W58RGZ17R0221.pdf
PDF 127 KB Posted
- Attached to
- Overhaul of UH-60 Actuator
- Solicitation number
- W58RGZ17R0221
About this file
Solicitation W58RGZ17R0221
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W58RGZ-17-R-0221 2017DEC19
DAWN PATTERSON (256)842-5181
DAWN.P.PATTERSON2.CIV@MAIL.MIL
2018JAN22 03:00pm
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
336413
1,250
X
X DOA1
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 63
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: DAWN PATTERSON
Buyer Office Symbol/Telephone Number: CCAM-AL-M/(256)842-5181
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
1. Reserved.
2. This Solicitation is for a five (5) year Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to
FAR 52.216-22
3. There is not an adequate Depot Maintenance Work Requirement for the Overhaul of the UH-60 Actuator. Sikorsky Aircraft Corporation, CAGE Code 78286, and Simmonds Precision Products Inc., CAGE Code: 12511, are the only approved sources. No other sources have the capabilities in place to accomplish this Overhaul effort.
4. When Applicable, the contractor is reminded to complete the Foreign Military Sales (FMS) Customer DA FORM 2410 (Component Removal and Repair Overhaul Record), submitted with the item for repair, in accordance with DA Pamphlet 738-751 and TB-1500-341-01. Upon completion of repair, if authorized, the contractor is reminded to fill out U.S. Army DA Form 2410 and return it to the FMS customer with the repaired asset(s), along with the FMS customer version of the DA Form 2410.
5. The FMS Customer and geographical location(s) for deliveries, inspection and acceptance points are unknown at this time.
6. Funds shall be obligated by issuance of Delivery Orders and not by the contract itself.
7. The minimum quantity set forth herein shall be obligated on Delivery Order (DO) 0001, to be issued simultaneously with the award of the contract. The Government shall have no further obligation to purchase any quantities after DO 0001.
8. The Government will not be required to obtain the contractor's signature prior to the issuance of an order.
9. The Government intends to award only one (1) basic Fixed Price IDIQ contract as a result of this solicitation.
10. The Government has segregated the estimated quantities into five ordering periods. However, this does not preclude exercising the
Government's right under FAR 52.216-19 by ordering the maximum quantity specified in FAR 52.216-19(b)(1) at any time during the five year ordering period.
Ordering Period 1 will be from date of contract award through 365 days after contract award (DACA).
Ordering Period 2 will be from 366 DACA through 730 DACA.
Ordering Period 3 will be from 731 DACA through 1,095 DACA.
Ordering Period 4 will be from 1,096 DACA through 1,460 DACA.
Ordering Period 5 will be from 1,461 DACA through 1,825 DACA.
11. Please insert your firm fixed unit prices for the 1st, 2nd, 3rd, 4th, and 5th ordering periods in the spaces provided under each
CLIN/SubCLIN.
12. For purposes of Block 12 on page 1, the offer acceptance period is 120 days from the date for receipt of offers specified in Block
9, unless a different period is inserted by the offeror in the blank in Block 12.
13. No Government Furnished Materials (GFM), other than the reparable assets and reusable containers, will be provided.
14. Offers shall be submitted in accordance with FAR Clause 52.212-1. Facsimile and electronic submissions are not authorized.
Proposals shall be mailed to:
Army Contracting Command - Redstone
ATTN: Dawn P. Patterson, CCAM-ALM
Bldg. 5303, 2nd Floor
Redstone Arsenal, AL 35898-5280
15. If any offeror chooses to hand carry their proposal, the offeror must reach the appointed location (identified as building 5300, 5300 Martin Road, Redstone Arsenal, AL 35898, Foyer) by the date and time as stated in block 9 on page 1 of the solicitation. Please be advised that Redstone Arsenal is a restricted facility and should an offeror choose to hand carry a proposal, a minimum of 72 hours
2 63
W58RGZ-17-R-0221
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
notice to the Contracting Officer is required in order to ensure access by the closing date/time of the solicitation. Any unauthorized entity must be identified as having a need, as validated by the Contracting Officer, in order to gain access to the post. The contracting office must notify the Gate personnel, who monitor post access, a minimum of 48 hours prior to an entity gaining entrance to the restricted post. Please note that any proposals delivered late as a result of failure to comply with the procedure will not be accepted, IAW FAR 52.212-1 entitled "Instructions to Offerors-Commercial Items".
16. The contractor is required to submit an M&O Plan in accordance with CDRL A003. The documentation shall be submitted within 30 days after contract award.
17. Reserved.
18. The contractor shall provide with their proposal a response that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools;
2. Confirmed requisitions for the required tools;
3. Confirmed arrangements for subcontracting the processes requiring the special tools; or
4. Specific plans describing their technical approach to develop equivalent tools.
19. The Contractor may be required to submit additional cost or pricing data if only one offer is received IAW DFARS Clause 252.215-
7008, entitled "Only One Offer".
20. The contractor is instructed to put the following words in the remarks column of the DD 250/WAWF: "Repair and Return Process D6".
21. Access to DLA FedMall (formerly EMALL) is NOT authorized. ___
22. The National Defense Authorization Act for Fiscal Year 1993, Public Law 102-484, Section 326, prohibits use of Other Direct Cost
(ODC) in Department of Defense contracts awarded on or after 1 June 1993, unless appropriate authority is granted.
23. The following websites are provided for the purpose of obtaining/reviewing various Army publications and technical manuals/bulletins:
A. - Technical Manuals and Bulletins
B. - DA Pamphlets and Army Regulations
24. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: _________________________________________
TELEPHONE NUMBER: _____________________________
FAX NUMBER: ___________________________________
E-MAIL ADDRESS: _______________________________
*** END OF NARRATIVE A0001 ***
3 63
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
CLIN 0001AA is for the Maintenance and
Overhaul (M&O) Plan and Product Verification
Audit (PVA) for the UH-60 Actuator, Output
NSN: 1680-01-571-7578.
PVA and M&O Plan CLIN for the following item:
INPUT NSN: 1680-01-571-7578
OUTPUT NSN: 1680-01-571-7578
INPUT P/Ns: 70400-06641-201, DL2155M31MOD1
OUTPUT P/N: DL2155M31MOD1
M&O Plan must be submitted and approved per
CDRL A003, Exhibit C, before PVA may be conducted.
PVA must be approved before overhaul may begin.
(End of narrative A001)
0001AA PRODUCT VERIFICATION AUDIT (PVA) FOR ACTUATOR $ _____________________________________________ __________________
SERVICE REQUESTED: PVA
CLIN CONTRACT TYPE:
Firm Fixed Price
THIS IS A FIRM FIXED PRICE CLIN_______________________________
This effort is for the performance of the M&O
Plan and the PVA for the NOUN: ACTUATOR, INPUT NSN: 1680-01-571-7578;
INPUT P/NS: 70400-06641-201, DL2155M31MOD1;
OUTPUT NSN: 1680-01-571-7578; OUTPUT P/N:
DL2155M31MOD1
The M&O Plan shall be completed IAW CONTRACT
DATA REQUIREMENT LIST (CDRL) A003, Exhibit C as shown in Section J, and submitted to this office withing 30 days after contract award date. PVA cannot occur until the M&O Plan is approved.
NOTE: A copy of the cover letter for the report shall be forwarded to the Contract
Specialist at:
U.S. ARMY AVIATION AND MISSILE COMMAND
ATTN: DAWN PATTERSON CCAM-ALM, BLDG
5303, 2nd FLOOR, REDSTONE ARSENAL, ALABAMA 35898-5000.
4 63
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
The PVA shall be IAW the Inspection and
Acceptance Section Narrative, PRODUCT
VERIFICATION AUDIT STATEMENT OF WORK.
The PVA shall be conducted 90 days after receipt of assets. The Contractor shall prepare three (3) units for PVA. Contractor is required to notify QUALITY via:
usarmy.redstone.rdecom-amrdec.mbx.qs-contracts@mail.mil and the Contractor
Specialist for the scheduling of the PVA.
CONTRACT SPECIALIST POC INFO: DAWN PATTERSON,
dawn.p.patterson2.civ@mail.mil
PVA Report: The report shall be submitted to the email address below:
usarmy.redstone.rdecom-amrdec.mbx.qs-contracts@mail.mil
NOTE: A copy of the cover letter for the PVA report shall be forwarded to the Contract
Specialist at the email address below:
dawn.p.patterson2.civ@mail.mil
PAYMENT INSTRUCTIONS: THE CONTRACTOR WILL BE
PAID FOR THE PVA BY UTILIZING THE WIDE AREA
WORK FLOW (WAWF) SITE. THE CONTRACTOR MUST
ENTER CODE W58H0Z.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0002 ACTUATOR
NSN: 1680-01-571-7578
Mfr CAGE: 12511
Mfr Part Number: DL2155M31M0D1
0002AA OVERHAUL OF THE UH-60 ACTUATOR (US QTY) $ $ _______________________________________ ______________ __________________
COMMODITY NAME: ACTUATOR
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is for the Overhaul of the UH-60 ________
Black Hawk, Actuator.
Input:
5 63
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
NSN: 1680-01-571-7578
P/Ns: 70400-06641-201, DL2155M31MOD1
Output:
NSN: 1680-01-571-7578
P/N: DL2155M31MOD1
(End of narrative B001)
Offeror is required to fill in proposed firm-fixed-unit price(s) for the ordering periods 1 to 5:
ORDERING PERIOD 1- U/P $____________ (FFP) Min
Qty 60 EA US
ORDERING PERIOD 2- U/P $____________ (FFP) Est
Qty 72 EA US
ORDERING PERIOD 3- U/P $____________ (FFP) Est
Qty 72 EA US
ORDERING PERIOD 4- U/P $____________ (FFP) Est
Qty 72 EA US
ORDERING PERIOD 5- U/P $____________ (FFP) Est
Qty 72 EA US
Overhaul is in accordance with the
Description/Specifications/Work Statement
Section, entitled Statement of
Work/Specifications - Contractor
Specifications.
This Firm-Fixed-Price (FFP) CLIN includes all labor charges, mandatory and non-mandatory replacement parts and material, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the
Description/Specifications/Work Statement
Section entitled Statement of
Work/Specifications - Contractor
Specifications.
Delivery of overhauled assets are in accordance with the Deliveries or Performance
Section.
THIS IS A FIRM-FIXED-PRICE CLIN.
(End of narrative B002)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
PACKAGING REQUIREMENTS
LOCATION OF PACKAGING/PACKING/SPECS:
ADDENDA: 01
LEVEL PRESERVATION: Military
6 63
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0003 ACTUATOR
NSN: 1680-01-571-7578
Mfr CAGE: 12511
Mfr Part Number: DL2155M31MOD1
0003AA OVERHAUL OF THE UH-60 ACTUATOR (FMS) $ $ ____________________________________ ______________ __________________
COMMODITY NAME: ACTUATOR
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is for the Overhaul of the UH-60 ________
Black Hawk, Actuator.
Input:
NSN: 1680-01-571-7578
P/Ns: 70400-06641-201, DL2155M31MOD1
Output:
NSN: 1680-01-571-7578
P/N: DL2155M31MOD1
(End of narrative B001)
This CLIN will be used only if a FMS customer requires this item. If no FMS customer(s) are identified, the United States Army requirer may utilize the FMS quantity. The estimated quantities are listed below. The FMS customer and geographical locations for deliveries, inspection and acceptance points are unknown at this time. FMS quantities cannot exceed 70 each.
Offeror is required to fill in proposed firm-fixed-unit price(s) for the ordering periods 1 to 5:
ORDERING PERIOD 1- U/P $____________ (FFP) Est
Qty 0 EA US
ORDERING PERIOD 2- U/P $____________ (FFP) Est
Qty 17 EA US
7 63
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
ORDERING PERIOD 3- U/P $____________ (FFP) Est
Qty 18 EA US
ORDERING PERIOD 4- U/P $____________ (FFP) Est
Qty 17 EA US
ORDERING PERIOD 5- U/P $____________ (FFP) Est
Qty 18 EA US
Overhaul is in accordance with the
Description/Specifications/Work Statement
Section, entitled Statement of
Work/Specifications - Contractor
Specifications.
This Firm-Fixed-Price (FFP) CLIN includes all labor charges, mandatory and non-mandatory replacement parts and material, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the
Description/Specifications/Work Statement
Section entitled Statement of
Work/Specifications - Contractor
Specifications.
Delivery of overhauled assets are in accordance with the Deliveries or Performance
Section.
THIS IS A FIRM-FIXED-PRICE CLIN.
(End of narrative B002)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
PACKAGING REQUIREMENTS
LOCATION OF PACKAGING/PACKING/SPECS:
ADDENDA: 01
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0004 SCRAP
0004AA SCRAP OF UH-60 ACTUATOR $ _______________________ __________________
8 63
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: SCRAP
CLIN CONTRACT TYPE:
Firm Fixed Price
THE GOVERNMENT'S ESTIMATED QUANTITY PER
ORDERING PERIOD IS 10 EACH FOR PROPOSAL
EVALUATION PURPOSES ONLY.
Offeror is required to fill in the proposed firm-fixed-unit prices for ordering periods 1 to 5:
ORDERING PERIOD 1 - U/P $____________ Est Qty
10 EA
ORDERING PERIOD 2 - U/P $____________ Est Qty
10 EA
ORDERING PERIOD 3 - U/P $____________ Est Qty
10 EA
ORDERING PERIOD 4 - U/P $____________ Est Qty
10 EA
ORDERING PERIOD 5 - U/P $____________ Est Qty
10 EA
Scrap assets from CLINs 0002AA, and 0003AA shall be in accordance with the
Description/Specifications/Work Statement
Section, entitled Statement of
Work/Specifications - Contractor
Specifications.
Units authorized to be scrapped in accordance with the Description/Specifications/Work
Statement Section shall be reflected as an increase in CLIN 0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA and 0003AA.
In the event the Procuring Contracting Officer
(PCO) determines that certain items should be scrapped, the contractor shall scrap such items at the fixed-unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.
The Government may, at its discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.
THIS IS A FIRM-FIXED-PRICE CLIN.
9 63
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B002)
Deliveries or Performance _________________________
0005 CONTAINERS
0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________
SERVICE REQUESTED: CONTAINERS
CLIN CONTRACT TYPE:
Firm Fixed Price
THE GOVERNMENT'S ESTIMATED QUANTITY PER ORDERING
PERIOD IS 10 EACH FOR PROPOSAL EVALUATION
PURPOSES ONLY.
Offeror is required to fill in proposed firm fixed unit prices for ordering periods 1 to 5:
ORDERING PERIOD 1 - U/P $____________ Est Qty 10
EA
ORDERING PERIOD 2 - U/P $____________ Est Qty 10
EA
ORDERING PERIOD 3 - U/P $____________ Est Qty 10
EA
ORDERING PERIOD 4 - U/P $____________ Est Qty 10
EA
ORDERING PERIOD 5 - U/P $____________ Est Qty 10
EA
The contractor shall provide the container in accordance with the
Description/Specifications/Work Statement
Section, entitled Statement of
Work/Specifications - Contractor Specifications and List of Attachments Section, Attachment 0001
Packaging Requirements.
The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.
The Contractor, IAW the
Description/Specifications/Work Statement
Section Statement of Work, should submit a
Report of Discrepancy (ROD) SF Form 364 through the Defense Contract Management Agency (DCMA)
10 63
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Quality Assurance Representative (QAR) for verification within 7 working days to the address shown on Exhibit B, Data Item A002.
When assets are received in unserviceable containers or without containers, approval of the PCO is required before replacement containers are purchased.
This CLIN covers containers for CLINs 0002AA and
0003AA.
THIS IS A FIRM-FIXED-PRICE CLIN.
(End of narrative B002)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0006 CONTRACT DATA REQUIREMENTS LIST (CDRLS) _______________________________________
Pricing for Data Items shall be included in the applicable unit price of CLINs 0002AA and
0003AA.
The contractor shall provide Data Items A001-
A006, in accordance with CDRLS, DD Form 1423, Section J, Exhibits A-F.
(End of narrative A001)
A001 THE ARMY MAINTENANCE MANAGEMENT SYSTEM - AVIATION _________________________________________________
(TAMMS-A) $ ** NSP ** _________ __________________
SERVICE REQUESTED: DATA ITEM A001
DATA ITEM A001 - DI-SESS-81758A - THE ARMY
MAINTENANCE MANAGEMENT SYSTEM - AVIATION (TAMMS-A) -
AS REQUIRED
(End of narrative B001)
Deliveries or Performance _________________________
11 63
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A002 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________
DISCREPANCY (ROD) $ ** NSP ** _________________ __________________
SERVICE REQUESTED: DATA ITEM A002
DATA ITEM A002 - DI-MGMT-80503 - REPORT OF SHIPPING
(ITEM) AND PACKAGING DISCREPANCY (ROD) - AS REQUIRED
(End of narrative B001)
Deliveries or Performance _________________________
A003 TECHNICAL REPORT - OVERHAUL (M&O) PLAN $ ** NSP ** ______________________________________ __________________
SERVICE REQUESTED: DATA ITEM A003
DATA ITEM A003 - DI-MISC-80508B - M&O PLAN (TECHNICAL
REPORT - STUDY/SERVICES) - SUBMIT 30 DAYS AFTER
CONTRACT (DAC) AWARD
(End of narrative B001)
Deliveries or Performance _________________________
A004 TECHNICAL REPORT - DD FORM 1348-1A $ ** NSP ** __________________________________ __________________
SERVICE REQUESTED: DATA ITEM A004
DATA ITEM A004 - DI-MISC-80508B - DD FORM 1348-1A
(TECHNICAL REPORT - STUDY/SERVICES) - AS REQUIRED
(End of narrative B001)
Deliveries or Performance _________________________
A005 QUALITY DEFICIENCY REPORT (QDR) $ ** NSP ** _______________________________ __________________
SERVICE REQUESTED: DATA ITEM A005
12 63
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DATA ITEM A005 - DI-QCIC-80736 - QUALITY DEFICIENCY
REPORT (QDR) - AS REQUIRED
(End of narrative B001)
Deliveries or Performance _________________________
A006 CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT $ ** NSP ** __________________________________________________ __________________
SERVICE REQUESTED: DATA ITEM A006
DATA ITEM A006 - DI-PSSS-81995 - CONTRACT DEPOT
MAINTENANCE (CDM) PRODUCTION REPORT - AS REQUIRED
(End of narrative B001)
Deliveries or Performance _________________________
13 63
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
TITLE_____ DATE____
1 STATEMENT OF WORK/SPECIFICATIONS - CONTRACTOR JUL/2001
SPECIFICATIONS
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools and data necessary to accomplish the inspection and Overhaul required to return the items as specified in Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the Overhaul, as applicable, the items shall be packaged as defined in Section D and
Attachment 0001 of this contract and shipped to the destination(s) specified in each individual delivery order.
b. Prior to commencement of Overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine the total cost of such Overhaul including labor, services, parts and materials. The Contractor shall continue the overhaul process on all end items when the total cost to overhaul does not exceed $12,735.00. The overhaul shown in Section B for CLINs 0002AA and 0003AA are
Firm-Fixed-Price (FFP). The Contractor will be required to complete the overhaul at the FFP on all end items regardless of the damage as long as the total cost to overhaul does not exceed $12,735.00. The Contractor will be required to provide other than certified cost and pricing data and a Report of Discrepancy (ROD) signed by the DCMA QAR to the Procuring Contracting Officer (PCO) to confirm that the total cost to overhaul will exceed $12,735.00. This data will include at minimum material cost (80% of material cost will be supported by current vendor quotes), labor hours, labor rates, overheads, G&A(s), and profit rate. More information to support the Contractor's price may be requested by the Government. In no event will any asset be scrapped prior to an approved modification by the PCO. No additional funding except for missing parts, if approved, will be provided to the Contractor to complete the overhaul of the end item.
The Government cannot guarantee the condition or configuration of the assets sent to the Contractor for overhaul.
c. In the event that the total contractor cost to overhaul is determined (approved by PCO) to exceed $12,735.00, the Contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the Contractor's approved
Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity.
d. Overhaul shall be accomplished IAW best commercial practices using contractor specifications (blueprints and drawings), processes and procedures. The Contractor shall notify the PCO through the cognizant ACO of any change or deviation from the list of specifications
(blueprints and drawings), processes and procedures provided by the Contractor with its proposal IAW the clause in Section L entitled, "Identification of Specifications, Processes and Procedures," and attached to this contract.
e. Reserved.
f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the
Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW Data Item A002, Exhibit B.
g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-23, with change 12, Painting and Marking of Army Aircraft.
h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibits A-F. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addressees indicated on the DD Form(s) 1423. All RODs and QDRs must be approved/signed by the DCMA QAR prior to submission.
i. Reserved.
j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall prepare TAMMS data IAW DI-SESS-81758 and the TAMMS instructions attached to the solicitation/contract. The Contractor shall complete the forms and records as specified in DA PAM 738-51, TB 1-1500-341-01, TM 1-1500-328-23, and Data Item A001, Exhibit A.
k. Reserved.
l. Reserved.
m. Reserved.
14 63
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
n. Inventory Transactions - The Contractor shall prepare the following reports:
1. The contractor shall prepare a Depot Maintenance Production Report IAW DI-PSSS-81995, Data Item A006, Exhibit F and Attachment
0006.
2. The contractor shall complete and maintain the DD Form 1348-1A receipt for reparables on all shipments IAW DI-MISC-80508, DD Form
1348-1A, and Data Item A004, Exhibit D. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22 (signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:
The contractor shall prepare this data to include the following corresponding receipt information:
A. National Stock Number (NSN) - (Positions 8-22)
B. Condition Code - (Position 71)
C. Unit Price - (Positions 74-80)
D. Total Price - (Block 1)
E. Actual Quantity Received - (Block 10)
F. Nomenclature - (Block 17)
G. Signature and Date - (Blocks 22 and 23)
An example of a 1348-1A filled out correctly is attached (See Attachment 0004).
If there are any questions with the above information please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
o. Reserved.
p. Reserved.
q. The Government reserves the right to replace any items scrapped.
r. Reserved.
s. The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736, Data Item A005, Exhibit E.
t. Reserved.
u. Shipping Containers, shall be utilized. Packaging requirements IAW instructions attached to the Solicitation/Contract, see Attachment
0001. The Contract must use a method of shipment that provides a procedure so that the package can be tracked in case the shipment is not received by AMCOM.
v. Maintenance & Overhaul (M&O) Plan Documentation: The Contractor shall provide documentation IAW DI-MISC-80508, Data Item A003, Exhibit C and Attachment 0003. The documentation shall include all legacy (existing) technical information, procedures, and processes
(e.g., Overhaul travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration (FAA) approved documentation) that the contractor utilized or will utilize in the overhaul of the item. The documentation may be in contractor format. The Contractor shall mark the documentation IAW the contract and provide for reproduction cost only.
*** END OF NARRATIVE C0001 ***
15 63
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PACKAGING AND MARKING
TITLE_____ DATE____
1 BAR CODE MARKING JUN/2003
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.Automatic Identification and Data
Capture Techniques - Bar Code Symbology Specification - Code 39.
*** END OF NARRATIVE D0001 ***
16 63
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996
3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2008 or Equivalent; any equivalent must be approved prior to award.
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
TITLE_____ DATE____
5 CALIBRATION JAN/2012
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National
Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test
Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International
Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.
*** END OF NARRATIVE E0001 ***
TITLE_____ DATE____
6 PRODUCT VERIFICATION AUDIT (PVA) STATEMENT DEC/2006
OF WORK
Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.
(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA as specified in this contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the
AMRDEC Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from
AMRDEC ED. The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the
"Changes" clause of the contract.
(b) The Contractor shall:
(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN:
QSContracts@amrdec.army.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United
States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
17 63
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(c) The initial PVA will be performed on one of the first three (3) items overhauled. The PVA candidate will be selected by the AMRDEC
PVA Team Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance
Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.
(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work
Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.
(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government acceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.
(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.
(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.
Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.
(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the
AMRDEC PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.
1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
2. Minor: In the event a minor defect is discovered, the following actions shall be taken:
a. The contractor shall isolate the cause of the defect and initiate corrective actions.
b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major
18 63
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
defect will apply.
3. Major: In the event a major defect is discovered, the following actions shall be taken:
a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.
b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to AMCOM.
d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.
4. Critical: In the event a critical defect is discovered, the following actions shall be taken:
a. All actions outlined in paragraph 3 above shall be completed.
b. Upon request, the contractor shall provide the AMRDEC Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).
c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant QAR to issue a Corrective Action Request.
(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and effective corrective action has been initiated to preclude reoccurrence of the defect.
(n). The contractor shall prepare and forward, through the cognizant government quality element, finalized audit reports within ten (10) working days after completion of the PVA to Commander, U.S. Army Research Development and Engineering Command, ATTN:
QSContracts@amrdec.army.mil, Redstone Arsenal, AL 35898-5000 and the Acquisition Center address as shown on Order 0001. (In the event reorganization changes this address, the contractor will be notified of the new, correct address by the CO). The report shall include:
1. Name and location of contractor
2. Contract number or equivalent
3. Descriptive noun, national stock number, part number, and serial number of the item audited
4. Complete description of each audit finding, with corrective action taken, and action taken to prevent recurrence.
5. The audit report shall be signed, as a minimum, by the contractor's quality manager or his designated representative.
Objections, accompanied with explanations, on any audit finding(s) shall be specifically annotated and forwarded to AMCOM for resolution. Objection by the contractor as to the existence of a defect or as to its classification will be resolved by the PVA
Chairman. Further non-concurrence will be referred to the PCO for final resolution IAW the clause entitled "Disputes" as stated in the contract.
(o) The AMRDEC PVA Chairman will acknowledge receipt of the Final Audit Report and complete the following within 10 working days of receipt:
1. Review the Final PVA Report for compliance and completeness
2. Review the report for acceptance/rejection of corrective action and actions taken to prevent recurrence.
3. Forward a written reply to the AMCOM CO and/or cognizant government quality element, recommending acceptance or rejection of the Final Audit Report.
19 63
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
4. If the Final Audit Report is disapproved, the Contractor shall repeat any or all PVA tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the
Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver a revised report to the Government under the terms and conditions and within the time specified by the Government. These actions must be coordinated with the cognizant government QAR. The Government shall take action on this report within 10 working days. The
Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(p) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after approval of the Final Audit Report, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted. Notification is required 10 business days prior to shipment of the next delivery.
(q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon acceptance of the Final
Audit Report. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.
(r) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(s) Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1)
Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(t) In cases where this PVA is a part of the Source Approval Request (SAR) process, the process planning will be considered approved upon receipt of an approval memorandum from AMRDEC Aviation Engineering Directorate (AED). If the component is a Critical Safety Item
(CSI), see those specific contract clauses for other requirements that may also be audited during the PVA. PVA approval is contingent on contractor submission and AED approval of changes to manufacturing planning, to correct defects identified during PVA.
(u) Unless otherwise specified…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.