Solicitation_W58RGZ18R0164.pdf
PDF 179 KB Posted
- Solicitation number
- W58RGZ18R0164
About this file
Solicitation
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W58RGZ-18-R-0164
X
2018MAR05
2018APR06
DOA1
2018MAR05 SEE SCHEDULE
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
MASHIA S. OWENS
(256)842-0939
CCAM-ALM
MASHIA.S.OWENS.CIV@MAIL.MIL
X 1 25
1 58
X 1
X 5 X 15
X 18 X 19 X 23
X 33
X 36
X 39
X 49
X 50
X 56
X 58
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MASHIA S. OWENS
Buyer Office Symbol/Telephone Number: CCAM-ALM/(256)842-0939
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
THE SWITCHING GROUP, DIGITAL IS NOT A CRITICAL SAFETY ITEM (CSI). THERE IS NO ADEQUATE DEPOT MAINTENANCE WORK REQUIREMENT (DMWR) FOR
THIS OVERHAUL EFFORT; ACCORDINGLY, THIS REQUIREMENT CANNOT SUPPORT A COMPETITIVE SOLICITATION. THIS REQUIREMENT IS RESTRICTED TO THE
FOLLOWING APPROVED SOURCES FOR THE OVERHAUL/REPAIR:
- SIKORSKY AIRCRAFT CORPORATION. (CAGE CODE 78286)
- GE AVIATION SYSTEMS LLC., (CAGE CODE 35351)
THIS WILL BE A 5 YEAR FIRM-FIXED-PRICE INDEFINITE DELIVERY INDEFINTIE QUANTITY (IDIQ) CONTRACT PURSUANT TO FAR 52.216-22.
NO GOVERNMENT FURNISHED MATERIAL (GFM) OTHER THAN THE REPARABLES WILL BE PROVIDED.
ACCESS TO DLA EMALL IS NOT AUTHORIZED. ___
THE GOVERNMENT IS ONLY OBLIGATED TO PURCHASE THE MINIMUM QUANTITY. SUBJECT TO THE AVAILABILITY OF FUNDS, ANY QUANTITIES ORDERED WILL BE
PRICED AT THE UNIT PRICE ESTABLISHED FOR THE ORDERING PERIOD IN WHICH THEY ARE ORDERED. FUNDS SHALL BE OBLIGATED BY ISSUANCE OF DELIVERY
ORDERS AND NOT BY THE CONTRACT ITSELF.
SHIPPING INSTRUCTIONS WILL BE PROVIDED IN EACH INDIVIDUAL DELIVERY ORDER.
THE CONTRACTOR MAY BE REQUESTED TO SUBMIT ADDITIONAL COST OR PRICING DATA IF ONLY ONE OFFER IS RECEIVED IAW DFARS CLAUSE 252.215-7008, ENTITLED "ONLY ONE OFFER."
THE YEARLY ESTIMATED QUANTITIES LISTED HEREIN DO NOT COMMIT THE GOVERNMENT TO ORDERING THAT OR ANY QUANTITY ABOVE THE MINIMUM QUANTITY.
THE MAXIMUM QUANTITY INCLUDES 30 EACH FOR EACH PRID RESERVED FOR FOREIGN MILITARY SALES (FMS). HOWEVER, IF NO FMS CUSTOMERS REQUIRE THIS
ITEM, THE UNITED STATES ARMY REQUIRE MAY UTILIZE THE FMS QUANTITY.
THE MINIMUM QUANTITY SET FORTH HEREIN SHALL BE OBLIGATED ON DELIVERY ORDER 0001, TO BE ISSUED SIMULTANEOUSLY WITH THE AWARD OF THE
CONTRACT. ANY ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE FIRM FIXED PRICE IN EFFECT DURING THE ORDERING PERIOD IN WHICH THEY
ARE ORDERED.
ALL ORDERING PERIODS ARE IN INCREMENTS OF 12 MONTHS FROM THE DATE OF AWARD.
ORDERING PERIODS ARE AS FOLLOWS:________________________________
THE FIRST ORDERING PERIOD IS FROM DATE OF CONTRACT AWARD THROUGH 365 DAYS AFTER CONTRACT AWARD.
THE SECOND ORDERING PERIOD IS FROM 366 DAYS AFTER CONTRACT AWARD THROUGH 730 DAYS AFTER CONTRACT AWARD.
THE THIRD ORDERING PERIOD IS FROM 731 DAYS AFTER CONTRACT AWARD THROUGH 1095 DAYS AFTER CONTRACT AWARD.
THE FOURTH ORDERING PERIOD IS FROM 1096 DAYS AFTER CONTRACT AWARD THROUGH 1460 DAYS AFTER CONTRACT AWARD.
THE FIFTH ORDERING PERIOD IS FROM 1461 DAYS AFTER CONTRACT AWARD THROUGH 1825 DAYS AFTER CONTRACT AWARD.
PLEASE INSERT YOUR FIRM FIXED UNIT PRICE FOR THE 1st, 2nd, 3rd, 4th, and 5th YEAR IN THE SPACES PROVIDED UNDER EACH CLIN/SUBCLIN.
NOTE: THE OFFERORS ATTENTION IS CALLED TO THE PROCEDURES FOR RECEIPT OF REPARABLES WHICH FOLLOWS AND IS ALSO IN SECTION G.
AN ELECTRONIC COPY OF DD FORM 1348-1A FOR ALL SHIPMENTS OF REPARABLES SHALL BE FORWARDED TO 1) THE EMAIL ADDRESS IN BLOCK 10 ON PAGE 1
OF THE BASIC CONTRACT/DELIVERY ORDER/MODIFICATION AND ALSO TO 2) . THE DD FORM 1348-1A SHALL ANNOTATE TO WHICH CONTRACT/DELIVERY ORDER
THE ASSETS WILL BE APPLIED AS REPARABLES.
2 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
THE DD FORM 1348-1A GUIDANCE AS FOLLOWS:
A. MAINTAIN ANY RECEIPT DOCUMENTATION RECEIVED FROM THE DEPOTS
B. UPON RECEIPT OF MATERIAL, FILL IN BLOCK 10 TO INDICATE THE QUANTITY RECEIVED AND PROVIDE A SIGNATURE AND DATE ON THE
DD FORM 1348-1A. PRINTED NAMES, NAME/DATE STAMPS, AND INITIALS ARE NOT ACCEPTABLE.
C. IF A DD FORM 1348-1A IS NOT RECEIVED, A 1348-1A MUST BE CREATED WITH THE CORRESPONDING RECEIPT INFORMATION TO CONTAIN
THE FOLLOWING:
I. UNIT OF ISSUE AND QUANTITY- (POSITIONS 23-29)
II. DOCUMENT NUMBER- (POSITIONS 30-43)
III. NATIONAL STOCK NUMBER (NSN)- (POSITIONS 8-22)
IV. CONDITION CODE- (POSITION 71)
V. UNIT PRICE- (POSITION 74-80
VI. TOTAL PRICE- (BLOCK 1)
VII. ACTUAL QUANTITY RECEIVED- (BLOCK 10)
VIII. NOMENCLATURE- (BLOCK 17)
IX. SIGNATURE AND DATE- (BLOCKS 22 AND 23)
D. COMPLETED 1348s SHOULD BE SENT TO THE FOLLOWING MAILBOX UPON RECEIPT OF MATERIAL:
USARMY.REDSTONE.USAMC.MBX.IMMC-SMBAMMO@MAIL.MIL
AN EXAMPLE OF A 1348-1A FILLED OUT CORRECTLY IS ATTACHED (SEE ATTACHMENT 0008).
ALL PROPOSALS/RESPONSES SHALL INCLUDE A SPECIAL TOOLING AND TEST EQUIPMENT SECTION THAT ADDRESSES THE CONTRACTOR'S PLAN TO MEET ALL
GOVERNMENT SPECIAL TOOLING AND TEST EQUIPMENT REQUIREMENTS WITH EITHER:
1. PHYSICAL POSSESSION OF THE REQUIRED TOOLS.
2. CONFIRMED REQUISITIONS FOR THE REQUIRED TOOLS.
3. CONFIRMED ARRANGEMENTS FOR SUBCONTRACTING THE PROCESSES REQUIRING THE SPECIAL TOOLS OR,
4. SPECIFIC PLANS DESCRIBING THEIR TECHNICAL APPROACH TO DEVELOP EQUIVALENT TOOLS.
THE NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 1993, PUBLIC LAW 102-484, SECTION 326, PROHIBITS USE OF ODC IN DEPARTMENT OF
DEFENSE CONTRACTS AWARDED ON OR AFTER 01 JUNE 1993, UNLESS APPROPRIATE AUTHORITY IS GRANTED.
WHEN APPLICABLE, THE CONTRACTOR IS REMINDED TO COMPLETE THE FOREIGN MILITARY SALES (FMS) CUSTOMER DA FORM 2410 (COMPONENT REMOVAL AND
REPAIR OVERHAUL RECORD), SUBMITTED WITH THE ITEM FOR REPAIR, IN ACCORDANCE WITH DA PAMPHLET 738-751 AND TB-1500-341-01. UPON COMPLETION
OF REPAIR, IF AUTHORIZED, THE CONTRACTOR IS REMINDED TO FILL OUT DA FORM 2410 AND RETURN IT TO THE FMS CUSTOMER WITH THE REPAIRED
ASSET(S), ALONG WITH THE FMS CUSTOMER VERSION OF THE DA FORM 2410.
THE CONTRACTOR SHALL REPORT PRODUCTION STATUS REQUIREMENTS IAW CDRL DI-ALSS-80728A. THE FOLLOWING WEBSITES ARE PROVIDED FOR THE PURPOSE
OF OBTAINING/REVIEWING VARIOUS ARMY PUBLICATIONS AND TECHNICAL MANUALS/BULLETINS:
A. https://liw.logsa.army.mil/etmapp/#/etm/home - TECHNICAL MANUALS AND BULLETINS
B. http://www.apd.army.mil/ - DA PAMPHLETS AND ARMY REGULATIONS
ELECTRONIC SUBMISSION OF PROPOSALS IS NOT AUTHORIZED. ___
PROPOSALS SHALL BE MAILED TO:
ARMY CONTRACTING COMMAND - REDSTONE
ATTN: MASHIA S. OWENS
CCAM-AL-B, BLDG 5303, 2nd FLOOR
REDSTONE ARSENAL, AL 35898-5280
COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:
3 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
NAME: ________________________________
TELEPHONE NUMBER: ____________________
FAX NUMBER: __________________________
E-MAIL ADDRESS: ______________________
IF ANY OFFEROR CHOOSES TO HAND CARRY THEIR PROPOSAL, THE OFFEROR MUST REACH THE APPOINTED LOCATION (IDENTIFIED AS BUILDING 5303, 5300
MARTIN ROAD, REDSTONE ARSENAL, AL 35898, FOYER) BY THE DATE AND TIME AS STATED IN BLOCK 9 ON PAGE 1 OF THE SOLICITATION. PLEASE BE
ADVISED THAT REDSTONE ARSENAL IS A RESTRICTED FACILITY AND SHOULD AN OFFEROR CHOOSE TO HAND CARRY A PROPOSAL, A MINIMUM OF 72 HOURS
NOTICE TO THE CONTRACTING OFFICER IS REQUIRED IN ORDER TO ENSURE ACCESS BY THE CLOSING DATE/TIME OF THE SOLICITATION. ANY UNAUTHORIZED
ENTITY MUST BE IDENTIFIED AS HAVING A NEED, AS VALIDATED BY THE CONTRACTING OFFICER, IN ORDER TO GAIN ACCESS TO THE POST. THE
CONTRACTING OFFICE MUST NOTIFY THE GATE PERSONNEL, WHO MONITOR POST ACCESS, A MINIMUM OF 48 HOURS PRIOR TO AN ENTITY GAINING ENTRANCE TO
THE RESTRICTED POST. PLEASE NOT THAT ANY PROPOSALS DELIVERED LATE AS A RESULT OF FAILURE TO COMPLY WITH THE PROCEDURE WILL NOT BE
ACCEPTED, IAW FAR 52.215-1 ENTITLED "INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION".
*** END OF NARRATIVE A0001 ***
4 58
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
0001AA PROJECT VERIFICATION AUDIT (PVA) $ ________________________________ __________________
SERVICE REQUESTED: PVA
CLIN CONTRACT TYPE:
Firm Fixed Price
THIS IS A FIRM FIXED PRICE CLIN.
This CLIN represents the Product Verification
Audit (PVA) for Switching Group, Digital, NSN:
5895-01-558-7972.
Offeror is required to fill in a proposed firm fixed unit price for the PVA:
$__________(FFP)
The PVA shall be in accordance with Narrative
Section E, "Product Verification Audit (PVA)
Statement of Work".
PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 units for the PVA. The Contractor is required to notify the Government Quality Office for scheduling of the PVA by email to the following address:
QS-Contracts@amrdec.army.mil
With copy emailed to the Contract Specialist at:
mashia.s.owens.civ@mail.mil.
The Contractor will prepare and forward, through the cognizant Government Quality Element, the
Finalized Audit Reports within 10 working days after completion of the PVA to both email addresses above.
NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:
U.S. Army Contracting Command - Redstone
Attn: Mashia Owens, CCAM-ALB
Bldg. 5303, 2nd Floor
Redstone Arsenal, AL 35898-5280
Failure to pass the PVA may lead to Termination________________________________________________ for Default of the contract.____________________________
Payment Instructions:_____________________
The Contractor will go into Wide Area Work Flow
(WAWF) to receive payment for the PVA. The
5 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Contractor shall use DODAAC W58H0Z when submitting the PVA invoice in WAWF and make it to the attention of Antionette McClinton.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0002 QUANTITY
NSN: 5895-01-558-7972
Mfr CAGE: 01823
Mfr Part Number: 7060001823102
0002AA OVERHAUL/REPAIR (US QUANTITY) $ $ _____________________________ ______________ __________________
COMMODITY NAME: QUANTITY
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0002AA is for the overhaul/repair of the
Uh-60 Switching Group, Digital for US Army requirements.
INPUT NSN:
5895-01-558-7972
INPUT PART NUMBERS:
70600-01823-102
OUTPUT NSN: 5895-01-558-7972
OUTPUT PART NUMBER: 70600-01823-102
Offeror is required to fill in proposed firm-fixed-unit prices for ordering periods 1 through 5:
ORDERING PERIOD 1 - U/P $_________ (FFP) MIN QTY 20
EA
ORDERING PERIOD 2 - U/P $_________ (FFP) EST QTY 25 EA
ORDERING PERIOD 3 - U/P $_________ (FFP) EST QTY 30 EA
ORDERING PERIOD 4 - U/P $_________ (FFP) EST QTY 35 EA
ORDERING PERIOD 5 - U/P $_________ (FFP) EST QTY 40 EA
6 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Overhaul/repair shall be in accordance with
Section C Clause entitled Statement of
Work/Specifications-Government
Specifications.
This Firm Fixed Price (FFP) CLIN includes all labor charges, mandatory and non-mandatory replacement parts and material, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in section C entitled
Statement of Work/Specifications - Government
Specifications.
THIS IS A FIRM-FIXED-PRICE CLIN.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW MIL-STD-2073-1
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0003 FMS QUANTITY
NSN: 5895-01-558-7972
Mfr CAGE: 78286
Mfr Part Number: 7060001823102
0003AA OVERHAUL/REPAIR (FMS QUANTITY) $ $ ______________________________ ______________ __________________
COMMODITY NAME: FMS QUANTITY
CLIN CONTRACT TYPE:
Firm Fixed Price
INPUT:
NSN: 5895-01-558-7972, P/N: 70600-01823-102
OUTPUT:
NSN: 5895-01-558-7972, P/N: 70600-01823-102
Overhaul/Repair shall be in accordance with
7 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
the 'Statement of Work/Specifications -
Contractor Specifications' in section C.
This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to repair/ overhaul/ upgrade the input assets, as specified in Section C, Statement Of Work.
This CLIN will be used only if an FMS customer requires this item. If no FMS customers are identified, the United States Army requirer may utilize the FMS quantity. The estimated quantities are listed below. The FMS customer and geographical locations for deliveries, inspection and acceptance points are unknown at this time, FMS quantities cannot exceed 30 each.
OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT
PRICE:
YEAR 1- U/P $_____________ (FFP) Est Qty 00 ea, FMS
YEAR 2- U/P $_____________ (FFP) Est Qty 07 ea, FMS
YEAR 3- U/P $_____________ (FFP) Est Qty 07 ea, FMS
YEAR 4- U/P $_____________ (FFP) Est Qty 08 ea, FMS
YEAR 5- U/P $_____________ (FFP) Est Qty 08 ea, FMS
INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS
CLIN.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW MIL-STD-2073-1
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0004 SCRAP
8 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0004AA SCRAP $ ______ __________________
SERVICE REQUESTED: SCRAP
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is for assets which are beyond economical repair (i.e., scrap) from CLINs
0002AA, 0003AA.
The Government's estimated quantity per ordering period is 1 each.
Offeror is required to fill in a proposed firm fixed unit price for each ordering period:
Ordering Period 1 $____________ EACH
Ordering Period 2 $____________ EACH
Ordering Period 3 $____________ EACH
Ordering Period 4 $____________ EACH
Ordering Period 5 $____________ EACH
Scrapped assets from CLINs 0002AA, and/or
0003AA, shall be in accordance with Section C, entitled Statement of Work Specifications -
Contractor Specifications.
Units determined to be scrapped in accordance with Section C shall be reflected as an increase in CLIN 0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA, and/or
0003AA, as applicable.
In the event the Procuring Contracting Officer
(PCO) determines that certain items shall be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.
The Government may, at it's discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.
(End of narrative C001)
9 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0005 CONTAINERS
0005AA CONTRACT FURNISHED CONTAINERS $ _____________________________ __________________
SERVICE REQUESTED: CONTAINERS
This CLIN is for contractor furnished containers for CLINs 0002AA, and/or 0003AA.
The Government estimates that a quantitiy of 1
EACH will be required for each of the ordering periods.
Offeror is required to fill in a proposed firm fixed unit price for each ordering period:
Ordering Period 1 $____________ EACH
Ordering Period 2 $____________ EACH
Ordering Period 3 $____________ EACH
Ordering Period 4 $____________ EACH
Ordering Period 5 $____________ EACH
The contractor shall provide the container in accordance with Attachment 0002 - Packaging requirements and Section J, entitled Statement of Work/Specifications - Contractor
Specificationsand reusable containers.
The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.
The Contractor, IAW Section C Statement of Work, shall submit a Report of Discrepancy (ROD) SF
Form 364 through the DCMA QAR for verification within 7 working days to the address shown on
Data Item A001. Assets received with an unserviceable container, or without a container, require prior approval of the PCO before
10 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
containers can be purchased.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0006 CONTRACT DATA REQUIREMENTS LIST(CDRLS) ______________________________________
This CLIN is "Not Separately Priced" (NSP). Pricing for data shall be included in the unit prices of
CLINs 0002AA and 0003AA.
The Contractor shall provide Data Items A001 - A005 in accordance with the Contract Data Requirements
List, Exhibits A, B, C, D, and E.
(End of narrative A001)
A001 REPORT OF SHIPPING AND PACKAGING DISCREPANCY $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: DATA ITEM A001
DATA ACQUISITION DOCUMENT NUMBER : DI-MGMT-80503
Submission of the Report of Shipping and Packaging
Discrepancy shall occur within 10 days of discovery of the discrepancy.
(End of narrative C001)
Deliveries or Performance _________________________
A002 TECHNICAL REPORT STUDY SERVICES (M&O PLAN) $ ** NSP ** __________________________________________ __________________
SERVICE REQUESTED: DATA ITEM A002
DATA ITEM A002 - DATA ACQUISITION DOCUMENT NUMBER :
DI-MISC-80508B(AS REQUIRED)
11 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Data Item A002 refers to the M&O Plan as outlined in the Statement of Work Contractor Specifications, paragraph V. The M&O Plan shall be submitted to this office within 30 days after contract award date. If disapproved, the contractor shall resubmit within 20 calendar days of Government disapproval. PVA cannot occur until the M&O Plan is submitted and approved.
For a sample of a M&O Plan, please visit the following link:
; and select "AMCOM Maintenance and Overhaul (M&O)
SAR" then "Example M&O Plan".
Revisions shall be submitted 10 calendar days the change.
Note: A copy of the plan shall be forwarded to the contract specialist at:
U.S. ARMY Contracting Command - Redstone
ATTN: Mashia Owens, CCAM-ALB
5300 Martin Road
Bldg 5303, 2nd Floor
Redstone Arsenal, AL 35898-5000
(End of narrative C001)
Deliveries or Performance _________________________
A003 TECHNICAL REPORT STUDY SERVICES 1348-1A $ ** NSP ** _______________________________________ __________________
SERVICE REQUESTED: DATA ITEM A003
DATA ITEM A003 - DATA ACQUISITION DOCUMENT NUMBER :
DI-MISC-80508B(AS REQUIRED)
Data Item A003 refers to the DD Form 1348-1A as outlined in the Statement of Work Contractor
Specifications, paragraph N. The DD Form 1348-1A The
Contractor shall deliver report within 5 working days of receipt of repairables
The Data Form 1348-1A shall be deilvered to:
usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
Revisions shall be submitted 10 calendar after the change.
Note: A copy of the plan shall be forwarded to the contract specialist at:
U.S. ARMY Contracting Command - Redstone
ATTN: Mashia Owens, CCAM-ALB
12 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
5300 Martin Road
Bldg 5303, 2nd Floor
Redstone Arsenal, AL 35898-5000
(End of narrative C001)
Deliveries or Performance _________________________
A004 CONTRACT DEPOT MAINTENANCE PRODUCTION REPORT $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: DATA ITEM A004
DATA ITEM A004 - DATA ACQUISITION DOCUMENT NUMBER :
DI-PSSS-81995
Date of first submission is 3 working days after receipt of reparables.
Frequency of submission is monthly.
Data shall be prepared in accordance with Attachment
0005, Template for Depot Maintenance Production
Report, and submitted to the following email addresses:
usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
(End of narrative C001)
Deliveries or Performance _________________________
A005 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________
SERVICE REQUESTED: DATA ITEM A005
DATA ITEM A005 - DATA ACQUISITION DOCUMENT NUMBER :
DI-QCIC-80736 (AS REQUIRED)
No report is necessary unless there is a deficiency.
Contractor shall submit NO LATER THAN 10 days after discovery of deficiency.
(End of narrative C001)
13 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
14 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
C-1 5152.247-5900 INBOUND/OUTBOUND CARGO AND CONTRACTOR EQUIPMENT CENSUS APR/2012
(ECC-A)
a. Movement and coordination of inbound and outbound cargo in Afghanistan is critical to ensuring an effective drawdown. The contractor shall provide visibility of their inbound cargo and equipment via the Synchronized Pre-deployment Operational Tracker (SPOT) census for their contract. This requirement includes the prime's, and subcontractor's at all tiers, cargo and equipment. The contractor shall report any individual piece of equipment valued at $50,000 or more. Incoming cargo and equipment census data shall be input 30 days prior to start of performance or delivery of supplies and quarterly thereafter for inbound and outbound equipment.
b. This reporting is required on Rolling Stock (RS), Non Rolling Stock (RNRS), and Twenty foot Equivalent Units (TEU). The following definitions apply to these equipment/cargo categories:
(1) Rolling Stock (RS): All equipment with wheels or tracks that is self-propelled, or is un-powered and can be towed by a vehicle on a roadway. Also includes standard trailer mounted equipment such as generators, water purification equipment, and other support equipment with permanent wheels. Specific examples of RS include Wheeled Armored Vehicles (WAVS), Mine-Resistant Ambush-
Protected (MRAP) family of vehicles (FOVS), and Highly Mobile Multipurpose Wheeled Vehicles (HMMWVS).
(2) Non Rolling Stock (RNRS): All equipment that is not classified as Rolling Stock. Includes equipment that is not trailer-mounted or originally designed to be driven or towed over a roadway.
(3) Twenty foot Equivalent Units (TEU): Standard unit for describing a ship's cargo capacity, or a shipping terminal's cargo handling capacity. One TEU represents the cargo capacity of a standard intermodal shipping container, 20 feet long, 8 feet wide, and
8.5 feet high. One TEU is equivalent to 4 QUADCONS and 3 TRICONS. One TEU has an internal volume of 1,166 cubic feet.
c. This data will be used by United States Forces-Afghanistan (USFOR-A) to assist in tracking the drawdown of Afghanistan. The contractor is responsible for movement of their own cargo and equipment. The data provided by contractors is for informational purposes only in order to plan and coordinate the drawdown effort. The Government assumes no responsibility for contractor demobilization except as stated in individual contract terms and conditions.
(End)
C-1 Statement of Work/Specifications Government Specifications
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul/repair for Switching Group, Digital that is required to return the items as specified by Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul/repair, as applicable, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s) specified in each individual delivery order.
b. Prior to commencement of overhaul/repair, the Contractor shall disassemble and inspect the item to the extent necessary to determine the complete cost to overhaul/repair. The Contractor shall continue the overhaul/repair process on all end items when the total cost to overhaul/repair does not exceed $12,124.62. The overhaul/repair line items shown in section B are firm-fixed price. The contractor will be required to complete the overhaul/repair on all end items regardless of the damage as long as the total contractor cost to overhaul/repair does not exceed $12,124.62. The contractor will be required to provide data other than certified cost and pricing data and a report of discrepancy signed by the DCMA QAR to the Procuring Contracting Officer (PCO) to confirm the total cost to overhaul/repair will exceed $12,124.62. This data will include at minimum material cost (80% of material cost will be supported by current vendor quotes), labor hours, labor rates, overheads, G&A, and profit rate. More information to support the contractor's price may be requested by the Government. In no event will an asset be scrapped prior to an approved modification by the Contracting Officer.
No additional funding except for missing parts will be provided to the contractor to complete the overhaul/repair of the end item. The firm fixed prices in the overhaul/repair CLINs must include/cover all mandatory and non-mandatory parts as required by the Depot
Maintenance Work Requirement (DMWR); however, PCO approval is required prior to the purchase of missing parts. The Government cannot guarantee the condition of the assets sent to the Contractor for overhaul/repair.
c. In the event that the total contractor cost to overhaul/repair is determined (approved by PCO) to exceed $12,124.62, the contractor shall scrap such assets at the fixed unit price in CLIN 0004AA of section B hereof and make disposition in accordance with
(IAW) the contractor's approved Government property procedures. Such scrapped items shall count toward the minimum quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity. Any item other than those determined to be scrapped must be overhauled/repaired at the firm fixed price in the awarded contract.
15 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
d. Overhaul/repair shall be accomplished IAW COntractor's blueprints and drawings.
e. Critical Safety Item: N/A.
f. Upon receipt of the repairables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503 (Exhibit A).
g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental
Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-
23, w/chg 12, Painting and Marking of Army Aircraft.
h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibits A - E. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423. All RODs must be approved by the DCMA QAR prior to submission.
i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with the PVA SOW found in section E of the solicitation/contract.
j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall prepare TAMMS data IAW DI-SESS-81758 and the
TAMMS instructions attached to the solicitation/contract. The Contractor shall complete the forms and records as specified in DA PAM 738-
751, TB 1-1500-341-01, TM 1-1500-328-23.
k. Serial Number Report Requirement (SNRR): N/A
l. The items the Contractor shall repair are identified below:
Input NSN P/N
5895-01-558-7972 70600-01823-102
Output NSN P/N
5895-01-558-7972 70600-01823-102
m. Reserved.
n. Inventory Transactions - The contractor shall prepare the following reports:
1. The contractor shall prepare a Contract Depot Maintenance Production Report IAW DI-PSSS-81995 (Exhibit D).
2. The contractor shall complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW DI-MISC-80508 and DD Form
1348-1A. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22 (signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:
http://www.acq.osd.mil/dpap/ccap/cc/jcchb/files/formspubsregs/dod_funding_documents/dd13481a.pdf
The contractor shall prepare this data to include the following corresponding receipt information:
A. National Stock Number (NSN) - (Positions 8-22)
B. Condition Code - (Position 71)
C. Unit Price - (Positions 74-80)
D. Total Price - (Block 1)
E. Actual Quantity Received - (Block 10)
F. Nomenclature - (Block 17)
G. Signature and Date - (Blocks 22 and 23)
If there are any questions with the above information please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
o. Reserved
p. Reserved.
q. The Government reserves the right to replace any items scrapped.
16 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
r. Overhaul Repair Report: N/A
s. Quality Deficiency Report: The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736 (Exhibit E).
t. Supplier Interface and Oversight: N/A
u. Shipping Containers NSN: N/A. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.
v. Overhaul/Recapitalization/Upgrade/Repair (M&O Plan) Documentation: The contractor shall provide documentation IAW DI-MISC-80508.
The documentation shall include all legacy (existing) technical information, procedures, and processes (e.g., Overhaul/Repair travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration (FAA) approved documentation) that the contractor utilized or will utilize in the overhaul of the item. The documentation may be in contractor format. The contractor shall mark the documentation IAW the contract and provide for reproduction cost only.
*** END OF NARRATIVE C0001 ***
17 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D-1 BAR CODE MARKINGS
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
*** END OF NARRATIVE D0001 ***
18 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996
E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2008 OR EQUIVALENT with prior approval from Procurement Contracting Officer.
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E-5 PVA SOW
Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.
(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA as specified in this contract.
This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the
AMRDEC Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from
AMRDEC ED. The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the
"Changes" clause of the contract.
(b) The Contractor shall:
(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN: QS-
Contracts@amrdec.army.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United
States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
(c) The initial PVA will be performed on one of the first three (3) items overhauled. The PVA candidate will be selected by the AMRDEC
PVA Team Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
19 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance
Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.
(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work
Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.
(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government aceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.
(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.
(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the
PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.
Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.
(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the AMRDEC PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.
1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
2. Minor: In the event a minor defect is discovered, the following actions shall be taken:
a. The contractor shall isolate the cause of the defect and initiate corrective actions.
b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
3. Major: In the event a major defect is discovered, the following actions shall be taken:
a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.
b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
20 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to AMCOM.
d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.
4. Critical: In the event a critical defect is discovered, the following actions shall be taken:
a. All actions outlined in paragraph 3 above shall be completed.
b. Upon request, the contractor shall provide the AMRDEC Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).
c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant QAR to issue a Corrective Action Request.
(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and effective corrective action has been initiated to preclude reoccurrence of the defect.
(n). The contractor shall prepare and forward, through the cognizant government quality element, finalized audit reports within ten
(10) working days after completion of the PVA to Commander, U.S. Army Research Development and Engineering Command, ATTN: QS-
Contracts@amrdec.army.mil, Redstone Arsenal, AL 35898-5000 and the Acquisition Center address as shown on Order 0001. (In the event reorganization changes this address, the contractor will be notified of the new, correct address by the CO). The report shall include:
1. Name and location of contractor
2. Contract number or equivalent
3. Descriptive noun, national stock number, part number, and serial number of the item audited
4. Complete description of each audit finding, with…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.