08/13/2019

ET405PRID 160150-10APart Number

2835-01-469-3420NSN CH-47System

ENGINE, GAS TURBINE (APU)Nomenclature

YAdequate DMWR Available?

DMWR-1-2835-205DMWR ID

09/18/2009DMWR Date

2DMWR Chg #

NPre-Award Survey Recommended?

NCorrelation Performance Study Required ? YPVA Recommended?

Requirements of WP 0018 00.

Identify Any Special Processes, Test Procedures, and/or Instructions

NCritical Safety Item?

There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for the CH-47 Gas Turbine Engine (APU) at the time of this review.

Special Airworthiness Considerations

AED Notes: FCDD-AMA-M-Sustainment has confirmed the CSI/NST status through the ARISE CIM database on 7 June 2019.

The part is Non-CSI and Non-NST. There were no required changes. DEM

Other Requirements / Comments

If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:

NSpecial Post-Contract Award Requirements?

Special Post-Contract Award Requirements

The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEO D2544, D2545, and D2546.

Other Requirements / Comments (Part II)

AED Notes: FCDD-AMA-M-SUSTAINMENT HAS RE-CONFIRMED THE CSI/NST STATUS THROUGH THE ARISE CIM

DATABASE ON 31 JULY 2019. THE PART IS NON-CSI AND NON-NST. NO CHANGES MADE. DEM

Other Requirements / Comments (Part III)

Other Requirements / Comments (Part IV)

Other Requirements / Comments (Part V)

NDoes QE-STD-2 Apply?

N

Additional CSI Requirements

CSI Contains CSI Replacement Parts? NEngineering Testing Required?

The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

RStatus

YTDPL?

Approved Date

M&O AED REQUIREMENTS DATA

Correlation Performance Study Requirements

Commerciality Determination

Commercial Item? N NBest Commercial Practice Acceptable?

08/13/2019

ET405PRID 160150-10APart Number

2835-01-469-3420NSN CH-47System

D1000B

D1001

D1008A

D1023

D1080

D1114

D1123

D1126

D1197

D1233

D1562A

D1634

D1647

D1652

D1655

D1656

D1658

D1679

D1685

D1688

D1691

D1692

D1693

D1709

D1723

D1743

D1744

D1753

D1846

D1848

D1994

D2077

D2127

D2129

D2544

D2545

D2546

P6258

P6676B

P6698D

P6701C

WP 0018 00 Table 1 and WP 0034 00 Table 1

Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes

MEOs Required for Competitive Contract?

RStatus