W58RGZ-15-R-0236.pdf
PDF 136 KB Posted
- Solicitation number
- W58RGZ-15-R-0236
About this file
Solicitation W58RGZ-15-R-0236
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W58RGZ-15-R-0236 2016JUN03
MARBARA BLOCKER (256)842-6217
MARBARA.J.BLOCKER.CIV@MAIL.MIL
2016JUL08 04:00pm
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
335312
X
X DOA1
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 58
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: MARBARA BLOCKER
Buyer Office Symbol/Telephone Number: CCAM-AL-M/(256)842-6217
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
THIS REQUIREMENT IS RESTRICTED TO SIKORSKY AIRCRAFT CORPORATION. (CAGE 78286)_____________________________________________________________________________
THIS ITEM IS NOT A CRITICAL SAFETY ITEM (CSI).
THIS WILL BE A 5 YEAR FIRM-FIXED PRICE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT PURSUANT TO FAR 52.216-22.
SUBJECT TO THE AVAILABILITY OF FUNDS, ANY QUANTITIES ORDERED WILL BE PRICED AT THE UNIT PRICE ESTABLISHED FOR THE ORDERING PERIOD IN
WHICH THEY ARE ORDERED. FUNDS SHALL BE OBLIGATED BY ISSUANCE OF DELIVERY ORDERS AND NOT BY THE CONTRACT ITSELF.
SHIPPING INSTRUCTIONS WILL BE PROVIDED IN EACH INDIVIDUAL DELIVERY ORDER.
THE YEARLY ESTIMATED QUANTITIES LISTED HEREIN DO NOT COMMIT THE GOVERNMENT TO ORDERING THAT OR ANY QUANTITY ABOVE THE MINIMUM
QUANTITY.
ALL ORDERING PERIODS ARE IN INCREMENTS OF 12 MONTHS FROM THE DATE OF AWARD.
ORDERING PERIODS:
THE FIRST ORDERING PERIOD IS FROM DATE OF CONTRACT AWARD THROUGH 365 DAYS AFTER CONTRACT AWARD.
THE SECOND ORDERING PERIOD IS FROM 366 DAYS AFTER CONTRACT AWARD THROUGH 730 DAYS AFTER CONTRACT AWARD.
THE THIRD ORDERING PERIOD IS FROM 731 DAYS AFTER CONTRACT AWARD THROUGH 1095 DAYS AFTER CONTRACT AWARD.
THE FOURTH ORDERING PERIOD IS FROM 1096 DAYS AFTER CONTRACT AWARD THROUGH 1460 DAYS AFTER CONTRACT AWARD.
THE FIFTH ORDERING PERIOD IS FROM 1461 DAYS AFTER CONTRACT AWARD THROUGH 1825 DAYS AFTER CONTRACT AWARD.
PLEASE INSERT YOUR FIRM FIXED UNIT PRICES FOR THE 1ST, 2ND, 3RD, 4TH, AND 5TH ORDERING PERIODS IN THE SPACES PROVIDED UNDER EACH
CLIN/SUBCLIN.
NOTE: THE OFFERORS ATTENTION IS CALLED TO AMCOM REGULATION 52.245-4005, PROCEDURES FOR RECEIPT OF REPARABLES, WHICH FOLLOWS AND IS
ALSO IN SECTION G:
AN ELECTRONIC COPY OF DD FORM 1348-1A FOR ALL SHIPMENTS OF REPARABLES SHALL BE FORWARDED TO 1) THE EMAIL ADDRESS IN BLOCK 6 ON PAGE
1 OF THE BASIC CONTRACT/DELIVERY ORDER/MODIFICATION AND ALSO TO 2) USARMY.REDSTONE.USAMC.MBX.IMMC-SMB-AMMO@MAIL.MIL. THE DD FORM
1348-1A SHALL ANNOTATE TO WHICH CONTRACT/DELVIERY ORDER THE ASSETS WILL BE APPLIED AS REPARABLES.
WHEN APPLICABLE, THE CONTRACTOR IS REMINDED TO COMPLETE THE FOREIGN MILITARY SALES (FMS) CUSTOMER DA FORM 2410 (COMPONENT REMOVAL
AND REPAIR OVERHAUL RECORD), SUBMITTED WITH THE ITEM FOR REPAIR, IN ACCORDANCE WITH DA PAMPHLET 738-751 AND TB-1500-341-01. UPON
COMPLETION OF REPAIR, IF AUTHORIZED, THE CONTRACTOR IS REMINDED TO FILL OUT U.S. ARMY DA FORM 2410 AND RETURN IT TO THE FMS CUSTOMER
WITH THE REPAIRED ASSET(S), ALONG WITH THE FMS CUSTOMER VERSION OF THE DA FORM 2410.
THE NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 1993, PUBLIC LAW 102-484, SECTION 326, PROHIBITS USE OF ODC IN DEPARTMENT OF
DEFENSE CONTRACTS AWARDED ON OR AFTER 1 JUN 93, UNLESS APPROPRIATE AUTHORITY IS GRANTED.
THE CONTRACTOR IS INSTRUCTED TO PUT THE FOLLOWING WORDS IN THE REMARKS COLUMN OF THE DD 250/WAWF; "REPAIR AND RETURN PROCESS D6".
THE FOLLOWING WEBSITES ARE PROVIDED FOR THE PURPOSE OF OBTAINING/REVIEWING VARIOUS ARMY PUBLICATIONS AND TECHNICAL
MANUALS/BULLETINS:
2 58
W58RGZ-15-R-0236
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A. https://www.logsa.army.mil/etms/online.htm - Technical Manuals and Bulletins
B. http://www.usapa.army.mil - DA Pamphlets and Army Regulations
NO GOVERNMENT FURNISHED MATERIALS (GFM), OTHER THAN THE REPARABLE ASSETS AND REUSABLE CONTAINERS, WILL BE PROVIDED.
ACCESS TO DLA EMAIL IS NOT AUTHORIZED. ___
PROPOSALS SHALL BE MAILED TO:
ARMY CONTRACTING COMMAND - REDSTONE
ATTN: Marbara Blocker
CCAM-AL-M, BLDG 5303, 2nd Floor
REDSTONE ARSENAL, AL 35898-5280
COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: ________________________________
TELEPHONE NUMBER: ____________________
FAX NUMBER: __________________________
E-MAIL ADDRESS: ______________________
*** END OF NARRATIVE A0001 ***
Based on audit readiness initiatives mandated by the Department of Army, the following actions are required to ensure existence and completeness, thereby, improving and sustaining inventory accountability and audit compliance.
1. Maintain any receipt documentation received from the depots
2. Upon receipt of material, fill in Block 10 to indicate the quantity received and provide a signature and date on the
DD Form 1348-1A. Printed names, name/date stamps, and initials are not acceptable.
3. If a DD Form 1348-1A is not received, a 1348-1A must be created with the corresponding receipt information to contain the following:
a. Unit of Issue and Quantity- (Positions 23-29)
b. Document Number- (Positions 30-43)
c. National Stock Number (NSN)- (Positions 8-22)
d. Condition Code- (Position 71)
e. Unit Price- (Position 74-80
f. Total Price- (Block 1)
g. Actual Quantity Received- (Block 10)
h. Nomenclature- (Block 17)
i. Signature and Date- (Blocks 22 and 23)
4. Completed 1348s should be sent to the following mailbox upon receipt of material.
usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
An example of a 1348-1A filled out correctly is attached.
*** END OF NARRATIVE A0002 ***
3 58
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA, COMPUTER, AIR DATA
Submittal and approval of the M&O Plan, in accordance with Data Item A002 (Attachment 0003), is required prior to commencement of Repair.
The M&O Plan shall be submitted to this office 30 days after contract award date (see Data Item A002, Attachment 0003)
Shipment and payment cannot occur until the M&O Plan is approved.
(End of narrative A001)
0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________
SERVICE REQUESTED: PVA, COMPUTER, AIR DATA
CLIN CONTRACT TYPE:
Firm Fixed Price
THIS IS A FIRM-FIXED-PRICE CLIN.
This CLIN represents the Product Verification Audit
(PVA) for the COMPUTER, AIR DATA, NSN: 6610-01-614-
3703.
Offeror is required to fill in a proposed firm fixed unit price for the PVA:
$__________(FFP)
PVA shall be in accordance with Clause 52.209-4723, Section E, "Product Verification Audit (PVA)
Statement of Work".
PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3
COMPUTER, AIR DATA for the PVA. The Contractor is required to notify the Government Quality Office for scheduling of the PVA by email to the following address:
QS-Contracts@amrdec.army.mil
With copy emailed to the Contract Specialist at:
marbara.j.blocker.civ@mail.mil
The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.
NOTE: A copy of the cover letter for the report
4 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
shall be forwarded to the Contract Specialist at:
U.S. Army Contracting Command - Redstone
Bldg 5303, 2nd Floor
ATTN: CCAM-ALM, Marbara Blocker
Redstone Arsenal, Alabama 35898-5000
PVA requires approval prior to Government acceptance of contract deliverable assets.
Failure to pass the PVA may lead to Termination for____________________________________________________
Default of the contract.________________________
Payment Instructions: The Contractor will go into_____________________
Wide Area Work Flow (WAWF) to receive payment for the
PVA. The Contractor shall use DODAAC W58H0Z when submitting the PVA invoice in WAWF. The Contracting
Officer will approve the PVA invoice.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0002 COMPUTER, AIR DATA
Mfr CAGE: 78286
Mfr Part Number: 70600-01822-106
SYSTEM: UH-60
NOUN: COMPUTER, AIR DATA
INPUT NSN: 6610-01-614-3703
INPUT P/N: 70600-01822-106
OUTPUT NSN: 6610-01-614-3703
OUTPUT P/N: 70600-01822-106
MINIMUM QUANTITY: 5 EACH
MAXIMUM QUANTITY: 48 EACH
THE MAXIMUM QUANTITY INCLUDES 8 EACH RESERVED FOR
FOREIGN MILITARY SALES (FMS). HOWEVER, IF NO FMS
CUSTOMERS REQUIRE THIS ITEM, THE UNITED STATES ARMY
REQUIRER MAY UTILIZE THE FMS QUANTITY.
US QUANTITIES FOR ORDERING PERIOD 1 THRU 5 ON CLIN
0002AA ARE AS FOLLOWS:
ORDERING PERIOD 1 - 5 EACH (MINIMUM)
ORDERING PERIOD 2 - 5 EACH (ESTIMATED)
ORDERING PERIOD 3 - 10 EACH (ESTIMATED)
ORDERING PERIOD 4 - 10 EACH (ESTIMATED)
ORDERING PERIOD 5 - 10 EACH (ESTIMATED)
5 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
FMS QUANTITIES FOR ORDERING PERIODS 1 THRU 5 ON
CLIN 0003AA ARE AS FOLLOWS:
ORDERING PERIOD 1 - 0 EACH (ESTIMATED)
ORDERING PERIOD 2 - 2 EACH (ESTIMATED)
ORDERING PERIOD 3 - 2 EACH (ESTIMATED)
ORDERING PERIOD 4 - 2 EACH (ESTIMATED)
ORDERING PERIOD 5 - 2 EACH (ESTIMATED)
THE MINIMUM QUANTITY SET FORTH HEREIN SHALL BE
OBLIGATED ON DELIVERY ORDER 0001, TO BE ISSUED
SIMULTANEOUSLY WITH THE AWARD OF THE CONTRACT. ANY
ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE
FIRM FIXED PRICE IN EFFECT DURING THE ORDERING
PERIOD IN WHICH THEY ARE ORDERED.
(End of narrative A001)
0002AA OVERHAUL COMPUTER, AIR DATA (US) $ $ ________________________________ ______________ __________________
COMMODITY NAME: COMPUTER, AIR DATA
CLIN 0002AA is for overhaul of the UH-60 Computer, Air Data for US Army requirements.
INPUT NSN: 6610-01-614-3703
INPUT P/N: 70600-01822-106
OUTPUT NSN: 6610-01-614-3703
OUTPUT P/N: 70600-01822-106
Yearly quantities for CLIN 0002AA are:
1st Year: 5 each minimum qty
2nd Year: 5 each estimated qty
3rd Year: 10 each estimated qty
4th Year: 10 each estimated qty
5th Year: 10 each estimated qty
Offeror is required to fill in a proposed Firm Fixed
Unit Price for each ordering period:
YEAR 1 $____________(UNIT PRICE)
YEAR 2 $____________(UNIT PRICE)
YEAR 3 $____________(UNIT PRICE)
YEAR 4 $____________(UNIT PRICE)
YEAR 5 $____________(UNIT PRICE)
Overhaul shall be in accordance with clause 52.211-
4003 in Section C entitled 'Statement of
Work/Specifications - Contractor Specifications'.
This Firm Fixed Price CLIN includes all parts, labor charges, preservation, packaging, packing, marking, 6 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
and data items necessary to return the unit to a serviceable condition, as stated in Section C
Statement of Work.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-2073-1 & MIL-STD-129 MARKINGS
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Packaging shall be IAW Packaging Requirements, Attachment 0001.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0003 COMPUTER, AIR DATA
NSN: 6610-01-614-3703
Mfr CAGE: 78286
Mfr Part Number: 70600-01822-106
0003AA OVERHAUL COMPUTER, AIR DATA (FMS) $ $ _________________________________ ______________ __________________
COMMODITY NAME: COMPUTER, AIR DATA
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0003AA is for overhaul of the UH-60 Computer, Air Data for FMS requirements.
INPUT NSN: 6610-01-614-3703
INPUT P/N: 70600-01822-106
OUTPUT NSN: 6610-01-614-3703
OUTPUT P/N: 70600-01822-106
Yearly quantities for CLIN 0003AA are:
1st Year: 0 each estimated qty
2nd Year: 2 each estimated qty
3rd Year: 2 each estimated qty
4th Year: 2 each estimated qty
5th Year: 2 each estimated qty
7 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Offeror is required to fill in a proposed Firm Fixed
Unit Price for each ordering period including year 1 with an estimated quantity of 0:
YEAR 1 $____________(UNIT PRICE)
YEAR 2 $____________(UNIT PRICE)
YEAR 3 $____________(UNIT PRICE)
YEAR 4 $____________(UNIT PRICE)
YEAR 5 $____________(UNIT PRICE)
Overhaul shall be in accordance with clause 52.211-
4003 in Section C entitled 'Statement of
Work/Specifications - Contractor Specifications'.
This Firm Fixed Price CLIN includes all parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition, as stated in Section C
Statement of Work.
If no FMS customers are identified, the US Army
Requirer may utilize the FMS quantity.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-2073-1 & MIL-STD-129 MARKINGS
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Packaging shall be IAW Packaging Requirements, Attachment 0001.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0004 BEYOND ECONOMICAL REPAIR
0004AA BEYOND ECONOMICAL REPAIR (BER) $ ______________________________ __________________
8 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: BEYOND ECONOMICAL REPAIR
CLIN CONTRACT TYPE:
Firm Fixed Price
Beyond Economical Repair assets from CLIN 0002AA or
0003AA shall be scrapped in accordance with clause
52.211-4003 in Section C entitled 'Statement of
Work/Specifications - Contractor Specifications'.
Units authorized to be scrapped IAW Section C shall be reflected as an increase to CLIN 0004AA and a corresponding decrease to CLIN 0002AA or 0003AA. In the event the PCO determines that certain items shall be scrapped, the contractor shall scrap such items at the firm fixed unit price in Section B hereof and make disposition IAW the contractor's approved Government property procedures. Scrapped items shall count towards the minimum quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Offeror is required to fill in a proposed firm fixed unit price for each ordering period:
YEAR 1 $____________(Estimated 1 Each)
YEAR 2 $____________(Estimated 1 Each)
YEAR 3 $____________(Estimated 1 Each)
YEAR 4 $____________(Estimated 1 Each)
YEAR 5 $____________(Estimated 1 Each)
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0005 CONTAINER, COMPUTER, AIR DATA
0005AA CONTAINER FURNISHED CONTAINERS(S) $ _________________________________ __________________
SERVICE REQUESTED: CONTAINER, COMPUTER, AIR DATA
CLIN CONTRACT TYPE:
Firm Fixed Price
9 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
This CLIN is for contractor furnished containers for CLINs 0002AA and 0003AA.
This is a Firm Fixed Priced CLIN.
The Government's estimated quantity per ordering period is 1 each.
Offeror is required to fill in a proposed firm fixed unit price for each ordering period:
YEAR 1 $____________(Estimated 1 Each)
YEAR 2 $____________(Estimated 1 Each)
YEAR 3 $____________(Estimated 1 Each)
YEAR 4 $____________(Estimated 1 Each)
YEAR 5 $____________(Estimated 1 Each)
There is no minimum quantity requirement. This line item will be used on as needed basis.
The contractor shall provide the container in accordance with Section C, entitled Statement of
Work and Packaging Requirements (Attachment
0001).
The Government cannot determine at the time of contract award, how many of the assets to be overhauled/repaired will be received by the
Contractor in unserviceable containers or received without containers. The Contractor, IAW
Section C Statement of Work, shall submit a
Report of Discrepancy (ROD) SF Form 364 through the DCMA QAR for verification within 7 working days to the address shown on Data Item A001.
When assets are received in unserviceable containers or without containers, approval of the PCO is required before replacement containers are purchased.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0006 CONTRACT DATA REQUIREMENTS LIST _______________________________
This CLIN is Not Separately Priced (NSP)
Pricing for data shall be included in the unit price
10 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
of CLINS 0002AA and 0003AA.
The Contractor shall provide data items A001 - A004 in accordance with the Contract Data Requirements
List, see Attachments 0002 - 0005.
(End of narrative A001)
A001 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________
DISCREPANCY $ ** NSP ** ___________ __________________
SERVICE REQUESTED: DATA ITEM A001
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ACQUISITION DOCUMENT NUMBER : DI-MGMT-80503
Submission of the Report of Shipping and Packaging
Discrepancy shall occur within 10 days of discovering the discrepancy.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A002 TECHNICAL REPORT - STUDY / SERVICE $ ** NSP ** __________________________________ __________________
SERVICE REQUESTED: DATA ITEM A002
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ACQUISITION DOCUMENT NUMBER : DI-MISC-80508B
Data Item A002 refers to the maintenance and overhaul plan as outlined in Section C clause 52.211-
4003 paragraph M and Attachment 0006 Maintenance and
Overhaul Plan Description and Guidance. The overhaul plan shall be submitted to this office within 30 days after contract award. Repairs cannot occur until the maintenance and overhaul plan is approved.
(End of narrative C001)
11 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A003 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________
SERVICE REQUESTED: DATA ITEM A003
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ACQUISITION DOCUMENT NUMBER : DI-QCIC-80736
No report is necessary unless there is a deficiency.
Contractor shall submit NO LATER THAN 10 days after discovery of deficiency.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A004 DEPOT MAINTENANCE PRODUCTION REPORT $ ** NSP ** ___________________________________ __________________
SERVICE REQUESTED: DATA ITEM A004
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ACQUISITION DOCUMENT NUMBER : DI-ALSS-80728A
Date of first submission is 3 working days after receipt of reparables.
Frequency of submission is monthly.
Date of subsequent submissions - No later than 10 days after the end of the month.
Data shall be prepared in accordance with section J
Attachment 0007, Template for Depot Maintenance
Production Report, and submitted to the following email addresses:
usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil &
12 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
usarmy.redstone.peo-avn.list.cargo-maintoverhual-t55@mail.mil
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
13 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.211-4003 STATEMENT OF WORK/SPECIFICATIONS - CONTRACTOR SPECIFICATIONS JUL/2001
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools and data necessary to accomplish the inspection and overhaul/repair required to return the items as specified in Section B, to condition code A as defined by Army Regulation 725-_______________
50. The input/output configurations shall be as defined in Section B herein. Upon completion of the overhaul/repair, as applicable, the items shall be packaged as defined in Section D of this contract and shipped to the destination(s) specified in each individual delivery order.
b. Prior to commencement of overhaul/repair, the Contractor shall disassemble and inspect the item to the extent _______________ necessary to determine that the total cost of such overhaul/repair including labor, services, parts and materials does not exceed $5,359.20. The Contractor will be required to complete the overhaul/repair at the (FFP) in the contract when the _________ total overhaul/repair for each item regardless of the damage as long as the total cost to Overhaul does not exceed $5,359.20.
The Contractor will be required to provide data other than certified cost and pricing data and a report of discrepancy (ROD) signed by the DCMA QAR to the Procuring Contracting Officer (PCO) to confirm that the total cost to overhaul/repair will exceed $5,359.20. This data will include at the minimum material cost (80% of material cost will be supported by current vendor quotes), labor hours, labor rates, overheads, G&A, and profit rate. More information to support the contractor's price may be requested by the Government. In no event will any asset be scrapped prior to an approved modification by the PCO. No additional funding except for missing parts will be provided to the Contractor to complete the overhaul/repair of the end item. The Government cannot guarantee the condition of the assets sent to the contractor for overhaul/repair.
c. In the event that the total contractor cost to overhaul/repair is determined (approved by the PCO) to exceed
$5,359.20, the contractor shall scrap such assets at the fixed unit price in Section B herof and make disposition in accordance with the contractor's approved Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity.
d. Overhaul/repair shall be accomplished IAW the contractor's overhaul specifications and drawings.
e. This is not a Critical Safety Item.
f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved Government Property procedures.
Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503, Data Item A001.
g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental
Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-
23,with change 12 Painting and Marking of Army Aircraft.
h. Data and reports shall be submitted IAW the Contract Data Requirements List. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Form(s) 1423. The DCMA QAR shall provide concurrence on all Reports of Discrepancies.
i. Product Verification Audit (PVA): The Contractor shall conduct the PVA IAW AMCOM FAR Clause 52.209-4723.
j. The Army Maintenance Management System - Aviation (TAMMS-A): The contractor shall complete the forms and records as specified in DA PAM 738-751.
k. Reserved
l. Reserved
m. Reserved
n. Inventory Transactions - The contractor shall provide a Depot Maintenance Production Report IAW Data Item A004.
o. Reserved
14 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
p. Reserved
q. The Government reserves the right to replace any items scrapped.
r. Reserved
s. Quality Deficiency Report: The contractor shall prepare the Quality Deficiency Report IAW Data Item A003.
t. Reserved
u. Reserved
v. Overhaul/Recapitalization/Upgrade/Repair (M&O) Documentation: The Contractor shall provide documentation in accordance with DI-MISC-80508. The documentation shall include all legacy (existing) technical information, procedures, and processes (e.g., Overhaul/Repair travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration (FAA) approved documentation) that the contractor utilized or will utilize in the overhaul of the item. The documentation may be in contractor format. The contractor shall mark the documentation IAW the contract and provide for reproduction cost only.
(End of Clause)
2 52.246-4008 IDENTIFICATION MARKING OCT/1992
Item shall be marked per MIL-STD-130.
(End of Clause)
15 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality ISO 9001:2000 or equivalent. Any equivalencies must be approved by the
Contracting Officer prior to award.
(End of clause)
4 52.209-4723 PRODUCT VERIFICATION AUDIT (PVA) STATEMENT OF WORK DEC/2006
Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.
(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA as specified in this contract.
This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the
AMRDEC Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from
AMRDEC ED. The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the
"Changes" clause of the contract.
(b) The Contractor shall:
(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN: QS-
Contracts@amrdec.army.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United
States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
(c) The initial PVA will be performed on one of the first three (3) items overhauled. The PVA candidate will be selected by the AMRDEC
PVA Team Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance
Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.
(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work
16 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.
(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government aceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.
(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.
(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the
PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.
Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.
(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the AMRDEC PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.
1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
2. Minor: In the event a minor defect is discovered, the following actions shall be taken:
a. The contractor shall isolate the cause of the defect and initiate corrective actions.
b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
3. Major: In the event a major defect is discovered, the following actions shall be taken:
a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.
b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to AMCOM.
d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.
4. Critical: In the event a critical defect is discovered, the following actions shall be taken:
a. All actions outlined in paragraph 3 above shall be completed.
b. Upon request, the contractor shall provide the AMRDEC Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).
c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the
17 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
contracting officer.
NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant QAR to issue a Corrective Action Request.
(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and effective corrective action has been initiated to preclude reoccurrence of the defect.
(n). The contractor shall prepare and forward, through the cognizant government quality element, finalized audit reports within ten
(10) working days after completion of the PVA to Commander, U.S. Army Research Development and Engineering Command, ATTN: QS-
Contracts@amrdec.army.mil, Redstone Arsenal, AL 35898-5000 and the Acquisition Center address as shown on Order 0001. (In the event reorganization changes this address, the contractor will be notified of the new, correct address by the CO). The report shall include:
1. Name and location of contractor
2. Contract number or equivalent
3. Descriptive noun, national stock number, part number, and serial number of the item audited
4. Complete description of each audit finding, with corrective action taken, and action taken to prevent recurrence.
5. The audit report shall be signed, as a minimum, by the contractor's quality manager or his designated representative.
Objections, accompanied with explanations, on any audit finding(s) shall be specifically annotated and forwarded to AMCOM for resolution. Objection by the contractor as to the existence of a defect or as to its classification will be resolved by the PVA
Chairman. Further non-concurrence will be referred to the PCO for final resolution IAW the clause entitled "Disputes" as stated in the contract.
(o) The AMRDEC PVA Chairman will acknowledge receipt of the Final Audit Report and complete the following within 10 working days of receipt:
1. Review the Final PVA Report for compliance and completeness
2. Review the report for acceptance/rejection of corrective action and actions taken to prevent recurrence.
3. Forward a written reply to the AMCOM CO and/or cognizant government quality element, recommending acceptance or rejection of the Final Audit Report.
4. If the Final Audit Report is disapproved, the Contractor shall repeat any or all PVA tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the
Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver a revised report to the Government under the terms and conditions and within the time specified by the Government.
These actions must be coordinated with the cognizant government QAR. The Government shall take action on this report within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(p) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after approval of the Final Audit Report, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted. Notification is required 10 business days prior to shipment of the next delivery.
(q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon acceptance of the Final
Audit Report. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.
(r) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(s) Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1)
Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(t) In cases where this PVA is a part of the Source Approval Request (SAR) process, the process planning will be considered approved upon receipt of an approval memorandum from AMRDEC Aviation Engineering Directorate (AED). If the component is a Critical Safety Item
(CSI), see those specific contract clauses for other requirements that may also be audited during the PVA. PVA approval is contingent on contractor submission and AED approval of changes to manufacturing planning, to correct defects identified during PVA.
(u) Unless otherwise specified in this contract, any end item destroyed or exceeds reparable limites during the PVA process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items must be delivered.
18 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(End of clause)
5 52.246-4003 CALIBRATION JAN/2012
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National
Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test
Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International
Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.
19 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DELIVERIES OR PERFORMANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.242-15 STOP-WORK ORDER AUG/1989
2 52.247-29 F.O.B. ORIGIN FEB/2006
3 52.247-34 F.O.B. DESTINATION NOV/1991
4 52.247-52 CLEARANCE AND DOCUMENTATION REQUIREMENTS--SHIPMENTS TO DOD AIR OR FEB/2006
WATER TERMINAL TRANSSHIPMENT POINTS
5 52.247-55 F.O.B. POINT FOR DELIVERY OF GOVERNMENT-FURNISHED PROPERTY JUN/2003
6 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY AUG/2012
7 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION MAR/2016
(a) Definitions. As used in this clause--
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards
Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid_equivalents.html.
"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .