 ea ________

Ordering Period 5 $________ EST Qty 1 ea ________

The contractor shall provide containers IAW

Attachment 0001, M&O Packaging Requirements and

Section C, Description/Specifications/Work

Statement.

The Government cannot determine, at the time of contract award, how many of the assets to be repaired will be received by the contractor in unserviceable containers or received without containers.

The Contractor, IAW the Statement of Work, shall submit a Supply Discrepancy Report (SDR) within 7 working days for assets received with an unserviceable container, or without a container.

PCO apporval is required before containers can be purchased.

IAW DLM 4000.25

Volume 2, April 09,2022, Change 14, C17. Chapter

17, supersedes and replaces Joint Publication DLAI

4140.55/ar 735-11-2/SECNAVINST 4355.18A/AFJMAN 23-

215, Reporting of Supply Discrepancies August 6, 2001. Supply Discrepancy Report (SDR)is used to report shipping or packaging discrepancies at:

https://home.daas.dla.mil/daashome/websdr.asp

Contractor must comply with

MIL-STD-2073-1E w/change 4, DOD

Standard Practice for Military

Packaging and MIL STD 129R, DOD Standard Practice for

Military Marking for Shipment and

Storage. DOD packaging, regulations, standards, and specifications may be obtained online at https://quicksearch.dla.mil/qsSearch.aspx and available to the public.

10 67

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

This CLIN covers containers for CLINs 0002AA and

0003AA.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0006 CONTRACTOR DATA REQUIREMENTS LIST (CDRLS) _________________________________________

This CLIN is "Not Separately Priced" (NSP). Pricing for data shall be included in the unit prices of

CLINs 0002AA and/or 0003AA.

The Contractor shall provide Data Items A001 in accordance with the Contract Data Requirements List, Exhibit A.

(End of narrative A001)

A001 LOGISTICS PRODUCT DATA TAMMS-A $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: EXHIBIT A/SI-MISC-81758A

CLIN CONTRACT TYPE:

Firm Fixed Price

DATA ITEM A001 - DATA ACQUISITION DOCUMENT NUMBER DI-

SESS-81758A

The contractor shall provide data as required based upon delivery schedules and contract requirements.

Within two business days after a Government QA acceptance the contractor shall submit a copy of the

Wide Area Work Flow (WAWF) receiving reports listing each Serial Number (SN) shipped via e-mail to the address listed below. A final receiving report for each Delivery Order (DO) and or contract closeout shall be via submittal to WAWF; use DODAAC W45H08.

The Requiring Office will verify final accounting of all TAMMS-A data reported against the contract/DO and verify that all TAMMS-A data has been received.

Any discrepancies will be identified within 5 working days after receipt and comments provided to the contractor. The contractor shall correct errors and resubmit within 10 working days after receipt of the requiring office comments.

11 67

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative C001)

Deliveries or Performance _________________________

12 67

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

SECTION C-1 - DESCRIPTION/SPECIFICATION/WORK STATEMENT

Statement of Work for

NSN: 1650-01-285-3024

PRID: DB227

P/N: 70106-08100-046

Status: R

a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul for DAMPENER that is required to return the items as specified by Section B, to condition code A as defined by

Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul, as applicable, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s) specified in each individual delivery order.

b. Prior to commencement of overhaul the Contractor shall disassemble and inspect the item to the extent necessary to determine the complete cost to overhaul. The contractor shall continue the overhaul on all end items when the total cost to overhaul does not exceed

$5,394.17. The Contractor will be required to complete the overhaul on all end items regardless of the damage as long as the total cost to overhaul does not exceed $5,394.17. The Contractor will be required to provide other than certified cost and pricing data and a

Report of Discrepancy (ROD) signed by the DCMA QAR to the Procuring Contracting Officer (PCO) to confirm that the total cost to overhaul will exceed $5,394.17. This data will include, at minimum, material costs (80% of material cost will be supported by current vendor quotes), labor hours, overheads, G&A, and profit rate. More information to support the Contractor's price may be requested by the

Government. In no event will any assets be scrapped prior to an approved modification by the PCO. No additional funding, except for missing parts, will be provided to the contractor to complete the overhaul/recapitalization of the end item. The Contractor is not authorized to purchase missing parts unless and until a modification is processed and approved by the Contracting Officer. The

Government cannot guarantee the condition of the assets sent to the contractor for overhaul.

c. In the event the total contractor cost to overhaul is determined (approved by PCO) to exceed $5,394.17, the contractor shall scrap such assets at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the contractor's approved

Government procedures. Such scrapped items shall count toward the quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity. Any other parts other than those determined to be scrapped must be overhauled at the firm fixed price in the awarded contract.

d. Overhaul shall be accomplished IAW Depot Maintenance Work Requirement (DMWR): DMWR-1-1650-419, Dated 06/21/2019(NO REV), and

Maintenance Engineering Orders: (B4492, B4491, B4490, B4369, B4359, B4312, B4311, B4310, B4262, B4093, B4092,B4091,B4090, B4088, B4052, B3715, and B3689).

DAMPENER (NSN: 1650-01-285-3024) (P/N: 70106-08100-046) (EIC: NA)

e. Critical Safety Item: N/A

f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the

Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/ deterioration or those with shipping discrepancies shall be reported IAW Supply Discrepancy Report: Contractor shall report Supply

Discrepancies using the following:

https://home.daas.dla.mil/dasshome/websdr.asp

g. RESERVED

h. Data and reports shall be submitted IAW the Contract Data Requirements List, Exhibit A.

i. Product Verification Audit (PVA): The Contractor shall conduct the PVA as specified in Section E, PVA Statement of Work, of the solicitation/contract.

j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall prepare TAMMS data IAW DI-SESS-81758 and the

TAMMS instructions attached to the solicitation/contract. The Contractor shall complete the forms and records as specified in DA PAM 738-

751, TB 1-1500-341-01, TM 1-1500-328-23.

13 67

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

k. Serial Number Report Requirement (SNRR): N/A

l. The items the Contractor shall overhaul are identified below:

INPUT NSN & PART NUMBER (P/N) OUTPUT NSN & PART NUMBER (P/N)_____________________________ ______________________________

NSN: 1650-01-285-3024 NSN: 1650-01-285-3024

P/N: 70106-08100-046 P/N: 70106-08100-046

m. The overhaul planned quantity for 5 years is minimum 580, maximum 5,137. Input will be 30 days after receipt of order (ARO). Output shall be as specified in the solicitation/contract schedule. Serviceable (U.S.) assets shall be returned to PLANT 7015 DODAAC: W45H08

RIC: B52.

(1) 1st year qty 580 (U.S)

(2) 2nd year qty 925 (U.S)

(3) 3rd year qty 925 (U.S)

(4) 4th year qty 925 (U.S)

(5) 5th year qty 926 (U.S)

(1) 1st year qty 0 (FMS)

(2) 2nd year qty 214 (FMS)

(3) 3rd year qty 214 (FMS)

(4) 4th year qty 214 (FMS)

(5) 5th year qty 214 (FMS)

n. Inventory Transactions - The contractor shall prepare the following reports:

1. The contractor shall comply with the Total Asset Visibility Contractor (TAV-C) reporting instructions IAW Attachment 0005, Contractor Repair TAV-C Requirements.

o. Supply Discrepancy Report: Contractor shall report all Supply Discrepancies using the following website:

https://hone.daas.dla.mil/daashome/websdr.asp

p. The Government reserves the right to replace any items scrapped.

q. Overhaul Repair Report: N/A

r. Quality Deficiency Report: The Contractor shall prepare Product Quality Deficiency Report. Contractor shall report all Product

Quality Deficiencies using the following website:

https://www.pdrep.csd.disa.mil/useraccess.htm

s. Supplier Interface and Oversight: N/A

t. Shipping Containers NSN: 8145-00-549-6647, P/N: 13414-078 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM. Remarks: Contractor shall furnish all containers as needed.

*** END OF NARRATIVE C0001 ***

14 67

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D-1 BAR CODE MARKINGS

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

D-2 PACKAGING INSTRUCTIONS

For packaging instructions refer to Section J, Attachment 0001, M&O Packaging Requirements.

*** END OF NARRATIVE D0001 ***

15 67

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996

E-3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

E-4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-5 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2000 or Equivalent

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

Product Verification Audit (PVA) Contract Requirements (June 2022 update)

PURPOSE. This PVA requirement establishes/assigns responsibilities for insertion of PVA procedures into overhaul work directives, maintenance data packages, and contract documents along with procedures and instructions to be applied in performing PVAs during overhaul, maintenance, modification kit installation, rework, remanufacture, manufacturing, and new procurement contracts. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.

(A) The Contractor shall perform and present for acceptance THREE units as specified in this contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, new manufacture technical requirements or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. PVA actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the

Systems Readiness Directorate (SRD). Like or similar items may be grouped for these purposes provided concurrence is obtained from SRD

Quality Management Division. The contractor may be directed by the Procuring Contracting Officer (PCO) to increase or decrease the scope of a PVA pursuant to the "Changes" clause of the contract for non-commercial items. If however this procurement is for a commercial item, the contractor and the Contracting Officer (CO) will need to enter into a bilateral contract modification to increase or decrease the scope of a PVA.

(B) The Contractor shall,

(1) With the concurrence of SRD Quality Management Division (QMD), schedule and perform PVA as required by the terms of the contract or as otherwise required.

(2) Notify PCO with information copy to the SRD QMD, ATTN, usarmy.redstone.devcom-avmc.mbx.qs-contracts@army.mil of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United States, notification shall be provided at least

95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.

(3) Provide technical personnel tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.

16 67

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(C) The PVA candidate will be selected by the SRD PVA Team Chairman at random from the three (3) tendered candidates for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.

(1) Alternate Procedure. Normally, three assets are required to be completed at time of PVA. If in the PVA Team Chairman's judgment it is in the best interest of the Government, an alternative approach may be taken due to circumstances such as shortage of overhaul assets, shortage of replacement parts, time constraints, or other considerations. At the PVA Team Chairman's discretion, only one PVA candidate may be required to be completed while the other two assets can be in various stages of overhaul as agreed upon (prior to the beginning of the PVA) between the PVA Team Chairman and the facility to be audited. For instance, one asset could be disassembled and ready for Overhaul Inspection Procedures, while the other may be prepared for a critical process such as acceptance testing. (This approach is particularly helpful if the critical process is performed by a subcontractor.) For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.

(D) The item selected for PVA will be inspected for adherence to preservation, packaging, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.

(E) The PVA Team will review the shop travelers, production processes, procedures, tooling, and, equipment used to maintain, overhaul, repair, or manufacture the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.

(F) Disassembly for overhauled items will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality

Assurance Representative (QAR), and the SRD PVA Team Chairman and team personnel.

(G) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work

Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.

(H) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as Shot peening, heat treating, etc.) performed by subcontractors may also be audited. Contractor shall be able to demonstrate that all testing/ inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.

(I) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for Government acceptance including preservation, packaging, marking, and update of historical records and all applicable documentation.

(J) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the SRD PVA Team Chairman's discretion, examination of representative assemblies any may be used as evidence of compliance to specification requirements. The SRD PVA Team Chairman will determine the scope and detail of the PVA process. The SRD PVA Team Chairman may delegate follow-up actions to the DCMA QAR, when it is determined to be prudent to the

PVA.

(K) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the PVA is completed, the SRD PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant

DCMA QAR and PM Representative. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved. Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established

(i.e. workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to ensure compliance with requirements.

(L) All defects will be recorded on the SRD PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each finding to the contractor quality assurance element and the cognizant DCMA QAR and PM Representative. This will allow immediate actions to begin in the resolution of the defect. Corrective actions, as well as actions taken to prevent recurrence, shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor quality manager or designated representative and the SRD PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects:

1. Observation: In the event an observation is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.

17 67

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

2. Minor: In the event a minor defect is discovered, the following actions shall be taken:

a. The contractor shall isolate the cause of the defect and initiate corrective actions.

b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.

c. In the event a minor defect is a recurrent deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.

3. Major: In the event a major defect is discovered, the following actions shall be taken:

a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.

b. The contractor shall provide the DCMA QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.

c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to the US Government.

d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.

e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.

f. The contractor shall assure the cognizant DCMA QAR and the SRD PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the

DCMA QAR and the SRD PVA Team Chairman within 24 hours after the verbal response.

4. Critical: In the event a critical defect is discovered, the following actions shall be taken:

a. All actions outlined in paragraph 3 above shall be completed.

b. Upon request, the contractor shall provide the SRD technical information necessary for the issuance of a Safety of Flight Message or

Aviation Safety Action Message to the field (if necessary).

c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.

NOTE: Systemic quality assurance process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant DCMA QAR to issue a Corrective Action Request.

(M) FINDING DEFINITIONS:

Minor Finding: A defect or a departure from established processes or standards that may result in failure or reduced usability of the product, or a process noncompliance that holds the potential of causing a defect in the future.

Major Finding: A defect, other than critical, that will likely result in failure, or reduce the usability of the product for its intended purpose.

Critical Finding: A defect that would result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the product or a defect likely to prohibit the performance of a major end item or major part thereof. This classification requires immediate cessation of Government acceptance/release of product until corrective actions are acceptable to the contracting officer.

Observation: A condition or circumstance that is noted during the PVA that does not currently meet the aforementioned defect criteria.

This category may also be used as suggestions for continuous improvement.

(N) Upon completion of the disassembly and/or testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy to the PVA Team Chairman that such a defect does not exist in the other 2

PVA candidates prior to acceptance, and an effective corrective action has been initiated to preclude re-occurrence of the defect.

(O) If there are failures during the PVA, the Contractor shall repeat any or all tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. These actions must be coordinated with the cognizant DCMA QAR.

The Government shall take action within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(P) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after official PVA approval from Contracting Officer, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted.

Notification is required 10 business days prior to shipment of the next delivery.

(Q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon receipt of the official PVA approval via the Contracting Officer. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.

18 67

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(R) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(S) Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1)

Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the government.

(T) RESERVED

(U) Unless otherwise specified in this contract, any end item destroyed or exceeds reparable limits during the PVA process is not to be considered as part of the contract quantity.

*** END OF NARRATIVE E0001 ***

E-7. CALIBRATION ___________

The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National

Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test

Equipment) or ISO 10012:1992 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International

Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.

*** END OF NARRATIVE E0002 ***

19 67

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

F-1 52.242-15 STOP-WORK ORDER AUG/1989

F-2 52.242-17…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .