AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2019NOV05
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
JAZMYNE D. WILLIAMS
EMAIL: JAZMYNE.D.WILLIAMS2.CIV@MAIL.MIL
W58RGZ-19-R-0381
2019OCT08
X
X 2019NOV29 04:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 6
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: JAZMYNE D. WILLIAMS
Buyer Office Symbol/Telephone Number: CCAM-AL-A/(256)876-4394
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
A-1. The purpose of Amendment 0001 is to correct the U.S. quantities.
A-2. CLIN 0002AA quantities are hereby corrected to reflect the following quantities:
Ordering Period 1: 20
Ordering Period 2: From: 60 \-To: 65 _____ ___
Ordering Period 3: From: 60 To: 65 _____ ___
Ordering Period 4: From: 60 To: 65 _____ ___
Ordering Period 5: From: 60 To: 65 _____ ___
A-3. Section C - Description/Specifications/Work Statement, C-1. Statement of Work/Specifications - Contractor Specifications, m. is hereby changed in order to reflect the following:
(1) 1st year qty 20
(2) 2nd year qty From: 73 To: 78 _____ ___
(3) 3rd year qty From: 73 To: 78 _____ ___
(4) 4th year qty From: 73 To: 78 _____ ___
(5) 5th year qty From: 73 To: 78 _____ ___
A-4. As a result of these changes, the proposal due date is hereby extended from 8 November 2019 to 29 November 2019.
A-5. All other terms and conditions remain unchanged and in full effect.
*** END OF NARRATIVE A0002 ***
2 6
W58RGZ-19-R-0381
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0002AA INSPECTION/OVERHAUL OF CONTROL, GENERATOR (US QTY) $ $ __________________________________________________ ______________ __________________
COMMODITY NAME: CH-47 CONTROL, GENERATOR
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
PROCUREMENT DOCUMENTATION TITLE:
IAW SOW
SYSTEM: CH-47
INPUT NSN: 6110-01-123-0157
INPUT PART NUMBER: 179-60500-5
OUTPUT NSN: 6110-01-123-0157
OUTPUT PART NUMBER: 179-60500-5
Overhaul shall be in accordance with Section C entitled 'Statement of Work/Specifications-Contractor
Specifications'.
This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE: US QTY 280 __________
U/P $_________ (FFP)EST Qty 20 ea
U/P $_________ (FFP)EST Qty 65 ea
U/P $_________ (FFP)EST Qty 65 ea
U/P $_________ (FFP)EST Qty 65 ea
U/P $_________ (FFP)EST Qty 65 ea
THIS IS ONLY ESTIMATED QUANTITIES. THE TOTAL MAXIMUM
QUANTITY FOR THIS REQUIREMENT IS 332 EACH (280 US/52 ____________________
FMS). THIS WILL BE FOR CLIN 0002AA AND CLIN0003AA___
DEPENDING ON (US/FMS) REQUIREMENT.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
3 6
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
MIL-STD-129 & MIL-STD-2073-1 MARKINGS APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
4 6
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C-1. Statement of Work/Specifications - Contractor Sepcifications
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul for CONTROL GENERATOR that is required to return the items as specified by Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul, as applicable, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s) specified in each individual delivery order.
b. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine if the item is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer (ACO) and shall stop work on the item(s) until given further instructions or disposition of the item(s) by the PCO.
c. In the event the PCO determines that certain items should be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the Contractor's approved Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder.
d. Overhaul shall be accomplished IAW Depot Maintenance Work Requirement (DMWR)
DMWR-55-6110-227 (7/19/2013 REV) GENERATOR CONTROL UNIT, P/N AE7083MK2 (179-60500-5), NSN 6110-01-123-0157 e.Critical Safety Item: N/A
f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the
Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/ deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503.
g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental Protection
Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 1-1500-345-23, CH 1, Painting and
Marking of Army Aircraft.
h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibit A. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423.
i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with Attachment 0009 - Product Verification
Audit Statement of Work as specified in the solicitation/contract attachment.
j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall complete the forms and records as specified in DA
PAM 738-751.
k. Serial Number Report Requirement (SNRR): N/A
l. The items the Contractor shall overhaul are identified below:
Input NSN P/N
6110-01-123-0157 179-60500-5
Output NSN P/N
6110-01-123-0157 179-60500-5
m. The overhaul planned quantity for 5 years is minimum 20, maximum 332. Input will be 30 days after receipt of order (ARO). Output shall be as specified in the solicitation/contract schedule. Serviceable assets shall be returned to PLANT 7047, RIC SDU.
(1) 1st year qty 20
(2) 2nd year qty 78
(3) 3rd year qty 78
(4) 4th year qty 78
(5) 5th year qty 78
n. Inventory Transactions - The contractor shall prepare the following reports:
5 6
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
1. The contractor shall prepare a Contract Depot Maintenance Production Report IAW DI-PSSS-81995.
2. The contractor shall complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW DI-MISC-80508 and DD Form
1348-1A. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22 (signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at: http://www.dtic.mil/whs/directives/forms/eforms/dd13481a.pdf
The contractor shall prepare this form to include the following corresponding receipt information:
A. Document Number - (Positions 30-44)
B. National Stock Number (NSN) - (Positions 8-22)
C. Condition Code - (Position 71)
D. Unit Price - (Positions 74-80)
E. Total Price - (Block 1)
F. Actual Quantity Received - (Block 10)
G. Nomenclature - (Block 17)
H. Signature and Date - (Blocks 22 and 23) "usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil"
3. The contractor shall perform a 100% physical inventory of general supplies on an annual basis per AR 740-26, Physical Inventory
Control. The contractor shall perform a 100% physical inventory of missiles/ammunition on a bi-annual basis per AMCR 740-27, Ammunition
Inventory and Accountability.
The contractor shall perform special inventory requests the same day as a government request is received from the responsible inventory manager.
The contractor shall prepare a physical inventory report IAW DI-MGMT-80441. Along with this report, an inventory memorandum to include count type, date performed, total count of lines, and signature shall be provided. The contractor shall ensure that the total lines inventoried correlates with lines present on count sheets.
If the physical inventory shows less than 97% of general supplies or less than 98% of missiles/ammunition are accounted for, the accountable Property Officer, Item Manager, or Contracting Officer is authorized to schedule a 100% physical inventory by a government official.
o. Foreign Military Sales (FMS): These total requirements meet or exceed the requirements for the Security Assistance Management
Directorate (SAMD) per the Acquisition Center Directorate IAW SAMD and Integrated Material Management Center (IMMC) Method of
Understanding (MOU) document dated 4 December 2004. The IMMC is responsible for conducting Weapons System Team (WST) reviews of SAMD's
FMS Aviation hardware, allowing 20% over the Army's maximum quantity during the life of the contract specifically for FMS requirements.
SAMD and IMMC will negotiate provisions for FMS critical items that exceed the standard 20% on case-by-case basis.
p. The replacement cost is $28,701.00 for the subject item. When price of overhaul exceeds $18,655.65, a review of disposition will be made by AMCOM.
q. The Government reserves the right to replace any items scrapped.
r. Overhaul Repair Report: N/A
s. Quality Deficiency Report: The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736.
t. Supplier Interface and Oversight: N/A
u. Shipping Containers NSN: 8145-00-553-1539, P/N: 13414-025 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.
Remarks: CONTRACTOR SHALL FURNISH ALL CONTAINERS
*** END OF NARRATIVE C0001 ***