Attachment 0001 - AED Req AX0MY037AX.pdf
PDF 4 KB Posted
- Solicitation number
- W58RGZ-20-R-0055
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
08/13/2019
ET405PRID 160150-10APart Number
2835-01-469-3420NSN CH-47System
ENGINE, GAS TURBINE (APU)Nomenclature
YAdequate DMWR Available?
DMWR-1-2835-205DMWR ID
09/18/2009DMWR Date
2DMWR Chg #
NPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
Requirements of WP 0018 00.
Identify Any Special Processes, Test Procedures, and/or Instructions
NCritical Safety Item?
There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for the CH-47 Gas Turbine Engine (APU) at the time of this review.
Special Airworthiness Considerations
AED Notes: FCDD-AMA-M-Sustainment has confirmed the CSI/NST status through the ARISE CIM database on 7 June 2019.
The part is Non-CSI and Non-NST. There were no required changes. DEM
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
NSpecial Post-Contract Award Requirements?
Special Post-Contract Award Requirements
The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEO D2544, D2545, and D2546.
Other Requirements / Comments (Part II)
AED Notes: FCDD-AMA-M-SUSTAINMENT HAS RE-CONFIRMED THE CSI/NST STATUS THROUGH THE ARISE CIM
DATABASE ON 31 JULY 2019. THE PART IS NON-CSI AND NON-NST. NO CHANGES MADE. DEM
Other Requirements / Comments (Part III)
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
NDoes QE-STD-2 Apply?
N
Additional CSI Requirements
CSI Contains CSI Replacement Parts? NEngineering Testing Required?
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
YTDPL?
Approved Date
M&O AED REQUIREMENTS DATA
Correlation Performance Study Requirements
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
08/13/2019
ET405PRID 160150-10APart Number
2835-01-469-3420NSN CH-47System
D1000B
D1001
D1008A
D1023
D1080
D1114
D1123
D1126
D1197
D1233
D1562A
D1634
D1647
D1652
D1655
D1656
D1658
D1679
D1685
D1688
D1691
D1692
D1693
D1709
D1723
D1743
D1744
D1753
D1846
D1848
D1994
D2077
D2127
D2129
D2544
D2545
D2546
P6258
P6676B
P6698D
P6701C
WP 0018 00 Table 1 and WP 0034 00 Table 1
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
RStatus
File details come from the government source that posted it. Updated .