W58RGZ-24-R-0049.pdf
PDF 190 KB Posted
- Attached to
- Solicitation for the maintenance and overhaul of the Computer Flight Control for the UH-60
- Solicitation number
- W58RGZ-24-R-0049
About this file
This document is a solicitation for the maintenance and overhaul of the Computer Flight Control for the UH-60 aircraft. The solicitation is for a firm-fixed-price indefinite-delivery, indefinite-quantity (IDIQ) contract with a 5-year ordering period.
The key details are:
- The minimum estimated quantity is 120 units with a maximum of 720 units, including 120 for Foreign Military Sales (FMS).
- The contract has 5 ordering periods, with the first ordering period starting on the date of contract award and the final period ending 1,825 days after award.
- Offerors must provide firm fixed unit prices for each of the 5 ordering periods.
- This is a commercial item procurement, so certified cost or pricing data will not be required.
- The government intends to award one contract as a result of this solicitation.
- The Computer Flight Control is not a Critical Safety Item.
- Offerors must submit a Maintenance and Overhaul Plan within 30 days after contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W58RGZ-24-R-0049
BRENDA NELSON (000)000-0000
BRENDA.NELSON.CIV@ARMY.MIL
2024JUL27 05:00pm
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
334511
X
X DOA1
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 75
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: BRENDA NELSON
Buyer Office Symbol/Telephone Number: CCAM-ALB/(000)000-0000
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
A-1. The Computer Flight Control is not a Critical Safety Item (CSI).
A-2. This is a five (5) year Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to FAR 52.216-22.
Input and Output NSN: 6615-01-599-7108
Input Part Numbers (P/N) and Output P/N: 1200100-3-004
Minimum Estimated Quantity: 120
Maximum Estimated Quantity: 720 (including 120 reserved for FMS)
A-3. A Depot Maintenance Work Requirement (DMWR) for the overhauling of the Computer Flight Control is not available. As noted above, however, the Computer Flight Control is not a CSI. Currently, there is only one known approved source for the inspection/overhaul/upgrade, as follows:
Hamilton-Sundstrand Corporation, 1 Hamilton Road, Windsor Locks, CT 06096, United States (CAGE Code: 73030) (UEI: JC42EBJ5NFJ1).
A-4. When Applicable, the contractor shall complete the Foreign Military Sales (FMS) Customer DA FORM 2410 (Component Removal and
Repair Overhaul Record), submitted with the item for repair, in accordance with DA Pamphlet 738-751, TB-1500-341-01, and TM-1-500-328-
23. Upon completion of repair, if authorized, the contractor shall fill out U.S. Army DA Form 2410 and return it to the FMS customer with the repaired asset(s), along with the FMS customer version of the DA Form 2410.
A-5. The FMS Customer and geographical location(s) for deliveries, inspection and acceptance points are unknown at this time.
A-6. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of Delivery Orders and not by the contract itself.
A-7. The minimum quantity of 120 each (US quantity) shall be obligated on the first delivery order, to be issued simultaneously with the award of the contract. Any additional quantities ordered will be priced at the firm fixed price in effect during the ordering period in which they are ordered.
A-8. The Government will not be required to obtain the contractor's signature prior to the issuance of an order.
A-9. The Government intends to award only one Firm-Fixed Price Indefinite Delivery, Indefinite Quantity (IDIQ) contract as a result of this solicitation.
A-10. The Government has segregated the estimated quantities into five ordering periods. However, this does not preclude exercising the
Government's right under FAR 52.216-19 by ordering the maximum quantity specified in FAR 52.216-19(b)(1) at any time during the five-year ordering period.
Ordering Period 1 will be from date of contract award through 365 days after contract award (DACA).
Ordering Period 2 will be from 366 DACA through 730 DACA.
Ordering Period 3 will be from 731 DACA through 1,095 DACA.
Ordering Period 4 will be from 1,096 DACA through 1,460 DACA.
Ordering Period 5 will be from 1,461 DACA through 1,825 DACA.
A-11. Please insert your firm fixed unit prices for the 1st, 2nd, 3rd, 4th, and 5th ordering periods in the spaces provided under each
CLIN/Sub CLIN.
A-12. The proposal acceptance period is 120 days from the deadline for receipt of proposal.
A-13. No Government Furnished Materials (GFM), other than the reparable assets and reusable containers, will be provided.
14. Electronic submission of quotes is authorized and is the only acceptable method of transmission. Quotes shall be emailed to brenda.nelson.civ@army.mil and lindy.l.pinchon.civ@army.mil.
2 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A-15. Facsimile and hard copy submission of quotes are not authorized and will not be accepted.
16. The Contractor is required to submit a Maintenance and Overhaul (M&O) Plan in accordance with CDRL A003. The documentation shall be submitted within 30 days after contract award (DACA).
A-17. There are no critical characteristics for this item.
A-18. Reserved.
A-19. This solicitation is for commercial items; therefore, certified cost or pricing data will not be required. Other data, to include commercial invoices, may be required to substantiate the quoted pricing.
A-20. The contractor is instructed to put the following words in the remarks column of the DD 250/WAWF: "Repair and Return Process D6".
A-21. Access to DLA FedMall (formerly known as EMALL) is NOT authorized. ___
A-22. The National Defense Authorization Act for Fiscal Year 1993, Public Law 102-484, Section 326, prohibits use of Ozone Depleting
Chemicals (ODCs) in Department of Defense contracts awarded on or after 1 June 1993, unless appropriate authority is granted.
23. The following websites are provided for the purpose of obtaining/reviewing various Army publications and technical manuals/bulletins:
A. https: //www.logsa.army. mil/etmapp/#/etm/home - Technical Manuals and Bulletins
B. https: //www.pubs.army.mil/ - DA Pamphlets and Army Regulations
A-24. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: _________________________________________
TELEPHONE NUMBER: _____________________________
FAX NUMBER: ___________________________________
E-MAIL ADDRESS: _______________________________
A-25. The contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions (Attachment 0003 -
Contractor Overhaul TAV-C Requirements).
A-26. DFARS Clause 252.204-7012, Jan 2023 is no longer the most recent version. Due to this, we are referencing Class Deviation 2024-
O0013, for DFARS clause 252.204-7012, which is dated 2 May 2024.
A-27. DFARS Clause 252.209-7004 is listed in this document with the title "Subcontracting with Firms that are Owned or Controlled by the Government of a Terrorist Country", however this clause was renamed on 04/25/2024 to be "Subcontracting with Firms that are Owned or
Controlled by the Government of a Country that is a State Sponsor of Terrorism.
*** END OF NARRATIVE A0001 ***
3 75
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
THE CONTRACTOR IS REQUIRED TO SUBMIT A MAINTENANCE
AND OVERHAUL PLAN IN ACCORDANCE WITH DATA ITEM
A003(EXHIBIT C) THE DOCUMENTATION SHALL BE SUBMITTED
30 DAYS AFTER CONTRACT AWARD.
THE MAINTENANCE AND OVERHAUL PLAN MUST BE__________________________________________
SUBMITTED_AND APPROVED BEFORE OVERHAUL AND/OR UPGRADE______________________________________________________
MAY_BEGIN.__________
(End of narrative A001)
0001AA PRODUCTION VERIFICATION AUDIT (PVA) $ ** NSP ** ___________________________________ __________________
SERVICE REQUESTED: PVA
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN represents the Product Verification Audit
(PVA) for the Computer Flight Control, output NSN:
6615-01-599-7108, as shown in CLINs 0002AA and 0003AA.
This is a Firm Fixed Price CLIN.
Offeror is required to fill in a proposed firm fixed unit price for the PVA:
PVA shall be in accordance with The "Product
Verification Audit (PVA) Statement of Work" in
Narrative E0001.
PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the
Government Quality Office for scheduling of the PVA by email to the following address:
usarmy.redstone.devcom-avmc.mbx.amr-mqcontracts@ army.mil
With copy emailed to the Contract Specialist at:
brenda.nelson.civ@army.mil usarmy.redstone.acc.list.acc-rsa-mo-postaward@ army.mil.
The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.
4 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
PVA requires approval prior to Government acceptance of contract deliverable assets.
Failure to pass the PVA may lead to Termination for_____________________________________________________
Default of the contract.________________________
Payment Instructions: The Contractor will be paid for______________________ the PVA by utilizing the Wide Area Work Flow (WAWF) site. The Contractor must enter code W58H0Z when submitting the PVA invoice, making it to the attention of Lindy Pinchon. The Contracting Officer will approve the PVA invoice.
(End of narrative C001)
0002 COMPUTER FLIGHT CONTROL (US)
NSN: 6615-01-599-7108
Mfr CAGE: 73030
Mfr Part Number: 1200100-3-004
Estimated yearly quantities for CLIN 0002AA are:
Ordering Period 1: 120 each minimum qty
Ordering Period 2: 120 each estimated qty
Ordering Period 3: 120 each estimated qty
Ordering Period 4: 120 each estimated qty
Ordering Period 5: 120 each estimated qty
Funds for the ordering period 1 quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the firm fixed price contract.
(End of narrative A001)
0002AA OVERHAUL, COMPUTER FLIGHT CONTROL(US) $ $ _____________________________________ ______________ __________________
COMMODITY NAME: COMPUTER FLIGHT CONTROL (US)
CLIN CONTRACT TYPE:
Firm Fixed Price
INPUT:
NSN: 6615-01-599-7108
P/N: 1200100-3-004
OUTPUT:
NSN: 6615-01-599-7108
P/N: 1200100-3-004
5 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Overhaul shall be in accordance with the Statement of Work.
This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the
Statement Of Work (SOW).
OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT
PRICE:
YEAR 1- U/P $_____________ (FFP) Est Qty 120 ea
YEAR 2- U/P $_____________ (FFP) Est Qty 120 ea
YEAR 3- U/P $_____________ (FFP) Est Qty 120 ea
YEAR 4- U/P $_____________ (FFP) Est Qty 120 ea
YEAR 5- U/P $_____________ (FFP) Est Qty 120 ea
INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS
CLIN.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENT, SECTION J, ATTCH 001
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Packaging and Marking: Contractor must comply with
MIL-STD-2073-1E with change 4, DOD Standard Practice for Military Packaging, and MIL STD 129R, Military
Marking for Shipment and Storage, not withstanding any language in Attachment 0001 to the contrary.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.
(End of narrative F001)
6 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0003 COMPUTER FLIGHT CONTROL (FMS)
NSN: 6615-01-599-7108
Mfr CAGE: 73030
Mfr Part Number: 1200100-3-004
Estimated yearly quantities for CLIN 0003AA are:
Ordering Period 1: 0 each minimum qty
Ordering Period 2: 30 each estimated qty
Ordering Period 3: 30 each estimated qty
Ordering Period 4: 30 each estimated qty
Ordering Period 5: 30 each estimated qty
Funds for the ordering period 1 quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the firm fixed price contract.
(End of narrative A001)
0003AA OVERHAUL, COMPUTER FLIGHT CONTROL (FMS) $ $ _______________________________________ ______________ __________________
COMMODITY NAME: COMPUTER FLIGHT CONTROL (FMS)
CLIN CONTRACT TYPE:
Firm Fixed Price
INPUT:
NSN: 6615-01-599-7108
P/N: 1200100-3-004
OUTPUT:
NSN: 6615-01-599-7108,
P/N: 1200100-3-004
Overhaul shall be in accordance with the Statement of Work.
This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the
Statement Of Work (SOW).
OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT
7 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
PRICE:
YEAR 1- U/P $_____________ (FFP) Est Qty 0 ea FMS
YEAR 2- U/P $_____________ (FFP) Est Qty 30 ea FMS
YEAR 3- U/P $_____________ (FFP) Est Qty 30 ea FMS
YEAR 4- U/P $_____________ (FFP) Est Qty 30 ea FMS
YEAR 5- U/P $_____________ (FFP) Est Qty 30 ea FMS
INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS
CLIN.
This CLIN will be used only if a FMS Customer requires the item. If no FMS Customers are identified, the US Army Requirer may utilize the
FMS quantity.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENT, SECTION J, ATTCH 001
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Packaging and Marking: Contractor must comply with
MIL-STD-2073-1E with change 4, DOD Standard Practice for Military Packaging, and MIL STD 129R, Military
Marking for Shipment and Storage, notwithstanding any language in Attachment 0001 to the contrary.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.
(End of narrative F001)
0004 SCRAP
8 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0004AA SCRAP $ ______ __________________
SERVICE REQUESTED: SCRAP
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is for assets which are beyond economical repair (i.e., scrap) from CLINs
0002AA and 0003AA.
The Government's estimated quantity per ordering period is 10 each. The estimated quantity of 10 is for proposal evaluation purposes only.
Offeror is required to fill in a proposed firm fixed unit price for each ordering period:
Ordering Period 1 ___________(FFP)Est Qty 10 ea
Ordering Period 2 $__________(FFP)Est Qty 10 ea
Ordering Period 3 $__________(FFP)Est Qty 10 ea
Ordering Period 4 $__________(FFP)Est Qty 10 ea
Ordering Period 5 $__________(FFP)Est Qty 10 ea
Scrapped assets from CLINs 0002AA and 0003AA shall be in accordance with the Statement of Work.
Units determined to be scrapped in accordance with Section C Statement of Work shall be reflected as an increase in CLIN 0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA and 0003AA as applicable.
In the event the Procuring Contracting Officer
(PCO) determines that certain items shall be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.
The Government may, at its discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
9 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
0005 CONTAINER
0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________
SERVICE REQUESTED: CONTAINER
CLIN CONTRACT TYPE:
Firm Fixed Price
THE GOVERNMENT'S ESTIMATED QUANTITY PER ORDERING
PERIOD IS 10 EACH FOR PROPOSAL EVALUATION PURPOSES
ONLY.
Offeror is required to fill in proposed firm fixed unit prices for ordering periods 1 to 5:
ORDERING PERIOD 1 $____________ Est Qty 10 EA
ORDERING PERIOD 2 $____________ Est Qty 10 EA
ORDERING PERIOD 3 $____________ Est Qty 10 EA
ORDERING PERIOD 4 $____________ Est Qty 10 EA
ORDERING PERIOD 5 $____________ Est Qty 10 EA
The contractor shall provide the container in accordance with Section C Statement of Work entitled
Statement of
Work and Section J, Attachment 0001 M&O
Packaging Requirements.
The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.
The Contractor, IAW Section C Statement of Work, should submit a Report of Discrepancy (ROD) SF
Form 364 through the Defense Contract Management
Agency (DCMA) Quality Assurance Representative
(QAR) for verification within 7 working days.
When assets are received in unserviceable containers or without containers, approval of the PCO is required before replacement
10 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
containers are purchased.
This CLIN covers containers for CLINs 0002AA and
0003AA.
THIS IS A FIRM-FIXED PRICE CLIN.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0006 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________
This CLIN is "Not Separately Priced" (NSP). Pricing for data shall be included in the unit prices of
CLINs 0002AA and 0003AA.
The Contractor shall provide Data Items A001 - A004 in accordance with the Contract Data Requirements
List, Exhibits A-D.
(End of narrative A001)
A001 GOVERNMENT PROPERTY INVENTORY REPORT $ ** NSP ** ____________________________________ __________________
SERVICE REQUESTED: GOVERNMENT PROPERTY INVENTORY
DATA ITEM A001 - DI-MGMT-80441D - Government Property
Inventory Report Instructions.
Report to be submitted no later than 15 days after completion of physical inventory.
(End of narrative C001)
Deliveries or Performance _________________________
11 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A002 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________
DISCREPANCY $ ** NSP ** ___________ __________________
SERVICE REQUESTED: REPORT OF SHIPPING (ITEM)
DATA ITEM A002 - DATA ACQUISITION DOCUMENT NUMBER :
DI-MGMT-80503
Submission of the Report of Shipping and Packaging
Discrepancy shall occur within 10 days of discovering the discrepancy.
(End of narrative C001)
Deliveries or Performance _________________________
A003 TECHNICAL REPORT--STUDY/SERVICES- M&O PLAN $ ** NSP ** __________________________________________ __________________
SERVICE REQUESTED: TECHNICAL REPORT-STUDY/SERVIC
SERVICE REQUESTED: CDRL A003
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ITEM A003 - DATA ACQUISITION DOCUMENT NUMBER :
DI-MISC-80508B
Data Item A003 refers to the M&O Plan, as required by CLIN 0001. The M&O Plan shall be submitted to this office within 30 days after contract award date. PVA cannot occur until the M&O Plan is submitted and approved.
Once the Government has approved the Contractor's plan, if the Contractor makes a change to the plan that affects a Critical Safety Item Critical
Characteristic, the Contractor shall submit the revised plan to the Government within 10 calendar days for review and approval.
Note: A copy of the plan shall be forwarded to the contract specialist at: brenda.nelson.civ@army.mil.
(End of narrative C001)
Deliveries or Performance _________________________
12 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A004 LOGISTICS PRODUCT DATA-TAMMS-A $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: LOGISTICS PRODUCT DATA-TAMMS-
SERVICE REQUESTED: CDRL A004
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ITEM A004 - DATA ACQUISITION DOCUMENT NUMBER
DISESS-
81758A
The contractor shall provide data as required based upon delivery schedules and contract requirements.
Within two business days after Government QA acceptance the contractor shall submit a copy of the
Procurement Integrated Enterprise Environment
(PIEE), Wide Area Workflow (WAWF) receiving reports listing each Serial Number (SN) shipped to the email address listed below. Or as an option, the contractor may add the email address as an optional notification email in PIEE/WAWF when creating the
DD250. A final receiving report for each Delivery
Order (DO) and or contract closeout shall be via submittal through PIEE/WAWF; use DODAAC W81D17 to close this CLIN.
The Requiring Office will validate all TAMMS-A data required by the contract/DO and verify that all
TAMMS-A data has been received. Any discrepancies will be identified within 5 working days after receipt and comments provided to the contractor. The contractor shall correct errors and resubmit within
10 working days after receipt of the requiring office comments and before shipping the components.
TAMMS-A submittal/approval shall be via contractors use of the TAMMS-A/MCDS web portal at https://tammsa
.redstone.army.mil . If the web portal is unavailable or the contractor currently does not have a TAMMS-A/MCDS account, contact the requiring office at the email address listed below.
The contractor may email the requiring office at usarmy.redstone.amcom.mbx.g3m-snrr@army.mil for more information regarding this CDRL requirement and compliance.
(End of narrative C001)
Deliveries or Performance _________________________
13 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
1 Statement of Work
1. The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data necessary to accomplish the inspection and overhaul for the COMPUTER FLIGHT CONTROL for the UH-60 (hereinafter the component) that is required to return the component to a serviceable condition sufficient to meet the standard of continued airworthiness in accordance with (IAW) Army
Regulation (AR) 70-62. Upon completion of the overhaul, the overhauled components shall be packaged IAW with this resultant contract and shipped to the destination(s) specified in each individual delivery order.
2. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the component to the extent necessary to determine if the component is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer and shall discontinue the overhaul until given further instructions or the authorization for disposition of the component by the PCO.
3. In the event the PCO determines that certain items should be scrapped, the Contractor shall scrap such items at the fixed unit price in Section B. In IAW Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.245-7005 Management and
Reporting of Government Property, included in this solicitation, the Contractor shall complete the Plant Clearance Inventory Schedule using the Plant Clearance capability of the GFP Module of the Procurement Integrated Enterprise Environment (PIEE), an electronic equivalent of the Standard Form 1428, Inventory Disposal Schedule. Users shall register for access and obtain training on the PIEE home page https://wawf.eb.mil/piee-landing . Such scrapped components shall count toward the quantities ordered and the Government can replace any components scrapped by the Contractor.
4. The Government does not have an adequate Depot Maintenance Work Requirement (DMWR) for this effort.
5. Critical Safety Item (CSI): The Computer Flight Control is not a CSI.
6. Upon receipt of the components, Contractor shall inspect containers for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Components received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved GFP procedures. Components received improperly packaged, damaged with corrosion/deterioration, or those with shipping discrepancies shall be reported IAW DI-MGMT-80503 (See section B, Contract Data
Requirements List [CDRL] A002).
7. GFP Attachment: The components being provided to the Contractor are identified and tracked as GFP. The Contractor shall maintain a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) GFP in its possession IAW
Federal Acquisition Regulation (FAR) 52.245-1, and its property management system shall satisfy the requirements of this clause. The
Contractor shall record the acquisition, receipt, shipment, consumption, disposal of GFP, and any transfer to another contract utilizing the GFP Module in PIEE, https://piee.eb.mil , as required by the DFARS Procedures, Guidance, and Information (PGI) 245.103-72
Government-furnished Property Attachments to Solicitations and resultant contracts. GFP training and guidance is located at the
Department of Defense (DoD) Procurement Toolbox at https://dodprocurementtoolbox.com/ .
8. Contractor shall comply with U.S. Army Technical Manual (TM) 1-1500-345-23, Painting and Marking of Army Aircraft, or most recent version, if painting is required in the performance of this resultant contract.
9. Contractor shall submit required data IAW the CDRL, DD Form 1423, Exhibit A - D electronically to the addresses indicated on the DD Form(s) 1423.
10. Product Verification Audit (PVA): The Contractor shall conduct the PVA IAW the detailed instructions as specified in
Section E of the solicitation and resultant contract.
11. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall complete the forms and records as specified in Department of the Army Pamphlet (DA PAM) 738-751 and TM 1-1500-328-23 as detailed in the attached TAMMS-A instructions. The
U.S. Army Aviation Missile Command (AMCOM) TAMMS-A Customer Support Office is reachable via email at usarmy.redstone.amcom.mbx.g3m-snrr@army.mil. The Contractor shall prepare TAMMS-A data IAW DI-SESS-81758A and the TAMMS-A instructions attached to the solicitation and resultant contract (CDRL A004).
12. Product Quality Deficiency Reports (PQDRs): When requested, the Contractor shall assist the cognizant Contract
Administration Office in evaluating PQDRs and exhibits for defects reported on components overhauled under this resultant contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the Contractors Quality Program. The Contractor shall utilize the Product Data
Reporting and Evaluation Program (PDREP) to submit a PQDR at https://www.pdrep.csd.disa.mil/pdrep_files/report_tools/pqdr.htm IAW
AR 702-7-1, Reporting of Product Quality Deficiencies within the U.S. Army.
14 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
13. The items the Contractor shall overhaul are identified below:
Input NSN P/N
6615-01-599-7108 1200100-3-004
Output NSN P/N
6615-01-599-7108 1200100-3-004
14. The overhaul planned quantity for 5 years is Minimum 120, Maximum 720. Input will be 30 days after receipt of order.
Output shall be as specified in the solicitation and resultant contract schedule. Serviceable assets shall be returned to Department of
Defense Activity Address Directory (DODAAC) W25G1W, Plant 7000.
1st year qty 120 4th year qty 150
2nd year qty 150 5th year qty 150
3rd year qty 150
15. Transactional Inventory Procedures - The Contractor shall prepare the following reports:
a. The Contractor shall complete and retain a signed copy of DD Form 1348-1A, receipt for repairable on all shipments.
The Contractor shall complete the DD Form 1348-1A and include a signature to evidence shipment and receipt. Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:
https://www.dla.mil/Disposition-Services/DDSR/Turn-In/1348-Help/
The Contractor shall prepare this form and include the following corresponding receipt information:
(1) Document Number - (Positions 30-44)
(2) National Stock Number (NSN) - (Positions 8-22)
(3) Condition Code - (Position 71)
(4) Unit Price - (Positions 74-80)
(5) Total Price - (Block 1)
(6) Actual Quantity Received - (Block 10)
(7) Nomenclature - (Block 17)
(8) Signature and Date - (Blocks 22 and 23)
For questions with the above information, please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil
b. The Contractor shall perform an annual inventory of all GFP, including items for overhaul and any contractor-acquired property such as containers during the period of performance of this resultant contract. This shall include any subcontractor inventories where GFP has been provided by the Government for overhaul. Contractor shall provide all results, findings, and corrective actions of any annual physical inventories to the Government IAW FAR Clause 52.245-1(f)(1)(iv), Physical Inventory. The Contractor shall prepare a physical inventory report IAW DI-MGMT-80441D (CDRL A001).
c. The Contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Attachment
0003 "Contractor Overhaul TAV-C Requirements and TAV-C Portal End User Standard Operating Procedures (SOP)".
16. Foreign Military Sales (FMS): Contractor shall always segregate US quantities and FMS quantities and must keep segregated at all times in transit and in storage and shall flow down this requirement to all subcontractors.
17. Reserved
18. Item Unique Identification (IUID): The Contractor shall apply IUID IAW Military Standard (MIL-STD) MIL-STD-130N, AR 700-145, Item
Unique Identification, and DA PAM 700-145, IUID Procedures, DFARS 211.274-2 Policy for item unique identification, which requires in paragraph (a)(3)(i) that IUID is required regardless of value for any DoD serially managed item (reparable or nonrepairable) or subassembly, component, or part embedded within a subassembly, component, or part. All registered Unique Item Identifiers (UIIs) shall be maintained as received and any UIIs created for component received without one, shall follow any published documentation, such as
DMWRs or Maintenance Engineering Orders (MEO). In the absence of these documents, Contractors must strictly adhere to the procedures outlined in the MIL-STD-130N. Maintaining a UII as received means the construction of the UII string shall not change; however, the UII can and will receive updates to the associated data, such as Marks, PN Rollovers, within the DoD IUID National Registry. Any questions about the IUID program should be directed toward the AMCOM IUID helpdesk at 256-425-8566 or usarmy.redstone.amcom.mbx.immc-sim-iuid@army.mil.
19. Shipping Containers and Shipment: Contractor shall utilize the packaging requirements contained in Attachment 0001, M&O Packaging
Requirements. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be
Contractor-furnished property. The method of shipment must include tracking of all packages for maintaining government property accountability and visibility. Contractor must comply with MIL-STD-2073-1E, DoD Standard Practice for Military Packaging and MIL-STD-
15 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
129R, DoD Standard Practice for Military Marking for Shipment and Storage. The Contractor shall package electronic parts susceptible to static discharge damage IAW ANSI/ESD S20.20-2021 Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding
Electrically Initiated Explosive Devices). If TAMMS-A is required, each individual repaired item must include a copy of all forms required by The Army Maintenance Management System Aviation (TAMMS-A).
*** END OF NARRATIVE C0001 ***
16 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996
3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
5 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2000 or higher.
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
6 PRODUCT VERIFICATION AUDIT (PVA)
Purpose: This PVA requirement establishes/assigns responsibilities for insertion of PVA procedures into overhaul work directives,maintenance data packages, and contract documents along with procedures and instructions to be applied in performing PVAs during overhaul, maintenance, modification kit installation, rework, remanufacture, manufacturing, and new procurement contracts. The
PVA candidate(s) are used to evaluate that the contractor's processes and procedures are adequate to ensure component integrity.
(A) The Contractor shall perform and present for acceptance THREE units as specified in the resultant contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, new manufacture technical requirements or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure items conform to contractual requirements. The Contractor may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. PVA actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the Combat Capabilities Development Command (DEVCOM) Aviation and Missile Center (AvMC) Systems Readiness Directorate (SRD). Like or similar items may be grouped for these purposes provided concurrence is obtained from SRD Quality Management Division. The contractor may be directed by the Procuring Contracting Officer (PCO) to increase or decrease the scope of a PVA pursuant to the "Changes" clause of the contract for non-commercial items.If however, this procurement is for a commercial item, the contractor and the contracting officer (CO) will need to enter into a bilateral contract modification to increase or decrease the scope of a PVA.
(B) The Contractor shall,
(1) With the concurrence of SRD Quality Management Division (QMD), schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify PCO with information copy to the SRD QMD, ATTN, "usarmy.redstone.devcom-avmc.mbx.qs-contracts@army.mil" of the date the
PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
(C) The PVA candidate will be selected by the SRD PVA Team Chairman at random from the three (3) tendered candidates for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
(1) Alternate Procedure. Normally, three assets are required to be completed at time of PVA. If in the PVA Team Chairman's judgment it is in the best interest of the Government, an alternative approach may be taken due to circumstances such as shortage of overhaul assets, shortage of replacement parts, time constraints, or other considerations. At the PVA Team Chairman's discretion, only one PVA candidate may be required to be completed while the other two assets can be in various stages of overhaul as agreed upon (prior to the beginning of the PVA) between the PVA Team Chairman and the facility to be audited. For instance, one asset could be disassembled and ready for Overhaul Inspection
Procedures, while the other may be prepared for a critical process such as acceptance testing. (This approach is particularly helpful if the critical process is performed by a subcontractor.) For reoccurring audits, if any,the audit candidate will be selected by the PVA
17 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Team Chairman from all completed items currently available.
(D) The item selected for PVA will be inspected for adherence to preservation, packaging, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(E) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to maintain,overhaul, repair, or manufacture the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
(F) Disassembly for overhauled items will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant Government Quality
Assurance Representative (QAR), and the SRD PVA Team Chairman and team personnel.
(G) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) will be conducted of all physical characteristics, to include but not limited to any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings, Depot
Maintenance Work Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this resultant contract.
(H) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as
Shot peening, heat treating, etc.) performed by subcontractors may also be audited. Contractor shall be able to demonstrate that all testing/ inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
(I) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for Government acceptance including preservation, packaging, marking, and update of historical records and all applicable documentation.
(J) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the SRD PVA Team Chairman's discretion, examination of representative assemblies may be used as evidence of compliance to specification requirements. The SRD PVA Team Chairman will determine the scope and detail of the PVA process. The SRD PVA Team Chairman may delegate follow-up actions to the DCMA QAR,when it is determined to be prudent to the PVA.
(K) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor.After the PVA is completed, the SRD PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant
DCMA QAR and PM Representative. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved. Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e. workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to ensure compliance with requirements.
(L) All defects will be recorded on a SRD PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each finding to the contractor quality assurance element and the cognizant DCMA QAR and PM Representative. This will allow immediate actions to begin in the resolution of the defect. Corrective actions, as well as actions taken to prevent recurrence,shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor quality manager or designated representative and the SRD PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects:
(1) Observation: In the event an observation is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
(2) Minor: In the event a minor defect is discovered, the following actions shall be taken:
(a) The contractor shall isolate the cause of the defect and initiate corrective actions.
(b) All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
(c) In the event a minor defect is a recurrant deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
18 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(3) Major: In the event a major defect is discovered, the following actions shall be taken:
(a) The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the
PVA Chairman.
(b) The contractor shall provide the DCMA QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
(c) The contractor shall determine impact of the defect on products previously delivered under the resultant contract, if any, and initiate corrective action to address those units at no additional cost to the US Government.
(d) The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
(e) The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
(f) The contractor shall assure the cognizant DCMA QAR and the SRD PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however,a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the DCMA QAR and the SRD PVA Team Chairman within 24 hours after the verbal response.
(4) Critical: In the event a critical defect is discovered, the following actions shall be taken:
(a) All actions outlined in paragraph 3 above shall be completed.
(b) Upon request, the contractor shall provide the SRD technical information necessary for the issuance of a Safety of Flight
Message or Aviation Safety Action Message to the field (if necessary).
(c) Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality assurance process discrepancies that affect the outcome of product(s)outside the scope of the PVA will require the cognizant DCMA QAR to issue a Corrective Action Request.
(M) Finding Definitions:
Minor Finding: A defect or a departure from established processes or standards that may result in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .