W58RGZ19R0279.pdf
PDF 144 KB Posted
- Attached to
- Solicitation
- Solicitation number
- W58RGZ-19-R-0279
About this file
Solicitation for Bid/Quote
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W58RGZ-19-R-0279
X
2019AUG27
2019SEP3005:30pm
DOA1
2019AUG27 SEE SCHEDULE
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
ARLESHA D. SMITH
(256)842-3771
CCAM-ALL
ARLESHA.D.SMITH.CIV@MAIL.MIL
1 58
X 1
X 5 X 15
X 17 X 18 X 23
X 29
X 31
X 34
X 43
X 44
X 52
X 56
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ARLESHA D. SMITH
Buyer Office Symbol/Telephone Number: CCAM-ALL/(256)842-3771
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
W58RGZ-19-R-0279________________
THIS IS 100% FULL AND OPEN COMPETITION
THE PURPOSE OF THIS SOLICITATION IS TO DO THE FOLLOWING:
A-1. AWARD A MAINTENANCE AND OVERHAUL (M&O)CONTRACT FOR THE FOLLOWING REQUIREMENTS FOR THE CH-47 HELICOPTER:
NOUN: CYLINDER ASSEMBLY
NSN: 1650-01-123-2704
P/N: 173HS510-1
A-2. THIS WILL BE A 5 YEAR FIRM-FIXED-PRICE MAINTENANCE AND OVERHAUL (M&O)INDEFINITE DELIVERY INDEFINTIE QUANTITY (IDIQ) CONTRACT
PURSUANT TO FAR 52.216-22. THE MINIMUM/MAXIMUM QUANTITY 10/90 EACH (15 FMS).
A-3. NO GOVERNMENT FURNISHED MATERIAL (GFM) OTHER THAN THE REPARABLES WILL BE PROVIDED.
A-4. ACCESS TO FEDMALL IS NOT AUTHORIZED.
A-5. THE GOVERNMENT IS ONLY OBLIGATED TO PURCHASE THE MINIMUM QUANTITY. SUBJECT TO THE AVAILABILITY OF FUNDS, ANY QUANTITIES ORDERED
WILL BE PRICED AT THE UNIT PRICE ESTABLISHED FOR THE ORDERING PERIOD IN WHICH THEY ARE ORDERED. FUNDS SHALL BE OBLIGATED BY ISSUANCE OF
DELIVERY ORDERS AND NOT BY THE CONTRACT ITSELF.
A-6. SHIPPING INSTRUCTIONS WILL BE PROVIDED IN EACH INDIVIDUAL DELIVERY ORDER.
A-7. THE CONTRACTOR MAY BE REQUESTED TO SUBMIT ADDITIONAL COST OR PRICING DATA IF ONLY ONE OFFER IS RECEIVED IAW DFARS CLAUSE 252.215-
7008, ENTITLED "ONLY ONE OFFER."
A-8. THE YEARLY ESTIMATED QUANTITIES LISTED HEREIN DO NOT COMMIT THE GOVERNMENT TO ORDERING THAT OR ANY QUANTITY ABOVE THE MINIMUM
QUANTITY.
A-9. THE MAXIMUM QUANTITY IS 90 EACH WHICH INCLUDES 15 EACH RESERVED FOR FOREIGN MILITARY SALES (FMS). HOWEVER, IF NO FMS CUSTOMERS
REQUIRE THIS ITEM, THE UNITED STATES ARMY REQUIRE MAY UTILIZE THE FMS QUANTITY.
A-10. THE MINIMUM QUANTITY SET FORTH HEREIN SHALL BE OBLIGATED ON THE INITIAL DELIVERY ORDER, WHICH IS TO BE ISSUED SIMULTANEOUSLY WITH
THE AWARD OF THE CONTRACT. ANY ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE FIRM FIXED PRICE IN EFFECT DURING THE ORDERING PERIOD
IN WHICH THEY ARE ORDERED.
A-11. ALL ORDERING PERIODS ARE IN INCREMENTS OF 12 MONTHS FROM THE DATE OF AWARD. ITEMS, PRICES, AND AMOUNTS FOR THE FIRST ORDERING
PERIOD ARE EFFECTIVE FROM DATE OF CONTRACT AWARD TO 12 MONTHS AFTER EFFECTIVE DATE OF CONTRACT.
ORDERING PERIODS ARE AS FOLLOWS:________________________________
THE FIRST ORDERING PERIOD IS FROM DATE OF CONTRACT AWARD THROUGH 366 DAYS AFTER CONTRACT AWARD.
THE SECOND ORDERING PERIOD IS FROM 367 DAYS AFTER CONTRACT AWARD THROUGH 731 DAYS AFTER CONTRACT AWARD.
THE THIRD ORDERING PERIOD IS FROM 732 DAYS AFTER CONTRACT AWARD THROUGH 1096 DAYS AFTER CONTRACT AWARD.
THE FOURTH ORDERING PERIOD IS FROM 1097 DAYS AFTER CONTRACT AWARD THROUGH 1462 DAYS AFTER CONTRACT AWARD.
THE FIFTH ORDERING PERIOD IS FROM 1463 DAYS AFTER CONTRACT AWARD THROUGH 1827 DAYS AFTER CONTRACT AWARD.
2 58
W58RGZ-19-R-0279 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PLEASE INSERT YOUR FIRM FIXED UNIT PRICE FOR THE 1st, 2nd, 3rd, 4th, and 5th YEAR IN THE SPACES PROVIDED UNDER EACH CLIN/SUBCLIN.
NOTE: THE OFFERORS ATTENTION IS CALLED TO THE PROCEDURES FOR RECEIPT OF REPARABLES WHICH FOLLOWS AND IS ALSO IN SECTION G.
A-12. AN ELECTRONIC COPY OF DD FORM 1348-1A FOR ALL SHIPMENTS OF REPARABLES SHALL BE FORWARDED TO 1) THE EMAIL ADDRESS IN BLOCK 10 ON
PAGE 1 OF THE BASIC CONTRACT/DELIVERY ORDER/MODIFICATION AND ALSO TO 2) . THE DD FORM 1348-1A SHALL ANNOTATE TO WHICH CONTRACT/DELIVERY
ORDER THE ASSETS WILL BE APPLIED AS REPARABLES.
THE DD FORM 1348-1A GUIDANCE AS FOLLOWS:
A. MAINTAIN ANY RECEIPT DOCUMENTATION RECEIVED FROM THE DEPOTS
B. UPON RECEIPT OF MATERIAL, FILL IN BLOCK 10 TO INDICATE THE QUANTITY RECEIVED AND PROVIDE A SIGNATURE AND DATE ON THE
DD FORM 1348-1A. PRINTED NAMES, NAME/DATE STAMPS, AND INITIALS ARE NOT ACCEPTABLE.
C. IF A DD FORM 1348-1A IS NOT RECEIVED, A 1348-1A MUST BE CREATED WITH THE CORRESPONDING RECEIPT INFORMATION TO CONTAIN
THE FOLLOWING:
I. UNIT OF ISSUE AND QUANTITY- (POSITIONS 23-29)
II. DOCUMENT NUMBER- (POSITIONS 30-43)
III. NATIONAL STOCK NUMBER (NSN)- (POSITIONS 8-22)
IV. CONDITION CODE- (POSITION 71)
V. UNIT PRICE- (POSITION 74-80
VI. TOTAL PRICE- (BLOCK 1)
VII. ACTUAL QUANTITY RECEIVED- (BLOCK 10)
VIII. NOMENCLATURE- (BLOCK 17)
IX. SIGNATURE AND DATE- (BLOCKS 22 AND 23)
D. COMPLETED 1348-1A SHOULD BE SENT TO THE FOLLOWING MAILBOX UPON RECEIPT OF MATERIAL:
USARMY.REDSTONE.USAMC.MBX.IMMC-SMBAMMO@MAIL.MIL
AN EXAMPLE OF A 1348-1A FILLED OUT CORRECTLY IS ATTACHED (SEE ATTACHMENT 0005).
A-13. ALL PROPOSALS/RESPONSES SHALL INCLUDE A SPECIAL TOOLING AND TEST EQUIPMENT SECTION THAT ADDRESSES THE CONTRACTOR'S PLAN TO MEET
ALL GOVERNMENT SPECIAL TOOLING AND TEST EQUIPMENT REQUIREMENTS WITH EITHER:
1. PHYSICAL POSSESSION OF THE REQUIRED TOOLS.
2. CONFIRMED REQUISITIONS FOR THE REQUIRED TOOLS.
3. CONFIRMED ARRANGEMENTS FOR SUBCONTRACTING THE PROCESSES REQUIRING THE SPECIAL TOOLS OR,
4. SPECIFIC PLANS DESCRIBING THEIR TECHNICAL APPROACH TO DEVELOP EQUIVALENT TOOLS.
A-14. THE NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 1993, PUBLIC LAW 102-484, SECTION 326, PROHIBITS USE OF ODC IN DEPARTMENT
OF DEFENSE CONTRACTS AWARDED ON OR AFTER 01 JUNE 1993, UNLESS APPROPRIATE AUTHORITY IS GRANTED.
A-15. WHEN APPLICABLE, THE CONTRACTOR IS REMINDED TO COMPLETE THE FOREIGN MILITARY SALES (FMS) CUSTOMER DA FORM 2410 (COMPONENT REMOVAL
AND REPAIR OVERHAUL RECORD), SUBMITTED WITH THE ITEM FOR REPAIR, IN ACCORDANCE WITH DA PAMPHLET 738-751 AND TB-1500-341-01. UPON
COMPLETION OF REPAIR, IF AUTHORIZED, THE CONTRACTOR IS REMINDED TO FILL OUT DA FORM 2410 AND RETURN IT TO THE FMS CUSTOMER WITH THE
REPAIRED ASSET(S), ALONG WITH THE FMS CUSTOMER VERSION OF THE DA FORM 2410.
A-A- 16. THE CONTRACTOR SHALL REPORT PRODUCTION STATUS REQUIREMENTS IAW CDRL DI-ALSS-80728A. THE FOLLOWING WEBSITES ARE
PROVIDED FOR THE PURPOSE OF OBTAINING/REVIEWING VARIOUS ARMY PUBLICATIONS AND TECHNICAL MANUALS/BULLETINS:
A. - TECHNICAL MANUALS AND BULLETINS-
https://liw.logsa.army.mil/etmapp/#/etm/home
B. - DA PAMPHLETS AND ARMY REGULATIONS-
https://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
A-17. PROPOSALS SHALL BE SUBMITTED IN ACCORDANCE WITH FAR CLAUSE 52.215-1. FACSIMILE SUBMISSION OF PROPOSALS IS NOT AUTHORIZED. ___
PROPOSALS SHALL BE MAILED TO:
ARMY CONTRACTING COMMAND - REDSTONE
ATTN: ARLESHA SMITH
CCAM-AL-A, BLDG 5303, 2nd FLOOR
REDSTONE ARSENAL, AL 35898-5280
3 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A-18. THE GOVERNMENT INTENDS TO AWARD ONLY ONE CONTRACT AS A RESULT OF THIS SOLICITATION.
A-19. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: ________________________________
TELEPHONE NUMBER: ____________________
FAX NUMBER: __________________________
E-MAIL ADDRESS: ______________________
IF ANY OFFEROR CHOOSES TO HAND CARRY THEIR PROPOSAL, THE OFFEROR MUST REACH THE APPOINTED LOCATION (IDENTIFIED AS BUILDING 5303, 5300
MARTIN ROAD, REDSTONE ARSENAL, AL 35898, FOYER) BY THE DATE AND TIME AS STATED IN BLOCK 9 ON PAGE 1 OF THE SOLICITATION. PLEASE BE
ADVISED THAT REDSTONE ARSENAL IS A RESTRICTED FACILITY AND SHOULD AN OFFEROR CHOOSE TO HAND CARRY A PROPOSAL, A MINIMUM OF 72 HOURS
NOTICE TO THE CONTRACTING OFFICER IS REQUIRED IN ORDER TO ENSURE ACCESS BY THE CLOSING DATE/TIME OF THE SOLICITATION. ANY UNAUTHORIZED
ENTITY MUST BE IDENTIFIED AS HAVING A NEED, AS VALIDATED BY THE CONTRACTING OFFICER, IN ORDER TO GAIN ACCESS TO THE POST. THE
CONTRACTING OFFICE MUST NOTIFY THE GATE PERSONNEL, WHO MONITOR POST ACCESS, A MINIMUM OF 48 HOURS PRIOR TO AN ENTITY GAINING ENTRANCE TO
THE RESTRICTED POST. PLEASE NOT THAT ANY PROPOSALS DELIVERED LATE AS A RESULT OF FAILURE TO COMPLY WITH THE PROCEDURE WILL NOT BE
ACCEPTED, IAW FAR 52.215-1 ENTITLED "INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION".
A-20. IUID MARKING IS REQUIRED.
A-21. THIS REQUIREMENT IS NOT A CRITICAL SAFETY ITEM (CSI). THIS REQUIREMENT DOES REQUIRE THE SUBMISSION OF AN M&0 PLAN DOCUMENT. THIS
DOCUMENTATION WILL BE SUBMITTED TO THE GOVERNMENT WITHIN 30 DAYS AFTER AWARD. REFER TO ATTACHMENT 0007.
*** END OF NARRATIVE A0001 ***
4 58
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 CYLINDER ASSEMBLY
The Contractor is required to submit an M&O Plan in accordance with Section N in narrative C-1 titled
"Statement of Work/ Specifications- Contractor
Specifications" and Attachment 0007. The documentation shall be submitted within 30 days after contract award.
The M&O Plan must be submitted and approved before assets will be shipped in order for the PVA to be conducted.
PVA must be approved prior to overhaul of assets._________________________________________________
(End of narrative A001)
0001AA PRODUCTION VERIFICATION AUDIT $ _____________________________ __________________
SERVICE REQUESTED: CYLINDER ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
Note: The contractor must submit an M&O Plan, in accordance with the attached "M&O Frozen Plan
Description and Guidance" (Attachment 0007). This plan must be submitted no later than 30 days after award. The plan must be approved before the assets for PVA will be shipped.
This CLIN represents the Product Verification Audit
(PVA) for the Cylinder Assemble, Input/Output NSN:
1650-01-123-2704as shown in CLINs 0002AA and 0003AA.
This is a Firm Fixed Price CLIN.
Offeror is required to fill in a proposed firm fixed unit price for the PVA:
PVA shall be in accordance with The "Product
Verification Audit (PVA) Statement of Work".
PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the
Government Quality Office for scheduling of the PVA by email to the following address:
QS-Contracts@amrdec.army.mil
With copy emailed to the Contract Specialist at arlesha.d.smith.civ@mail.mil
5 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.
NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:
U.S. Army Contracting Command - Redstone
Bldg 5303, 2nd Floor
ATTN: CCAM-AL-A, Arlesha Smith, Redstone Arsenal, Alabama 35898-5000 or emailed to:
arlesha.d.smith.civ@mail.mil
PVA requires approval prior to Government acceptance of contract deliverable assets.
Failure to pass the PVA may lead to Termination for____________________________________________________
Default of the contract.________________________
Payment Instructions: The Contractor will go into_____________________
Wide Area Work Flow (WAWF) to receive payment for the
PVA. The Contractor shall use DODAAC W58RGZ when submitting the PVA invoice in WAWF, making it to the attention of Charles R. Miller. The Contracting
Officer will approve the PVA invoice.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
0002 CYLINDER ASSEMBLY
NSN: 1650-01-123-2704
SYSTEM: CH-47
NOUN: CYLINDER ASSEMBLY
INPUT/ OUTPUT NSN: 1650-01-123-2704
INPUT/ OUTPUT PART NUMBER:
173HS510-1
MINIMUM QUANTITY: 10
MAXIMUM QUANTITY:90
6 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
THE MAXIMUM QUANTITY INCLUDES 10 EACH RESERVED FOR
FMS. HOWEVER, IF NO FMS CUSTOMERS REQUIRE THIS ITEM,
THE UNITED STATES ARMY REQUIRER MAY UTILIZE THE FMS
QUANTITY.
US QUANTITIES FOR ORDERING PERIODS 1 THRU 5 ARE AS
FOLLOWS (CLIN 0002AA):
1st 15 MINIMUM
2nd 15 ESTIMATED
3rd 15 ESTIMATED
4th 15 ESTIMATED
5th 15 ESTIMATED
FMS QUANTITIES FOR ORDERING OERIODS 1 THRU 5 ARE AS
FOLLOWS (0003AA):
1st 0 ESTIMATED
2nd 3 ESTIMATED
3rd 4 ESTIMATED
4th 4 ESTIMATED
5th 4 ESTIMATED
THE MINIMUM QUANTITY SET FORTH HEREIN SHALL BE
OBLIGATED ON DELIVERY ORDER 0001, TO BE ISSUED
CONCURRENTLY WITH THE AWARD OF THE CONTRACT. ANY
ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE
FIRM FIXED PRICE IN EFFECT DURING THE ORDERING PERIOD
IN WHICH THEY ARE ORDERED.
(End of narrative A001)
0002AA REPAIR/OVERHAUL (US) $ $ ____________________ ______________ __________________
COMMODITY NAME: CYLINDER ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0002AA is for the repair/ overhaul of the CH-47
Cylinder Assembly for US Army requirements.
INPUT/ OUTPUT NSN: 1650-01-123-2704
INPUT/ OUTPUT PART NUMBER: 173HS510-1
Overhaul/Upgrade shall be in accordance with Section
C 'Statement of Work/Specifications-Contractor
Specifications'.
This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.
7 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE: OVERHAUL US QUANTITY
ORDERING PERIOD 1 $_________ (FFP) Qty 15 ea (EST)
ORDERING PERIOD 2 $_________ (FFP) Qty 15 ea (EST)
ORDERING PERIOD 3 $_________ (FFP) Qty 15 ea (EST)
ORDERING PERIOD 4 $_________ (FFP) Qty 15 ea (EST)
ORDERING PERIOD 5 $_________ (FFP) Qty 15 ea (EST)
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
WEIGHT: 51.5 LENGTH: 25.0 WIDTH: 19.0
DEPTH: 19.0
MIL-STD-129 MARKINGS SHALL APPLY.
LEVEL OF PRESERVATION MUST BE IN ACCORDANCE WITH:
MIL-STD-2073-1 CODES, APPENDIX, J: JI/A/MP(54)
JII/CD(1) JIII/PM(00) JIV/WM(GB)
JV/CD(NA) JVI/CT(H) JVII/UC(ZZ) JVII/IC(00)
JIX/A/PK(F) JX/SM(19) JVIIIA/OPI(M)
SUPPLEMENTAL INFORMATION: 8145-00-540-1762, 13414-
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
Refer to the "Delivery Schedule" and "Delivery of
Additional Quantities," found in section F, for
Government Required Delivery Schedule.
(End of narrative F001)
8 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0003 CYLINDER ASSEMBLY
Mfr CAGE: 00000
Mfr Part Number: 173HS510-1
0003AA REPAIR/ OVERHAUL (FMS) $ $ ______________________ ______________ __________________
COMMODITY NAME: CYLINDER ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0003AA is for the repair/overhaul of the
Cylinder Assembly for FMS requirements.
INPUT/OUTPUT NSN: 1650-01-123-2704
INPUT/OUTPUT PART NUMBER:
173HS510-1
This CLIN will be used only if an FMS customer requires this item. If no FMS customers are identified, the United States Army requirer may utilize the FMS quantity. The estimated quantities are listed below. The FMS customer and geographical locations for deliveries, inspection and acceptance points are unknown at this time.
FMS quantities cannot exceed 30 each.
Overhaul shall be in accordance with Section C
'Statement of Work/Specifications-Contractor
Specifications'.
This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE: OVERHAUL US QUANTITY
ORDERING PERIOD 1 $_________ (FFP) Qty 0 ea (EST)
ORDERING PERIOD 2 $_________ (FFP) Qty 3 ea (EST)
ORDERING PERIOD 3 $_________ (FFP) Qty 4 ea (EST)
ORDERING PERIOD 4 $_________ (FFP) Qty 4 ea (EST)
ORDERING PERIOD 5 $_________ (FFP) Qty 4 ea (EST)
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
9 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
LEVEL PRESERVATION: Military
LEVEL PACKING: A
WEIGHT: 51.5 LENGTH: 25.0 WIDTH: 19.0
DEPTH: 19.0
MIL-STD-129 MARKINGS SHALL APPLY.
LEVEL OF PRESERVATION MUST BE IN ACCORDANCE WITH:
MIL-STD-2073-1 CODES, APPENDIX, J: JI/A/MP(54)
JII/CD(1) JIII/PM(00) JIV/WM(GB)
JV/CD(NA) JVI/CT(H) JVII/UC(ZZ) JVII/IC(00)
JIX/A/PK(F) JX/SM(19) JVIIIA/OPI(M)
SUPPLEMENTAL INFORMATION: 8145-00-540-1762, 13414-
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
Refer to the "Delivery Schedule" and "Delivery of
Additional Quantities," found in section F, for
Government Required Delivery Schedule.
(End of narrative F001)
0004 SHIPPING CONTAINERS
0004AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________
SERVICE REQUESTED: SHIPPING CONTAINERS
CLIN CONTRACT TYPE:
Firm Fixed Price
SHIPPING CONTAINERS
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED UNIT
PRICE FOR ALL 5 ORDERING PERIODS:
ORDERING PERIOD 1 $________(FFP) 10 EA, EST QTY ________
ORDERING PERIOD 2 $________(FFP) 10 EA, EST QTY ________
ORDERING PERIOD 3 $________(FFP) 10 EA, EST QTY ________
ORDERING PERIOD 4 $________(FFP) 10 EA, EST QTY ________
ORDERING PERIOD 5 $________(FFP) 10 EA, EST QTY ________
10 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
THE ESTIMATED QUANTITY OF 10 EA IS FOR EVALUATION
PURPOSES ONLY.
THE CONTRACTOR SHALL PROVIDE CONTAINERS, IN ACCORDANCE
WITH ATTACHMENT 0003, PACKAGING REQUIREMENT INSTRUCTIONS
AND SECTION C, ENTITLED 'STATEMENT OF WORK/SPECIFICATIONS
- CONTRACTOR SPECIFICATIONS' AND 'REUSABLE CONTAINERS'.
THE GOVERNMENT CANNOT DETERMINE, AT THE TIME OF CONTRACT
AWARD, HOW MANY OF THE ASSETS TO BE REPAIRED WILL BE
RECEIVED BY THE CONTRACTOR IN UNSERVICEABLE CONTAINERS OR
RECEIVED WITHOUT CONTAINERS.
THE CONTRACTOR, IAW SECTION C, 'STATEMENT OF WORK', SHALL
SUBMIT A REPORT OF DISCREPANCY (ROD), SF FORM 364,
THROUGH THEIR GOVERNMENT DCMA QAR FOR VERIFICATION WITHIN
7 WORKING DAYS TO THE ADDRESS SHOWN ON DATA ITEM A004.
ASSETS RECEIVED IN UNSERVICEABLE CONTAINERS OR WITHOUT A
CONTAINER, REQUIRE THE PRIOR APPROVAL OF THE PCO TO BE
PURCHASED.
This CLIN covers containers for CLINs 0002AA and
0003AA.
THIS IS A FIRM-FIXED-PRICE CLIN.
(End of narrative C001)
Deliveries or Performance _________________________
0005 Services - Priced
0005AA Services - Priced $ __________________ __________________
SECTION C - Description/Specifications/Work Statement_________
Scrap assets from CLIN 0002AA and 0003AA shall be scrapped or returned in accordance with Section C, Statement of Work/Specifications - Contractor
Specifications.
Units determined to be scrap IAW Section C shall be reflected as an increase to CLIN 0005AA with a corresponding decrease in quantity and funds to CLIN
0002AA and 0003AA, as appropriate.
In the event the Procuring Contracting Officer (PCO) determines that certain items are scrap the
11 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Contractor shall make disposition IAW the contractors approved Government property procedures. Scrapped items shall count toward the minimum quantities ordered hereunder.
The Government may, at its discretion, reduce any items determined scrap by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the Contracting
Officer via formal modification. In no event shall the Contractor scrap an item prior to receiving a contractual modification for a unit.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED UNIT
PRICE FOR ALL 5 ORDERING PERIODS:
ORDERING PERIOD 1 $________(FFP) 10 EA, EST QTY ________
ORDERING PERIOD 2 $________(FFP) 10 EA, EST QTY ________
ORDERING PERIOD 3 $________(FFP) 10 EA, EST QTY ________
ORDERING PERIOD 4 $________(FFP) 10 EA, EST QTY ________
ORDERING PERIOD 5 $________(FFP) 10 EA, EST QTY ________
(End of narrative C001)
Deliveries or Performance _________________________
0006 CONTRACT DATA REQUIREMENTS LIST _______________________________
This CLIN is "Not Separately Priced" (NSP). Pricing____________________________________________ for data shall be included in the unit prices of
CLINs 0002AA, 0002AB, 0003AA, and 0003AB.
The Contractor shall provide Data Items A001 - A005 in accordance with the Contract Data Requirements
List, Exhibits A, B, C, D, and E.
(End of narrative A001)
A001 TECHNICAL REPORT- STUDY SERVICES $ ** NSP ** ________________________________ __________________
SERVICE REQUESTED: DD FORM 1348-1A
DATA ITEM A001 - DI-MISC-80508B - DD FORM 1348-1A (AS
REQUIRED)
(End of narrative C001)
12 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
A002 GOVERNMENT PROPERTY INVENTORY REPORT $ ** NSP ** ____________________________________ __________________
SERVICE REQUESTED: PHYSICAL INVENTORY INSTRUCTIO
Report to be submitted no later than 15 days after completion of physical inventory.
Data shall be delivered to:
usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
(End of narrative C001)
Deliveries or Performance _________________________
A003 CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT $ ** NSP ** __________________________________________________ __________________
SERVICE REQUESTED: CDM
DATA ACQUISITION DOCUMENT NUMBER: DI-PSSS-81995
Date of first submission is 5 working days after receipt of reparables.
Frequency of submission is monthly.
Each monthly submission shall include balance of each
NSN o nhand at the contractor's facility associated with this contract. The balance shall be verified by the contractor prior to submission.
The contractor shall provide data in Microsoft EXCEL
Spreadsheet format to: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil.
(End of narrative C001)
Deliveries or Performance _________________________
A004 REPORT OF SHIPPING(ITEM) AND PACKAGING DISCREPANCY $ ** NSP ** __________________________________________________ __________________
13 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: ROD
DATA ACQUISITION DOCUMENT NUMBER: DI-MGMT-80503
Submission of the Report of Shipping and Packaging
Discrepancy shall occur within 10 days of discovering the discrepancy.
(End of narrative C001)
Deliveries or Performance _________________________
A005 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________
SERVICE REQUESTED: QDR
DATA ACQUISITION DOCUMENT NUMBER: DI-QCIC-80736
No report is necessary unless there is a deficiency.
Contractor shall submit NO LATER THAN 10 days after discovery of deficiency.
The Contractor shall coordinate quality deficiency with the Cognizant Government Representative.
(End of narrative C001)
Deliveries or Performance _________________________
14 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C-1 STATEMENT OF WORK / SPECIFICATIONS - CONTRACTOR SPECIFICATIONS
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools and data necessary to accomplish the inspection and overhaul required to return the items as specified in Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul, as applicable, the items shall be packaged as defined in Section D of this contract and shipped to the destination(s) specified in Section F.
b. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine if the total cost of such overhaul including labor, services, parts and materials. The Contractor shall continue the overhaul process on all end items when the total cost to overhaul does not exceed $16,225.95. The overhaul shown in Section B for CLINs 0002 (US quanities) and
0003 (FMS quanities) are Firm-Fixed-Price (FFP). The Contractor will be required to complete the overhaul on all end items regardless of the damage as long as the total cost to overhaul does not exceed $16,225.95. The Contractor will be required to provide other than certified cost and pricing data and a Report of Discrepancy (ROD) signed by the DCMA QAR to the Procuring Contracting Officer (PCO) to confirm that the total cost to overhaul will exceed $16,225.95. This data will include at minimum material cost (65% of material cost will be supported by current vendor quotes), labor hours, labor rates, overheads, G&A(s), and profit rate. More information to support the Contractor's price may be requested by the Government. In no event will any asset be scrapped prior to an approved modification by the PCO. No additional funding except for missing parts will be provided to the Contractor to complete the overhaul of the end item. The
Government cannot guarantee the condition of the assets sent to the Contractor for overhaul.
c. In the event that the total contractor cost to overhaul/upgrade is determined (approved by PCO) to exceed $16,225.95, the Contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the Contractor's approved Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity.
d. Overhaul shall be accomplished IAW Approved Technical Drawings or Blue Prints.
e. Critical Safety Item (CSI): N/A.
f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the
Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503.
g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-23, Change 1, Painting and
Marking of Army Aircraft.
h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibits A-E. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Form(s) 1423.
i. Product Verification Audit (PVA) shall be conducted IAW CLIN 0001AA and in E-5, titled Product Verification Audit (PVA) Statement of
Work, as specified in Section E of the Solicitation/Contract.
j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall complete the forms and records as specified in DA
PAM 738-751.
k. The Government reserves the right to replace any items scrapped.
l. The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736, Data Item A005, Exhibit E.
m. Shipping Containers NSN: 8145-00-540-1762, P/N: 13414-046 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM. There is no NSN listed.
n. The Contractor shall prepare the DD FORM 1348-1A IAW DI-MISC-80508, QE-STD-2, Data Item A001, Exhibit A, and the M&O Plan Description and Guidance Instructions, Attachment 0007. Also see and select AMCOM Maintenance and Overhaul (M&O) SAR."
15 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE C0001 ***
16 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D-1 BAR CODE MARKINGS
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39. Automatic Identification and Data
Capture Techniques - Bar Code Symbology Specification - Code 39.
*** END OF NARRATIVE D0001 ***
17 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996
E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
HIGHER LEVEL CONTRACT QUALITY REQUIREMENT (FAR 52.246-11); ISO 9001:2000 OR EQUIVALENT.
(End of clause)
E-5 PRODUCT VERIFICATION AUDIT (PVA) STATEMENT OF WORK
Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.
(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA as specified in this contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the AMRDEC
Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from AMRDEC ED.
The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the "Changes" clause of the contract.
(b) The Contractor shall:
(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN:
QSContracts@amrdec.army.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United
States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
(c) The initial PVA will be performed on one of the first three (3) items overhauled. The PVA candidate will be selected by the AMRDEC
PVA Team Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
18 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance
Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.
(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work
Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.
(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government acceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.
(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies may be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.
(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.
Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.
(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the AMRDEC
PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.
1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
2. Minor: In the event a minor defect is discovered, the following actions shall be taken:
a. The contractor shall isolate the cause of the defect and initiate corrective actions.
b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
3. Major: In the event a major defect is discovered, the following actions shall be taken:
a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.
b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, 19 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
and initiate corrective action to address those units at no additional cost to AMCOM.
d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.
4. Critical: In the event a critical defect is discovered, the following actions shall be taken:
a. All actions outlined in paragraph 3 above shall be completed.
b. Upon request, the contractor shall provide the AMRDEC Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).
c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant QAR to issue a Corrective Action Request.
(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and effective corrective action has been initiated to preclude reoccurrence of the defect.
(n). The contractor shall prepare and forward, through the cognizant government quality element, finalized audit reports within ten (10) working days after completion of the PVA to Commander, U.S. Army Research Development and Engineering Command, ATTN:
QSContracts@amrdec.army.mil, Redstone Arsenal, AL 35898-5000 and the Acquisition Center address as shown on Order 0001. (In the event reorganization changes this address, the contractor will be notified of the new, correct address by the CO). The report shall include:
1. Name and location of contractor
2. Contract number or equivalent
3. Descriptive noun, national stock number, part number, and serial number of the item audited
4. Complete description of each audit finding, with corrective action taken, and action taken to prevent recurrence.
5. The audit report shall be signed, as a minimum, by the contractor's quality manager or his designated representative.
Objections, accompanied with explanations, on any audit finding(s) shall be specifically annotated and forwarded to AMCOM for resolution. Objection by the contractor as to the existence of a defect or as to its classification will be resolved by the PVA
Chairman. Further non-concurrence will be referred to the PCO for final resolution IAW the clause entitled "Disputes" as stated in the contract.
(o) The AMRDEC PVA Chairman will acknowledge receipt of the Final Audit Report and complete the following within 10 working days of receipt:
1. Review the Final PVA Report for compliance and completeness
2. Review the report for acceptance/rejection of corrective action and actions taken to prevent recurrence.
3. Forward a written reply to the AMCOM CO and/or cognizant government quality element, recommending acceptance or rejection of the Final Audit Report.
4. If the Final Audit Report is disapproved, the Contractor shall repeat any or all PVA tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the
Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver a revised report to the Government under the terms and conditions and within the time specified by the Government. These actions must be coordinated with the cognizant government QAR. The Government shall take action on this report within 10 working days. The
Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(p) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, 20 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
parts sources, or location where work is to be performed) after approval of the Final Audit Report, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted. Notification is required 10 business days prior to shipment of the next delivery.
(q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon acceptance of the Final
Audit Report. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.
(r) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(s) Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1)
Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(t) In cases where this PVA is a part of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.