Attachment_1_-_AED_Req_Data_AX9M9013AX.pdf

PDF 5 KB Posted

Attached to
Cover Assembly, Sump
Solicitation number
W58RGZ-19-R-0097
Issued by

About this file

Attachment 1

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

06/08/2018

M564PRID 145D5322-3Part Number

1615-01-113-0242NSN CH-47FSystem

COVER ASSEMBLY, SUMPNomenclature

YAdequate DMWR Available?

DMWR-55-1615-325DMWR ID

02/20/2013DMWR Date

DMWR Chg #

NPre-Award Survey Recommended?

NCorrelation Performance Study Required ? YPVA Recommended?

(1) See DMWR 55-1615-325, Chapter 3-11 General, In Process Inspection and OIP for overhaul inspection requirements.

(2) Nondestructive testing procedures (NDT) for magnetic particle and flouresent penetrant shall be in accordance with ASTM E1444 and ASTM E1417as per DMWR 55-1615-325 paragraph 3-15. c and d. All technique sheets shall be reviewed and approved by a Level III NDT Inspector. All peresonnel performing magnetic and penetrant task shall be certified in accordance with AIA/NAS NAS 410.

(3) The overhaul facility is responsible for acquisitions, maintenance, calibrationan, disposition of all T, Measurement, and Diagnostic Equipment (TMDE). TMDE shall be maintained and controlled in accordance with MIL-I-45607, ISO10012, NCSL Z540.3, or AMCOM-R 702-7. Calibration documents for all TMDE shall be traceable to the National Institute of Standards and Technology (NIST).

(4) See Chapter 4 Section II, in DMWR 55-1615-325 for Final Performance Check, for test procedures.

Identify Any Special Processes, Test Procedures, and/or Instructions

NCritical Safety Item?

No emerging airworthiness issues affecting Critrical Safety Items (CSI), and concerns over reliability, durability, etc. for the CH- 47F Sump Cover Assembly exist during the time of this review.

Special Airworthiness Considerations

AED Notes: AEM Sustainment has confirmed the CSI/NST status through the ARISE CIM database on 8 February 2018 and the component is Non-CSI and Non-NST.JC

Other Requirements / Comments

If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:

NSpecial Post-Contract Award Requirements?

Special Post-Contract Award Requirements

DMWR 55-1615-325 does not contain detailed IUID requirements for this component. The PM has not tasked AED to update this DMWR to incorporate IUID detailed procedures. Recommend contacting CH-47 PM IUID Office, Jennifer Bishop at (256) 876- 8526 for any updates and/or waiver/deviation of IUID Contracting DFAR clauses on the IUID marking of the Sump Cover Assembly.

Other Requirements / Comments (Part II)

AED Notes: AEM Sustainment has re-verified the CSI and NST data through ARISE CIM database on 04/04/2018. Component is still Non-CSI and Non-NST. There are No changes to the data. MW.

Other Requirements / Comments (Part III)

Other Requirements / Comments (Part IV)

Other Requirements / Comments (Part V)

NDoes QE-STD-2 Apply?

N

Additional CSI Requirements

CSI Contains CSI Replacement Parts? NEngineering Testing Required?

The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

RStatus

YTDPL?

Approved Date

M&O AED REQUIREMENTS DATA

Commerciality Determination

Commercial Item? N NBest Commercial Practice Acceptable?

06/08/2018

M564PRID 145D5322-3Part Number

1615-01-113-0242NSN CH-47FSystem

D1049

D1051

D1077A

D1248

D1804

D1844

D1845

D1922

D1923

D1926

D2031

D2075

D2087

D2088

D2201

D2287

See Tables 2-1 and 2-2 of DMWR 55-1615-325 for critical tools and test/inspection equipment.

Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes

MEOs Required for Competitive Contract?

RStatus

Correlation Performance Study Requirements

File details come from the government source that posted it.