W58RGZ22B0004-0004_SAM.GOV_28_OCTOBER_2022.pdf
PDF 16 KB Posted
- Attached to
- OVERHAUL OF THE DAMPENER, UH-60 HELICOPTER
- Solicitation number
- W58RGZ-22-B-0004_0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 10_DOCUMENT SUMMARY LIST.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0004 2022OCT28
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
ERICA BURNETTE
EMAIL: ERICA.N.BURNETTE.CIV@ARMY.MIL
W58RGZ-22-B-0004
2022AUG19
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 5
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ERICA BURNETTE
Buyer Office Symbol/Telephone Number: CCAM-AL-B/(256)955-0134
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
THE PURPOSE OF AMENDMENT 0004 TO SOLICITATION W58RGZ-22-B-0004 (DAMPENER)IS TO ANSWER INDUSTRY QUESTIONS.
A-1.
INDUSTRY QUESTION 1. It was mentioned on page 2 that the Document Summary List has been updated to reflect the current revision of DMWR-
1-1650-419 Rev date 21 June 2019. However, a new copy was not sent with the amendment.
ANSWER 1: The document summary list has been updated and will be referenced as Attachment 10 .
INDUSTRY QUESTION 2. Can you please re-clarify the following: Will the reparable inputs ship within 30 or 60 days of award? Amendment
0003 states 30 days on page 8, while also stating 60 days on page 9. We realize this was addressed on page 2, however both inputs are still mentioned in the amendment.
ANSWER 2: This has been updated to reflect 30 days on page 9.
INDUSTRY QUESTION 3. I want to clarify an item in Section C-1 (SOW) para b.\~ It states that the not to exceed cost of overhaul is
$5394.17. Should this be construed as the maximum bid price on this unit?
ANSWER 3: No. This statement is referencing the Beyond Economic Repair (BER) Scrap.
A-2. All other terms and conditions remain unchanged.
*** END OF NARRATIVE A0005 ***
2 5
W58RGZ-22-B-0004
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
F-9. DELIVERY SCHEDULE _________________
(a) The Contractor agrees to accept the MINIMUM quantity of reparables immediately upon issuance of a contract/delivery order(s).
The Government will ship the reparables assests to the contractor for the PVA in accordance to the following schedules:
(1) Shipment by Government:
No. of Days After Award
ITEM NO. QTY of Contract/Order _______ ___ _________________
0001AA (PVA) 3 30
0002AA 577 180
(2) Governments Required Output Schedule: ________
No. of Days After Award
ITEM NO. QTY of Contract/Order _______ ___ _________________
0001AA (PVA) 3 270
0002AA 75/month 300
*The delivery schedule for all data and reports is as specified on Exhibits A-F.
DELIVERY OF ADDITIONAL QUANTITIES_________________________________
Additional quantities of Item 0002AA and 0003AA up to the maximum quantity specified in Section B, if and when ordered in accordance ______ ______ with delivery order procedures, shall be delivered at a maximum monthly rate of 75 each per month commencing 180 days after receipt of reparables.
(End of Clause)
F-10. DEPARTMENT OF DEFENSE ACTIVITY ADDRESS CODE ___________________________________________
(a) This contract will require government property to be provided to the contractor. Shipments of government property to contractors cannot be accomplished without an assigned contractor Department of Defense Activity Address Code (DODAAC).
(b) The DODAAC will be a unique code assigned specifically to each contract/delivery order to be effective for the term of the contract/delivery order and will expire upon completion of the contract/delivery order.
(c) To facilitate the assignment of the DODAAC, the contractor must provide the following information:
(1) Mailing address (including 9 digit zip code):
(2) Freight address:
(3) Contractor and Government Entity (CAGE) Code where the government property is to be delivered:
3 5
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(4) Standard Point Location Code (SPLC):
(d) The contractor awarded this contract will be notified of the DODAAC when assigned, (approximately 30 days after award). No government property will be provided prior to the assignment of the DODAAC.
(End of clause)
F-11. ACCELERATED DELIVERY ____________________
The Government normally desires maximum acceleration of deliveries provided such acceleration is at no additional cost to the
Government. However, prior to acceleration of delivery, approval must be obtained from the Procuring Contracting Officer. Acceleration in the delivery of end items will not be acceptable to the Government unless all other scheduled deliveries relating to contract items such as provisioning, technical documentation, drawings, publications, overpack kits, etc., are accelerated by an equal period of time.
(End of clause)
*** END OF NARRATIVE F0001 ***
4 5
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0010 DOCUMENT SUMMARY LIST 002
5 5
| SECTION A |
| SECTION F |
| SECTION J |
File details come from the government source that posted it. Updated .