W58RGZ15R0398.pdf
PDF 132 KB Posted
- Attached to
- Solicitation W58RGZ-15-R-0398
- Solicitation number
- W58RGZ-15-R-0398
About this file
Solicitation W58RGZ-15-R-0398
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W58RGZ-15-R-0398
X
2016SEP20
2016OCT20
DOA1
2016SEP20 SEE SCHEDULE
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
KAREN W.COOPER
(256)842-4507
CCAM-AL-M
KAREN.W.COOPER.CIV@MAIL.MIL
X 1 25
1 58
X 1
X 5 X 13
X 15 X 16 X 20
X 29
X 32
X 35
X 42
X 43
X 48
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: KAREN W.COOPER
Buyer Office Symbol/Telephone Number: CCAM-AL-M/(256)842-4507
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
THIS REQUIREMENT IS RESTRICTED TO:
Sikorsky (78286)
THIS WILL BE A 5 YEAR FIRM-FIXED PRICE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT PURSUANT TO FAR 52.216-22.
SUBJECT TO THE AVAILABILITY OF FUNDS, ANY QUANTITIES ORDERED WILL BE PRICED AT THE UNIT PRICE ESTABLISHED FOR THE ORDERING PERIOD IN
WHICH THEY ARE ORDERED. FUNDS SHALL BE OBLIGATED BY ISSUANCE OF DELIVERY ORDERS AND NOT BY THE CONTRACT ITSELF.
SHIPPING INSTRUCTIONS WILL BE PROVIDED IN EACH INDIVIDUAL DELIVERY ORDER.
THE YEARLY ESTIMATED QUANTITIES LISTED HEREIN DO NOT COMMIT THE GOVERNMENT TO ORDERING THAT OR ANY QUANTITY ABOVE THE MINIMUM QUANTITY.
UH-60
NOUN: PANEL, CONTROL ELEC
INPUT AND OUTPUT NSNS & PART NUMBERS (P/N)__________________________________________
NSN: 1680-01-544-8954
P/N: 70550-02419-043
MINIMUM QUANTITY: 3
MAXIMUM QUANTITY: 235
THE MAXIMUM QUANTITY INCLUDES 39 EACH RESERVED FOR FOREIGN MILITARY SALES (FMS). HOWEVER, IF NO FMS CUSTOMERS REQUIRE THIS ITEM, THE
UNITED STATES ARMY REQUIRER MAY UTILIZE THE FMS QUANTITY.
US QUANTITIES (CLIN 0002)FOR FOR ORDERING PERIODS 1 THRU 3 ARE AS FOLLOWS:
1st _3_ MINIMUM __
2nd _58_ ESTIMATED __
3rd _40_ ESTIMATED __
4TH _45_ ESTIMATED ____
5TH _50_ ESTIMATED ____
FMS QUANTITIES (CLIN 0003) ORDERING PERIODS 1 THRU 5 ARE AS FOLLOWS:
1st 0_ ESTIMATED _
2nd _9_ ESTIMATED _
3rd _10 ESTIMATED __
4TH _10 ESTIMATED ____
5TH _10_ESTIMATED ____
THE MINIMUM QUANTITY SET FOR HEREIN SHALL BE OBLIGATED ON DELIVERY ORDER 0001, TO BE ISSUED SIMULTANEOUSLY WITH THE AWARD OF THE
CONTRACT. ANY ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE FIRM FIXED UNIT PRICE IN EFFECT DURING THE ORDERING PERIOD IN WHICH
THEY ARE ORDERED.
ALL ORDER PERIODS ARE IN INCREMENTS OF 12 MONTHS FROM THE DATE OF AWARD.
ORDERING PERIODS:_________________
2 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
THE FIRST ORDERING PERIOD IS FROM DATE OF CONTRACT AWARD THROUGH 365 DAYS AFTER CONTRACT AWARD.
THE SECOND ORDERING PERIOD IS FROM 366 DAYS AFTER CONTRACT AWARD THROUGH 730 DAYS AFTER CONTRACT AWARD.
THE THIRD ORDERING PERIOD IS FROM 731 DAYS AFTER CONTRACT AWARD THROUGH 1095 DAYS AFTER CONTRACT AWARD.
THE FOURTH ORDERING PERIOD IS FROM 1096 DAYS AFTER CONTRACT AWARD THROUGH 1460 DAYS AFTER CONTRACT AWARD.
THE FIFTH ORDERING PERIOD IS FROM 1461 DAYS AFTER CONTRACT AWARD THROUGH 1825 DAYS AFTER CONTRACT AWARD.
PLEASE INSERT YOUR FIRM FIXED UNIT PRICE FOR THE 1st, 2nd, and 3rd YEAR IN THE SPACES PROVIDED UNDER EACH CLIN/SUBCLIN.
NOTE: THE OFFERORS ATTENTION IS CALLED TO AMCOM REGULATION 52.245-4005, PROCEDURES FOR RECEIPT OF REPARABLES, WHICH FOLLOWS AND IS ALSO
IN SECTION G:
TWO (2) RECEIPTED COPIES OF DD FORM 1348-1A OF ALL SHIPMENTS OF REPARABLE ITEMS RECEIVED SHALL BE MAILED DIRECTLY TO COMMANDER, US ARMY
AVIATION AND MISSILE COMMAND, REDSTONE ARSENAL, AL 35898-5000, ONE (1) COPY SENT ATTN: AMSAM-AC-LS AND ONE (1) COPY SENT ATTN: AMSAM-
MMCLS-MDC, WITHIN THEN (10) WORKING DAYS AFTER RECEIPT. THE DD FORM 1348-1A WILL BE STAMPED DIAGONALLY ACROSS THE CENTER REPARABLE IN
BOLD LETTERS, VERIFYING DATA THEREON AND ANNOTATING TO WHICH CONTRACT/DELIVERY ORDER ASSETS WILL BE APPLIED.
WHEN APPLICABLE, THE CONTRACTOR IS REMINDED TO COMPLETE THE FOREIGN MILITARY SALES (FMS) CUSTOMER DA FORM 2410 (COMPONENT REMOVAL AND
REPAIR OVERHAUL RECORD), SUBMITTED WITH THE ITEM FOR REPAIR, IN ACCORDANCE WITH DA PAMPHLET 738-751 AND TB-1500-341-01. UPON COMPLETION
OF REPAIR, IF AUTHORIZED, THE CONTRACTOR IS REMINDED TO FILL OUT DA FORM 2410 AND RETURN IT TO THE FMS CUSTOMER WITH THE REPAIRED
ASSET(S), ALONG WITH THE FMS CUSTOMER VERSION OF THE DA FORM 2410.
THE NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 1993, PUBLIC LAW 102-484, SECTION 326, PROHIBITS USE OF ODC IN DEPARTMENT OF
DEFENSE CONTRACTS AWARDED ON OR AFTER 01 JUNE 1993, UNLESS APPROPRIATE AUTHORITY IS GRANTED.
THE FOLLOWING WEBSITES ARE PROVIDED FOR THE PURPOSE OF OBTAINING/REVIEWING VARIOUS DA PAMPHLETS AND ARMY REGULATIONS AND TECHNICAL
MANUALS/BULLETINS:
- https://www.logsa.army.mil/etms/online.htm
- http://www.usapa.army.mil/
NO GOVERNMENT FURNISHED MATERIALS (GFM), OTHER THAN THE REPARABLE ASSET AND REUSABLE CONTAINERS, WILL BE PROVIDED.
ELECTRONIC SUBMISSION OF PROPOSALS IS NOT AUTHORIZED. ___
*** END OF NARRATIVE A0001 ***
Based on audit readiness initiatives mandated by the Department of the Army, the following corrections are required to ensure existance and completeness, thereby, improving and sustaining inventory accountability and audit complaince:
1. Maintain any receipt documentation received from the depots.
2. Upon receipt of material, fill in Block 10 to indicate the quantity received and provide a signature and date on the DD Form 1348-
1A. Printed names, name/date stamps, and initials are not acceptable.
3. If a DD Form 1348-1A is not received, a 1348-1A must be created with the corresponding receipt information to contain the following:
a. Unit of Issue and Quantity - (Positions 23-29)
b. Document Number - (Positions 30-43)
c. National Stock Number (NSN) - (Positions 8-22)
d. Condition Code - (Position 71)
e. Unit Price - (Position 74-80)
f. Total Price - (Block 1)
g. Actual Quantity Received - (Block 10)
3 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
h. Nomenclature - (Block 17)
i. Signature and Date - (Blocks 22 and 23)
4. Completed 1348s should be sent to the following mailbox upon receipt of material. usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
An example of a 1348-1A filled out correctly is attached as attachment 0006.
*** END OF NARRATIVE A0002 ***
4 58
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
M&O PLAN MUST BE SUBMITTED AND APPROVED PER CDRL A002
EXHIBIT B. BEFORE OVERHAUL MAY BEGIN. THE M&O PLAN
SHALL BE SUBMITTED TO THIS OFFICE 30 DAYS AFTER
CONTRACT AWARD DATE. (see CDRL A002, Attachment 0002)
NOTE: A COPY OF THE PLAN SHALL BE FORWARDED TO THE
CONTRACT SPECIALIST AT:U.S. ARMY AVIATION AND MISSILE
COMMAND ATTN: (KAREN COOPER) CCAM-ALM BLDG 5303, 2ND
FLOORREDSTONE ARSENAL, AL 35898-5000. For additional information and a sample M&O Plan, please visit the following link:
http://amcomdmz.redstone.army.mil/casl_cmo/casldba.cas l_cmo_samsar ; and select "AMCOM Maintenance and
Overhaul(M&O) SAR" then "Example M&O Plan" in the table of contents.
M&O plan must be approved prior to scheduling of the
PVA.
(End of narrative A001)
0001AA PVA $ ____ __________________
SERVICE REQUESTED: PVA
CLIN CONTRACT TYPE:
Firm Fixed Price
THIS IS A FIRM FIXED PRICE (FFP) CLIN_____________________________________
This effort is for the M and O plan and the required performance of the Product Verification
Audit (PVA).
The PVA shall be in accordance with AMCOM
Regulation 52.209-4723.
PVA shall be conducted 90 days after receipt of assets. The Contractor shall prepare 3 units for
PVA. The Contractor is required to notify the
Contract Specialist for scheduling of the PVA. The
Contract Specialist is Karen Cooper, karen.w.cooper.civ@mail.mil.
The Contractor will prepare and forward, through the cognizant Government Quality Element, the
Finalized Audit Reports within 10 working days after completion of the PVA to:
QS-Contracts@amrdec.army.mil
NOTE: A copy of the cover letter for the report
5 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
must also be sent/emailed to:
Army Contracting Command - RSA, CCAM-ALM (ATTN: Karen Cooper), Bldg 5303, 2nd
Floor, Redstone Arsenal, AL 35898-5280
Failure to pass the PVA may lead to termination of the contract. PVA must be approved prior to shipment of any assets. The Contractor is not authorized to proceed with repairing the remaining assets until the PVA is approved.
The Contractor will go into Wide Area Workflow
(WAWF) to receive payment for the PVA. The
Contractor shall use code W58H0Z when submitting the PVA invoice in WAWF. Jeanie Clark will approve the PVA invoice in WAWF.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0002 PANEL, CONTROL ELEC
Mfr CAGE: 78286
Mfr Part Number: 70550-02419-043
SYSTEM: UH-60
NOUN:Panel, Control, Elec.
INPUT NSN:
1680-01-544-8954
INPUT P/N:
70550-02419-043
OUTPUT NSN:
1680-01-544-8954
OUTPUT P/N:
70550-02419-043
MINIMUM QUANTITY: 3
MAXIMUM QUANTITY: 235
The Maximum Quantity includes 39 each reserved for
Foreign Military Sales (FMS).
However, if no FMS customers require this item, the
United States Army requirer may utilize the FMS
Quantity.
US quantities for ordering periods 1 thru 5 are as follows (CLIN 0002AA):
6 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
1st 3 Minimum
2nd 58 Estimated
3rd 40 Estimated
4th 45 Estimated
5th 50 Estimated
FMS Quantities for ordering periods 1 thru 5 are as follows (0003AA):
1st 0 Estimated
2nd 9 Estimated
3rd 10 Estimated
4th 10 Estimated
5th 10 Estimated
The Minimum Quantity set forth herein shall be obligated on Delivery Order 0001, to be issued concurrently with the award of the contract. Any additional quantities ordered will be priced at the
Firm Fixed Price in effect during the ordering period in which they are ordered.
(End of narrative A001)
0002AA OVERHAUL/REPAIR (US) $ $ ____________________ ______________ __________________
COMMODITY NAME: PANEL, CONTROL ELEC
CLIN CONTRACT TYPE:
Firm Fixed Price
Overhaul/Repair shall be in accordance with (IAW) clause 52.211-4002 in Section C entitled 'Statement of Work/Specifications-Contractor Specifications'.
This Firm Fixed Price (FFP) CLIN includes all parts, labor charges, marking, and data items necessary to return the unit, to a serviceable condition, as stated in Section C, Statement of
Work.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE:
PERIOD 1 - U/P $_________(FFP) MIN QTY 3 EA
PERIOD 2 - U/P $_________(FFP) EST QTY 58 EA
PERIOD 3 - U/P $_________(FFP) EST QTY 40 EA
PERIOD 4 - U/P $_________(FFP) EST QTY 45 EA
PERIOD 5 - U/P $_________(FFP) EST QTY 50 EA
(End of narrative C001)
Packaging and Marking _____________________
7 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0003 PANEL, CONTROL ELEC
Mfr CAGE: 78286
Mfr Part Number: 70550-02419-043
0003AA OVERHAUL/REPAIR (FMS) $ $ _____________________ ______________ __________________
COMMODITY NAME: PANEL, CONTROL ELEC
CLIN CONTRACT TYPE:
Firm Fixed Price
Overhaul/Repair shall be in accordance with (IAW) clause 52.211-4002 in Section C entitled 'Statement of Work/Specifications-Government Specifications'.
This Firm Fixed Price (FFP) CLIN includes all parts, labor changes, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in Section C, Statement of Work.
This CLIN is intended for Foreign Military Sales
(FMS) customers; however, if no FMS customers are identified, the US Army requirer may utilize the
FMS quantity. The estimated quantities are listed below. The FMS customer and geographical locations for deliveries, inspection and acceptance points are unknown at this time. Total FMS quantities cannot exceed 39 each.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE:
PERIOD 1 - U/P $_________(FFP) MIN QTY 0 EA
PERIOD 2 - U/P $_________(FFP) EST QTY 9 EA
PERIOD 3 - U/P $_________(FFP) EST QTY 10 EA
PERIOD 4 - U/P $_________(FFP) EST QTY 10 EA
PERIOD 5 - U/P $_________(FFP) EST QTY 10 EA
(End of narrative C001)
Packaging and Marking _____________________
8 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0004 SCRAP
0004AA SCRAP $ ______ __________________
SERVICE REQUESTED: SCRAP
CLIN CONTRACT TYPE:
Firm Fixed Price
THIS CLIN APPLIES TO U.S. AND FMS ASSETS________________________________________
SECTION C - DESCRIPTION/SPECIFICATION/WORK_________
STATEMENT
Units from CLIN 0002AA and 0003AA shall be scrapped or returned in accordance with (IAW)
Section C, entitled Statement of
Work/Specifications-Contractor Specifications.
Units determined to be scrap IAW Section C shall be reflected as an increase in CLIN 0004AA with a corresponding decrease in quantity and funds in
CLIN 0002AA or 0003AA.
In the event the PCO determines that certain items are scrap, the Contractor shall make disposition
IAW the Contractor's approved Government Property
Procedures.
The Government may, at its own discretion, reduce any items determined scrap by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the Contracting
Office via formal modification.
In no event shall the Contractor scrap an item prior to receiving a contractual modification approved by the Contracting Officer.
This is a Firm Fixed Price CLIN.
OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT
PRICES FOR THE FIVE (5) ORDER PERIODS:
PERIOD 1 - U/P $________(FFP) 1 EA, EST QTY
PERIOD 2 - U/P $________(FFP) 1 EA, EST QTY
9 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
PERIOD 3 - U/P $________(FFP) 1 EA, EST QTY
PERIOD 4 - U/P $________(FFP) 1 EA, EST QTY
PERIOD 5 - U/P $________(FFP) 1 EA, EST QTY
(End of narrative C001)
Deliveries or Performance _________________________
0005 CONTAINERS
0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________
SERVICE REQUESTED: CONTAINERS
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is for contractor furnished containers for CLINs 0002AA, 0003AA
The Government's estimated quantity per ordering period is 10 each.
Offeror is required to fill in a proposed firm fixed unit price for each ordering period:
Ordering Period 1 $____________ 1 EACH
Ordering Period 2 $____________ 1 EACH
Ordering Period 3 $____________ 1 EACH
Ordering Period 4 $____________ 1 EACH
Ordering Period 5 $____________ 1 EACH
Quantity of 10 used for bid estimating purposes only.
The contractor shall provide the container in accordance with Section C, entitled Statement of
Work and Section J, Packaging Requirements.
The Government cannot determine at the time of contract award, how many of the assets to be overhauled/repaired will be received by the
Contractor in unserviceable containers or received without containers.
The Contractor, IAW Section C Statement of Work, shall submit a Report of Discrepancy (ROD) SF
10 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Form 364 through the DCMA QAR for verification within 7 working days to the address shown on
Data Item A001. When assets are received in unserviceable containers or without containers, approval of the PCO is required before replacement containers are purchased.
(End of narrative C001)
Deliveries or Performance _________________________
0006 CDRLS _____
A001 REPORT OF SHIPPING AND PACKAGING DISCREPANCY $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: PANEL, CONTROL ELEC
Report shall be submitted on an as needed basis IAW
DI-MGMT-80503 and para f of the SOW.
(End of narrative C001)
Deliveries or Performance _________________________
A002 TECHNICAL REPORT - STUDY/SERVICES $ ** NSP ** _________________________________ __________________
SERVICE REQUESTED: PANEL, CONTROL, ELEC
report shall be submitted IAW DI-MISC-80508B and para
V of the SOW. report shall be submitted 30 days after contract award.
(End of narrative C001)
Deliveries or Performance _________________________
A003 DEPOT MAINTENANCE PRODUCTION REPORT $ ** NSP ** ___________________________________ __________________
SERVICE REQUESTED: PANEL, CONTROL ELEC
11 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
The contractor shall submit the data monthly IAW DI-
ALSS-80728A and para N of the SOW. Report shall be submitted on a monthly basis to email addresses in the CDRL.
(End of narrative C001)
Deliveries or Performance _________________________
A004 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________
SERVICE REQUESTED: PANEL CONTROL ELEC
contractor shall submit the report on an as needed basis IAW DI-QCIC-80736 and para S of the SOW.
(End of narrative C001)
Deliveries or Performance _________________________
12 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
C-1 52.211-4003 STATEMENT OF WORK/SPECIFICATIONS - CONTRACTOR SPECIFICATIONS JUL/2001
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools and data necessary to accomplish the inspection and Overhaul/Repair required to _______________ return the items as specified in Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the Overhaul/Repair, as applicable, the items shall be packaged as defined _______________ in Section D of this contract and shipped to the destination(s) specified in Section F of each order.
b. Prior to commencement of the Overhaul/Repair the contractor shall disassemble and inspect the item to the extent necessary to determine that the total cost of the Overhaul/Repair including labor, services, parts and materials but not limited to these does not exceed $21,449.00. The contractor will be required to complete the Overhaul/Repair at the firm fixed prices in section B of the contract as long as the total cost to Overhaul/Repair does not exceed $21,449.00. The Contractor will be required to provide data other than certified cost and pricing data and a report of discrepancy (ROD)signed by the DCMA Quality Assurance Representative to the Procuring
Contracting Officer (PCO) to confirm that the total cost to Overhaul/Repair will exceed $21,449.00. This data will include at the minimum material cost (80% of material cost will be supported by current vendor quotes, labor hours, labor rates, oveheads, G&A, and profit rate. More information to support the contractor's price may be requested by the PCO. In no event will any assets be scrapped prior to an approved modification by the PCO. No additional funding except for missing parts will be provided to the contractor to complete the overhaul of the end item. The Government cannot guarantee the condition of the assets to the contractor for overhaul.
c. In the event the PCO determines that the total contractor cost to Overhaul/Repair will exceed $21,449.00 the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the Contractor's approved
Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity.
d. Overhaul/Repair shall be accomplished IAW contractor specifications, processes and procedures. The Contractor shall notify the _______________
PCO through the cognizant ACO of any change or deviation from the list of specifications, processes and procedures provided by the
Contractor with its proposal IAW the clause in Section L entitled, "Identification of Specifications, Processes and Procedures," and attached to this contract.
e. reserved
f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed
IAW the Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW data item A001, Exhibit A. ____
g. reserved
h. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental Protection
Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-23, Painting and
Marking of Army Aircraft.
i. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibits A thru D. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addressees indicated on the DD Form(s) 1423. The DCMA QAR must provide concurrence on all Reports of Discrepancies.
j. Product Verification Audit (PVA) shall be conducted IAW AMCOM Reg 702-002, Aviation Product Verification Audit Requirements, dated December 15, 2000.
k. reserved
l. reserved
m. reserved
n. The contractor shall provide a Depot Maintenance Production Report IAW data item A003, Exhibit C.
o. reserved
13 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
p. reserved
q. reserved
r. reserved
s. Quality Deficiency Report: The contractor shall prepare the Quality Deficiency Report IAW Data item A003 shown as Exhibit D.
t. reserved
u. reserved
v. The contractor shall provide the Maintenance and overhaul plan IAW CDRL A002, Exhibit B.
(End of Clause)
14 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
D-1 52.247-4700 BAR CODE MARKINGS JUN/2003
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
(End of Clause)
15 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996
E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2000 or equivalent.
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E-5 52.209-4723 PRODUCT VERIFICATION AUDIT (PVA) STATEMENT OF WORK - ALTERNATE I DEC/2006
Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.
(a) This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonschedueld PVAs accomplished by the
AMRDEC Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from the
AMRDEC ED. The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the
"Change" clause of the contract.
(b) The Contractor shall:
(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN: QS-
Contracts@amrdec.army.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United
States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
(c) Alternate Procedure. Normally, 3 assets are required to be completed at time of PVA. If, in the PVA Team Chairman's judgment it is in the best interest of the Government, an alternative approach may be taken due to circumstances such as shortage of overhaul assets, shortage of replacement parts, time constraints, or other considerations. At the PVA Team Chairman's discretion, only one PVA candidate may be required to be completed while the other two assets can be in various stages of overhaul as agreed upon (prior to the beginning of the PVA) between the PVA Team Chairman and the facility to be audited. For instance, one asset could be disassembled and ready for
16 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Overhaul Inspection Procedures (OIPs), while the other may be prepared for a critical process such as acceptance testing. (This approach is particularly helpful if the critical process is performed at a subcontractor.) For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance
Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.
(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work
Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.
(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government aceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.
(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.
(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the
PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.
Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.
(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the AMRDEC PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.
1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
2. Minor: In the event a minor defect is discovered, the following actions shall be taken:
a. The contractor shall isolate the cause of the defect and initiate corrective actions.
b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
3. Major: In the event a major defect is discovered, the following actions shall be taken:
17 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.
b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to AMCOM.
d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.
4. Critical: In the event a critical defect is discovered, the following actions shall be taken:
a. All actions outlined in paragraph 3 above shall be completed.
b. Upon request, the contractor shall provide the AMRDEC Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).
c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant QAR to issue a Corrective Action Request.
(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and effective corrective action has been initiated to preclude reoccurrence of the defect.
(n). The contractor shall prepare and forward, through the cognizant government quality element, finalized audit reports within ten
(10) working days after completion of the PVA to Commander, U.S. Army Research Development and Engineering Command, QS-
Contracts@amrdec.army.mil, Redstone Arsenal, AL 35898-5000 and the Acquisition Center address as shown on Order 0001. (In the event reorganization changes this address, the contractor will be notified of the new, correct address by the CO). The report shall include:
1. Name and location of contractor
2. Contract number or equivalent
3. Descriptive noun, national stock number, part number, and serial number of the item audited
4. Complete description of each audit finding, with corrective action taken, and action taken to prevent recurrence.
5. The audit report shall be signed, as a minimum, by the contractor's quality manager or his designated representative.
Objections, accompanied with explanations, on any audit finding(s) shall be specifically annotated and forwarded to AMCOM for resolution. Objection by the contractor as to the existence of a defect or as to its classification will be resolved by the PVA
Chairman. Further non-concurrence will be referred to the PCO for final resolution IAW the clause entitled "Disputes" as stated in the contract.
(o) The AMRDEC PVA Chairman will acknowledge receipt of the Final Audit Report and complete the following within 10 working days of receipt:
1. Review the Final PVA Report for compliance and completeness
2. Review the report for acceptance/rejection of corrective action and actions taken to prevent recurrence.
3. Forward a written reply to the AMCOM CO and/or cognizant government quality element, recommending acceptance or rejection of the Final Audit Report.
4. If the Final Audit Report is disapproved, the Contractor shall repeat any or all PVA tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the
Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver a revised report to the Government under the terms and conditions and within the time specified by the Government.
These actions must be coordinated with the cognizant government QAR. The Government shall take action on this report within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(p) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after approval of the Final Audit Report, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted. Notification is required 10 business days prior to shipment of the next delivery.
18 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon acceptance of the Final
Audit Report. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.
(r) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(s) Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1)
Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(t) In cases where this PVA is a part of the Source Approval Request (SAR) process, the process planning will be considered approved upon receipt of an approval memorandum from AMRDEC Aviation Engineering Directorate (AED). If the component is a Critical Safety Item
(CSI), see those specific contract clauses for other requirements that may also be audited during the PVA. PVA approval is contingent on contractor submission and AED approval of changes to manufacturing planning, to correct defects identified during PVA.
(u) Unless otherwise specified in this contract, any end item destroyed or exceeds reparable limites during the PVA process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items must be delivered.
(End of clause)
E-6 52.246-4003 CALIBRATION JAN/2012
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National
Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test
Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International
Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.
19 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.242-15 STOP-WORK ORDER AUG/1989
F-2 52.247-29 F.O.B. ORIGIN FEB/2006
F-3 52.247-34 F.O.B. DESTINATION NOV/1991
F-4 52.247-52 CLEARANCE AND DOCUMENTATION REQUIREMENTS--SHIPMENTS TO DOD AIR OR FEB/2006
WATER TERMINAL TRANSSHIPMENT POINTS
F-5 52.247-55 F.O.B. POINT FOR DELIVERY OF GOVERNMENT-FURNISHED PROPERTY JUN/2003
F-6 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984
F-7 52.247-59 F.O.B. ORIGIN--CARLOAD AND TRUCKLOAD SHIPMENTS APR/1984
F-8 52.247-61 F.O.B.--ORIGIN--MINIMUM SIZE OF SHIPMENTS APR/1984
F-9 52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS JAN/1991
F-10 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY AUG/2012
F-11 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION MAR/2016
(a) Definitions. As used in this clause--
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards
Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid_equivalents.html.
"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .