SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W58RGZ-19-R-0197
X
2019FEB21
2019APR1904:00pm
DOA1
2019FEB21 SEE SCHEDULE
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
SHONNELLE CUMMINS
(256)842-2384
CCAM-CAB-C/GP
SHONNELLE.L.CUMMINS.CIV@MAIL.MIL
1 62
X 1
X 5 X 14
X 16 X 17 X 21
X 31
X 34
X 37
X 44
X 45
X 52
X 61
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
THE FOLLOWING AMENDMENTS HAVE BEEN INCORPORATED
Buyer Name: SHONNELLE CUMMINS
Buyer Office Symbol/Telephone Number: CCAM-CAB-C/GP/(256)842-2384
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
THE ALTIMETER, ENCODER IS NOT A CRITICAL SAFETY ITEM (CSI). THERE IS AN ADEQUATE DEPOT MAINTENANCE WORK REQUIREMENT (DMWR) FOR THIS
OVERHAUL EFFORT; AND THIS REQUIREMENT CAN SUPPORT A COMPETITIVE SOLICITATION.
THIS WILL BE A 5 YEAR FIRM-FIXED-PRICE INDEFINITE DELIVERY INDEFINTIE QUANTITY (IDIQ) CONTRACT PURSUANT TO FAR 52.216-22 WITH A MINIMUM
QUANTITY OF 150 EA AND MAXIMUM QUANTITY OF 1,150 EA WHICH INCLUDES THE FMS MINIMUM QUANTITY OF 0 EA AND MAXIMUM QUANTITY 192 EA.
NO GOVERNMENT FURNISHED MATERIAL (GFM) OTHER THAN THE REPARABLES WILL BE PROVIDED.
ACCESS TO DLA EMALL IS NOT AUTHORIZED.
THE GOVERNMENT IS ONLY OBLIGATED TO PURCHASE THE MINIMUM QUANTITY. SUBJECT TO THE AVAILABILITY OF FUNDS, ANY QUANTITIES ORDERED WILL BE
PRICED AT THE UNIT PRICE ESTABLISHED FOR THE ORDERING PERIOD IN WHICH THEY ARE ORDERED. FUNDS SHALL BE OBLIGATED BY ISSUANCE OF DELIVERY
ORDERS AND NOT BY THE CONTRACT ITSELF.
SHIPPING INSTRUCTIONS WILL BE PROVIDED IN EACH INDIVIDUAL DELIVERY ORDER.
THE CONTRACTOR MAY BE REQUESTED TO SUBMIT ADDITIONAL COST OR PRICING DATA IF ONLY ONE OFFER IS RECEIVED IAW DFARS CLAUSE 252.215-7008, ENTITLED "ONLY ONE OFFER."
THE YEARLY ESTIMATED QUANTITIES LISTED HEREIN DO NOT COMMIT THE GOVERNMENT TO ORDERING THAT OR ANY QUANTITY ABOVE THE MINIMUM QUANTITY.
THE MINIMUM QUANTITY SET FORTH HEREIN SHALL BE OBLIGATED ON THE FIRST DELIVERY ORDER, TO BE ISSUED SIMULTANEOUSLY WITH THE AWARD OF THE
CONTRACT. ANY ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE FIRM FIXED PRICE IN EFFECT DURING THE ORDERING PERIOD IN WHICH THEY
ARE ORDERED.
ALL ORDERING PERIODS ARE IN INCREMENTS OF 12 MONTHS FROM THE DATE OF AWARD.
ORDERING PERIODS ARE AS FOLLOWS:________________________________
THE FIRST ORDERING PERIOD IS FROM DATE OF CONTRACT AWARD THROUGH 365 DAYS AFTER CONTRACT AWARD.
THE SECOND ORDERING PERIOD IS FROM 366 DAYS AFTER CONTRACT AWARD THROUGH 730 DAYS AFTER CONTRACT AWARD.
THE THIRD ORDERING PERIOD IS FROM 731 DAYS AFTER CONTRACT AWARD THROUGH 1095 DAYS AFTER CONTRACT AWARD.
THE FOURTH ORDERING PERIOD IS FROM 1096 DAYS AFTER CONTRACT AWARD THROUGH 1460 DAYS AFTER CONTRACT AWARD.
THE FIFTH ORDERING PERIOD IS FROM 1461 DAYS AFTER CONTRACT AWARD THROUGH 1825 DAYS AFTER CONTRACT AWARD.
PLEASE INSERT YOUR FIRM FIXED UNIT PRICE FOR THE 1st, 2nd, 3rd, 4th, and 5th YEAR IN THE SPACES PROVIDED UNDER EACH CLIN/SUBCLIN.
NOTE: THE OFFERORS ATTENTION IS CALLED TO THE PROCEDURES FOR RECEIPT OF REPARABLES WHICH FOLLOWS AND IS ALSO IN SECTION G.
AN ELECTRONIC COPY OF DD FORM 1348-1A FOR ALL SHIPMENTS OF REPARABLES SHALL BE FORWARDED TO 1) THE EMAIL ADDRESS IN BLOCK 10 ON PAGE 1
OF THE BASIC CONTRACT/DELIVERY ORDER/MODIFICATION AND ALSO TO 2) mailto:usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil . THE DD
FORM 1348-1A SHALL ANNOTATE TO WHICH CONTRACT/DELIVERY ORDER THE ASSETS WILL BE APPLIED AS REPARABLES.
2 62
W58RGZ-19-R-0197 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
THE DD FORM 1348-1A GUIDANCE AS FOLLOWS:
A. MAINTAIN ANY RECEIPT DOCUMENTATION RECEIVED FROM THE DEPOTS
B. UPON RECEIPT OF MATERIAL, FILL IN BLOCK 10 TO INDICATE THE QUANTITY RECEIVED AND PROVIDE A SIGNATURE AND DATE ON THE DD FORM 1348-1A.
PRINTED NAMES, NAME/DATE STAMPS, AND INITIALS ARE NOT ACCEPTABLE.
C. IF A DD FORM 1348-1A IS NOT RECEIVED, A 1348-1A MUST BE CREATED WITH THE CORRESPONDING RECEIPT INFORMATION TO CONTAIN THE FOLLOWING:
I. UNIT OF ISSUE AND QUANTITY- (POSITIONS 23-29)
II. DOCUMENT NUMBER- (POSITIONS 30-43)
III. NATIONAL STOCK NUMBER (NSN)- (POSITIONS 8-22)
IV. CONDITION CODE- (POSITION 71)
V. UNIT PRICE- (POSITION 74-80
VI. TOTAL PRICE- (BLOCK 1)
VII. ACTUAL QUANTITY RECEIVED- (BLOCK 10)
VIII. NOMENCLATURE- (BLOCK 17)
IX. SIGNATURE AND DATE- (BLOCKS 22 AND 23)
D. COMPLETED 1348S SHOULD BE SENT TO THE FOLLOWING MAILBOX UPON RECEIPT OF MATERIAL:
USARMY.REDSTONE.USAMC.MBX.IMMC-SMBAMMO@MAIL.MIL
AN EXAMPLE OF A 1348-1A FILLED OUT CORRECTLY IS ATTACHED (SEE ATTACHMENT 0008).
ALL PROPOSALS/RESPONSES SHALL INCLUDE A SPECIAL TOOLING AND TEST EQUIPMENT SECTION THAT ADDRESSES THE CONTRACTOR'S PLAN TO MEET ALL
GOVERNMENT SPECIAL TOOLING AND TEST EQUIPMENT REQUIREMENTS WITH EITHER:
1. PHYSICAL POSSESSION OF THE REQUIRED TOOLS.
2. CONFIRMED REQUISITIONS FOR THE REQUIRED TOOLS.
3. CONFIRMED ARRANGEMENTS FOR SUBCONTRACTING THE PROCESSES REQUIRING THE SPECIAL TOOLS OR,
4. SPECIFIC PLANS DESCRIBING THEIR TECHNICAL APPROACH TO DEVELOP EQUIVALENT TOOLS.
THE NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 1993, PUBLIC LAW 102-484, SECTION 326, PROHIBITS USE OF ODC IN DEPARTMENT OF
DEFENSE CONTRACTS AWARDED ON OR AFTER 01 JUNE 1993, UNLESS APPROPRIATE AUTHORITY IS GRANTED.
WHEN APPLICABLE, THE CONTRACTOR IS REMINDED TO COMPLETE THE FOREIGN MILITARY SALES (FMS) CUSTOMER DA FORM 2410 (COMPONENT REMOVAL AND
REPAIR OVERHAUL RECORD), SUBMITTED WITH THE ITEM FOR REPAIR, IN ACCORDANCE WITH DA PAMPHLET 738-751 AND TB-1500-341-01. UPON COMPLETION
OF REPAIR, IF AUTHORIZED, THE CONTRACTOR IS REMINDED TO FILL OUT DA FORM 2410 AND RETURN IT TO THE FMS CUSTOMER WITH THE REPAIRED
ASSET(S), ALONG WITH THE FMS CUSTOMER VERSION OF THE DA FORM 2410.
THE CONTRACTOR SHALL REPORT PRODUCTION STATUS REQUIREMENTS IAW CDRL DI-ALSS-80728A. THE FOLLOWING WEBSITES ARE PROVIDED FOR THE PURPOSE
OF OBTAINING/REVIEWING VARIOUS ARMY PUBLICATIONS AND TECHNICAL MANUALS/BULLETINS:
A. HTTPS://WWW.LOGSA.ARMY.MIL/ETMS/ONLINE.HTM - TECHNICAL MANUALS AND BULLETINS
B. HTTP://WWW.USAPA.ARMY.MIL - DA PAMPHLETS AND ARMY REGULATIONS
ELECTRONIC SUBMISSION OF PROPOSALS IS AUTHORIZED.
PROPOSALS SHALL BE MAILED TO:
ARMY CONTRACTING COMMAND - REDSTONE
ATTN: SHONNELLE L. CUMMINS
CCAM-CAB-C, BLDG 5303, 1ST FLOOR
REDSTONE ARSENAL, AL 35898-5280
OR EMAIL TO:
3 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SHONNELLE.L.CUMMINS.CIV@MAIL.MIL
COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: ________________________________
TELEPHONE NUMBER: ____________________
FAX NUMBER: __________________________
E-MAIL ADDRESS: ______________________
IF ANY OFFEROR CHOOSES TO HAND CARRY THEIR PROPOSAL, THE OFFEROR MUST REACH THE APPOINTED LOCATION (IDENTIFIED AS BUILDING 5303, 5300
MARTIN ROAD, REDSTONE ARSENAL, AL 35898, FOYER) BY THE DATE AND TIME AS STATED IN BLOCK 9 ON PAGE 1 OF THE SOLICITATION. PLEASE BE
ADVISED THAT REDSTONE ARSENAL IS A RESTRICTED FACILITY AND SHOULD AN OFFEROR CHOOSE TO HAND CARRY A PROPOSAL, A MINIMUM OF 72 HOURS
NOTICE TO THE CONTRACTING OFFICER IS REQUIRED IN ORDER TO ENSURE ACCESS BY THE CLOSING DATE/TIME OF THE SOLICITATION. ANY UNAUTHORIZED
ENTITY MUST BE IDENTIFIED AS HAVING A NEED, AS VALIDATED BY THE CONTRACTING OFFICER, IN ORDER TO GAIN ACCESS TO THE POST. THE
CONTRACTING OFFICE MUST NOTIFY THE GATE PERSONNEL, WHO MONITOR POST ACCESS, A MINIMUM OF 48 HOURS PRIOR TO AN ENTITY GAINING ENTRANCE TO
THE RESTRICTED POST. PLEASE NOTE THAT ANY PROPOSALS DELIVERED LATE AS A RESULT OF FAILURE TO COMPLY WITH THE PROCEDURE WILL NOT BE
ACCEPTED, IAW FAR 52.215-1 ENTITLED "INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION".
*** END OF NARRATIVE A0001 ***
W58RGZ-19-R-0197________________
A-1. The purpose of this amendment is to remove Maintenance Engineering Order (MEO) B2869 from the Statement of Work. Depot Maintenance
Work Requirement (DMWR)55-6610-332, Change 5 (C5) incorporates all required MEOs.
A-2. All other terms and conditions in the soliciation remains unchanged.
*** END OF NARRATIVE A0002 ***
W58RGZ-19-R-0197________________
A-1. The purpose of this amendment is to extend the solicitation closing date from March 25, 2019 to April 19, 2019.
A-2. Add Attachment 0008 Procurement Package Requirements - Transportation Support Branch.
A-3. Add FAR Clause 52.247-50 No Evaluation of Transportation Costs.
A-4. All other terms and conditions in the solicitation remain unchanged.
*** END OF NARRATIVE A0003 ***
4 62
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________
SERVICE REQUESTED: PVA
CLIN CONTRACT TYPE:
Firm Fixed Price
Note: The contractor must submit an M&O plan, in accordance with the attached "M&O Plan Guidance"
(Attachment 0003). This plan must be submitted no later than 30 days after award. The plan must be approved before the assets for PVA will be shipped.
This CLIN represents the Product Verification Audit
(PVA) for the Altimeter, Encoder output NSN: 6610-00-
134-5625, as shown in CLINs 0002AA.
This is a Firm Fixed Price CLIN.
Offeror is required to fill in a proposed firm fixed unit price for the PVA:
PVA shall be in accordance with AMCOM Regulation
52.209-4723, Product Verification Audit (PVA)
Statement of Work.
PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the
Government Quality Office for scheduling of the PVA by email to the following address:
QS-Contracts@amrdec.army.mil
With copy emailed to the Contract Specialist at:
shonnelle.l.cummins.civ@mail.mil
The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.
NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:
U.S. Army Contracting Command - Redstone
Bldg 5303, 1st Floor
ATTN: CCAM-CAB-C, Shonnelle Cummins
Redstone Arsenal, Alabama 35898-5000 or emailed to:
5 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
shonnelle.l.cummins.civ@mail.mil
PVA requires approval prior to Government acceptance of contract deliverable assets.
Failure to pass the PVA may lead to Termination for____________________________________________________
Default of the contract.________________________
Payment Instructions: The Contractor will go into_____________________
Wide Area Work Flow (WAWF) to receive payment for the
PVA. The Contractor shall use DODAAC W58RGZ when submitting the PVA invoice in WAWF, making it to the attention of Monty Teasley. The Contracting Officer will approve the PVA invoice.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
0002 ALTIMETER, ENCODER
NSN: 6610-00-134-5625
Mfr CAGE: 89944
Mfr Part Number: B4515210002
0002AA OVERHAUL OF ALTIMETER, ENCODER (US) $ $ ___________________________________ ______________ __________________
COMMODITY NAME: ALTIMETER, ENCODER
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is for the Overhaul/Upgrade of the CC, Altimeter,Encoder
INPUT NSN:
6610-00-134-5625
INPUT PN:
B451521002
OUTPUT NSN:
6610-00-134-5625
OUTPUT PN:
B451521002
(End of narrative B001)
6 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Offeror is required to fill in proposed firm-fixed-unit price(s) for the ordering periods 1 to 5:
ORDERING PERIOD 1- U/P $____________ (FFP) Min
Qty 158 EA US
ORDERING PERIOD 2- U/P $____________ (FFP) Est
Qty 200 EA US
ORDERING PERIOD 3- U/P $____________ (FFP) Est
Qty 200 EA US
ORDERING PERIOD 4- U/P $____________ (FFP) Est
Qty 200 EA US
ORDERING PERIOD 5- U/P $____________ (FFP) Est
Qty 200 EA US
Overhaul/upgrade shall be in accordance with
Section C, entitled Statement of
Work/Specifications - Contractor
Specifications.
This Firm-Fixed-Price (FFP) CLIN includes all labor charges, mandatory and non-mandatory replacement parts and material, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in Section C entitled
Statement of Work/Specifications - Contractor
Specifications.
Delivery of overhauled assets are in accordance with Section F.
THIS IS A FIRM-FIXED-PRICE CLIN.
(End of narrative B002)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS & MIL-STD-2073-1
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
7 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0003 ALTIMETER, ENCODER
NSN: 6610-00-134-5625
Mfr CAGE: 89944
Mfr Part Number: B4515210002
0003AA OVERHAUL/UPGRADE/REPAIR (FMS) ALTIMETER,ENCODER $ $ _______________________________________________ ______________ __________________
COMMODITY NAME: ALTIMETER, ENCODER
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is for the Overhaul/Upgrade of the CC, Altimeter,Encoder
INPUT NSN:
6610-00-134-5625
INPUT PN:
B4515210002
OUTPUT NSN:
6610-00-134-5625
OUTPUT PN: B4515210002
(End of narrative B001)
This CLIN will be used only if an FMS customer requires this item. If no FMS customers are identified, the United States Army requirer may utilize the FMS quantity. The estimated quantities are listed below. The FMS customer and geographical locations for deliveries, inspection and acceptance points are unknown at this time. FMS quantities cannot exceed
192 each.
Offeror is required to fill in proposed firm-fixed-unit price(s) for the ordering periods 1 to 5:
ORDERING PERIOD 1- U/P $____________ (FFP) Est
Qty 39 EA FMS
ORDERING PERIOD 2- U/P $____________ (FFP) Est
Qty 39 EA FMS
ORDERING PERIOD 3- U/P $____________ (FFP) Est
Qty 38 EA FMS
ORDERING PERIOD 4- U/P $____________ (FFP) Est
Qty 38 EA FMS
ORDERING PERIOD 5- U/P $____________ (FFP) Est
8 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Qty 38 EA FMS
Overhaul shall be in accordance with Section C, entitled Statement of Work/Specifications -
Contractor Specifications.
Delivery of overhauled assets are in accordance with Section F.
INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR
THIS CLIN.
THIS IS A FIRM-FIXED-PRICE CLIN.
(End of narrative B002)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
PACKAGING REQUIREMENTS
LOCATION OF PACKAGING/PACKING/SPECS:
ADDENDA: 19
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0004 SCRAP
0004AA SCRAP OF ALTIMETER, ENCODER $ ___________________________ __________________
SERVICE REQUESTED: SCRAP
CLIN CONTRACT TYPE:
Firm Fixed Price
THIS CLIN APPLIES TO U.S. AND FMS ASSETS________________________________________
SECTION C - Description/Specifications/Work Statement_________
Units from CLIN 0002AA and 0003AA shall be scrapped or returned in accordance with Section C, Statement of Work/Specifications - Contractor Specifications.
Units determined to be scrap IAW Section C shall be reflected as an increase to CLIN 0004AA with a corresponding decrease in quantity and funds to CLIN
0002AA and 0003AA as appropriate. In the event the
9 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
PCO determines that certain items are scrap, the
Contractor shall make disposition IAW the contractors approved Government property procedures. Scrapped items shall count toward the minimum quantities ordered hereunder. The Government may, at its own discretion, reduce any items determined scrap by input of additional assets and said scrap quantities will count as part of the total maximum quantity.
Scrap requires authorization by the Contracting
Officer via formal modification. In no event shall the Contractor scrap an item prior to receiving a contractual modification for a unit.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE:
Ordering Period 1 - $ ____________(FFP) Est Qty 1 EA
Ordering Period 2 - $ ____________(FFP) Est Qty 1 EA
Ordering Period 3 - $ ____________(FFP) Est Qty 1 EA
Ordering Period 4 - $ ____________(FFP) Est Qty 1 EA
Ordering Period 5 - $ ____________(FFP) Est Qty 1 EA
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0005 CONTAINERS
0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________
SERVICE REQUESTED: CONTAINERS
CLIN CONTRACT TYPE:
Firm Fixed Price
THE PROPOSED PRICES APPLY TO REUSABLE
CONTAINERS.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM
FIXED UNIT PRICE FOR ALL ORDERING PERIODS:
ORDERING PERIOD 1 - U/P $__________(FFP) 1 EA,
EST QTY
ORDERING PERIOD 2 - U/P $__________(FFP) 1 EA,
EST QTY
ORDERING PERIOD 3 - U/P $__________(FFP) 1 EA,
10 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
EST QTY
ORDERING PERIOD 4 - U/P $__________(FFP) 1 EA,
EST QTY
ORDERING PERIOD 5 - U/P $__________(FFP) 1 EA,
EST QTY
THE CONTRACTOR SHALL PROVIDE CONTAINERS, IN
ACCORDANCE WITH EXHIBIT A, REPORT OF SHIPPING
(ITEM) AND PACKAGING DISCREPANCY AND SECTION C,
ENTITLED 'STATEMENT OF WORK (COMPETITIVE) LINE F
AND LINE U.
SUPPLEMENTAL INFORMATION:
PACKAGING REQUIREMENTS SEE ATTACHMENT 0002 M&O
PACKAGING REQUIREMENTS
THE GOVERNMENT CANNOT DETERMINE, AT THE TIME OF
CONTRACT AWARD, HOW MANY OF THE ASSETS TO BE
REPAIRED WILL BE RECEIVED BY THE CONTRACTOR IN
UNSERVICEABLE CONTAINERS OR RECEIVED WITHOUT
CONTAINERS.
THE CONTRACTOR, IAW SECTION C, 'STATEMENT OF
WORK', SHALL SUBMIT A REPORT OF DISCREPANCY
(ROD), SF FORM 364, THROUGH THEIR GOVERNMENT QAR
FOR VERIFICATION WITHIN 10 WORKING DAYS TO THE
ADDRESS SHOWN ON DATA ITEM A001. ASSETS RECEIVED
IN UNSERVICEABLE CONTAINERS OR WITHOUT A
CONTAINER, REQUIRE THE PRIOR APPROVAL OF THE PCO
BEFORE CONTAINERS CAN BE PURCHASED.
This CLIN covers containers for CLINS 0002AA and
0003AA. THIS IS A FIRM-FIXED PRICE CLIN.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0006 CONTRACT DATA REQUIERMINTS LIST _______________________________
A001 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________
DISCREPANCY $ ** NSP ** ___________ __________________
SERVICE REQUESTED: DATA ITEM A001
CLIN CONTRACT TYPE:
Firm Fixed Price
11 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
SEE EXHIBIT A
DATA ITEM A001 - DATA ACQUISITION DOCUMENT NUMBER: DI-
MGMT-80503 (AS REQUIRED)
Submission of the Report of Shipping and Packaging
Discrepancy shall occur within 10 days of discovering the discrepancy.
Refer to Attachments 0006 (Standard Form 364) and
0007 (Report of Discrepancy Guidance)for completing the Report of Discrepancy.
(End of narrative F001)
A002 CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT $ ** NSP ** __________________________________________________ __________________
SERVICE REQUESTED: DATA ITEM A002
CLIN CONTRACT TYPE:
Firm Fixed Price
Deliveries or Performance _________________________
SEE EXHIBIT B
DATA ACQUISITION DOCUMENT NUMBER: DI-PSSS-81995
Date of first submission is 5 working days after receipt of reparables.
Frequency of submission is monthly.
Date of subsequent submissions - No later than 10 days after the end of the month.
Data shall be prepared in Microsoft EXCEL Spreadsheet format and emailed to usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil.
(End of narrative F001)
A003 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________
SERVICE REQUESTED: DATA ITEM A003
CLIN CONTRACT TYPE:
Firm Fixed Price
12 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
SEE EXHIBIT C
DATA ACQUISITION DOCUMENT NUMBER: DI-QCIC-80736
(End of narrative F001)
13 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C-1 Statement of Work/Specifications Contractor Specifications
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul for Altimeter, Encoder that is required to return the items as specified by Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s)specified in each individual delivery order.
b. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine if the itme is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, teh Contractor shall notify the Procuring Contracting Officer (PCO) throught the cognizant Administrative Contracting Officer (ACO) and shall stop work on the item(s) until given further instructions or disposition of the itme(s) by the PCO.
c. In the event the PCO determines taht certain items should be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the Contractor's approved Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder.
d. Overhaul shall be accomplished IAW Depot Maintenance Work Requirement (DMWR)
DMWR-55-6610-332 C5
e. Critical Safety Item: N/A.
f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503 and approval by the PCO.
g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental
Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-
23, w/chg 12, Painting and Marking of Army Aircraft.
h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibit A. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423.
i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with the AMCOM FAR CLAUSE 52.209-4723 as specified in the solicitation/contract attachment.
j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall complete the forms and records as specified in DA PAM 738-751.
k. Serial Number Report Requirement (SNRR): N/A
l. The items the Contractor shall repair are identified below:
Input NSN P/N
6610-00-134-5625 B4515210002
Output NSN P/N
6610-00-134-5625 B4515210002
m. The overhaul planned quantity for 5 years is minimum 150, maximum 1150. Input will be 30 days after receipt of order
(ARO). Output shall be as specified in the solicitation/contract schedule. Serviceable assets shall be returned to AN5.
(1) 1st year qty 197 (4) 4th year qty 238
(2) 2nd year qty 239 (5) 5th year qty 238
(3) 3rd year qty 238
14 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
n. Inventory Transactions - The contractor shall prepare the following reports:
1. The contractor shall prepare a Contract Depot Maintenance Production Report IAW DI-PSSS-81995.
2. The contractor shall complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW DI-MISC-80508 and DD Form 1348-1A. The contractor shall complete the DDform 1348-1A, Block 10 (indicates the quantity received), along with Block 22
(signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment a DD Form 1348-1A is located at:
http://www.dtic.mil/whs/directives/forms/eforms/dd13481a.pdf
The contractor shall prepare the form to include the following corresponding receipt information:
A. Document Number (Positions 30-44)
B. National Stock Number (NSN)-(Positions 8-22)
C. Condition Code-(Position 71)
D. Unit Price- (Positions 74-80)
E. Total Price-(Block 1)
F. Actual Quantity Received-(Block 10)
G. Nomenclature-(Block 17)
H. Signature and Date-(Blocks 22 and 23)
If there are any questions with the above information please contact usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil.
3. The contractor shall perform a 100% physical inventory of general supplies on an annual basis per AR 740-26, Physical
Inventory Control. The contractor shall perform a 100% physical inventory of missiles/ammunition on a bi-annual basis per AMCR 740-27, Ammunition Inventory and Accountability.
The contractor shall perform special inventory requests the same day as a government request is received from the responsible inventory manager.
The contractor shall prepare a physical inventory report IAW DI-MGT-80441. Along with this report, an inventory memorandum to include count type, date performed, total count of lines, and signature shall be provided. The contractor shall ensure that the total lines inventoried correlates with lines present on count sheets.
If the physical inventory shows less than 97% of general supplies or less than 98% of missiles/ammunition are accounted for, the accountable Property Officer, Item Manager, or Contracting Officer is authorized to schedule a 100% physical inventory by a government official.
o. Foreign Military Sales (FMS): These total requirements met or exceeded the requirements for the Security Assistance Management
Directorate (SAMD) per the Acquisition Center Directorate IAW SAMD and Integrated Material Management Center (IMMC) Memorandum of
Understanding (MOU)dated 4 December 2004. The IMMC is responsible for conducting Weapons system Team (WST) reviews of SAMD's FMS
Aviation hardware, allowing 20% over the Army's maximum quantity durin gthe life of the contract specifically for FMS requirements. SAMD adn IMMC will negotiate provisions for FMS critical items that exceed the standard 20% on case-by-case basis.
p. Reserved.
q. The Government reserves the right to replace any items scrapped.
r. Overhaul Repair Report: N/A
s. Quality Deficiency Report: The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736.
t. Supplier Interface and Oversight: N/A.
u. Shipping Containers NSN: XXXX-XX-XXX-XXXX, Part Number XXXXX shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.
Remarks: None
*** END OF NARRATIVE C0001 ***
15 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D-1 BAR CODE MARKINGS
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
*** END OF NARRATIVE D0001 ***
16 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996
E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-5 PVA SOW
Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.
(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA PVA CLIN as specified in this contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the AMRDEC Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from AMRDEC ED. The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the "Changes" clause of the contract.
(b) The Contractor shall:
(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN: QS-
Contracts@amrdec.army.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United
States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
(c) The initial PVA will be performed on one of the first items overhauled. The PVA candidate will be selected by the AMRDEC PVA Team
Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance
Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.
17 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work
Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.
(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government aceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.
(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.
(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the
PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.
Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.
(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the AMRDEC PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.
1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
2. Minor: In the event a minor defect is discovered, the following actions shall be taken:
a. The contractor shall isolate the cause of the defect and initiate corrective actions.
b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
3. Major: In the event a major defect is discovered, the following actions shall be taken:
a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.
b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to AMCOM.
d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.
18 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
4. Critical: In the event a critical defect is discovered, the following actions shall be taken:
a. All actions outlined in paragraph 3 above shall be completed.
b. Upon request, the contractor shall provide the AMRDEC Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).
c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant QAR to issue a Corrective Action Request.
(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and effective corrective action has been initiated to preclude reoccurrence of the defect.
(n). The contractor shall prepare and forward, through the cognizant government quality element, finalized audit reports within ten
(10) working days after completion of the PVA to Commander, U.S. Army Research Development and Engineering Command, ATTN: QS-
Contracts@amrdec.army.mil, Redstone Arsenal, AL 35898-5000 and the Acquisition Center address as shown on Order 0001. (In the event reorganization changes this address, the contractor will be notified of the new, correct address by the CO). The report shall include:
1. Name and location of contractor
2. Contract number or equivalent
3. Descriptive noun, national stock number, part number, and serial number of the item audited
4. Complete description of each audit finding, with corrective action taken, and action taken to prevent recurrence.
5. The audit report shall be signed, as a minimum, by the contractor's quality manager or his designated representative.
Objections, accompanied with explanations, on any audit finding(s) shall be specifically annotated and forwarded to AMCOM for resolution. Objection by the contractor as to the existence of a defect or as to its classification will be resolved by the PVA
Chairman. Further non-concurrence will be referred to the PCO for final resolution IAW the clause entitled "Disputes" as stated in the contract.
(o) The AMRDEC PVA Chairman will acknowledge receipt of the Final Audit Report and complete the following within 10 working days of receipt:
1. Review the Final PVA Report for compliance and completeness
2. Review the report for acceptance/rejection of corrective action and actions taken to prevent recurrence.
3. Forward a written reply to the AMCOM CO and/or cognizant government quality element, recommending acceptance or rejection of the Final Audit Report.
4. If the Final Audit Report is disapproved, the Contractor shall repeat any or all PVA tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the
Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver a revised report to the Government under the terms and conditions and within the time specified by the Government.
These actions must be coordinated with the cognizant government QAR. The Government shall take action on this report within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(p) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after approval of the Final Audit Report, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted. Notification is required 10 business days prior to shipment of the next delivery.
(q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon acceptance of the Final
Audit Report. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.
(r) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(s) Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1)
Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(t) In cases where this PVA is a part of the Source Approval Request (SAR) process, the process planning will be considered approved upon receipt of an approval memorandum from AMRDEC Aviation Engineering Directorate (AED). If the component is a Critical Safety Item
(CSI), see those specific contract clauses for other requirements that may also be audited during the PVA. PVA approval is contingent on contractor submission and AED approval of changes to manufacturing planning, to correct defects identified during PVA.
19 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(u) Unless otherwise specified in this contract, any end item destroyed or exceeds reparable limites during the PVA process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items must be delivered.
*** END OF NARRATIVE E0001 ***
TITLE_____ DATE____
E-6 CALIBRATION JAN/2012
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National
Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test
Equipment) or ISO 10012:2003…