W58RGZ-25-R-0037.pdf

PDF 150 KB Posted

Attached to
Overhaul of the UH-60 ACTUATOR, ELECTROMEC
Solicitation number
W58RGZ-25-R-0037
Issued by

About this file

This is a Solicitation document (W58RGZ-25-R-0037) for a 3-year Firm-Fixed-Price Indefinite Delivery Indefinite Quantity (IDIQ) contract for the overhaul of UH-60 Actuator, Electromechanical (NSN: 1680-01-242-2066). The contract is issued by the Army Contracting Command-Redstone for a minimum quantity of 120 units and maximum quantity of 432 units (360 US quantity/72 FMS quantity).

The solicitation designates Kearfott Corporation (CAGE Code 05088) as the only approved source for this Critical Safety Item (CSI) overhaul. Proposals are due by February 28, 2025, at 2:00 PM. The contract includes three ordering periods of 365 days each, with initial delivery required within 60 days after receipt of order. A Product Verification Audit (PVA) of three units is required within 90 days of receiving reparables. The contractor must comply with specific packaging requirements per MIL-STD-2073-1 and MIL-STD-129R. Pricing is required for each ordering period, with the minimum quantity of 120 units to be ordered on the first delivery order issued simultaneously with contract award.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W58RGZ-25-R-0037

X

2024DEC13

2025FEB2802:00pm

DOA1

2024DEC13 SEE SCHEDULE

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

REGINALD C. BURRELL

(256)876-0150

CCAM-ALB

REGINALD.C.BURRELL2.CIV@ARMY.MIL

X 1 25

1 74

X 1

X 4 X 14

X 17 X 18 X 22

X 30

X 32

X 35

X 53

X 54

X 66

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: REGINALD C. BURRELL

Buyer Office Symbol/Telephone Number: CCAM-ALB/(256)876-0150

Type of Contract 1: Firm Fixed Price

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

A-1. The ACTUATOR, ELECTROMEC is a Critical Safety Item (CSI).

A-2. This will be a three (3) year Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to FAR

52.216-22.

A-3. There is not an adequate Depot Maintenance Work Requirement for the overhaul of the ACTUATOR, ELECTROMEC. Overhaul can only be performed by an approved source in accordance with Defense Federal Acquisitions Regulations (DFARS) Subpart 209.2 - Qualification

Requirements. This regulation implements quality control provisions of aviation critical safety items, as stated in Public Law 108-136, dated November 2003. The statute requires a CSI be overhauled by a source approved by the Combat Capabilities Development Command

(DEVCOM) Aviation and Missile Center (AvMC) Systems Readiness Directorate (SRD). The approved source for this overhaul is as follows:

Kearfott Corporation, 2858 US HWY 70 W, Black Mountain, NC 28711, United States (CAGE Code 05088)

A-4. When Applicable, the contractor is reminded to complete the Foreign Military Sales (FMS) Customer DA FORM 2410 (Component Removal and Repair Overhaul Record), submitted with the item for overhaul, in accordance with DA Pamphlet 738-751 and TB-1500-341-01. Upon completion of overhaul, if authorized, the contractor is reminded to fill out U.S. Army DA Form 2410 and return it to the FMS customer with the repaired asset(s), along with the FMS customer version of the DA Form 2410.

A-5. The FMS Customer and geographical location(s) for deliveries, inspection and acceptance points are unknown at this time.

A-6. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of Delivery Orders and not by the contract itself.

A-7. This requirement is for a minimum quantity of 120 each and a maximum quantity of 432 each (72 each set aside for FMS). The minimum quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the contract.

Any additional quantities ordered will be priced at the firm fixed price in effect during the ordering period in which they are ordered.

A-8. The Government will not be required to obtain the contractor's signature prior to the issuance of an order.

A-9. The Government intends to award only one basic Fixed Price IDIQ contract as a result of this solicitation.

A-10. The Government has segregated the estimated quantities into three ordering periods. However, this does not preclude exercising the Government's right under FAR 52.216-19 by ordering the maximum quantity specified in FAR 52.216-19(b)(1) at any time during the three year ordering period.

Ordering Period 1 will be from date of contract award through 365 days after contract award (DACA).

Ordering Period 2 will be from 366 DACA through 730 DACA.

Ordering Period 3 will be from 731 DACA through 1,095 DACA.

A-11. Please insert your firm fixed unit prices for the 1st, 2nd and 3rd ordering periods in the spaces provided under each

CLIN/SubCLIN.

A-12. For purposes of Block 12 on page 1, the offer acceptance period is 120 days from the date for receipt of offers specified in

Block 9, unless a different period is inserted by the offeror in the blank in Block 12.

A-13. No Government Furnished Materials (GFM), other than the reparable assets and reusable containers, will be provided.

A-14. Offers shall be submitted in accordance with FAR Clause 52.215-1. Facsimile and mail submissions are not authorized.

Proposals shall be emailed to:

reginald.c.burrell2.civ@army.mil lindy.l.pinchon.civ@army.mil

2 74

W58RGZ-25-R-0037 REPRINT

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A-15. Reserved.

A-16. The contractor is required to submit an M&O Plan in accordance with CDRL A003. The documentation shall be submitted within 30 days after contract award (DACA).

A-17. The Overhaul shall comply with the critical characteristics identified as Attachment 0010. Additionally, the contractor shall flow down these requirements to all suppliers of CSIs.

A-18. The contractor shall provide with their proposal a response that addresses the contractor's plan to meet all Government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

A-19. Reserved

A-20. The contractor is instructed to put the following words in the remarks column of the WAWF Reparable Receiving Report (WAWF

RRR)(See Defense Federal Acquisitions Supplement Appendex F): "Repair and Return Process D6M".

A-21. Access to DLA FedMall is NOT authorized. ___

A-22. The National Defense Authorization Act for Fiscal Year 1993, Public Law 102-484, Section 326, prohibits use of ozone-depleting substances in Department of Defense contracts awarded on or after 1 June 1993, unless appropriate authority is granted.

A-23. The following websites are provided for the purpose of obtaining/reviewing various Army publications and technical manuals/bulletins:

A. https://quicksearch.dla.mil/qsSearch.aspx - Technical Manuals and Bulletins

B. http://www.armypubs.army.mil/ - DA Pamphlets and Army Regulations

A-24. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: _________________________________________

TELEPHONE NUMBER: _____________________________

FAX NUMBER: ___________________________________

E-MAIL ADDRESS: _______________________________

A-25. Contractor must comply with MIL-STD-2073-1, DOD Standard Practice for Military Packaging and MIL STD 129R, DOD Standard Practice for Military Marking for Shipment and Storage. DOD packaging regulations, standards, and specifications may be obtained online at https://quicksearch.dla.mil/qsSearch.aspx and available to the public.

A-26. The Contractor shall comply with the Total Asset Visibility- contractor (TAV-C) reporting requirements, as outlined in Attachment

0001 - Contractor Repair TAV-C Requirements.

*** END OF NARRATIVE A0001 ***

3 74

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PVA

THE CONTRACTOR IS REQUIRED TO SUBMIT A FROZEN

MAINTENANCE PLAN IN ACCORDANCE WITH DATA ITEM A003

(EXHIBIT C) THE DOCUMENTATION SHALL BE SUBMITTED 30

DAYS AFTER CONTRACT AWARD.

THE MAINTENANCE AND OVERHAUL PLAN MUST BE SUBMITTED____________________________________________________

AND APPROVED BEFORE OVERHAUL MAY BEGIN._______________________________________

(End of narrative A001)

0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________

SERVICE REQUESTED: PVA

CLIN CONTRACT TYPE:

Firm Fixed Price

THIS IS A FIRM FIXED PRICE CLIN.

This CLIN represents the Product Verification Audit

(PVA) for Actuator, Electro-Mechanical, NSN: 1680-01-

242-2066, as shown in CLINs 0002AA and 0003AA.

Offeror is required to fill in a proposed firm fixed unit price for the PVA:

The PVA shall be in accordance with the "Product

Verification Audit (PVA) Statement of Work".

PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 units for the PVA. The Contractor is required to notify the

Government Quality Office for scheduling of the PVA by email to the following address:

usarmy.redstone.ccdc-avmc.mbx.qs-contracts@mail.mil

With copy emailed to the Contract Specialist at:

reginald.c.burrell2.civ@army.mil

The Contractor will prepare and forward, through the cognizant Government Quality Element, the Finalized

Audit Reports within 10 working days after completion of the PVA to both email addresses above.

NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:

reginald.c.burrell2.civ@army.mil

4 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Failure to pass the PVA may lead to Termination for____________________________________________________

Default of the contract.________________________

Payment Instructions:_____________________

The Contractor will go into Wide Area Work Flow

(WAWF) to receive payment for the PVA. The Contractor shall use DODAAC W58H0Z when submitting the PVA invoice in WAWF making it to the attention of Lindy

Pinchon. The Contracting Officer will approve the

PVA invoice.

PVA requires approval prior to Government acceptance of contract deliverable assets.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0002 ACTUATOR, ELECTRO-MECHANICAL

NSN: 1680-01-242-2066

Estimated yearly quantities for CLIN 0002AA are:

Ordering Period 1: 120 each estimated qty

Ordering Period 2: 120 each estimated qty

Ordering Period 3: 120 each estimated qty

Funds for ordering period 1 quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the firm fixed price contract.

(End of narrative A001)

0002AA OVERHAUL ACTUATOR, ELECTRO-MECHANICAL $ $ _____________________________________ ______________ __________________

COMMODITY NAME: ACTUATOR, ELECTRO-MECHANICAL

CLIN CONTRACT TYPE:

Firm Fixed Price

THIS IS A CRITICAL SAFETY ITEM.

(End of narrative B001)

Input NSN: 1680-01-242-2066 Input P/N: CU09609213

5 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Output NSN: 1680-01-242-2066 Output P/N: CU09609213

Overhaul shall comply with the Statement Of Work

(SOW).

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the units to a serviceable condition as stated in the Statement of Work (SOW).

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT PRICE:

YEAR 1- U/P $_______________ (FFP) Min Qty 120 ea.

YEAR 2- U/P $_______________ (FFP) Est Qty 120 ea.

YEAR 3- U/P $_______________ (FFP) Est Qty 120 ea.

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 CODES, APPENDIX J

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For packaging instructions, refer to Section J

Attachment 0002, M&O Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the Narrative entitled: "Delivery

Schedule" and "Delivery of Additional

Quantities" in Section F for the Government's

Required Delivery Schedule.

(End of narrative F001)

0003 ACTUATOR, ELECTRO-MECHANICAL

NSN: 1680-01-242-2066

COMMODITY NAME: ACTUATOR, ELECTRO-MECHANICAL

6 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

CLIN CONTRACT TYPE: FIRM FIXED PRICE

Estimated yearly quantities for CLIN 0003AA are:

Ordering Period 1: 0 each estimated qty

Ordering Period 2: 36 each estimated qty

Ordering Period 3: 36 each estimated qty

The maximum quantity for FMS requirements is 72.

This CLIN will be used only if a FMS customer requires this item. If no FMS customers are identified, the US Army Requirer may utilize the FMS quantity.

(End of narrative A001)

0003AA OVERHAUL ACTUATOR, ELECTRO-MECHANICAL (FMS) $ $ ___________________________________________ ______________ __________________

COMMODITY NAME: ACTUATOR, ELECTRO-MECHANICAL

CLIN CONTRACT TYPE:

Firm Fixed Price

THIS IS A CRITICAL SAFETY ITEM.

(End of narrative B001)

INPUT NSN: 1680-01-242-2066, P/N: CU09609213

OUTPUT NSN: 1680-01-242-2066, P/N: CU09609213

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the SOW.

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT PRICE:

Year 1-U/P $_______________ (FFP) Est Qty 0 ea, FMS

Year 2-U/P $_______________ (FFP) Est Qty 36 ea, FMS

Year 3-U/P $_______________ (FFP) Est Qty 36 ea, FMS

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-2073-1 CODES, APPENDIX J

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

7 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

For packaging instructions refer to Section J

Attachment 0002, M&O Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in Section F for the Government's Required Delivery Schedule.

(End of narrative F001)

0004 SCRAP

0004AA SCRAP ACTUATOR, ELECTRO-MECH $ ____________________________ __________________

SERVICE REQUESTED: SCRAP

CLIN CONTRACT TYPE:

Firm Fixed Price

SERVICE REQUESTED: SCRAP ACTUATOR, ELECTRO-MECH

SERVICE REQUESTED: SCRAP/BEYOND ECONOMICAL REPAIR

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for assets which are beyond economical repair (i.e., scrap) from CLINs 0002AA and/or 0003AA.

The Government's estimated quantity per ordering period is 10 each. The estimated quantity of 10 is for proposal evaluation purposes only.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $____________ ea

Ordering Period 2 $____________ ea

Ordering Period 3 $____________ ea

8 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Scrapped assets from CLINs 0002AA or 0003AA shall be in accordance with the Statement of Work

Specifications - Government Specifications.

As applicable on delivery orders issued, units determined to be scrapped in accordance with Section

C shall be reflected as an increase in CLIN 0004AA with a correspondence decrease in quantity and funds in CLINs 0002AA or 0003AA as applicable.

In the event the Procuring Contracting Officer (PCO) determines that certain items shall be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.

The Government may, at its discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.

Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0005 CONTAINERS

0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: CONTAINERS

CLIN CONTRACT TYPE:

Firm Fixed Price

SERVICE REQUESTED: CONTAINERS

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for contractor furnished containers for

CLINs 0002AA and/or 0003AA.

P/N: MS27684-3

NSN: 8110-00-254-5713

9 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Use Electrostatic Discharge (ESD) caps on all connectors (ZZ=SM- 17 & 39).

The Government estimates that a quantity of 10 each will be required for each of the ordering periods. The estimated quantity of 10 is for proposal evaluation purposes only.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $_____________ ea

Ordering Period 2 $_____________ ea

Ordering Period 3 $_____________ ea

The contractor shall provide the container in accordance with Attachment 0002 - M&O Packaging

Requirements and the Statement of

Work/Specifications - Contractor Specifications and reusable containers.

The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.

The contractor, IAW the Statement of Work, shall submit a Report of Discrepancy (ROD) SF Form 364 through the DCMA QAR for verification within 7 working days to the address shown on Data Item A002.

Assets received with an unserviceable container, or without a container, require prior approval of the PCO before containers can be purchased.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0006 CONTRACT DATA REQUIREMENTS LIST (CDRLS) _______________________________________

This CLIN is "Not Separately Priced" (NSP).

Pricing for data is included in the unit prices of

CLINs 0002AA and 0003AA.

The contractor shall provide Data Items A001-A003 in accordance with the Contract Data Requirements List, Exhibits A, B, and C.

(End of narrative A001)

10 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

A001 GOVERNMENT PROPERTY (GP) INVENTORY REPORT $ ** NSP ** _________________________________________ __________________

SERVICE REQUESTED: DATA ITEM A001 DI-MGMT-80441D

DATA ITEM A001 - DI-MGMT-80441D - Government Property

Inventory Report Instructions

Report to be submitted no later than 15 days after completion of physical inventory.

Data shall be delivered to:

usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil

(End of narrative C001)

Deliveries or Performance _________________________

A002 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________

DISCREPANCY $ ** NSP ** ___________ __________________

SERVICE REQUESTED: DATA ITEM A002 DI-MGMT-80503

CLIN CONTRACT TYPE:

Firm Fixed Price

DATA ITEM A002 - DATA ACQUISITION DOCUMENT NUMBER :

DI-MGMT-80503

a. FOR WRONG components received submit a Shipping

Supply Discrepancy Report (SDR).

b. For components received improperly packaged in containers, packaged in unserviceable containers, or packaged without containers (when a container is required), submit a packaging SDR.

c. When there is a packaging discrepancy and the wrong component is received submit a dual shipping and packaging SDR.

d. For packaging discrepancies discovered upon induction of the item to overhaul (hidden discrepancies), submit the SDR form within ten (10) days of discovery of the discrepancy.

e. If the packaging discrepancy appears to have caused deterioration of the item, include an estimated cost to repackage the asset in Block 12 of

11 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

the SF form 364.

f. Report by letter the number of excess reusable containers made available through scrap out of items, to addresses in block

14(A).

(End of narrative C001)

Deliveries or Performance _________________________

A003 M&O PLAN $ ** NSP ** ________ __________________

SERVICE REQUESTED: DATA ITEM A003 DI-MISC-80508B

CLIN CONTRACT TYPE:

Firm Fixed Price

DATA ITEM A003 - DATA ACQUISITION DOCUMENT NUMBER :

DI-MISC-80508B

When the contractor makes a change to the plan (as frozen at the time the

PVA is approved by the Government or, when a PVA is not required, prior to induction of the first overhaul, repair, upgrade, modification or recapitalization asset) that affects a critical characteristic, submit copy of the revised plan to the Government, for review and comments, within 30 days after the date of the change. As required, revise the plan based on the Government's review and comments and resubmit to the Government within 30 days of Government's comments.

Distribution Statement B: Distribution authorized to

U.S. Government agencies only;

test and evaluation; date of determination: 7 July, 2005. Other requests for this documentation shall be referred to Department of the Army Combat

Capabilities Development Command, Aviation and Missle Center, ATTN: FCDD-AME-U, Bldg.

5400, Fowler Rd, Redstone Arsenal, AL

35898-5000.

Export Control Act Warning - Not required

The first submission of the overhaul, repair, upgrade, modification, or recapitalization plan will be used by the Government for informational purposes only.

Documentation shall be provided electronically in adobe acrobat .pdf or compatible format on compact disk read only memory device (cd-rom).

12 74

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

DISTRIBUTION

a. Complete packages sent to: Department of the Army

Combat Capabilities Development Command, Aviation and Missile Center, ATTN: FCDD-AME-U, Bldg.

5400 Fowler Rd, Redstone Arsenal, AL

35898-5000.

b. Letter of transmittal only sent to procurement

Contracting Officer as specified in contract.

(End of narrative C001)

Deliveries or Performance _________________________

13 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

1. The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data necessary to accomplish the inspection and overhaul for the ACTUATOR, ELECTRO-MECHANICAL for the UH-60 (hereinafter the component) that is required to return the component to a serviceable condition sufficient to meet the standard of continued airworthiness in accordance with (IAW) Army Regulation (AR) 70-62. Upon completion of the overhaul, the overhauled components shall be packaged IAW with the contract and shipped to the destination(s) specified in each individual delivery order.

2. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the component to the extent necessary to determine if the component is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer and shall discontinue the overhaul until given further instructions or the authorization for disposition of the component by the PCO.

3. In the event the PCO determines that certain items should be scrapped, the Contractor shall scrap such items at the fixed unit price in Section B. IAW Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.245-7005 Management and

Reporting of Government Property, included in this solicitation and the resultant contract, the Contractor shall complete the Plant

Clearance Inventory Schedule using the Plant Clearance capability of the GFP Module of the Procurement Integrated Enterprise Environment

(PIEE), an electronic equivalent of the Standard Form 1428, Inventory Disposal Schedule. Users shall register for access and obtain training on the PIEE home page https://wawf.eb.mil/piee-landing . Such scrapped components shall count toward the quantities ordered and the Government can replace any components scrapped by the Contractor.

4. The Government does not have an adequate Depot Maintenance Work Requirement (DMWR) for this effort.

5. Critical Safety Item (CSI): This is a CSI.

a. This overhaul is for a CSI as identified by the Government and shall comply with the requirements of AMCOM Regulation

702-7, Aviation Critical Safety Items, Critical Application Items, and New Source Testing Program Management, Appendix C, Quality

Engineering Standard-1, Revision E (QE-STD-1E) and Appendix D, Quality Engineering Standard-2, Revision C (QE-STD-2C). If during the overhaul process, the Contractor determines that completion of the overhaul will require the Contractor to acquire and utilize a new component, the Contractor shall procure new components only from sources of supply approved by the Combat Capabilities Development

Command (DEVCOM) Aviation and Missile Center (AvMC), Systems Readiness Directorate (SRD). The Contractor must require purchase and acquisition of any new components to comply with QE-STD-1E. Adherence to QE-STD-1E and QE-STD-2C is required to maintain the integrity of the Critical Characteristics (CCs) of each CSI component. QE-STD-1E, QE-STD-2C, and a list of the applicable CCs are attached in

Section J.

b. Written notification shall be given to the PCO as soon as possible but at least 30 days prior to first delivery indicating the time frame when the subject CSI under the contract will be actively in production so that a Supplier Interface and

Oversight Program (SIOP) on-site review can be scheduled if such a review is determined by the Government to be necessary. The

Contractor shall cooperate with and allow the Government to conduct a SIOP on-site review (1-3 days typically) while the Contractor is actively overhauling the components. This review may also require site visits to critical process subcontractors. The purpose of the

SIOP on-site review is to inspect the overhaul processes and documentation for CSIs and provide feedback and direction regarding the CSI program.

c. NOTE: Some of the personnel that support the SIOP program (for example, evaluation of manufacturing planning and participation in the SIOP onsite reviews) are support contractors of the DEVCOM, AvMC, and SRD, who provide programmatic and technical services under the EXPRESS program. The SRD will, within 30 days of contract award, identify the contractors who may require access to your company's proprietary data (for example, frozen manufacturing planning) and facilities in performing their duties. The engineering support contractors will be allowed access only if a Non-Disclosure Agreement (NDA) between their employer and your company has been executed. A standard NDA will accompany the SRD notification. If an NDA with the identified support contractor has not been executed with your company, sign and submit the NDA with the frozen manufacturing planning to the PCO within 30 days of contract award. If you have any objections to the NDA or to its terms or conditions, contact the PCO in writing within 10 days of receipt of the SRD notification to allow sufficient time for a mutually acceptable arrangement to be reached.

6. Upon receipt of the components, the Contractor shall inspect containers for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Components received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved GFP procedures. Components received improperly packaged, damaged with corrosion/deterioration, or those with shipping discrepancies shall be reported IAW DI-MGMT-80503 (See section B, Contract Data

Requirements List [CDRL] A002).

7. GFP Attachment: The components being provided to the Contractor are identified and tracked as GFP. The Contractor shall maintain a system of internal controls to manage (control, use, preserve, protect, and maintain) GFP in its possession IAW Federal

Acquisition Regulation (FAR) 52.245-1, and its property management system shall satisfy the requirements of this clause. The Contractor

14 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

shall record the acquisition, receipt, shipment, consumption, disposal of GFP, and any transfer to another contract utilizing the GFP

Module in PIEE, https://piee.eb.mil , as required by the DFARS Procedures, Guidance, and Information (PGI) 245.103-72 Government-furnished Property Attachments to Solicitations and resultant contracts. GFP training and guidance is located at the Department of

Defense (DoD) Procurement Toolbox at https://dodprocurementtoolbox.com/ .

8. Contractor shall comply with U.S. Army Technical Manual (TM) 1-1500-345-23, Painting and Marking of Army Aircraft, or most recent version, if painting is required in the performance of the contract.

9. Contractor shall submit required data IAW the CDRL, DD Form 1423, Exhibit A - C electronically to the addresses indicated on the DD Form(s) 1423.

10. Product Verification Audit (PVA): The Contractor shall conduct the PVA IAW the detailed instructions as specified in

Section E of the solicitation and resultant contract.

11. Product Quality Deficiency Reports (PQDRs): When requested, the Contractor shall assist the cognizant Contract

Administration Office in evaluating PQDRs and exhibits for defects reported on components overhauled under the contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the Contractors Quality Program. The Contractor shall utilize the Product Data Reporting and

Evaluation Program (PDREP) to submit a PQDR at https://www.pdrep.csd.disa.mil/pdrep_files/report_tools/pqdr.htm IAW AR 702-7-

1, Reporting of Product Quality Deficiencies within the U.S. Army.

12. The items the Contractor shall overhaul are identified below:

Input NSN P/N

1680-01-242-2066 CU09609213

Output NSN P/N

1680-01-242-2066 CU09609213

13. The overhaul planned quantity for 3 years is Minimum 120, Maximum 432 (360 US QTY/ 72 FMS QTY) . Input will be 60 days after receipt of order. Output shall be as specified in the solicitation and resultant contract schedule. Serviceable assets shall be returned to Department of Defense Activity Address Directory (DODAAC) W25G1U, Plant 7002.

1st year US qty 120 1st year FMS qty 0

2nd year US qty 120 2nd year FMS qty 36

3rd year US qty 120 3rd year FMS qty 36

14. Transactional Inventory Procedures - The Contractor shall prepare the following reports:

a. The Contractor shall complete and retain a signed copy of DD Form 1348-1A, receipt for repairable on all shipments.

The Contractor shall complete the DD Form 1348-1A and include a signature to evidence shipment and receipt. Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:

https://www.dla.mil/Disposition-Services/DDSR/Turn-In/1348-Help/

The Contractor shall prepare this form and include the following corresponding receipt information:

(1) Document Number - (Positions 30-44)

(2) National Stock Number (NSN) - (Positions 8-22)

(3) Condition Code - (Position 71)

(4) Unit Price - (Positions 74-80)

(5) Total Price - (Block 1)

(6) Actual Quantity Received - (Block 10)

(7) Nomenclature - (Block 17)

(8) Signature and Date - (Blocks 22 and 23)

For questions with the above information, please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil

b. The Contractor shall perform an annual inventory of all GFP, including items for overhaul and any contractor-acquired property such as containers during the period of performance of the contract. This shall include any subcontractor inventories where GFP has been provided by the Government for overhaul. Contractor shall provide all results, findings, and corrective actions of any annual physical inventories to the Government IAW FAR Clause 52.245-1(f)(1)(iv), Physical Inventory. The Contractor shall prepare a physical inventory report IAW DI-MGMT-80441D (CDRL A001).

c. The Contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Attachment

0001 "Contractor Overhaul TAV-C Requirements and TAV-C Portal End User Standard Operating Procedures (SOP)".

15. Foreign Military Sales (FMS): Contractor shall always segregate US quantities and FMS quantities and must keep

15 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

segregated at all times in transit and in storage and shall flow down this requirement to all subcontractors.

16. Reserved.

17. Item Unique Identification (IUID): The Contractor shall apply IUID IAW Military Standard (MIL-STD) MIL-STD-130N, AR 700-145, Item

Unique Identification, and DA PAM 700-145, IUID Procedures, DFARS 211.274-2 Policy for item unique identification, which requires in paragraph (a)(3)(i) that IUID is required regardless of value for any DoD serially managed item (reparable or nonrepairable) or subassembly, component, or part embedded within a subassembly, component, or part. All registered Unique Item Identifiers (UIIs) shall be maintained as received and any UIIs created for component received without one, shall follow any published documentation, such as

DMWRs or Maintenance Engineering Orders (MEO). In the absence of these documents, Contractors must strictly adhere to the procedures outlined in the MIL-STD-130N. Maintaining a UII as received means the construction of the UII string shall not change; however, the UII can and will receive updates to the associated data, such as Marks, PN Rollovers, within the DoD IUID National Registry. Any questions about the IUID program should be directed toward the AMCOM IUID helpdesk at 256-425-8566 or

"mailto:usarmy.redstone.amcom.mbx.immc-sim-iuid@army.mil ".

18. Shipping Containers and Shipment: Contractor shall utilize the packaging requirements contained in Attachment 0002, M&O

Packaging Requirements. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor-furnished property. The method of shipment must include tracking of all packages for maintaining government property accountability and visibility. Contractor must comply with MIL-STD-2073-1E, DoD Standard Practice for Military Packaging and MIL-STD-

129R, DoD Standard Practice for Military Marking for Shipment and Storage. The Contractor shall package electronic parts susceptible to static discharge damage IAW ANSI/ESD S20.20-2021 Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding

Electrically Initiated Explosive Devices). If TAMMS-A is required, each individual repaired item must include a copy of all forms required by The Army Maintenance Management System Aviation (TAMMS-A).

19. Overhaul Plan Documentation: The Contractor shall provide overhaul plan documentation to include all legacy (existing) technical information, procedures, and processes (e.g., Overhaul travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration approved documentation) that the Contractor utilized or shall utilize in the overhaul of the item. The documentation may be in contractor format. The Contractor shall provide documentation IAW DI-MISC-80508B (CDRL A003).

20. NOTE - Applicable Technical Documents: The applicable documents referenced in this Statement of Work (SOW) are listed on the Contract Document Summary List (DSL) attached to the solicitation and resultant contract. The DSL lists the referenced documents by document ID, title, date, and category. The document versions specified on the DSL take precedence over the generic references (those without the revision letters) cited in the SOW.

*** END OF NARRATIVE C0001 ***

16 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D-1

Contractor must comply with MIL-STD-2073-1, DOD Standard Practice for Military Packaging and MIL STD 129R, DOD Standard Practice for

Military Marking for Shipment and Storage. Please note that compliance with these versions is required notwithstanding that the packaging instructions in Section J do not reference the most current versions of these Military Standards. DOD packaging regulations, standards, and specifications may be obtained online at https://quicksearch.dla.mil/qsSearch.aspx and available to the public

*** END OF NARRATIVE D0001 ***

17 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996

E-3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

E-4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-5 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2000 or higher

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E-6 PRODUCT VERIFICATION AUDIT (PVA) STATEMENT OF WORK (SOW)

Purpose: This PVA requirement establishes/assigns responsibilities for insertion of PVA procedures into overhaul work directives, maintenance data packages, and contract documents along with procedures and instructions to be applied in performing PVAs during overhaul, maintenance, modification kit installation, rework, remanufacture, manufacturing, and new procurement contracts. The PVA candidate(s) are used to evaluate that the contractor's processes and procedures are adequate to ensure component integrity.

(A) The Contractor shall perform and present for acceptance THREE units as specified in the contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, new manufacture technical requirements or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure items conform to contractual requirements. The Contractor may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. PVA actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the Combat Capabilities

Development Command (DEVCOM) Aviation and Missile Center (AvMC) Systems Readiness Directorate (SRD). Like or similar items may be grouped for these purposes provided concurrence is obtained from SRD Quality Management Division. The contractor may be directed by the

Procuring Contracting Officer (PCO) to increase or decrease the scope of a PVA pursuant to the "Changes" clause of the contract for non-commercial items.

(B) The Contractor shall,

(1) With the concurrence of SRD Quality Management Division (QMD), schedule and perform PVA as required by the terms of the contract or as otherwise required.

(2) Notify PCO with information copy to the SRD QMD, ATTN, "usarmy.redstone.devcom-avmc.mbx.qs-contracts@army.mil" of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.

(3) Provide technical personnel tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.

(C) The PVA candidate will be selected by the SRD PVA Team Chairman at random from the three (3) tendered candidates for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items

18 74

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

currently available.

(1) Alternate Procedure. Normally, three assets are required to be completed at time of PVA. If in the PVA Team Chairman's judgment it is in the best interest of the Government, an alternative approach may be taken due to circumstances such as shortage of overhaul assets, shortage of replacement parts, time constraints, or other considerations. At the PVA

Team Chairman's discretion, only one PVA candidate may be required to be completed while the other two assets can be in various stages of overhaul as agreed upon (prior to the beginning of the PVA) between the PVA Team Chairman and the facility to be audited. For instance, one asset could be disassembled and ready for Overhaul Inspection

Procedures, while the other may be prepared for a critical process such as acceptance testing. (This approach is particularly helpful if the critical process is performed by a subcontractor.) For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.

(D) The item selected for PVA will be inspected for adherence to preservation, packaging, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.

(E) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to maintain, overhaul, repair, or manufacture the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.

(F) Disassembly for overhauled items will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant Government Quality

Assurance Representative (QAR), and the SRD PVA Team Chairman and team personnel.

(G) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection shall be conducted (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings, Depot Maintenance Work Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in the contract.

(H) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as

Shot peening, heat treating, etc.) performed by subcontractors may also be audited. Contractor shall be able to demonstrate that all testing/ inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.

(I) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for Government acceptance including preservation, packaging, marking, and update of historical records and all applicable documentation.

(J) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the SRD PVA Team Chairman's discretion, examination of representative assemblies may be used as evidence of compliance to specification requirements. The SRD PVA Team Chairman will determine the scope and detail of the PVA process. The SRD PVA Team Chairman may delegate follow-up actions to the DCMA QAR, when it is determined to be prudent to the PVA.

(K) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor.

After the PVA is completed, the SRD PVA Team Chairman will conduct an exit critique…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .