Final_Solicitation_W58RGZ-16-R-0125.pdf
PDF 170 KB Posted
- Solicitation number
- W58RGZ-16-R-0125
About this file
Solicitation
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W58RGZ-16-R-0125
X
2017JUN21
2017JUL31
DOA1
2017JUN21 SEE SCHEDULE
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
ANDREW CAMERON
(256)842-7478
CCAM-AL-M
ANDREW.E.CAMERON.CIV@MAIL.MIL
1 70
X 1
X 5 X 16
X 24 X 25 X 29
X 39
X 41
X 44
X 51
X 53
X 59
X 69
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ANDREW CAMERON
Buyer Office Symbol/Telephone Number: CCAM-AL-M/(256)842-7478
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
Title_____ Date________
NOTICE TO OFFERORS - FLIGHT SAFETY PARTS FEB/1996
REQUIRING ENGINEERING TESTING
(a) The parts being procured under this solicitation are identified as flight safety parts requiring engineering testing. In accordance with the Army policy pertaining to such parts, this procurement is limited to only those sources (1) who have been approved in accordance with AMCOM (previously ATCOM) source approval procedures and (2) whose part has successfully completed all required engineering testing. Notwithstanding the fact that the technical data package may list sources who have not been tested, only those sources listed in Section B are eligible for award.
(b) By submitting an offer/bid/quote, the contractor certifies that (1) parts representative of the parts it will deliver have previously been subjected to and have passed all requisite engineering testing and (2) the critical manufacturing processes that will be used to produce the parts are either unchanged since the representative parts were tested or that changes in critical manufacturing processes have been approved by the Government in accordance with QE-STD-1 or other Government approved standard. The contractor agrees to provide any and all pertinent documentation which the Government deems necessary to show compliance with the foregoing requirements.
*** END OF NARRATIVE A0001 ***
1. This item is a Critical Safety Item (CSI). __________________________________________
2. This is a five (5) year Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to FAR 52.216-22
3. There is a Depot Maintenance Work Requirement for the overhaul/repair of the Housing, Assembly, Pitch; however, this requirement is for items that have been classified as CSI, and is therefore restricted to approved sources. The Boeing Company (CAGE Code: 8V613) and
PCX Aerostructures, LLC (Cage Code: 82001) are the only approved sources. No other sources have the capabilities in place to accomplish this overhaul effort.
4. When Applicable, the contractor is reminded to complete the Foreign Military Sales (FMS) Customer DA FORM 2410 (Component Removal and Repair Overhaul Record), submitted with the item for repair, in accordance with DA Pamphlet 738-751 and TB-1500-341-01. Upon completion of repair, if authorized, the contractor is reminded to fill out U.S. Army DA Form 2410 and return it to the FMS customer with the repaired asset(s), along with the FMS customer version of the DA Form 2410.
5. The FMS Customer and geographical location(s) for deliveries, inspection and acceptance points are unknown at this time.
6. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of Delivery Orders and not by the contract itself.
7. The minimum quantity set forth herein shall be obligated on Delivery Order (DO) 0001, to be issued simultaneously with the award of the contract. Any additional quantities ordered will be priced at the firm fixed price in effect during the ordering period in which they are ordered.
8. The Government will not be required to obtain the contractor's signature prior to the issuance of an order.
9. The Government intends to award only one basic Fixed Price IDIQ contract as a result of this solicitation.
10. The Government has segregated the estimated quantities into five ordering periods. However, this does not preclude exercising the
Government's right under FAR 52.216-19 by ordering the maximum quantity specified in FAR 52.216-19(b)(1) at any time during the five year ordering period.
Ordering Period 1 will be from date of contract award through 365 days after contract award (DACA).
Ordering Period 2 will be from 366 DACA through 730 DACA.
Ordering Period 3 will be from 731 DACA through 1,095 DACA.
Ordering Period 4 will be from 1,096 DACA through 1,460 DACA.
2 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Ordering Period 3 will be from 1,461 DACA through 1,825 DACA.
11. Please insert your firm fixed unit prices for the 1st, 2nd, 3rd, 4th, and 5th ordering periods in the spaces provided under each
CLIN/SubCLIN.
12. For purposes of Block 12 on page 1, the offer acceptance period is 120 days from the date for receipt of offers specified in Block
9, unless a different period is inserted by the offeror in the blank in Block 12.
13. No Government Furnished Materials (GFM), other than the reparable assets and reusable containers, will be provided.
14. Offers shall be submitted in accordance with FAR Clause 52.215-1. Facsimile and electronic submissions are not authorized.
Proposals shall be mailed to:
Army Contracting Command - Redstone
ATTN: Andrew E. Cameron, CCAM-ALM
Bldg. 5303, 2nd Floor
Redstone Arsenal, AL 35898-5280
15. If any offeror chooses to hand carry their proposal, the offeror must reach the appointed location (identified as building 5300, 5300 Martin Road, Redstone Arsenal, AL 35898, Foyer) by the date and time as stated in block 9 on page 1 of the solicitation. Please be advised that Redstone Arsenal is a restricted facility and should an offeror choose to hand carry a proposal, a minimum of 72 hours notice to the Contracting Officer is required in order to ensure access by the closing date/time of the solicitation. Any unauthorized entity must be identified as having a need, as validated by the Contracting Officer, in order to gain access to the post. The contracting office must notify the Gate personnel, who monitor post access, a minimum of 48 hours prior to an entity gaining entrance to the restricted post. Please note that any proposals delivered late as a result of failure to comply with the procedure will not be accepted, IAW FAR 52.215-1 entitled "Instructions to Offerors-Competitive Acquisition".
16. The Contractor is required to submit a Frozen Plan in accordance with CDRL A005 and (IAW) Clause C-3, AFARS 52.209-4012, "Flight
Safety Parts Critical Characteristics Maintenance and Overhaul QE-STD-2, Paragraph 6.1.2. The documentation shall be submitted within
30 days after contract award (DACA).
17. The Contractor shall flow down the critical characteristics and QE-STD-1 to all suppliers of Critical Safety Items (CSI).
18. The contractor shall provide with their proposal a response that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
19. The Contractor may be requested to submit additional cost or pricing data if only one offer is received IAW DFARS Clause 252.215-
7008, entitled "Only One Offer."
20. The contractor is instructed to put the following words in the remarks column of the DD 250/WAWF: "Repair and Return Process D6".
21. Access to DLA EMALL is NOT authorized. ___
22. The National Defense Authorization Act for Fiscal Year 1993, Public Law 102-484, Section 326, prohibits use of Other Direct Cost
(ODC) in Department of Defense contracts awarded on or after 1 June 1993, unless appropriate authority is granted.
23. The following websites are provided for the purpose of obtaining/reviewing various Army publications and technical manuals/bulletins:
A. https://www.logsa.army.mil/etms/online.cfm - Technical Manuals and Bulletins
B. http://www.apd.army.mil/ - DA Pamphlets and Army Regulations
24. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: _________________________________________
TELEPHONE NUMBER: _____________________________
3 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
FAX NUMBER: ___________________________________
E-MAIL ADDRESS: _______________________________
25. Special Processes, Test Procedures, and/or Instructions:
(a) Shot peening is a critical characteristic. Shot peen process/procedure from an AMCOM-approved source shall meet requirements of WP
0067 00 and MEO T7673A.
(b) Heat treated condition/inspection (ref. WP 0022 00) for visual evidences of heat oxidation is a critical characteristic.
(c) Florescent Penetrant Inspection (FPI) shall conformed ASTM 1417 and TM 1-1500-264-23 and performed to WP 0058 00.
26. The Prime or OEM is required to submit a Frozen Plan 30 days after contract award to Engineering Directorate (ED) and Aviation
Engineering Directorate (AED). The Frozen Plan will be reviewed and require approval by ED and AED prior to government acceptance of contract deliverable assets.
*** END OF NARRATIVE A0002 ***
4 70
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
THE CONTRACTOR IS REQUIRED TO SUBMIT A FROZEN PLAN
IN ACCORDANCE WITH THE NARRATIVE ENTITLED, "FLIGHT
SAFETY PARTS CRITICAL CHARACTERISTICS MAINTENANCE
AND OVERHAUL QE-STD-2, PARAGRAPH 6.1.2 AND EXHIBIT E
DATA ITEM A005. THE DOCUMENTATION SHALL BE
SUBMITTED 30 DAYS AFTER CONTRACT AWARD.
THE FROZEN PLAN MUST BE SUBMITTED AND APPROVED_______________________________________________
BEFORE PVA MAY BE CONDUCTED. PVA MUST BE APPROVED__________________________________________________
BEFORE OVERHAUL MAY BEGIN.__________________________
(End of narrative A001)
0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________
SERVICE REQUESTED: PVA
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN represents the Product Verification Audit
(PVA) for the Housing, Assembly, Pitch, output NSN:
1615-01-507-5295, as shown in CLINs 0002AA and
0003AA.
This is a Firm Fixed Price CLIN.
Offeror is required to fill in a proposed firm fixed unit price for the PVA:
PVA shall be in accordance with The "Product
Verification Audit (PVA) Statement of Work".
PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the
Government Quality Office for scheduling of the PVA by email to the following address:
QS-Contracts@amrdec.army.mil
With copy emailed to the Contract Specialist at:
andrew.e.cameron.civ@mail.mil
The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.
5 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:
U.S. Army Contracting Command - Redstone
Bldg 5303, 2nd Floor
ATTN: CCAM-AL-M, Andrew E. Cameron
Redstone Arsenal, Alabama 35898-5000 or emailed to:
andrew.e.cameron.civ@mail.mil
PVA requires approval prior to Government acceptance of contract deliverable assets.
Failure to pass the PVA may lead to Termination for____________________________________________________
Default of the contract.________________________
Payment Instructions: The Contractor will go into_____________________
Wide Area Work Flow (WAWF) to receive payment for the
PVA. The Contractor shall use DODAAC W58H0Z when submitting the PVA invoice in WAWF, making it to the attention of Jeanie Clark. The Contracting Officer will approve the PVA invoice.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0002 HOUSING, ASSEMBLY, PITCH
NSN: 1615-01-507-5295
Mfr CAGE: 8V613
Mfr Part Number: 7-311411215-19
0002AA OVERHAUL/REPAIR HOUSING, ASSEMBLY, PITCH (US) $ $ _____________________________________________ ______________ __________________
COMMODITY NAME: HOUSING, ASSEMBLY, PITCH
CLIN CONTRACT TYPE:
Firm Fixed Price
Estimated yearly quantities for CLIN 0002AA are:
Ordering Period 1: 75 each minimum qty
Ordering Period 2: 75 each estimated qty
Ordering Period 3: 75 each estimated qty
Ordering Period 4: 75 each estimated qty
Ordering Period 5: 75 each estimated qty
6 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Funds for the ordering period 1 quantity set forth herein shall be obligated on delivery order 0001, to be issued simultaneously with the award of the firm fixed price contract.
This is a Critical Safety Item. Attached
Critical Characteristics apply.
(End of narrative B001)
INPUT:
NSN: 1615-01-507-5295, P/N: 7-311411215-19
OUTPUT:
NSN: 1615-01-507-5295, P/N: 7-311411215-19
Overhaul/Repair shall be in accordance with the
'Statement of Work/Specifications-Government
Specifications' found in section C.
This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to overhaul the input assets, as specified in Section C, Statement Of Work.
OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT
PRICE:
YEAR 1- U/P $_____________ (FFP) Min Qty 75 ea
YEAR 2- U/P $_____________ (FFP) Est Qty 75 ea
YEAR 3- U/P $_____________ (FFP) Est Qty 75 ea
YEAR 4- U/P $_____________ (FFP) Est Qty 75 ea
YEAR 5- U/P $_____________ (FFP) Est Qty 75 ea
INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR
THIS CLIN.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW MIL-STD-2073-1
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
For Packaging Instructions refer to section J
Attachment 0001, Packaging Instructions.
(End of narrative D001)
7 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
Refer to the "Delivery Schedule" and "Delivery of
Additional Quantities," found in section F, for
Government Required Delivery Schedule.
(End of narrative F001)
0003 HOUSING, ASSEMBLY, PITCH
NSN: 1615-01-507-5295
Mfr CAGE: 8V613
Mfr Part Number: 7-311411215-19
0003AA OVERHAUL/REPAIR HOUSING, ASSEMBLY, PITCH (FMS) $ $ ______________________________________________ ______________ __________________
COMMODITY NAME: HOUSING, ASSEMBLY, PITCH
CLIN CONTRACT TYPE:
Firm Fixed Price
Estimated yearly quantities for CLIN 0003AA are:
Ordering Period 1: 15 each estimated qty
Ordering Period 2: 15 each estimated qty
Ordering Period 3: 15 each estimated qty
Ordering Period 4: 15 each estimated qty
Ordering Period 5: 15 each estimated qty
This CLIN will be used only if a FMS Customer
Requires this item. If no FMS Customers are identified, the US Army Requirer may utilize the
FMS quantity.
This is a Critical Safety Item. Attached Critical
Characteristics apply.
(End of narrative B001)
INPUT:
NSN: 1615-01-507-5295, P/N: 7-311411215-19
OUTPUT:
NSN: 1615-01-507-5295, P/N: 7-311411215-19
Overhaul/Repair shall be in accordance with the 'Statement of Work/Specifications-
Government Specifications' in section C.
Attached Critical Characteristics apply.
8 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to overhaul the input assets, as specified in Section C, Statement Of Work.
OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT
PRICE:
YEAR 1- U/P $_____________ (FFP) Est Qty 15 ea, FMS
YEAR 2- U/P $_____________ (FFP) Est Qty 15 ea, FMS
YEAR 3- U/P $_____________ (FFP) Est Qty 15 ea, FMS
YEAR 4- U/P $_____________ (FFP) Est Qty 15 ea, FMS
YEAR 5- U/P $_____________ (FFP) Est Qty 15 ea, FMS
INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS
CLIN.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW MIL-STD-2073-1
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
For Packaging Instructions refer to section J
Attachment 0001, Packaging Instructions.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
Refer to the "Delivery Schedule" and "Delivery of
Additional Quantities," found in section F, for
Government Required Delivery Schedule.
(End of narrative F001)
9 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0004 SCRAP
0004AA SCRAP $ ______ __________________
SERVICE REQUESTED: SCRAP
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is for assets which are beyond economical repair (i.e., scrap) from CLINs
0002AA and/or 0003AA.
The Government's estimated quantity per ordering period is 10 each.
Offeror is required to fill in a proposed firm fixed unit price for each ordering period:
Ordering Period 1 $____________ EACH
Ordering Period 2 $____________ EACH
Ordering Period 3 $____________ EACH
Ordering Period 4 $____________ EACH
Ordering Period 5 $____________ EACH
Scrapped assets from CLINs 0002AA and/or
0003AA, shall be in accordance with Section C, entitled Statement of Work Specifications -
Government Specifications.
Units determined to be scrapped in accordance with Section C shall be reflected as an increase in CLIN 0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA and/or
0003AA, as applicable.
In the event the Procuring Contracting Officer
(PCO) determines that certain items shall be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.
The Government may, at it's discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a
10 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
contractual modification for a unit.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0005 CONTAINERS
0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________
SERVICE REQUESTED: CONTAINERS
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is for contractor furnished containers for CLINs 0002AA and/or 0003AA.
P/N: 13414-102
NSN: 8145-00-514-2798
PM=ZZ=11 on bushings
The Government estimates that a quantitiy of 10
EACH will be required for each of the ordering periods.
Offeror is required to fill in a proposed firm fixed unit price for each ordering period:
Ordering Period 1 $____________ EACH
Ordering Period 2 $____________ EACH
Ordering Period 3 $____________ EACH
Ordering Period 4 $____________ EACH
Ordering Period 5 $____________ EACH
The contractor shall provide the container in accordance with Attachment 0001 - M&O Packaging
Requirements and Section C, entitled Statement of Work/Specifications - Government
Specificationsand reusable containers.
The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in
11 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
unserviceable containers or received without containers.
The Contractor, IAW Section C Statement of Work, shall submit a Report of Discrepancy (ROD) SF
Form 364 through the DCMA QAR for verification within 7 working days to the address shown on
Data Item A001. Assets received with an unserviceable container, or without a container, require prior approval of the PCO before containers can be purchased.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0006 CONTRACTOR DATA REQUIREMENTS LIST (CDRL) ________________________________________
This CLIN is "Not Separately Priced" (NSP). Pricing for data shall be included in the unit prices of
CLINs 0002AA and 0003AB.
The Contractor shall provide Data Items A001 - A005 in accordance with the Contract Data Requirements
List, Exhibits A, B, C, D, and E.
(End of narrative A001)
A001 REPORT OF SHIPPING AND PACKAGING DISCREPANCY $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: DATA ITEM A001
DATA ITEM A001 - DATA ACQUISITION DOCUMENT NUMBER :
DI-MGMT-80503 (AS REQUIRED)
Submission of the Report of Shipping and Packaging
Discrepancy shall occur within 10 days of discovering the discrepancy. Refer to attachments
0003 (Standard Form 364) and 0004 (Report of
Discrepancy Guidance) for completing the Report of
Discrepancy.
(End of narrative C001)
Deliveries or Performance _________________________
12 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A002 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________
SERVICE REQUESTED: DATA ITEM A002
DATA ITEM A002 - DATA ACQUISITION DOCUMENT NUMBER :
DI-QCIC-80736 (AS REQUIRED)
No report is necessary unless there is a deficiency.
Contractor shall submit NO LATER THAN 10 days after discovery of deficiency.
(End of narrative C001)
Deliveries or Performance _________________________
A003 DEPOT MAINTENANCE PRODUCTION REPORT $ ** NSP ** ___________________________________ __________________
SERVICE REQUESTED: DATA ITEM A003
DATA ITEM A003 - DATA ACQUISITION DOCUMENT NUMBER :
DI-PSSS-81995
Date of first submission is 5 working days after receipt of reparables.
Frequency of submission is monthly.
Data shall be prepared in accordance with Attachment
0005, Template for Depot Maintenance Production
Report, and submitted to the following email addresses:
usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
(End of narrative C001)
Deliveries or Performance _________________________
A004 LOGISTICS PRODUCT DATA - TAMMS-A $ ** NSP ** ________________________________ __________________
SERVICE REQUESTED: DATA ITEM A004
13 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DATA ITEM A004 - DATA ACQUISITION DOCUMENT NUMBER DI-
SESS-81758A
The contractor shall provide data as required based upon delivery schedules and contract requirements.
Within two business days after a Government QA acceptance the contractor shall submit a copy of the
Wide Area Work Flow (WAWF) receiving reports listing each Serial Number (SN) shipped via e-mail to the address listed below. A final receiving report for each Delivery Order (DO) and or contract closeout shall be via submittal to WAWF; use DODAAC W81D17.
The Requiring Office will verify final accounting of all TAMMS-A data reported against the contract/DO and verify that all TAMMS-A data has been received.
Any discrepancies will be identified within 5 working days after receipt and comments provided to the contractor. The contractor shall correct errors and resubmit within 10 working days after receipt of the requiring office comments.
TAMMS-A submittal/approval shall be via contractor/vendors use of the TAMMS-A/MCDS web portal https://tamms-a.redstone.army.mil. If the web portal is unavailable or the contractor currently does not have a TAMMS-A/MCDS account, see the
Statement of Work attachments for additional instructions.
(End of narrative C001)
Deliveries or Performance _________________________
A005 FROZEN PLAN - TECHNICAL REPORT - STUDY&SERVICES $ ** NSP ** _______________________________________________ __________________
SERVICE REQUESTED: DATA ITEM A005
DATA ITEM A005 - DATA ACQUISITION DOCUMENT NUMBER :
DI-MISC-80508B(AS REQUIRED)
Data Item A005 refers to the Frozen M&O Plan as outlined in the Statement of Work Government
Specifications, paragraph V. The M&O Plan shall be submitted to this office within 30 days after contract award date. PVA cannot occur until the M&O
Plan is submitted and approved.
For a sample of a M&O Plan, please visit the following link:
http://amcomdmz.redstone.army.mil/casl_cmo/casldba.ca sl_cmo_samsar; and select "AMCOM Maintenance and
14 70
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Overhaul (M&O) SAR" then "Example M&O Plan".
When the contractor makes a change to the plan (as frozen at the time the
PVA is approved by the Government or, when a PVA is not required, prior to induction of the first overhaul, repair, upgrade, modification or recapitalization asset) that affects a critical characteristic, submit copy of the revised plan to the Government, for review and comments, within
30 days after the date of the change. As required, revised the plan based on the Government's review and comments and resubmit to the government within 30 days of Government's comments.
Note: A copy of the plan shall be forwarded to the contract specialist at:
U.S. ARMY Contracting Command - Redstone
ATTN: Andrew Cameron, CCAM-ALM
5300 Martin Road
Bldg 5303, 2nd Floor
Redstone Arsenal, AL 35898-5000
(End of narrative C001)
Deliveries or Performance _________________________
15 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C-1 Statement of Work/Specifications Government Specifications
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul/repair for Housing, Assembly, Pitch that is required to return the items as specified by Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul/repair, as applicable, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s) specified in each individual delivery order.
b. Prior to commencement of overhaul/repair, the Contractor shall disassemble and inspect the item to the extent necessary to determine the complete cost to overhaul/repair. The Contractor shall continue the overhaul/repair process on all end items when the total cost to overhaul/repair does not exceed $5,662.81. The overhaul/repair line items shown in section B are firm-fixed price. The contractor will be required to complete the overhaul/repair on all end items regardless of the damage as long as the total contractor cost to overhaul/repair does not exceed $5,662.81. The contractor will be required to provide data other than certified cost and pricing data and a report of discrepancy signed by the DCMA QAR to the Procuring Contracting Officer (PCO) to confirm the total cost to overhaul/repair will exceed $5,662.81. This data will include at minimum material cost (80% of material cost will be supported by current vendor quotes), labor hours, labor rates, overheads, G&A, and profit rate. More information to support the contractor's price may be requested by the Government. In no event will an asset be scrapped prior to an approved modification by the Contracting Officer.
No additional funding except for missing parts will be provided to the contractor to complete the overhaul/repair of the end item. The firm fixed prices in the overhaul/repair CLINs must include/cover all mandatory and non-mandatory parts as required by the Depot
Maintenance Work Requirement (DMWR); however, PCO approval is required prior to the purchase of missing parts. The Government cannot guarantee the condition of the assets sent to the Contractor for overhaul/repair.
c. In the event that the total contractor cost to overhaul/repair is determined (approved by PCO) to exceed $5,662.81, the contractor shall scrap such assets at the fixed unit price in CLIN 0004AA of section B hereof and make disposition in accordance with
(IAW) the contractor's approved Government property procedures. Such scrapped items shall count toward the minimum quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity. Any item other than those determined to be scrapped must be overhauled/repaired at the firm fixed price in the awarded contract.
d. Overhaul/repair shall be accomplished IAW Depot Maintenance Work Requirement (DMWR) DMWR-1-1615-312, Dated
07/09/2010, Change #1, and Maintenance Engineering Orders C4598, C4659D, E1349, E1392, E1459, E1471, E1479A, E1480A, E1513, E1515, E1516, E1517, E1520A, E1521, E1522, E1523, E1524, E1525, E1526, E1527, E1528, E1529, E1530, E1531, E1532, E1533, E1534A, E1535, E1536, E1537, E1538, E1539, E1540, E1541, E1542, E1543, E1544A, E1545, E1547, E1577, E1618, E1632, E1649, E1653, E1678, E1680, E1692, E1698, T1356D, T5412, T5588, T6320, T6941, T7666A, T7671, T7672, T7673A, T7675, T7678A, T7722, and
T7723A (Attachments 0010 - 0066).
e. Critical Safety Item: The overhaul/repair shall comply with the critical characteristics identified as an attachment to the solicitation/contract (Attachment 0068).
f. Upon receipt of the repairables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503 (Exhibit A).
g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental
Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-
23, w/chg 12, Painting and Marking of Army Aircraft.
h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibits A - E. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423. All RODs must be approved by the DCMA QAR prior to submission.
i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with the PVA SOW found in section E of the solicitation/contract.
j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall prepare TAMMS data IAW DI-SESS-81758 and the
TAMMS instructions attached to the solicitation/contract. The Contractor shall complete the forms and records as specified in DA PAM 738-
751, TB 1-1500-341-01, TM 1-1500-328-23.
k. Serial Number Report Requirement (SNRR): N/A
16 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
l. The items the Contractor shall repair are identified below:
Input NSN P/N
1615-01-507-5295 7-311411215-19
Output NSN P/N
1615-01-507-5295 7-311411215-19
m. Reserved.
n. Inventory Transactions - The contractor shall prepare the following reports:
1. The contractor shall prepare a Contract Depot Maintenance Production Report IAW DI-PSSS-81995.
2. The contractor shall complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW DI-MISC-80508 and DD Form
1348-1A. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22 (signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:
http://www.acq.osd.mil/dpap/ccap/cc/jcchb/files/formspubsregs/dod_funding_documents/dd13481a.pdf
The contractor shall prepare this data to include the following corresponding receipt information:
A. National Stock Number (NSN) - (Positions 8-22)
B. Condition Code - (Position 71)
C. Unit Price - (Positions 74-80)
D. Total Price - (Block 1)
E. Actual Quantity Received - (Block 10)
F. Nomenclature - (Block 17)
G. Signature and Date - (Blocks 22 and 23)
If there are any questions with the above information please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
o. Reserved
p. Reserved.
q. The Government reserves the right to replace any items scrapped.
r. Overhaul Repair Report: N/A
s. Quality Deficiency Report: The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736 (Exhibit B).
t. Supplier Interface and Oversight: The Contractor shall prepare the Process Plan IAW DI-MISC-80508, QE-STD-2, and the M&O Plan
Description and Guidance Instructions. See http://amcomdmz.redstone.army.mil/casl_cmo/casldba.casl_cmo_samsar and select "AMCOM
Maintenance and Overhaul/repair (M&O) SAR."
u. Shipping Containers NSN: 8145-00-514-2798, P/N: 13414-102 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.
*** END OF NARRATIVE C0001 ***
QE-STD-1
REVISION D
1 OCT 96
C-2 FLIGHT SAFETY PARTS
CRITICAL CHARACTERISTICS
NEW MANUFACTURE
QE-STD-1
Paragraph
Purpose------------------------------------- 1.0
Scope--------------------------------------- 2.0
17 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
References---------------------------------- 3.0
Definitions--------------------------------- 4.0
Policy-------------------------------------- 5.0
Requirements-------------------------------- 6.0
Manufacturing Planning---------------------- 6.1
Plan Content-------------------------------- 6.1.1
Frozen Planning Requirements---------------- 6.1.2
Changes to Frozen Planning------------------ 6.1.3
Audits-------------------------------------- 6.2
Critical Characteristics-------------------- 6.3
Inspection of Critical Characteristics------ 6.3.1
Variability Reduction Methods--------------- 6.3.2
NonConforming Critical Characteristics------ 6.3.3
Contradictory Critical Characteristics------ 6.3.4
Delivered Nonconformances------------------- 6.3.5
Records------------------------------------- 6.4
Traceability of Records--------------------- 6.4.1
Purchasing Records-------------------------- 6.4.2
Retention of Records------------------------ 6.4.3
Certification of Personnel------------------ 6.5
Tolerance of Measurement & Test Equipment--- 6.6
Serialization------------------------------- 6.7
1.0 PURPOSE: To establish the minimum level of activity that is required to manufacture Flight Safety Parts (FSPs) containing ________
Manufacturing Critical Characteristics (CCs). Requirements established herein are intended to establish and maintain the integrity of
CCs throughout the manufacturing process.
2.0 SCOPE: This document is to be used in conjunction with other contractually specified quality requirements. This document shall ______ apply to all FSPs.
3.0 REFERENCES: ___________
a. ANSI/ASQC B1,B2,B3-1996
b. ISO 10012-1
c. Competition Advocate's Shopping List (CASL)
d. AMCOM Regulation 702-7 Flight Safety Critical Aircraft Parts/New Source Testing Program Management
4.0 DEFINITIONS: ____________
a. FSP (Airframe): Any part, assembly, or installation containing a critical characteristic (CC) whose failure, malfunction, or _______________ absence could cause loss of or serious damage to the aircraft, and/or serious injury or death to the occupants.
b. FSP (Engine): Any part, assembly, or installation containing a critical characteristic whose failure, malfunction, or absence _____________ could cause an uncommanded engine shut down, and/or an uncontained engine failure resulting in loss of, or serious damage to the aircraft and/or serious injury or death to the occupants.
c. Critical Characteristic: Any feature throughout the life cycle of a FSP, such as dimension, finish, material or assembly, ________________________ manufacturing or inspection process, installation, operation, field maintenance, or depot overhaul requirement which if nonconforming, missing or degraded could cause the failure or malfunction of the FSP.
d. Approved Source: A manufacturer or vendor who has satisfied, prior to contract award, all AMCOM source approval requirements ________________ as set forth in the CASL to include, if applicable, engineering testing requirements (fatigue, endurance, and/or interchangeability).
5.0 POLICY: AMCOM will only procure Flight Safety Parts from approved sources. So as to maintain the integrity and quality of these _______ critical spare parts, manufacturers of FSPs, components, sub-assemblies, and assemblies are required to adhere to the requirements of this document in its entirety. If a contractor has difficulty in maintaining process control as evident through such things as internal management audits, customer audits, the receipt of quality deficiency reports for parts previously supplied to AMCOM et. al., this will require immediate corrective action for the current contract and could affect the award of future contracts to that contractor.
6.0 REQUIREMENTS: All requirements of this document (paras. 6.1 - 6.7) shall be complied with by a contractor receiving a contract to _____________
18 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
produce FSPs. If a process or processes that involve a CC is subcontracted, this document must be imposed, in its entirety, on the subcontractor performing the work.
6.1 MANUFACTURING PLANNING: _______________________
6.1.1 PLAN CONTENT: All manufacturing, assembly, and inspection points shall be controlled by detailed procedures outlining each step _____________ or parameter of the process along with any materials, tooling, equipment, environmental control, and operator certification required that leads to the specific production of an end item. Plans shall clearly identify all CCs and will include identification, in accordance with contractor procedures, as to its particular revision. All process plans shall clearly define sequence of operation, machine type, and accept/reject limits for the specific process or operation. Critical processes not easily verified by subsequent inspection shall clearly define process operating parameters with tolerances.
6.1.2 FROZEN PLANNING REQUIREMENTS: The contractor is responsible for developing manufacturing planning. Review and control of these ____________________________ plans will be the responsibility of the Contractor's Control Board (CCB) consisting of qualified personnel equipped with adequate resources to assure development of complete, reliable, and traceable documentation. Parts manufactured utilizing these plans shall meet all contractual requirements. Plans developed for FSPs shall be frozen when:
a. In the case of FSPs not requiring engineering testing, under the first production contract for the FSP at such time a successful First Article Test is completed, or at the start of production if FAT is not required.
b. In the case of FSPs requiring engineering test, at the time articles are manufactured which successfully meet the engineering test requirements.
Once frozen, plans shall remain frozen throughout the existing contract and all subsequent contracts for the item unless changes to the planning are made in accordance with this standard.
6.1.3 CHANGES TO FROZEN PLANNING: The portion of the frozen manufacturing plan pertaining to a CC shall not be changed without prior ___________________________
CCB recommendation, justification to AMCOM, and receipt of approval by the Procuring Contracting Officer (PCO). Changes not affecting critical characteristics or occurring as the result of an AMCOM approved Engineering Change Proposal (ECP), require CCB approval only.
All changes to frozen planning affecting CCs will be submitted to AMCOM. When the item, CC, or process is produced by a subcontractor, the planning shall be reviewed and approved by the contractor, and be subject to the same restrictions as above.
6.2 AUDITS: Contractors are to perform self-audits of their frozen planning when that planning applies to CCs produced or verified in _______ house. At a minimum, audits will be performed at the start of each production contract, annually, and when process changes occur. It is incumbent upon the prime contractor to assure that subcontractors accomplish self-audits, and the prime shall maintain records verifying that their vendors are in full compliance with the audit requirement. All audit findings will be recorded and corrective action will be documented.
6.3 CRITICAL CHARACTERISTICS: _________________________
6.3.1 INSPECTION OF CRITICAL CHARACTERISTICS: All CCs which can be nondestructively inspected/tested shall be subjected to 100 percent _______________________________________ inspection by the contractor or subcontractor. Critical characteristics which require destructive testing are to be tested on a lot or batch basis, with no skip lots allowed. All inspection records shall identify the FSP part number, serial or lot number, and characteristic inspected. Critical characteristics shall be identified on the inspection records in such a manner as to draw attention to them. Inspection records shall reflect the exact readings or dimensions, date of inspection, identity of inspector, and any required inspection certification. These requirements are in addition to other contractual requirements.
6.3.2 VARIABILITY REDUCTION METHODS: Once the program demonstrates that the critical processes are statistically in control, stable, _______________________________ and capable, the contractor may submit to the PCO for approval its documentation with a request to implement a Statistical Process
Control (SPC) program in lieu of 100 percent inspection. This approval authority may be delegated to the Defense Contract Management
Agency (DCMA) by the PCO in which case AMCOM will be informed of any approval or suspension of SPC. At the Government's discretion, 100 percent inspection may be reinstated if the process controls prove inadequate.
6.3.3 NONCONFORMING CRITICAL CHARACTERISTICS: Nonconformances of CCs shall not be dispositioned "use as is" or "repair" through _______________________________________ contractor action, rework to print is acceptable. Waivers or deviations may be requested as specified in the contract. Request for waivers or deviations of CCs shall be classified as critical and will be forwarded to AMCOM for approval/disapproval.
6.3.4 CONTRADICTORY CRITICAL CHARACTERISTICS: Contradictions between the AMCOM FSP Spares Technical Data Package (STDP) list of _______________________________________ critical characteristics and the drawing/specifications shall not be resolved by the order of precedence paragraph in the STDP. The ___ contractor shall notify the PCO immediately and any work pertaining to the critical characteristic in question shall be stopped until a written resolution to the contradiction is issued to the contractor from the PCO.
6.3.5 DELIVERED NONCONFORMANCES: Contractors shall notify the PCO immediately of any discovered nonconformances that may exist in __________________________ previously delivered FSPs. Notification is required whether or not the characteristic in question has been classified as a critical characteristic. Notification shall include a description of the suspected nonconformance, contract number, part number, and affected
19 70
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
serial numbers or lot numbers, when applicable.
6.4 RECORDS: ________
6.4.1 TRACEABILITY OF RECORDS: All records relating to FSPs shall be traceable to the date and place of production. Records shall ________________________ provide the degree of traceability required to enable subsequent verification of all aspects of material, manufacture, special process, personnel certification, variability control charts (if applicable), assembly, and inspection of CCs. Special processes include but are not limited to heat treat, shotpeening, and nondestructive testing.
6.4.2 PURCHASING RECORDS: All purchase orders for subcontracted products or processes that contain CCs must clearly identify the CC ___________________ and reference this document for compliance. All documents and referenced data for FSPs shall be available for review by the Government to determine compliance.
6.4.3 RETENTION OF RECORDS: The contractor shall retain copies of all records generated pursuant to this standard and make these _____________________ records available to the Government upon request. Records shall be retained for a period of at least five years after the contractor ceases to manufacture the part for which this standard applies. At the end of this period, or in the event of relocation or shutdown, all records shall be offered to the PCO prior to disposal.
6.5 CERTIFICATION OF PERSONNEL: Contractor personnel performing work or having inspection responsibilities pertaining to CCs, shall be ___________________________ certified to the appropriate professional level as outlined in the applicable national…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .