W58RGZ19R0063.pdf

PDF 116 KB Posted

Attached to
PROCESSOR, SIGNAL DATA
Solicitation number
W58RGZ19R0063
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
W58RGZ19R0063-0002.pdf PDF
W58RGZ19R0063-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W58RGZ-19-R-0063

X

2018NOV05

2018DEC0506:00pm

DOA1

2018NOV05 SEE SCHEDULE

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

MELANIE H. EARLEY

(256)876-2047

CCAM-ALL

MELANIE.D.HELSEREARLEY.CIV@MAIL.MIL

X 1 25

1 56

X 1

X 5 X 15

X 17 X 18 X 22

X 24

X 27

X 32

X 40

X 41

X 50

X 54

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MELANIE H. EARLEY

Buyer Office Symbol/Telephone Number: CCAM-ALL/(256)876-2047

Type of Contract 1: Firm Fixed Price

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

THE PROCESSOR, SIGNAL DATA (MPSU)IS NOT A CRITICAL SAFETY ITEM (CSI). THERE IS NO ADEQUATE DEPOT MAINTENANCE WORK REQUIREMENT (DMWR) FOR

THIS OVERHAUL EFFORT.

THIS WILL BE A 5 YEAR FIRM-FIXED-PRICE INDEFINITE DELIVERY INDEFINTIE QUANTITY (IDIQ) CONTRACT PURSUANT TO FAR 52.216-22.

NO GOVERNMENT FURNISHED MATERIAL (GFM) OTHER THAN THE REPARABLES WILL BE PROVIDED.

ACCESS TO DLA EMALL IS NOT AUTHORIZED.

THE GOVERNMENT IS ONLY OBLIGATED TO PURCHASE THE MINIMUM QUANTITY. SUBJECT TO THE AVAILABILITY OF FUNDS, ANY QUANTITIES ORDERED WILL BE

PRICED AT THE UNIT PRICE ESTABLISHED FOR THE ORDERING PERIOD IN WHICH THEY ARE ORDERED. FUNDS SHALL BE OBLIGATED BY ISSUANCE OF DELIVERY

ORDERS AND NOT BY THE CONTRACT ITSELF.

SHIPPING INSTRUCTIONS WILL BE PROVIDED IN EACH INDIVIDUAL DELIVERY ORDER.

THE CONTRACTOR MAY BE REQUESTED TO SUBMIT ADDITIONAL COST OR PRICING DATA IF ONLY ONE OFFER IS RECEIVED IAW DFARS CLAUSE 252.215-7008, ENTITLED "ONLY ONE OFFER."

THE YEARLY ESTIMATED QUANTITIES LISTED HEREIN DO NOT COMMIT THE GOVERNMENT TO ORDERING THAT OR ANY QUANTITY ABOVE THE MINIMUM QUANTITY.

THE MAXIMUM QUANTITY INCLUDES 95 EACH FOR FOREIGN MILITARY SALES (FMS). HOWEVER, IF NO FMS CUSTOMERS REQUIRE THIS ITEM, THE UNITED

STATES ARMY REQUIRE MAY UTILIZE THE FMS QUANTITY.

THE MINIMUM QUANTITY SET FORTH HEREIN SHALL BE OBLIGATED ON EACH DELIVERY ORDER, TO BE ISSUED SIMULTANEOUSLY WITH THE AWARD OF THE

CONTRACT. ANY ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE FIRM FIXED PRICE IN EFFECT DURING THE ORDERING PERIOD IN WHICH THEY

ARE ORDERED.

ALL ORDERING PERIODS ARE IN INCREMENTS OF 12 MONTHS FROM THE DATE OF AWARD.

ORDERING PERIODS ARE AS FOLLOWS:________________________________

THE FIRST ORDERING PERIOD IS FROM DATE OF CONTRACT AWARD THROUGH 365 DAYS AFTER CONTRACT AWARD.

THE SECOND ORDERING PERIOD IS FROM 366 DAYS AFTER CONTRACT AWARD THROUGH 730 DAYS AFTER CONTRACT AWARD.

THE THIRD ORDERING PERIOD IS FROM 731 DAYS AFTER CONTRACT AWARD THROUGH 1095 DAYS AFTER CONTRACT AWARD.

THE FOURTH ORDERING PERIOD IS FROM 1096 DAYS AFTER CONTRACT AWARD THROUGH 1460 DAYS AFTER CONTRACT AWARD.

THE FIFTH ORDERING PERIOD IS FROM 1461 DAYS AFTER CONTRACT AWARD THROUGH 1825 DAYS AFTER CONTRACT AWARD.

PLEASE INSERT YOUR FIRM FIXED UNIT PRICE FOR THE 1st, 2nd, 3rd, 4th, and 5th YEAR IN THE SPACES PROVIDED UNDER EACH CLIN/SUBCLIN.

NOTE: THE OFFERORS ATTENTION IS CALLED TO THE PROCEDURES FOR RECEIPT OF REPARABLES WHICH FOLLOWS AND IS ALSO IN SECTION G.

AN ELECTRONIC COPY OF DD FORM 1348-1A FOR ALL SHIPMENTS OF REPARABLES SHALL BE FORWARDED TO 1) THE EMAIL ADDRESS IN BLOCK 10 ON PAGE 1

OF THE BASIC CONTRACT/DELIVERY ORDER/MODIFICATION AND ALSO TO 2) mailto:usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil . THE DD FORM

1348-1A SHALL ANNOTATE TO WHICH CONTRACT/DELIVERY ORDER THE ASSETS WILL BE APPLIED AS REPARABLES.

THE DD FORM 1348-1A GUIDANCE AS FOLLOWS:

A. MAINTAIN ANY RECEIPT DOCUMENTATION RECEIVED FROM THE DEPOTS

2 56

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

B. UPON RECEIPT OF MATERIAL, FILL IN BLOCK 10 TO INDICATE THE QUANTITY RECEIVED AND PROVIDE A SIGNATURE AND DATE ON THE

DD FORM 1348-1A. PRINTED NAMES, NAME/DATE STAMPS, AND INITIALS ARE NOT ACCEPTABLE.

C. IF A DD FORM 1348-1A IS NOT RECEIVED, A 1348-1A MUST BE CREATED WITH THE CORRESPONDING RECEIPT INFORMATION TO CONTAIN

THE FOLLOWING:

I. UNIT OF ISSUE AND QUANTITY- (POSITIONS 23-29)

II. DOCUMENT NUMBER- (POSITIONS 30-43)

III. NATIONAL STOCK NUMBER (NSN)- (POSITIONS 8-22)

IV. CONDITION CODE- (POSITION 71)

V. UNIT PRICE- (POSITION 74-80

VI. TOTAL PRICE- (BLOCK 1)

VII. ACTUAL QUANTITY RECEIVED- (BLOCK 10)

VIII. NOMENCLATURE- (BLOCK 17)

IX. SIGNATURE AND DATE- (BLOCKS 22 AND 23)

D. COMPLETED 1348S SHOULD BE SENT TO THE FOLLOWING MAILBOX UPON RECEIPT OF MATERIAL:

USARMY.REDSTONE.USAMC.MBX.IMMC-SMBAMMO@MAIL.MIL

AN EXAMPLE OF A 1348-1A FILLED OUT CORRECTLY IS ATTACHED (SEE ATTACHMENT 0008).

ALL PROPOSALS/RESPONSES SHALL INCLUDE A SPECIAL TOOLING AND TEST EQUIPMENT SECTION THAT ADDRESSES THE CONTRACTOR'S PLAN TO MEET ALL

GOVERNMENT SPECIAL TOOLING AND TEST EQUIPMENT REQUIREMENTS WITH EITHER:

1. PHYSICAL POSSESSION OF THE REQUIRED TOOLS.

2. CONFIRMED REQUISITIONS FOR THE REQUIRED TOOLS.

3. CONFIRMED ARRANGEMENTS FOR SUBCONTRACTING THE PROCESSES REQUIRING THE SPECIAL TOOLS OR,

4. SPECIFIC PLANS DESCRIBING THEIR TECHNICAL APPROACH TO DEVELOP EQUIVALENT TOOLS.

THE NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 1993, PUBLIC LAW 102-484, SECTION 326, PROHIBITS USE OF ODC IN DEPARTMENT OF

DEFENSE CONTRACTS AWARDED ON OR AFTER 01 JUNE 1993, UNLESS APPROPRIATE AUTHORITY IS GRANTED.

WHEN APPLICABLE, THE CONTRACTOR IS REMINDED TO COMPLETE THE FOREIGN MILITARY SALES (FMS) CUSTOMER DA FORM 2410 (COMPONENT REMOVAL AND

REPAIR OVERHAUL RECORD), SUBMITTED WITH THE ITEM FOR REPAIR, IN ACCORDANCE WITH DA PAMPHLET 738-751 AND TB-1500-341-01. UPON COMPLETION

OF REPAIR, IF AUTHORIZED, THE CONTRACTOR IS REMINDED TO FILL OUT DA FORM 2410 AND RETURN IT TO THE FMS CUSTOMER WITH THE REPAIRED

ASSET(S), ALONG WITH THE FMS CUSTOMER VERSION OF THE DA FORM 2410.

THE CONTRACTOR SHALL REPORT PRODUCTION STATUS REQUIREMENTS IAW CDRL DI-ALSS-80728A. THE FOLLOWING WEBSITES ARE PROVIDED FOR THE PURPOSE

OF OBTAINING/REVIEWING VARIOUS ARMY PUBLICATIONS AND TECHNICAL MANUALS/BULLETINS:

A. HTTPS://WWW.LOGSA.ARMY.MIL/ETMS/ONLINE.HTM - TECHNICAL MANUALS AND BULLETINS

B. HTTP://WWW.USAPA.ARMY.MIL - DA PAMPHLETS AND ARMY REGULATIONS

ELECTRONIC SUBMISSION OF PROPOSALS IS AUTHORIZED.

PROPOSALS SHALL BE MAILED TO:

ARMY CONTRACTING COMMAND - REDSTONE

ATTN: MELANIE D. EARLEY

CCAM-AL-M, BLDG 5303, 2nd FLOOR

REDSTONE ARSENAL, AL 35898-5280

OR EMAIL TO:

MELANIE.D.EARLEY.CIV@MAIL.MIL

COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:

3 56

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

NAME: ________________________________

TELEPHONE NUMBER: ____________________

FAX NUMBER: __________________________

E-MAIL ADDRESS: ______________________

IF ANY OFFEROR CHOOSES TO HAND CARRY THEIR PROPOSAL, THE OFFEROR MUST REACH THE APPOINTED LOCATION (IDENTIFIED AS BUILDING 5303, 5300

MARTIN ROAD, REDSTONE ARSENAL, AL 35898, FOYER) BY THE DATE AND TIME AS STATED IN BLOCK 9 ON PAGE 1 OF THE SOLICITATION. PLEASE BE

ADVISED THAT REDSTONE ARSENAL IS A RESTRICTED FACILITY AND SHOULD AN OFFEROR CHOOSE TO HAND CARRY A PROPOSAL, A MINIMUM OF 72 HOURS

NOTICE TO THE CONTRACTING OFFICER IS REQUIRED IN ORDER TO ENSURE ACCESS BY THE CLOSING DATE/TIME OF THE SOLICITATION. ANY UNAUTHORIZED

ENTITY MUST BE IDENTIFIED AS HAVING A NEED, AS VALIDATED BY THE CONTRACTING OFFICER, IN ORDER TO GAIN ACCESS TO THE POST. THE

CONTRACTING OFFICE MUST NOTIFY THE GATE PERSONNEL, WHO MONITOR POST ACCESS, A MINIMUM OF 48 HOURS PRIOR TO AN ENTITY GAINING ENTRANCE TO

THE RESTRICTED POST. PLEASE NOT THAT ANY PROPOSALS DELIVERED LATE AS A RESULT OF FAILURE TO COMPLY WITH THE PROCEDURE WILL NOT BE

ACCEPTED, IAW FAR 52.215-1 ENTITLED "INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION".

*** END OF NARRATIVE A0001 ***

4 56

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PVA

0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________

SERVICE REQUESTED: PVA

CLIN CONTRACT TYPE:

Firm Fixed Price

Note: The contractor must submit an M&O plan, in accordance with the attached "M&O Plan Guidance"

(Attachment 0003). This plan must be submitted no later than 30 days after award. The plan must be approved before the assets for PVA will be shipped.

This CLIN represents the Product Verification Audit

(PVA) for the Processor, Signal Data (MPSU), output

NSN: 1270-01-544-6370, as shown in CLINs 0002AA, 0003AA.

This is a Firm Fixed Price CLIN.

Offeror is required to fill in a proposed firm fixed unit price for the PVA:

PVA shall be in accordance with The "Product

Verification Audit (PVA) Statement of Work".

PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the

Government Quality Office for scheduling of the PVA by email to the following address:

QS-Contracts@amrdec.army.mil

With copy emailed to the Contract Specialist at:

melanie.d.earley.civ@mail.mil

The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.

NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:

U.S. Army Contracting Command - Redstone

Bldg 5303, 2nd Floor

ATTN: CCAM-AL-A, Melanie D. Earley

Redstone Arsenal, Alabama 35898-5000 or emailed to:

5 56

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

melanie.d.earley.civ@mail.mil

PVA requires approval prior to Government acceptance of contract deliverable assets.

Failure to pass the PVA may lead to Termination for____________________________________________________

Default of the contract.________________________

Payment Instructions: The Contractor will go into_____________________

Wide Area Work Flow (WAWF) to receive payment for the

PVA. The Contractor shall use DODAAC W58H0Z when submitting the PVA invoice in WAWF, making it to the attention of Jeanie Clark. The Contracting Officer will approve the PVA invoice.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0002 PROCESSOR, SIGNAL DATA (MPSU)

NSN: 1270-01-544-6370

SYSTEM: AH-64

NOUN: PROCESSOR, SIGNAL DATA (MPSU)

INPUT/OUTPUT NSN: 1270-01-544-6370

INPUT/OUTPUT PART NUMBERs:

1209-2013-FA

MINIMUM QUANTITY: 75

MAXIMUM QUANTITY:570

THE MAXIMUM QUANTITY INCLUDES 95 EACH RESERVED FOR

FMS. HOWEVER, IF NO FMS CUSTOMERS REQUIRE THIS ITEM,

THE UNITED STATES ARMY REQUIRER MAY UTILIZE THE FMS

QUANTITY.

US QUANTITIES FOR ORDERING PERIODS 1 THRU 5 ARE AS

FOLLOWS (CLIN 0002AA):

1st 75 MINIMUM

2nd 100 ESTIMATED

3rd 100 ESTIMATED

4th 100 ESTIMATED

5th 100 ESTIMATED

FMS QUANTITIES FOR ORDERING OERIODS 1 THRU 5 ARE AS

6 56

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

FOLLOWS (0003AA):

1st 15 ESTIMATED

2nd 20 ESTIMATED

3rd 20 ESTIMATED

4th 20 ESTIMATED

5th 20 ESTIMATED

THE MINIMUM QUANTITY SET FORTH HEREIN SHALL BE

OBLIGATED ON THE FIRST DELIVERY ORDER, TO BE ISSUED

CONCURRENTLY WITH THE AWARD OF THE CONTRACT. ANY

ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE

FIRM FIXED PRICE IN EFFECT DURING THE ORDERING PERIOD

IN WHICH THEY ARE ORDERED.

(End of narrative A001)

0002AA OVERHAUL OF PROCESSOR, SIGNAL DATA (MPSU) (US QTY) $ $ __________________________________________________ ______________ __________________

COMMODITY NAME: PROCESSOR, SIGNAL DATA (MPSU)

CLIN CONTRACT TYPE:

Firm Fixed Price

CLIN 0002AA is for the overhaul/upgrade of the AH-64

PROCESSOR, SIGNAL DATA (MPSU) for US Army requirements.

INPUT/OUTPUT NSN: 1270-01-544-6370

INPUT/OUTPUT PART NUMBER: 1209-2013-FA

Overhaul shall be in accordance with clause 52.211-

4003 in Section C entitled 'Statement of

Work/Specifications-Contractor Specifications'.

This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.

OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED

UNIT PRICE: OVERHAUL US QUANTITY

ORDERING PERIOD 1 $_________ (FFP) Qty 75 ea

ORDERING PERIOD 2 $_________ (FFP) Qty 100 ea

ORDERING PERIOD 3 $_________ (FFP) Qty 100 ea

ORDERING PERIOD 4 $_________ (FFP) Qty 100 ea

ORDERING PERIOD 5 $_________ (FFP) Qty 100 ea

(End of narrative B001)

7 56

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS & MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

0003 PROCESSOR, SIGNAL DATA (MPSU)

NSN: 1270-01-544-6370

0003AA OVERHAUL OF PROCESSOR, SIGNAL DATA (MSU) (FMS QTY) $ $ __________________________________________________ ______________ __________________

COMMODITY NAME: PROCESSOR, SIGNAL DATA (MPSU)

CLIN CONTRACT TYPE:

Firm Fixed Price

CLIN 0003AA is for the Overhaul of the Processor, Signal Data (MSPU) for FMS requirements.

INPUT/OUTPUT NSN: 1270-01-544-6370

INPUT/OUTPUT PART NUMBER:

1209-2013-FA

This CLIN will be used only if an FMS customer requires this item. If no FMS customers are identified, the United States Army requirer may utilize the FMS quantity. The estimated quantities are listed below. The FMS customer and geographical locations for deliveries, inspection and acceptance points are unknown at this time.

FMS quantities cannot exceed 95 each.

Overhaul shall be in accordance with clause 52.211-

4003 in Section C entitled 'Statement of

Work/Specifications-Contractor Specifications'.

This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.

OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED

UNIT PRICE: OVERHAUL FMS QUANTITY

8 56

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ORDERING PERIOD 1 $_________ (FFP) Qty 15 ea

ORDERING PERIOD 2 $_________ (FFP) Qty 20 ea

ORDERING PERIOD 3 $_________ (FFP) Qty 20 ea

ORDERING PERIOD 4 $_________ (FFP) Qty 20 ea

ORDERING PERIOD 5 $_________ (FFP) Qty 20 ea

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING ATTACHED

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

0004 SCRAP

0004AA SCRAP $ ______ __________________

SERVICE REQUESTED: SCRAP

CLIN CONTRACT TYPE:

Firm Fixed Price

SECTION C - Description/Specifications/Work Statement_________

Scrap assets from CLIN 0002AA and 0003AA shall be scrapped or returned in accordance with Section C, Statement of Work/Specifications - Contractor

Specifications.

Units determined to be scrap IAW Section C shall be reflected as an increase to CLIN 0004AA with a corresponding decrease in quantity and funds to CLIN

0002AA and 0003AA, as appropriate.

In the event the Procuring Contracting Officer (PCO) determines that certain items are scrap the

Contractor shall make disposition IAW the contractors approved Government property procedures. Scrapped items shall count toward the minimum quantities ordered hereunder.

9 56

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

The Government may, at its own discretion, reduce any items determined scrap by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.

Scrap requires authorization by the Contracting

Officer via formal modification. In no event shall the Contractor scrap an item prior to receiving a contractual modification for a unit.

OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED UNIT

PRICE FOR ALL 5 ORDERING PERIODS:

ORDERING PERIOD 1 $________(FFP) 10 EA, EST QTY ________

ORDERING PERIOD 2 $________(FFP) 10 EA, EST QTY ________

ORDERING PERIOD 3 $________(FFP) 10 EA, EST QTY ________

ORDERING PERIOD 4 $________(FFP) 10 EA, EST QTY ________

ORDERING PERIOD 5 $________(FFP) 10 EA, EST QTY ________

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0005 CONTAINERS

0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: CONTAINERS

SHIPPING CONTAINERS

OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED UNIT

PRICE FOR ALL 5 ORDERING PERIODS:

ORDERING PERIOD 1 $________(FFP) 10 EA, EST QTY ________

ORDERING PERIOD 2 $________(FFP) 10 EA, EST QTY ________

ORDERING PERIOD 3 $________(FFP) 10 EA, EST QTY ________

ORDERING PERIOD 4 $________(FFP) 10 EA, EST QTY ________

ORDERING PERIOD 5 $________(FFP) 10 EA, EST QTY ________

THE ESTIMATED QUANTITY OF 10 EA IS FOR EVALUATION

PURPOSES ONLY.

THE CONTRACTOR SHALL PROVIDE CONTAINERS, IN ACCORDANCE

WITH ATTACHMENT 0002, PACKAGING REQUIREMENT INSTRUCTIONS

AND SECTION C, ENTITLED 'STATEMENT OF WORK/SPECIFICATIONS

10 56

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

- CONTRACTOR SPECIFICATIONS' AND 'REUSABLE CONTAINERS'.

SUPPLEMENTAL INFORMATION:

NSN: 1270-01-544-6370; P/N: 1209-2013-FA

THE GOVERNMENT CANNOT DETERMINE, AT THE TIME OF CONTRACT

AWARD, HOW MANY OF THE ASSETS TO BE REPAIRED WILL BE

RECEIVED BY THE CONTRACTOR IN UNSERVICEABLE CONTAINERS OR

RECEIVED WITHOUT CONTAINERS.

THE CONTRACTOR, IAW SECTION C, 'STATEMENT OF WORK', SHALL

SUBMIT A REPORT OF DISCREPANCY (ROD), SF FORM 364,

THROUGH THEIR GOVERNMENT DCMA QAR FOR VERIFICATION WITHIN

7 WORKING DAYS TO THE ADDRESS SHOWN ON DATA ITEM A006.

ASSETS RECEIVED IN UNSERVICEABLE CONTAINERS OR WITHOUT A

CONTAINER, REQUIRE THE PRIOR APPROVAL OF THE PCO TO BE

PURCHASED.

This CLIN covers containers for CLINs 0002AA and

0003AA.

THIS IS A FIRM-FIXED-PRICE CLIN.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0006 CONTRACT DATA REQUIREMENTS LIST _______________________________

This CLIN is "Not Separately Priced" (NSP). Pricing____________________________________________ for data shall be included in the unit prices of

CLINs 0002AA and 0003AA.

The Contractor shall provide Data Items A001 - A005 in accordance with the Contract Data Requirements

List, Exhibits A-F.

(End of narrative A001)

DATA ITEM A003 - DI-MISC-80508B - DD FORM 1348-1A (AS

REQUIRED)

(End of narrative A001)

A001 DD FORM 1348-1A $ ** NSP ** _______________ __________________

11 56

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SERVICE REQUESTED: DATA ITEM A001

CLIN CONTRACT TYPE:

Firm Fixed Price

Deliveries or Performance _________________________

DATA ITEM A002 - DI-MISC-80508B - MAINTENANCE &

OVERHAUL PLAN (TECHNICAL REPORT - STUDY/SERVICES -

PROCESS PLAN) - SUBMIT 30 DAYS AFTER CONTRACT (DAC)

AWARD

(End of narrative A001)

A002 MAINTENANCE AND OVERHAUL PLAN (M&O) $ ** NSP ** ___________________________________ __________________

SERVICE REQUESTED: DATA ITEM A002

Deliveries or Performance _________________________

DATA ACQUISITION DOCUMENT NUMBER: DI-PSSS-81995

Date of first submission is 3 working days after receipt of reparables.

Frequency of submission is monthly.

Date of subsequent submissions - No later than 10 days after the end of the month.

Data shall be prepared in contractor format, and provided in digital format.

(End of narrative A001)

A003 CONTRACT DEPOT MAINTENANCE (CDM) REPORT $ ** NSP ** _______________________________________ __________________

SERVICE REQUESTED: DATA ITEM A003

CLIN CONTRACT TYPE:

Firm Fixed Price

Deliveries or Performance _________________________

12 56

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

DATA ACQUISITION DOCUMENT NUMBER: DI-QCIC-80736

No report is necessary unless there is a deficiency.

Contractor shall submit NO LATER THAN 10 days after discovery of deficiency.

(End of narrative A001)

A004 QUALITY DEFICIENCY REPORT (QDR) $ ** NSP ** _______________________________ __________________

SERVICE REQUESTED: DATA ITEM A004

CLIN CONTRACT TYPE:

Firm Fixed Price

Deliveries or Performance _________________________

DATA ITEM A005 - DI-MGMT-80441C - GOVERNMENT PROPERTY

INVENTORY REPORT. DATA SHALL BE LIVERED TO:

USARMY.REDSTONE.USAMC.MBX.IMMC-SMB-AMMO@MAIL.MIL

(End of narrative A001)

A005 GOVERNMENT PROPERTY INVENTORY REPORT $ ** NSP ** ____________________________________ __________________

SERVICE REQUESTED: DATA ITEM A005

CLIN CONTRACT TYPE:

Firm Fixed Price

Deliveries or Performance _________________________

DATA ACQUISITION DOCUMENT NUMBER: DI-MGMT-80503

Submission of the Report of Shipping and Packaging

Discrepancy shall occur within 10 days of discovering the discrepancy.

(End of narrative A001)

A006 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________

DISCREPANCY (ROD) $ ** NSP ** _________________ __________________

SERVICE REQUESTED: DATA ITEM A006

13 56

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

CLIN CONTRACT TYPE:

Firm Fixed Price

Deliveries or Performance _________________________

14 56

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C-1 Statement of Work/Specifications Contractor Specifications

a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul for Processor, Signal Data (MPSU) that is required to return the items as specified by Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s)specified in each individual delivery order.

b. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine the complete cost to overhaul. At this time, the exact conditions of the assets are unknown, and the quantities listed under the initial orders will be estimates. The Contractor shall inform the Government, via RODs, the quantities applicable to each CLIN after the initial inspection is complete. The Contractor shall continue the overhaul process on all end items when the total cost to overhaul does not exceed $15,273.54. The overhaul line items shown in section B are firm-fixed price. The contractor will be required to complete the overhaul on all end items regardless of the damage as long as the total contractor cost to overhaul does not exceed $15,273.54. The contractor will be required to provide data other than certified cost and pricing data and a report of discrepancy signed by the DCMA

QAR to the Procuring Contracting Officer (PCO) to confirm the total cost to overhaul will exceed $15,273.54. This data will include at minimum material cost (80% of material cost will be supported by current vendor quotes), labor hours, labor rates, overheads, G&A, and profit rate. More information to support the contractor's price may be requested by the Government. In no event will an asset be scrapped prior to an approved modification by the Contracting Officer. No additional funding except for missing parts will be provided to the contractor to complete the overhaul of the end item. The firm fixed prices in the overhaul CLINs must include/cover all mandatory and non-mandatory parts. The Government cannot guarantee the condition of the assets sent to the Contractor for overhaul.

c. In the event that the total contractor cost to overhaul is determined (approved by PCO) to exceed $15,273.54, the contractor shall scrap such assets at the fixed unit price in CLIN 0004AA of section B hereof and make disposition in accordance with (IAW) the contractor's approved Government property procedures. Such scrapped items shall count toward the minimum quantities ordered hereunder.

The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity. Any item other than those determined to be scrapped must be overhauled/upgraded at the firm fixed price in the awarded contract.

d. Overhaul shall be accomplished IAW Contractor's blueprints and drawings.

e. Critical Safety Item: N/A.

f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503.

g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental

Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-

23, w/chg 12, Painting and Marking of Army Aircraft.

h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibit A. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423.

i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with the PVA SOW found in section E of the solicitation/contract.

j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall prepare TAMMS data IAW DI-SESS-81758 and the

TAMMS instructions attached to the solicitation/contract. The Contractor shall complete the forms and records as specified in DA PAM 738-

751, TB 1-1500-341-01, TM 1-1500-328-23.

k. Serial Number Report Requirement (SNRR): N/A

l. The items the Contractor shall repair are identified below:

Input NSN P/N

1270-01544-6370 1209-2013-FA

15 56

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Output NSN P/N

1270-01544-6370 1209-2013-FA

m. The overhaul/upgrade planned quantity for 5 years is minimum 75, maximum 570. Input will be 135 days after receipt of order (ARO). Output shall be as specified in the solicitation/contract schedule. Serviceable assets shall be returned to

DODAAC: W52G1U, RIC: AN5.

n. Inventory Transactions - The contractor prepare a Contract Depot Maintenance Production Report IAW DI-ALSS-80728A.

o. Reserved

p. Reserved.

q. The Government reserves the right to replace any items scrapped.

r. Overhaul Repair Report: N/A

s. Quality Deficiency Report: The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736.

t. Supplier Interface and Oversight: N/A.

u. Shipping Containers NSN: 8145-00-536-4925 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.

v. Overhaul/Recapitalization/Upgrade/Repair (M&O Plan) Documentation: The contractor shall provide documentation IAW DI-MISC-80508.

The documentation shall include all legacy (existing) technical information, procedures, and processes (e.g., Overhaul/Repair travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration (FAA) approved documentation) that the contractor utilized or will utilize in the overhaul of the item. The documentation may be in contractor format. The contractor shall mark the documentation IAW the contract and provide for reproduction cost only.

*** END OF NARRATIVE C0001 ***

16 56

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D-1 BAR CODE MARKINGS

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

*** END OF NARRATIVE D0001 ***

17 56

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996

E-5 PVA SOW

Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.

(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA as specified in this contract.

This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the

AMRDEC Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from

AMRDEC ED. The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the

"Changes" clause of the contract.

(b) The Contractor shall:

(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.

(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN: QS-

Contracts@amrdec.army.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United

States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.

(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.

(c) The initial PVA will be performed on one of the first three (3) items overhauled. The PVA candidate will be selected by the AMRDEC

PVA Team Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.

(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.

(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.

(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance

Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.

(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work

Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.

(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.

18 56

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government aceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.

(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.

(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the

PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.

Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.

(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the AMRDEC PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.

1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.

2. Minor: In the event a minor defect is discovered, the following actions shall be taken:

a. The contractor shall isolate the cause of the defect and initiate corrective actions.

b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.

c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.

3. Major: In the event a major defect is discovered, the following actions shall be taken:

a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.

b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.

c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to AMCOM.

d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.

e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.

f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.

4. Critical: In the event a critical defect is discovered, the following actions shall be taken:

a. All actions outlined in paragraph 3 above shall be completed.

b. Upon request, the contractor shall provide the AMRDEC Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).

c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.

NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant QAR to issue a Corrective Action Request.

(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA

19 56

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

candidates prior to acceptance, and effective corrective action has been initiated to preclude reoccurrence of the defect.

(n). The contractor shall prepare and forward, through the cognizant government quality element, finalized audit reports within ten

(10) working days after completion of the PVA to Commander, U.S. Army Research Development and Engineering Command, ATTN: QS-

Contracts@amrdec.army.mil, Redstone Arsenal, AL 35898-5000 and the Acquisition Center address as shown on Order 0001. (In the event reorganization changes this address, the contractor will be notified of the new, correct address by the CO). The report shall include:

1. Name and location of contractor

2. Contract number or equivalent

3. Descriptive noun, national stock number, part number, and serial number of the item audited

4. Complete description of each audit finding, with corrective action taken, and action taken to prevent recurrence.

5. The audit report shall be signed, as a minimum, by the contractor's quality manager or his designated representative.

Objections, accompanied with explanations, on any audit finding(s) shall be specifically annotated and forwarded to AMCOM for resolution. Objection by the contractor as to the existence of a defect or as to its classification will be resolved by the PVA

Chairman. Further non-concurrence will be referred to the PCO for final resolution IAW the clause entitled "Disputes" as stated in the contract.

(o) The AMRDEC PVA Chairman will acknowledge receipt of the Final Audit Report and complete the following within 10 working days of receipt:

1. Review the Final PVA Report for compliance and completeness

2. Review the report for acceptance/rejection of corrective action and actions taken to prevent recurrence.

3. Forward a written reply to the AMCOM CO and/or cognizant government quality element, recommending acceptance or rejection of the Final Audit Report.

4. If the Final Audit Report is disapproved, the Contractor shall repeat any or all PVA tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the

Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver a revised report to the Government under the terms and conditions and within the time specified by the Government.

These actions must be coordinated with the cognizant government QAR. The Government shall take action on this report within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(p) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after approval of the Final Audit Report, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted. Notification is required 10 business days prior to shipment of the next delivery.

(q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon acceptance of the Final

Audit Report. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.

(r) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(s) Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1)

Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(t) In cases where this PVA is a part of the Source Approval Request (SAR) process, the process planning will be considered approved upon receipt of an approval memorandum from AMRDEC Aviation Engineering Directorate (AED). If the component is a Critical Safety Item

(CSI), see those specific contract clauses for other requirements that may also be audited during the PVA. PVA approval is contingent on contractor submission and AED approval of changes to manufacturing planning, to correct defects identified during PVA.

(u) Unless otherwise specified in this contract, any end item destroyed or exceeds reparable limites during the PVA process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items must be delivered.

*** END OF NARRATIVE E0001 ***

TITLE_____ DATE____

E-6 CALIBRATION JAN/2012

The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National

Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test

Equipment) or ISO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.