06/08/2018
M564PRID 145D5322-3Part Number
1615-01-113-0242NSN CH-47FSystem
COVER ASSEMBLY, SUMPNomenclature
YAdequate DMWR Available?
DMWR-55-1615-325DMWR ID
02/20/2013DMWR Date
DMWR Chg #
NPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
(1) See DMWR 55-1615-325, Chapter 3-11 General, In Process Inspection and OIP for overhaul inspection requirements.
(2) Nondestructive testing procedures (NDT) for magnetic particle and flouresent penetrant shall be in accordance with ASTM E1444 and ASTM E1417as per DMWR 55-1615-325 paragraph 3-15. c and d. All technique sheets shall be reviewed and approved by a Level III NDT Inspector. All peresonnel performing magnetic and penetrant task shall be certified in accordance with AIA/NAS NAS 410.
(3) The overhaul facility is responsible for acquisitions, maintenance, calibrationan, disposition of all T, Measurement, and Diagnostic Equipment (TMDE). TMDE shall be maintained and controlled in accordance with MIL-I-45607, ISO10012, NCSL Z540.3, or AMCOM-R 702-7. Calibration documents for all TMDE shall be traceable to the National Institute of Standards and Technology (NIST).
(4) See Chapter 4 Section II, in DMWR 55-1615-325 for Final Performance Check, for test procedures.
Identify Any Special Processes, Test Procedures, and/or Instructions
NCritical Safety Item?
No emerging airworthiness issues affecting Critrical Safety Items (CSI), and concerns over reliability, durability, etc. for the CH- 47F Sump Cover Assembly exist during the time of this review.
Special Airworthiness Considerations
AED Notes: AEM Sustainment has confirmed the CSI/NST status through the ARISE CIM database on 8 February 2018 and the component is Non-CSI and Non-NST.JC
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
NSpecial Post-Contract Award Requirements?
Special Post-Contract Award Requirements
DMWR 55-1615-325 does not contain detailed IUID requirements for this component. The PM has not tasked AED to update this DMWR to incorporate IUID detailed procedures. Recommend contacting CH-47 PM IUID Office, Jennifer Bishop at (256) 876- 8526 for any updates and/or waiver/deviation of IUID Contracting DFAR clauses on the IUID marking of the Sump Cover Assembly.
Other Requirements / Comments (Part II)
AED Notes: AEM Sustainment has re-verified the CSI and NST data through ARISE CIM database on 04/04/2018. Component is still Non-CSI and Non-NST. There are No changes to the data. MW.
Other Requirements / Comments (Part III)
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
NDoes QE-STD-2 Apply?
N
Additional CSI Requirements
CSI Contains CSI Replacement Parts? NEngineering Testing Required?
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
YTDPL?
Approved Date
M&O AED REQUIREMENTS DATA
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
06/08/2018
M564PRID 145D5322-3Part Number
1615-01-113-0242NSN CH-47FSystem
D1049
D1051
D1077A
D1248
D1804
D1844
D1845
D1922
D1923
D1926
D2031
D2075
D2087
D2088
D2201
D2287
See Tables 2-1 and 2-2 of DMWR 55-1615-325 for critical tools and test/inspection equipment.
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
RStatus
Correlation Performance Study Requirements
File details come from the government source that posted it.