W58D2M21Q0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS #1

Question #1:

- What is the difference between FACTOR I Past Experience and FACTOR II Past performance?

- Can we submit the same contract for both Experience and Performance?

Government answer:

- The difference between the two evaluation factors is the methodology used by the Government to evaluate the acceptability or unacceptability, in accordance with the description contained into Addendum to FAR clause 52.212- 2 of the standard form/solicitation 1449.

- As long as the past experience, or past performance, matches within the above mentioned description, yes.

Question #2:

Is it possible to participate in the tender without having made the inspection?

Government answer: As per the instructions above does not preclude the Vendor from participating in this requirement. NOTE: Interested parties are NOT

Question #3:

than 90 days. In our case, the issue date of the DURC is 11/02/2021 and it expires at 11/06/2021. It is valid for 120 days and before that date it is not possible to request a new one. The 90 days would expire on 11/05/2021 during the evaluation of the documentation. Is it okay if we attach the DURC we have?

Government answer: This solicitation due in date is May 3, 2021. Addendum to 52.212-1 specifies that the quoter shall provide with the Quotation a copy NOT older than ninety (90) days from the date of initial receipt of quotation.

Therefore, in the event the DURC expires after that date, the documentation was valid for the established period, and the renewal of the DURC will be required at that point.

Question #4:

and DUNS number. What is it about the POC?

Government answer: oint of Contact/Authorized Representative f the participating and interested Company.

Question #5:

On page 54 letter e) "A completed copy of the representations and certifications at FAR 52.212-3 or a copy of the first page of the contractor's SAM on line records at Caution-www.sam.gov/SAM" is required. What documentation should we produce for this purpose? Is it sufficient to report the CAGE and DUNS numbers in the cover letter and in the covers of each volume / factor?

Government answer: that sentence indicates that should be provided an electronic copy of the webpage showing

Question #6:

The formats relating the Company Experience and Past Performance requirement will be uploaded to the platform?

Or can we use a model used for another solicitation?

Government answer: the mentioned Past experience questionnaire and past performance questionnaire are uploaded to this posting as attachments #14 and #15.

Question #7:

Regarding the "Attachment6DetailB2-B5" file, we ask:

- detail A-2 we ask for confirmation that a fence with a radius of 4 meters and therefore a perimeter of 12.64 meters is envisaged.

- detail A-2 does the fence relate to a single plant or, given the size, will there be more herbaceous essences within the area?

- the image has numbers with different colors. It is requested to clarify whether there is a difference on a technical level between the two colors (green and orange) and to what they correspond.

- confirmation is requested that the number of posts for each fence is equal to 8.

Government answer:

-Correct. For every tree to be cut, marked in Detail A, shall be installed a fence around the poplar stumps. (para

5.2.6 Task 6 of technical specification).

-If some trees are nearest between them, the fence can include some inside. (para 5.2.6 Task 6 of technical specification) -Orange: Pine / Green: White Poplar.

-Correct, if the fence is around one poplar stump. Number of posts can be changed is some trees can be included in one fence.

Question #8:

Regarding the "Attachment6DetailB2-B5" file, we ask:

- detail B-5 from the drawing is a double fence with closure on the upper part to create a tunnel.

Information regarding purpose and functionality is requested.

- detail B-5, the length of this part of the double fence with tunnel is required.

- detail B-5 is to be carried out along the entire length of the fence or is it just a part?

- the entire length of the fence to be built is required as per detail B-1

- technical information is required regarding detail B-4

- indication of the entire length referred to in particular B-3 is required.

Government answer:

-The tunnel is necessary to the fallow deer/wild boars capture and loading of them on a truck. (para 5.2.5 Task 5 of technical specification) -The length of tunnel is: 12 mt.

-Just a part: 12 mt.

-The length of the entire perimeter fence shall be 140 mt.

-Every 12 lm, fence posts shall be reinforced by bracing poles -B-3 is a detail of the perimeter fence. The entire fence shall be 140 lm.

Question #9:

During the meeting, reference was made to a file / document which will be updated shortly. What document is it about?

Government answer:

The file is Drawing revised on 22 Apr 2021.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 03-May-2021 12:00 PM to 10-May-2021 12:00 PM.

(End of Summary of Changes)