SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W58RGZ-16-R-0308

X

2017APR03

2017MAY31

DOA1

2017APR03 SEE SCHEDULE

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

ANDREW CAMERON

(256)842-7478

CCAM-AL-M

ANDREW.E.CAMERON.CIV@MAIL.MIL

1 78

X 1

X 5 X 15

X 26 X 27 X 31

X 41

X 44

X 47

X 58

X 59

X 65

X 76

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: ANDREW CAMERON

Buyer Office Symbol/Telephone Number: CCAM-AL-M/(256)842-7478

Type of Contract 1: Firm Fixed Price

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

Notice to Offerors Flight Safety Parts Requiring Engineering Testing

(a) The parts being procured under this solicitation are identified as flight safety parts requiring engineering testing. In accordance with the Army policy pertaining to such parts, this procurement is limited to only those sources (1) who have been approved in accordance with AMCOM (previously ATCOM) source approval procedures and (2) whose part has successfully completed all required engineering testing. Notwithstanding the fact that the technical data package may list sources who have not been tested, only those sources listed in Section B are eligible for award.

(b) By submitting an offer/bid/quote, the contractor certifies that (1) parts representative of the parts it will deliver have previously been subjected to and have passed all requisite engineering testing and (2) the critical manufacturing processes that will be used to produce the parts are either unchanged since the representative parts were tested or that changes in critical manufacturing processes have been approved by the Government in accordance with QE-STD-1 or other Government approved standard. The contractor agrees to provide any and all pertinent documentation which the Government deems necessary to show compliance with the foregoing requirements.

THE TRAILING ARM ASSEMBLY IS A CRITICAL SAFETY ITEM (CSI). CONTRACTS FOR OVERHAUL OF CSI ITEMS CAN ONLY BE AWARDED TO A SOURCE APPROVED

BY THE HEAD OF THE DESIGN CONTROL ACTIVITY. THIS REQUIREMENT IS RESTRICTED TO THE FOLLOWING APPROVED SOUCES OF OVERHAUL:

-The Boeing Company (CAGE code 8V613)

-MOOG Inc. (CAGE code 0UES3)

THIS WILL BE A 5 YEAR FIRM-FIXED-PRICE INDEFINITE DELIVERY INDEFINTIE QUANTITY (IDIQ) CONTRACT PURSUANT TO FAR 52.216-22.

NO GOVERNMENT FURNISHED MATERIAL (GFM) OTHER THAN THE REPARABLES WILL BE PROVIDED.

ACCESS TO DLA EMALL IS NOT AUTHORIZED.

THE GOVERNMENT IS ONLY OBLIGATED TO PURCHASE THE MINIMUM QUANTITY. SUBJECT TO THE AVAILABILITY OF FUNDS, ANY QUANTITIES ORDERED WILL BE

PRICED AT THE UNIT PRICE ESTABLISHED FOR THE ORDERING PERIOD IN WHICH THEY ARE ORDERED. FUNDS SHALL BE OBLIGATED BY ISSUANCE OF DELIVERY

ORDERS AND NOT BY THE CONTRACT ITSELF.

SHIPPING INSTRUCTIONS WILL BE PROVIDED IN EACH INDIVIDUAL DELIVERY ORDER.

THE CONTRACTOR IS REQUIRED TO SUBMIT A FROZEN PLAN IN ACCORDANCE WITH (IAW) "FLIGHT SAFETY PARTS CRITICAL CHARACTERISTICS MAINTENANCE

AND OVERHAUL QE-STD-2," PARAGRAPH 6.1.2. THE DOCUMENTATION SHALL BE SUBMITTED WITHIN 30 DAYS AFTER CONTRACT AWARD.

THE CONTRACTOR MAY BE REQUESTED TO SUBMIT ADDITIONAL COST OR PRICING DATA IF ONLY ONE OFFER IS RECEIVED IAW DFARS CLAUSE 252.215-7008, ENTITLED "ONLY ONE OFFER."

THE YEARLY ESTIMATED QUANTITIES LISTED HEREIN DO NOT COMMIT THE GOVERNMENT TO ORDERING THAT OR ANY QUANTITY ABOVE THE MINIMUM QUANTITY.

AH-64 (D/E)

NOUN: TRAILING ARM ASSEMBLY

INPUT AND OUTPUT NSNs & PART NUMBERs (P/Ns)___________________________________________

INPUT NSN: 1620-01-147-4776

INPUT P/N: 1168320-102

OUTPUT NSN: 1620-01-147-4776

OUTPUT P/N: 1168320-102

MINIMUM QUANTITY: 10

2 78

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

MAXIMUM QUANTITY: 60

THE MAXIMUM QUANTITY INCLUDES 70 EACH FOR EACH PRID RESERVED FOR FOREIGN MILITARY SALES (FMS). HOWEVER, IF NO FMS CUSTOMERS REQUIRE THIS

ITEM, THE UNITED STATES ARMY REQUIRE MAY UTILIZE THE FMS QUANTITY.

US QUANTITIES (CLIN 0002) FOR ORDERING PERIODS 1 THRU 5 ARE AS FOLLOWS:

ORDERING PERIOD 1 _10_ MINIMUM __

ORDERING PERIOD 2 _10_ ESTIMATED __

ORDERING PERIOD 3 _10_ ESTIMATED __

ORDERING PERIOD 4 _10_ ESTIMATED __

ORDERING PERIOD 5 _10_ ESTIMATED __

FMS QUANTITIES (CLIN 0003) FOR ORDERING PERIODS 1 THRU 5 ARE AS FOLLOWS:

ORDERING PERIOD 1 _02_ ESTIMATED ___

ORDERING PERIOD 2 _02_ ESTIMATED __

ORDERING PERIOD 3 _02_ ESTIMATED __

ORDERING PERIOD 4 _02_ ESTIMATED __

ORDERING PERIOD 5 _02_ ESTIMATED __

THE MINIMUM QUANTITY SET FORTH HEREIN SHALL BE OBLIGATED ON DELIVERY ORDER 0001, TO BE ISSUED SIMULTANEOUSLY WITH THE AWARD OF THE

CONTRACT. ANY ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE FIRM FIXED PRICE IN EFFECT DURING THE ORDERING PERIOD IN WHICH THEY

ARE ORDERED.

ALL ORDERING PERIODS ARE IN INCREMENTS OF 12 MONTHS FROM THE DATE OF AWARD.

ORDERING PERIODS ARE AS FOLLOWS:________________________________

THE FIRST ORDERING PERIOD IS FROM DATE OF CONTRACT AWARD THROUGH 365 DAYS AFTER CONTRACT AWARD.

THE SECOND ORDERING PERIOD IS FROM 366 DAYS AFTER CONTRACT AWARD THROUGH 730 DAYS AFTER CONTRACT AWARD.

THE THIRD ORDERING PERIOD IS FROM 731 DAYS AFTER CONTRACT AWARD THROUGH 1095 DAYS AFTER CONTRACT AWARD.

THE FOURTH ORDERING PERIOD IS FROM 1096 DAYS AFTER CONTRACT AWARD THROUGH 1460 DAYS AFTER CONTRACT AWARD.

THE FIFTH ORDERING PERIOD IS FROM 1461 DAYS AFTER CONTRACT AWARD THROUGH 1825 DAYS AFTER CONTRACT AWARD.

PLEASE INSERT YOUR FIRM FIXED UNIT PRICE FOR THE 1st, 2nd, 3rd, 4th, and 5th YEAR IN THE SPACES PROVIDED UNDER EACH CLIN/SUBCLIN.

NOTE: THE OFFERORS ATTENTION IS CALLED TO THE PROCEDURES FOR RECEIPT OF REPARABLES WHICH FOLLOWS AND IS ALSO IN SECTION G.

AN ELECTRONIC COPY OF DD FORM 1348-1A FOR ALL SHIPMENTS OF REPARABLES SHALL BE FORWARDED TO 1) THE EMAIL ADDRESS IN BLOCK 9 ON PAGE 1 OF

THE BASIC CONTRACT/DELIVERY ORDER/MODIFICATION AND ALSO TO 2) usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil. THE DD FORM 1348-1A

SHALL ANNOTATE TO WHICH CONTRACT/DELIVERY ORDER THE ASSETS WILL BE APPLIED AS REPARABLES.

ALL PROPOSALS/RESPONSES SHALL INCLUDE A SPECIAL TOOLING AND TEST EQUIPMENT SECTION THAT ADDRESSES THE CONTRACTOR'S PLAN TO MEET ALL

GOVERNMENT SPECIAL TOOLING AND TEST EQUIPMENT REQUIREMENTS WITH EITHER:

1. PHYSICAL POSSESSION OF THE REQUIRED TOOLS.

2. CONFIRMED REQUISITIONS FOR THE REQUIRED TOOLS.

3. CONFIRMED ARRANGEMENTS FOR SUBCONTRACTING THE PROCESSES REQUIRING THE SPECIAL TOOLS OR,

4. SPECIFIC PLANS DESCRIBING THEIR TECHNICAL APPROACH TO DEVELOP EQUIVALENT TOOLS.

THE NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 1993, PUBLIC LAW 102-484, SECTION 326, PROHIBITS USE OF ODC IN DEPARTMENT OF

DEFENSE CONTRACTS AWARDED ON OR AFTER 01 JUNE 1993, UNLESS APPROPRIATE AUTHORITY IS GRANTED.

WHEN APPLICABLE, THE CONTRACTOR IS REMINDED TO COMPLETE THE FOREIGN MILITARY SALES (FMS) CUSTOMER DA FORM 2410 (COMPONENT REMOVAL AND

REPAIR OVERHAUL RECORD), SUBMITTED WITH THE ITEM FOR REPAIR, IN ACCORDANCE WITH DA PAMPHLET 738-751 AND TB-1500-341-01. UPON COMPLETION

3 78

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

OF REPAIR, IF AUTHORIZED, THE CONTRACTOR IS REMINDED TO FILL OUT DA FORM 2410 AND RETURN IT TO THE FMS CUSTOMER WITH THE REPAIRED

ASSET(S), ALONG WITH THE FMS CUSTOMER VERSION OF THE DA FORM 2410.

THE CONTRACTOR SHALL REPORT PRODUCTION STATUS REQUIREMENTS IAW CDRL DI-ALSS-80728A. THE FOLLOWING WEBSITES ARE PROVIDED FOR THE PURPOSE

OF OBTAINING/REVIEWING VARIOUS ARMY PUBLICATIONS AND TECHNICAL MANUALS/BULLETINS:

A. HTTPS://WWW.LOGSA.ARMY.MIL/ETMS/ONLINE.HTM - TECHNICAL MANUALS AND BULLETINS

B. HTTP://WWW.USAPA.ARMY.MIL - DA PAMPHLETS AND ARMY REGULATIONS

ELECTRONIC SUBMISSION OF PROPOSALS IS NOT AUTHORIZED. ___

PROPOSALS SHALL BE MAILED TO:

ARMY CONTRACTING COMMAND - REDSTONE

ATTN: ANDREW E. CAMERON

CCAM-AL-M, BLDG 5303, 2nd FLOOR

REDSTONE ARSENAL, AL 35898-5280

COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: ________________________________

TELEPHONE NUMBER: ____________________

FAX NUMBER: __________________________

E-MAIL ADDRESS: ______________________

IF ANY OFFEROR CHOOSES TO HAND CARRY THEIR PROPOSAL, THE OFFEROR MUST REACH THE APPOINTED LOCATION (IDENTIFIED AS BUILDING 5303, 5300

MARTIN ROAD, REDSTONE ARSENAL, AL 35898, FOYER) BY THE DATE AND TIME AS STATED IN BLOCK 9 ON PAGE 1 OF THE SOLICITATION. PLEASE BE

ADVISED THAT REDSTONE ARSENAL IS A RESTRICTED FACILITY AND SHOULD AN OFFEROR CHOOSE TO HAND CARRY A PROPOSAL, A MINIMUM OF 72 HOURS

NOTICE TO THE CONTRACTING OFFICER IS REQUIRED IN ORDER TO ENSURE ACCESS BY THE CLOSING DATE/TIME OF THE SOLICITATION. ANY UNAUTHORIZED

ENTITY MUST BE IDENTIFIED AS HAVING A NEED, AS VALIDATED BY THE CONTRACTING OFFICER, IN ORDER TO GAIN ACCESS TO THE POST. THE

CONTRACTING OFFICE MUST NOTIFY THE GATE PERSONNEL, WHO MONITOR POST ACCESS, A MINIMUM OF 48 HOURS PRIOR TO AN ENTITY GAINING ENTRANCE TO

THE RESTRICTED POST. PLEASE NOT THAT ANY PROPOSALS DELIVERED LATE AS A RESULT OF FAILURE TO COMPLY WITH THE PROCEDURE WILL NOT BE

ACCEPTED, IAW FAR 52.215-1 ENTITLED "INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION".

*** END OF NARRATIVE A0001 ***

4 78

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PVA

THE CONTRACTOR IS REQUIRED TO SUBMIT A FROZEN PLAN

IN ACCORDANCE WITH THE NARRATIVE ENTITLED, "FLIGHT

SAFETY PARTS CRITICAL CHARACTERISTICS MAINTENANCE

AND OVERHAUL QE-STD-2, PARAGRAPH 6.1.2 AND EXHIBIT D

DATA ITEM A004. THE DOCUMENTATION SHALL BE

SUBMITTED 30 DAYS AFTER CONTRACT AWARD.

THE FROZEN PLAN MUST BE SUBMITTED AND APPROVED_______________________________________________

BEFORE PVA MAY BE CONDUCTED. PVA MUST BE APPROVED__________________________________________________

BEFORE OVERHAUL MAY BEGIN.__________________________

(End of narrative A001)

0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________

SERVICE REQUESTED: PVA

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN represents the Product Verification Audit

(PVA) for the Trailing Arm Assembly, output NSN: 1620-

01-147-4776, as shown in CLINs 0002AA, and 0003AA.

This is a Firm Fixed Price CLIN.

Offeror is required to fill in a proposed firm fixed unit price for the PVA:

PVA shall be in accordance with The "Product

Verification Audit (PVA) Statement of Work".

PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the

Government Quality Office for scheduling of the PVA by email to the following address:

QS-Contracts@amrdec.army.mil

With copy emailed to the Contract Specialist at:

andrew.e.cameron.civ@mail.mil

The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.

NOTE: A copy of the cover letter for the report

5 78

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

shall be forwarded to the Contract Specialist at:

U.S. Army Contracting Command - Redstone

Bldg 5303, 2nd Floor

ATTN: CCAM-AL-M, Andrew E. Cameron

Redstone Arsenal, Alabama 35898-5000 or emailed to:

andrew.e.cameron.civ@mail.mil

PVA requires approval prior to Government acceptance of contract deliverable assets.

Failure to pass the PVA may lead to Termination for____________________________________________________

Default of the contract.________________________

Payment Instructions: The Contractor will go into_____________________

Wide Area Work Flow (WAWF) to receive payment for the

PVA. The Contractor shall use DODAAC W58H0Z when submitting the PVA invoice in WAWF, making it to the attention of Jeanie Clark. The Contracting Officer will approve the PVA invoice.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0002 TRAILING ARM ASSEMBLY

NSN: 1620-01-147-4776

Mfr CAGE: 8V613

Mfr Part Number: 1168320-102

0002AA OVERHAUL TRAILING ARM ASSEMBLY (US) $ $ ___________________________________ ______________ __________________

COMMODITY NAME: TRAILING ARM ASSEMBLY

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0002AA are:

Ordering Period 1: 10 each estimated qty

Ordering Period 2: 10 each estimated qty

Ordering Period 3: 10 each estimated qty

Ordering Period 4: 10 each estimated qty

Ordering Period 5: 10 each estimated qty

6 78

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

The minimum quantity to be issued as delivery order 0001 is 10 assets.

Funds for the ordering period 1 quantity set forth herein shall be obligated on delivery order

0001, to be issued simultaneously with the award of the firm fixed price contract.

This is a Critical Safety Item. Attached Critical

Characteristics apply.

(End of narrative B001)

INPUT:

NSN: 1620-01-147-4776, P/N: 1168320-102

OUTPUT:

NSN: 1620-01-147-4776, P/N: 1168320-102

Overhaul shall be in accordance with the

'Statement of Work/Specifications -

Contractor Specifications' found in section

C.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition, as specified in

Section C, Statement Of Work.

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Min Qty 10 ea

YEAR 2- U/P $_____________ (FFP) Est Qty 10 ea

YEAR 3- U/P $_____________ (FFP) Est Qty 10 ea

YEAR 4- U/P $_____________ (FFP) Est Qty 10 ea

YEAR 5- U/P $_____________ (FFP) Est Qty 10 ea

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

7 78

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the "Delivery Schedule" and "Delivery of

Additional Quantities," found in section F, for

Government Required Delivery Schedule.

(End of narrative F001)

0003 TRAILING ARM ASSEMBLY

NSN: 1620-01-147-4776

Mfr CAGE: 8V613

Mfr Part Number: 1168320-102

0003AA OVERHAUL TRAILING ARM ASSEMBLY (FMS) $ $ ____________________________________ ______________ __________________

COMMODITY NAME: TRAILING ARM ASSEMBLY

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0003AA are:

Ordering Period 1: 2 each estimated qty

Ordering Period 2: 2 each estimated qty

Ordering Period 3: 2 each estimated qty

Ordering Period 4: 2 each estimated qty

Ordering Period 5: 2 each estimated qty

This CLIN will be used only if a FMS Customer

Requires this item. If no FMS Customers are identified, the US Army Requirer may utilize the

FMS quantity.

This is a Critical Safety Item. Attached Critical

Characteristics apply.

(End of narrative B001)

INPUT:

NSN: 1620-01-147-4776,

8 78

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

P/N: 1168320-102

OUTPUT:

NSN: 1620-01-147-4776,

P/N: 1168320-102

Overhaul shall be in accordance with the

'Statement of Work/Specifications -

Contractor Specifications' in section C.

Attached Critical Characteristics apply.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the items to a serviceable condition, as specified in Section C, Statement Of Work.

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Est Qty 2 ea, FMS

YEAR 2- U/P $_____________ (FFP) Est Qty 2 ea, FMS

YEAR 3- U/P $_____________ (FFP) Est Qty 2 ea, FMS

YEAR 4- U/P $_____________ (FFP) Est Qty 2 ea, FMS

YEAR 5- U/P $_____________ (FFP) Est Qty 2 ea, FMS

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

9 78

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

FOB POINT: Origin

Refer to the "Delivery Schedule" and "Delivery of

Additional Quantities," found in section F, for

Government Required Delivery Schedule.

(End of narrative F001)

0004 TRAILING ARM ASSEMBLY

0004AA SCRAP $ ______________________ __________________

SERVICE REQUESTED: TRAILING ARM ASSEMBLY

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for assets which are beyond economical repair(i.e., scrap) from CLINs

0002AA, and/or 0003AA.

The Government's estimated quantity per ordering period is 10 each.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $____________ EACH

Ordering Period 2 $____________ EACH

Ordering Period 3 $____________ EACH

Ordering Period 4 $____________ EACH

Ordering Period 5 $____________ EACH

Scrapped assets from CLINs 0002AA, and/or 0003AA shall be in accordance with Section C, entitled

Statement of Work Specifications - Contractor

Specifications.

Units determined to be scrapped in accordance with Section C shall be reflected as an increase in CLIN 0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA, and/or

0003AA as applicable.

In the event the Procuring Contracting Officer

(PCO) determines that certain items shall be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.

10 78

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

The Government may, at it's discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.

Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0005 TRAILING ARM ASSEMBLY

0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: TRAILING ARM ASSEMBLY

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for contractor furnished containers for CLINs 0002AA, and/or 0003AA.

Wood Packaging Material (WPM) must be ISPM-15 compliant.

The Government estimates that a quantitiy of 10

EACH will be required for each of the ordering periods.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $____________ EACH

Ordering Period 2 $____________ EACH

Ordering Period 3 $____________ EACH

Ordering Period 4 $____________ EACH

Ordering Period 5 $____________ EACH

The contractor shall provide the container in

11 78

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

accordance with Attachment 0001 - M&O Packaging

Instructions and Section C, entitled Statement of Work/Specifications - Contractor

Specificationsand reusable containers.

The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.

The Contractor, IAW Section C Statement of Work, shall submit a Report of Discrepancy (ROD) SF

Form 364 through the DCMA QAR for verification within 7 working days to the address shown on

Data Item A001. Assets received in W58RGZ-16-R-

0308 with an unserviceable container, or without a container, require prior approval of the PCO before containers can be purchased.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0006 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________

This CLIN is "Not Separately Priced" (NSP). Pricing for data shall be included in the unit prices of

CLINs 0002AA, and 0003AA.

The Contractor shall provide Data Items A001 - A004 in accordance with the Contract Data Requirements

List, Exhibits A, B, C, and D.

(End of narrative A001)

A001 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________

DISCREPANCY $ ** NSP ** ___________ __________________

SERVICE REQUESTED: DATA ITEM A001

DATA ITEM A001 - DATA ACQUISITION DOCUMENT NUMBER :

DI-MGMT-80503 (AS REQUIRED)

Submission of the Report of Shipping and Packaging

Discrepancy shall occur within 10 days of discovering the discrepancy. Refer to attachments

0003 (Standard Form 364) and 0004 (Report of

12 78

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Discrepancy Guidance) for completing the Report of

Discrepancy.

(End of narrative C001)

Deliveries or Performance _________________________

A002 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________

SERVICE REQUESTED: DATA ITEM A002

DATA ITEM A002 - DATA ACQUISITION DOCUMENT NUMBER :

DI-QCIC-80736 (AS REQUIRED)

No report is necessary unless there is a deficiency.

Contractor shall submit NO LATER THAN 10 days after discovery of deficiency.

(End of narrative C001)

Deliveries or Performance _________________________

A003 CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT $ ** NSP ** __________________________________________________ __________________

SERVICE REQUESTED: DATA ITEM A003

DATA ITEM A003 - DATA ACQUISITION DOCUMENT NUMBER :

DI-PSSS-81995

Date of first submission is 5 working days after receipt of reparables.

Frequency of submission is monthly.

Data shall be prepared in accordance with Attachment

0005, Template for Depot Maintenance Production

Report, and submitted to the following email addresses:

usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil

(End of narrative C001)

13 78

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Deliveries or Performance _________________________

A004 TECHNICAL REPORT - STUDY/SERVICES $ ** NSP ** _________________________________ __________________

SERVICE REQUESTED: DATA ITEM A004

DATA ITEM A004 - DATA ACQUISITION DOCUMENT NUMBER :

DI-MISC-80508B(AS REQUIRED)

Data Item A004 refers to the Frozen M&O Plan as outlined in the Statement of Work Contractor

Specifications, paragraph V. The M&O Plan shall be submitted to this office within 30 days after contract award date. PVA cannot occur until the

Frozen Plan is submitted and approved.

For a sample of a (Frozen) M&O Plan, please visit the following link:

http://amcomdmz.redstone.army.mil/casl_cmo/casldba.ca sl_cmo_samsar; and select "AMCOM Maintenance and

Overhaul (M&O) SAR" then "Example M&O Plan".

When the contractor makes a change to the plan (as frozen at the time the

PVA is approved by the Government or, when a PVA is not required, prior to induction of the first overhaul, repair, upgrade, modification or recapitalization asset) that affects a critical characteristic, submit copy of the revised plan to the Government, for review and comments, within

30 days after the date of the change. As required, revised the plan based on the Government's review and comments and resubmit to the government within 30 days of Government's comments.

Note: A copy of the plan shall be forwarded to the contract specialist at:

U.S. ARMY Contracting Command - Redstone

ATTN: Andrew Cameron, CCAM-ALM

5300 Martin Road

Bldg 5303, 2nd Floor

Redstone Arsenal, AL 35898-5000

(End of narrative C001)

Deliveries or Performance _________________________

14 78

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

Statement of Work/Specifications Contractor Specifications

a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul for Trailing Arm Assembly that is required to return the items as specified by Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul, as applicable, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s) specified in each individual delivery order.

b. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine the complete cost to overhaul. The Contractor shall continue the overhaul process on all end items when the total cost to overhaul does not exceed $16,937.31. The overhaul line items shown in section B are firm-fixed price. The contractor will be required to complete the overhaul on all end items regardless of the damage as long as the total contractor cost to overhaul does not exceed $16,937.31. The contractor will be required to provide data other than certified cost and pricing data and a report of discrepancy signed by the DCMA

QAR to the Procuring Contracting Officer (PCO) to confirm the total cost to overhaul will exceed $16,937.31. This data will include at minimum material cost (80% of material cost will be supported by current vendor quotes), labor hours, labor rates, overheads, G&A, and profit rate. More information to support the contractor's price may be requested by the Government. In no event will an asset be scrapped prior to an approved modification by the Contracting Officer. No additional funding except for missing parts will be provided to the contractor to complete the overhaul of the end item. The Government cannot guarantee the condition of the assets sent to the

Contractor for overhaul.

c. In the event that the total contractor cost to overhaul is determined (approved by PCO) to exceed $16,937.31, the contractor shall scrap such assets at the fixed unit price in CLIN 0004AA of section B hereof and make disposition in accordance with (IAW) the contractor's approved Government property procedures. Such scrapped items shall count toward the minimum quantities ordered hereunder.

The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity. Any item other than those determined to be scrapped must be overhauled at the firm fixed price in the awarded contract.

d. Overhaul shall be accomplished IAW the contractor's overhaul specifications and drawings.

e. Critical Safety Item: The overhaul shall comply with the critical characteristics identified as an attachment to the solicitation/contract.

f. Upon receipt of the repairables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503.

g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental

Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-

23, w/chg 12, Painting and Marking of Army Aircraft.

h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibit A. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423.

i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with the PVA SOW found in section C of the solicitation/contract.

j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall prepare TAMMS data IAW DI-SESS-81758 and the

TAMMS instructions attached to the solicitation/contract. The Contractor shall complete the forms and records as specified in DA PAM 738-

751.

k. Serial Number Report Requirement (SNRR): N/A

l. The items the Contractor shall overhaul are identified below:

Input NSN P/N

1620-01-147-4776 1168320-102

Output NSN P/N

1620-01-147-4776 1168320-102

15 78

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

m. The overhaul planned quantity for 5 years is minimum 10, maximum 60. Input will be 30 days after receipt of order

(ARO). Output shall be as specified in the solicitation/contract schedule. Serviceable assets shall be returned to W62G2T.

n. Inventory Transactions - The contractor prepare a Contract Depot Maintenance Production Report IAW DI-PSSS-81995. The contractor shall also complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW DI-MISC-80508 and DD Form 1348-1A. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22 (signature), and Block 23

(date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:

http://www.acq.osd.mil/dpap/ccap/cc/jcchb/files/formspubsregs/dod_funding_documents/dd13481a.pdf

The contractor shall prepare this data to include the following corresponding receipt information:

A. National Stock Number (NSN) - (Positions 8-22)

B. Condition Code - (Position 71)

C. Unit Price - (Positions 74-80)

D. Total Price - (Block 1)

E. Actual Quantity Received - (Block 10)

F. Nomenclature - (Block 17)

G. Signature and Date - (Blocks 22 and 23)

If there are any questions with the above information please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil

o. Reserved

p. Reserved.

q. The Government reserves the right to replace any items scrapped.

r. Overhaul Repair Report: N/A

s. Quality Deficiency Report: The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736.

t. Supplier Interface and Oversight: The Contractor shall prepare the Process Plan IAW DI-MISC-80508, QE-STD-2, and the M&O Plan

Description and Guidance Instructions. See http://amcomdmz.redstone.army.mil/casl_cmo/casldba.casl_cmo_samsar and select "AMCOM

Maintenance and Overhaul (M&O) SAR."

u. Shipping Containers: Wood Packaging Material (WPM) must be ISPM-15 compliant. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.

*** END OF NARRATIVE C0001 ***

QE-STD-1

REVISION D

1 OCT 96

FLIGHT SAFETY PARTS

CRITICAL CHARACTERISTICS

NEW MANUFACTURE

QE-STD-1

Paragraph

Purpose------------------------------------- 1.0

Scope--------------------------------------- 2.0

References---------------------------------- 3.0

Definitions--------------------------------- 4.0

Policy-------------------------------------- 5.0

Requirements-------------------------------- 6.0

Manufacturing Planning---------------------- 6.1

Plan Content-------------------------------- 6.1.1

Frozen Planning Requirements---------------- 6.1.2

Changes to Frozen Planning------------------ 6.1.3

Audits-------------------------------------- 6.2

16 78

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Critical Characteristics-------------------- 6.3

Inspection of Critical Characteristics------ 6.3.1

Variability Reduction Methods--------------- 6.3.2

NonConforming Critical Characteristics------ 6.3.3

Contradictory Critical Characteristics------ 6.3.4

Delivered Nonconformances------------------- 6.3.5

Records------------------------------------- 6.4

Traceability of Records--------------------- 6.4.1

Purchasing Records-------------------------- 6.4.2

Retention of Records------------------------ 6.4.3

Certification of Personnel------------------ 6.5

Tolerance of Measurement & Test Equipment--- 6.6

Serialization------------------------------- 6.7

1.0 PURPOSE: To establish the minimum level of activity that is required to manufacture Flight Safety Parts (FSPs) containing ________

Manufacturing Critical Characteristics (CCs). Requirements established herein are intended to establish and maintain the integrity of

CCs throughout the manufacturing process.

2.0 SCOPE: This document is to be used in conjunction with other contractually specified quality requirements. This document shall ______ apply to all FSPs.

3.0 REFERENCES: ___________

a. ANSI/ASQC B1,B2,B3-1996

b. ISO 10012-1

c. Competition Advocate's Shopping List (CASL)

d. AMCOM Regulation 702-7 Flight Safety Critical Aircraft Parts/New Source Testing Program Management

4.0 DEFINITIONS: ____________

a. FSP (Airframe): Any part, assembly, or installation containing a critical characteristic (CC) whose failure, malfunction, or _______________ absence could cause loss of or serious damage to the aircraft, and/or serious injury or death to the occupants.

b. FSP (Engine): Any part, assembly, or installation containing a critical characteristic whose failure, malfunction, or absence _____________ could cause an uncommanded engine shut down, and/or an uncontained engine failure resulting in loss of, or serious damage to the aircraft and/or serious injury or death to the occupants.

c. Critical Characteristic: Any feature throughout the life cycle of a FSP, such as dimension, finish, material or assembly, ________________________ manufacturing or inspection process, installation, operation, field maintenance, or depot overhaul requirement which if nonconforming, missing or degraded could cause the failure or malfunction of the FSP.

d. Approved Source: A manufacturer or vendor who has satisfied, prior to contract award, all AMCOM source approval requirements ________________ as set forth in the CASL to include, if applicable, engineering testing requirements (fatigue, endurance, and/or interchangeability).

5.0 POLICY: AMCOM will only procure Flight Safety Parts from approved sources. So as to maintain the integrity and quality of these _______ critical spare parts, manufacturers of FSPs, components, sub-assemblies, and assemblies are required to adhere to the requirements of this document in its entirety. If a contractor has difficulty in maintaining process control as evident through such things as internal management audits, customer audits, the receipt of quality deficiency reports for parts previously supplied to AMCOM et. al., this will require immediate corrective action for the current contract and could affect the award of future contracts to that contractor.

6.0 REQUIREMENTS: All requirements of this document (paras. 6.1 - 6.7) shall be complied with by a contractor receiving a contract to _____________ produce FSPs. If a process or processes that involve a CC is subcontracted, this document must be imposed, in its entirety, on the subcontractor performing the work.

6.1 MANUFACTURING PLANNING: _______________________

6.1.1 PLAN CONTENT: All manufacturing, assembly, and inspection points shall be controlled by detailed procedures outlining each step _____________ or parameter of the process along with any materials, tooling, equipment, environmental control, and operator certification required that leads to the specific production of an end item. Plans shall clearly identify all CCs and will include identification, in accordance with contractor procedures, as to its particular revision. All process plans shall clearly define sequence of operation, 17 78

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

machine type, and accept/reject limits for the specific process or operation. Critical processes not easily verified by subsequent inspection shall clearly define process operating parameters with tolerances.

6.1.2 FROZEN PLANNING REQUIREMENTS: The contractor is responsible for developing manufacturing planning. Review and control of these ____________________________ plans will be the responsibility of the Contractor's Control Board (CCB) consisting of qualified personnel equipped with adequate resources to assure development of complete, reliable, and traceable documentation. Parts manufactured utilizing these plans shall meet all contractual requirements. Plans developed for FSPs shall be frozen when:

a. In the case of FSPs not requiring engineering testing, under the first production contract for the FSP at such time a successful First Article Test is completed, or at the start of production if FAT is not required.

b. In the case of FSPs requiring engineering test, at the time articles are manufactured which successfully meet the engineering test requirements.

Once frozen, plans shall remain frozen throughout the existing contract and all subsequent contracts for the item unless changes to the planning are made in accordance with this standard.

6.1.3 CHANGES TO FROZEN PLANNING: The portion of the frozen manufacturing plan pertaining to a CC shall not be changed without prior ___________________________

CCB recommendation, justification to AMCOM, and receipt of approval by the Procuring Contracting Officer (PCO). Changes not affecting critical characteristics or occurring as the result of an AMCOM approved Engineering Change Proposal (ECP), require CCB approval only.

All changes to frozen planning affecting CCs will be submitted to AMCOM. When the item, CC, or process is produced by a subcontractor, the planning shall be reviewed and approved by the contractor, and be subject to the same restrictions as above.

6.2 AUDITS: Contractors are to perform self-audits of their frozen planning when that planning applies to CCs produced or verified in _______ house. At a minimum, audits will be performed at the start of each production contract, annually, and when process changes occur. It is incumbent upon the prime contractor to assure that subcontractors accomplish self-audits, and the prime shall maintain records verifying that their vendors are in full compliance with the audit requirement. All audit findings will be recorded and corrective action will be documented.

6.3 CRITICAL CHARACTERISTICS: _________________________

6.3.1 INSPECTION OF CRITICAL CHARACTERISTICS: All CCs which can be nondestructively inspected/tested shall be subjected to 100 percent _______________________________________ inspection by the contractor or subcontractor. Critical characteristics which require destructive testing are to be tested on a lot or batch basis, with no skip lots allowed. All inspection records shall identify the FSP part number, serial or lot number, and characteristic inspected. Critical characteristics shall be identified on the inspection records in such a manner as to draw attention to them. Inspection records shall reflect the exact readings or dimensions, date of inspection, identity of inspector, and any required inspection certification. These requirements are in addition to other contractual requirements.

6.3.2 VARIABILITY REDUCTION METHODS: Once the program demonstrates that the critical processes are statistically in control, stable, _______________________________ and capable, the contractor may submit to the PCO for approval its documentation with a request to implement a Statistical Process

Control (SPC) program in lieu of 100 percent inspection. This approval authority may be delegated to the Defense Contract Management

Agency (DCMA) by the PCO in which case AMCOM will be informed of any approval or suspension of SPC. At the Government's discretion, 100 percent inspection may be reinstated if the process controls prove inadequate.

6.3.3 NONCONFORMING CRITICAL CHARACTERISTICS: Nonconformances of CCs shall not be dispositioned "use as is" or "repair" through _______________________________________ contractor action, rework to print is acceptable. Waivers or deviations may be requested as specified in the contract. Request for waivers or deviations of CCs shall be classified as critical and will be forwarded to AMCOM for approval/disapproval.

6.3.4 CONTRADICTORY CRITICAL CHARACTERISTICS: Contradictions between the AMCOM FSP Spares Technical Data Package (STDP) list of _______________________________________ critical characteristics and the drawing/specifications shall not be resolved by the order of precedence paragraph in the STDP. The ___ contractor shall notify the PCO immediately and any work pertaining to the critical characteristic in question shall be stopped until a written resolution to the contradiction is issued to the contractor from the PCO.

6.3.5 DELIVERED NONCONFORMANCES: Contractors shall notify the PCO immediately of any discovered nonconformances that may exist in __________________________ previously delivered FSPs. Notification is required whether or not the characteristic in question has been classified as a critical characteristic. Notification shall include a description of the suspected nonconformance, contract number, part number, and affected serial numbers or lot numbers, when applicable.

6.4 RECORDS: ________

6.4.1 TRACEABILITY OF RECORDS: All records relating to FSPs shall be traceable to the date and place of production. Records shall ________________________ provide the degree of traceability required to enable subsequent verification of all aspects of material, manufacture, special process, personnel certification, variability control charts (if applicable), assembly, and inspection of CCs. Special processes include but are not limited to heat treat, shotpeening, and nondestructive testing.

18 78

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

6.4.2 PURCHASING RECORDS: All purchase orders for subcontracted products or processes that contain CCs must clearly identify the CC ___________________ and reference this document for compliance. All documents and referenced data for FSPs shall be available for review by the Government to determine compliance.

6.4.3 RETENTION OF RECORDS: The contractor shall retain copies of all records generated pursuant to this standard and make these _____________________ records available to the Government upon request. Records shall be retained for a period of at least five years after the contractor ceases to manufacture the part for which this standard applies. At the end of this period, or in the event of relocation or shutdown, all records shall be offered to the PCO prior to disposal.

6.5 CERTIFICATION OF PERSONNEL: Contractor personnel performing work or having inspection responsibilities pertaining to CCs, shall be ___________________________ certified to the appropriate professional level as outlined in the applicable national standards, best commercial practices, or as contractually required. A system for tracking personnel certification shall be an element in the contractor internal audit program to assure all certifications are maintained in a current status.

6.6 TOLERANCE OF MEASURING & TEST EQUIPMENT (M&TE): M&TE used to inspect FSPs must be discriminate to within ten percent of the total _______________________________________________ tolerance spread for the feature being inspected except as follows: for total tolerance spreads of less than .001, M&TE must be discriminate to twenty percent of the spread.

6.7 SERIALIZATION: All FSPs require individual serialization or identification by lot number for traceability. The contractor shall ______________ request either approval of or assignment of a block of serial numbers (S/Ns) by AMCOM. Serialization shall occur so that any individualized inspection/process that involves a critical characteristic is traceable to a specific S/N. All S/Ns approved for issue or provided by AMCOM shall be accounted for; this includes material scrapped during manufacturing. Serial numbers used in this program shall not be used on any other part manufactured by that contractor. Reporting of the S/Ns to the PCO shall be in accordance with contractual requirements.

QE-STD-2

REVISION A

4 OCT 96

FLIGHT SAFETY PARTS

CRITICAL CHARACTERISTICS

MAINTENANCE & OVERHAUL

QE-STD 2

Paragraph

Purpose--------------------------------------- 1.0

Scope----------------------------------------- 2.0

References------------------------------------ 3.0

Definitions----------------------------------- 4.0

Policy---------------------------------------- 5.0

Requirements---------------------------------- 6.0

Planning-------------------------------------- 6.1

Plan Content---------------------------------- 6.1.1

Frozen Planning Requirements------------------ 6.1.2

Changes to Frozen Planning-------------------- 6.1.3

Audits---------------------------------------- 6.2

Critical Characteristics---------------------- 6.3

Inspection of Critical Characteristics-------- 6.3.1

Nonconforming Critical Characteristics-------- 6.3.2

Contradictory Critical Characteristics-------- 6.3.3

Delivered Nonconformances--------------------- 6.3.4

Records--------------------------------------- 6.4

Traceability of Records----------------------- 6.4.1

Purchasing Records---------------------------- 6.4.2

Retention of Records-------------------------- 6.4.3

Certification of Personnel-------------------- 6.5

Measurement & Test Equipment------------------ 6.6

Calibration----------------------------------- 6.6.1

Tolerance-------------------------------------…