This is an amendment to a solicitation for professional services to support program development, integration, acquisition and bridging to logistics and operations. Key details include:

  • The solicitation is from the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground.

  • The amendment incorporates revised attachments including the performance work statement, evaluation criteria, and cost workbook instructions. It also updates contact information and extends the proposal submission deadline to September 6, 2023.

  • The opportunity is for a cost-plus-fixed-fee and fixed price level of effort contract to provide services such as program support, systems engineering, and logistics.

  • Individual task orders will define specific requirements including quantities, deliverables, and performance standards. Pricing will be negotiated at the task order level.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req No. 5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print) 16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Cost Plus Fixed Fee

W56KGY

ACC-APG Division C (W56KGY)

6565 SURVEILLANCE LOOP

APG, MD 21005-1846

ERIC J. ROBERTS

EMAIL: ERIC.J.ROBERTS48.CIV@ARMY.MIL

W56KGY-23-R-0001

2023JUL18

X

X 2023SEP06 01:00pm

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 9

17 August 2023

17 August 2023

Eric Roberts - Team Lead KO - ACC-APG

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: ERIC J. ROBERTS

Buyer Office Symbol/Telephone Number: CCAP-CCC/(443)861-5371

Type of Contract 1: Cost Plus Fixed Fee

Type of Contract 2: Fixed Price Level of Effort

Kind of Contract: Service Contracts

*** End of Narrative A0000 ***

1. The purpose of this Amendment 0001 to solicitation W56KGY-23-R-0001, is to incorporate the following changes:

a. Incorporate a revised Attachment 0001 - Base Performance Work Statement dated 15 August 2023 in Section J;

b. Incorporate a revised Attachment 0009 - Section L Supplement dated 15 August 2023 in Section J;

c. Incorporate a revised Attachment 0010 - Section M Supplement dated 15 August 2023 in Section J;

d. Incorporate a revised Attachment 0011 - Past Performance Instructions dated 15 August 2023 in Section J;

e. Incorporate a revised Attachment 0012 - Cost Workbook Instructions dated 15 August 2023 in Section J;

f. Incorporate a revised Attachment 0013 - Task Order 01 - PWS dated 15 August 2023 in Section J;

g. Incorporate a revised Attachment 0014 - Task Order 01 - Quantities/FTE dated 15 August 2023 in Section J;

h. Incorporate a revised Attachment 0017 - Task Order 01 - CRDLS dated 15 August 2023 in Section J to incorporate a revised

Performance Cost Template;

i. Update language provided in fillable clauses in the solicitation;

j. Update the Contract Specialist for this action to Ray Tchoulakian, raymond.g.tchoulakian.civ@army.mil;

k. Extend the proposal submission due date to 1:00 PM Eastern Time, 06 September 2023.

2. Except as provided herein, all other terms and conditions of the solicitation remains unchanged and in full force and effect.

*** END OF NARRATIVE A0002 ***

2 9

W56KGY-23-R-0001

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

E-1 CHANGED 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

As explicitly defined in order requirements.

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

3 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

F-1 CHANGED 52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT SEP/2000

(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of "As explicitly defined in Individual Orders, QASP or an amount determined by the Contracting Officer" per calendar day of delay.

(b) If the Government terminates this contract in whole or in part under the Default -- Fixed-Price Supply and Service clause, the

Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default -- Fixed-Price Supply and Service clause in this contract.

(End of Clause)

4 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

I-1 CHANGED 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING SEP/1989

(a) The Contractor shall test "Number of units to be explicitly defined in individual orders" unit(s) of Lot/Item "To be defined in individual orders" as specified in this contract. At least "To be Determined" calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within "To be explicitly defined in individiual orders" calendar days from the date of this contract to "TBD" marked First Article Test Report: Contract No. ___, Lot/Item No. ___. Within "TBD" calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the

Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the

Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(End of Clause)

I-2 CHANGED 52.222-2 PAYMENT FOR OVERTIME PREMIUMS JUL/1990

(a) The use of overtime is authorized under this contract if the overtime premium does not exceed "$0, or as explicitly defined in individual orders" or the overtime premium is paid for work --

(1) Necessary to cope with emergencies such as those resulting from accidents, natural disasters, breakdowns of production equipment, or occasional production bottlenecks of a sporadic nature;

(2) By indirect-labor employees such as those performing duties in connection with administration, protection, transportation, maintenance, standby plant protection, operation of utilities, or accounting;

(3) To perform tests, industrial processes, laboratory procedures, loading or unloading of transportation conveyances, and operations in flight or afloat that are continuous in nature and cannot reasonably be interrupted or completed otherwise; or

(4) That will result in lower overall costs to the Government.

5 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(b) Any request for estimated overtime premiums that exceeds the amount specified above shall include all estimated overtime for contract completion and shall --

(1) Identify the work unit; e.g., department or section in which the requested overtime will be used, together with present workload, staffing, and other data of the affected unit sufficient to permit the Contracting Officer to evaluate the necessity for the overtime;

(2) Demonstrate the effect that denial of the request will have on the contract delivery or performance schedule;

(3) Identify the extent to which approval of overtime would affect the performance or payments in connection with other Government contracts, together with identification of each affected contract; and

(4) Provide reasons why the required work cannot be performed by using multishift operations or by employing additional personnel.

(End of Clause)

I-3 CHANGED 252.217-7001 SURGE OPTION DEC/2018

(a) General. The Government has the option to

(1) Increase the quantity of supplies or services called for under this contract by no more than TBD percent or as explicitly defined in TO/DO requirements; and/or

(2) Accelerate the rate of delivery called for under this contract, at a price or cost established before contract award or to be established by negotiation as provided in this clause.

(b) Schedule.

(1) When the Capabilities Analysis Plan (CAP) is included in the contract, the option delivery schedule shall be the production rate provided with the Plan. If the Plan was negotiated before contract award, then the negotiated schedule shall be used.

(2) If there is no CAP in the contract, the Contractor shall, within 30 days from the date of award, furnish the Contracting Officer a delivery schedule showing the maximum sustainable rate of delivery for items in this contract. This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing facilities, equipment, and subcontracting structure.

(3) The Contractor shall not revise the option delivery schedule without approval from the Contracting Officer.

(c) Exercise of option.

(1) The Contracting Officer may exercise this option at any time before acceptance by the Government of the final scheduled delivery.

(2) The Contracting Officer will provide a preliminary oral or written notice to the Contractor stating the quantities to be added or accelerated under the terms of this clause, followed by a contract modification incorporating the transmitted information and instructions. The notice and modification will establish a not-to-exceed price equal to the highest contract unit price or cost of the added or accelerated items as of the date of the notice.

(3) The Contractor will not be required to deliver at a rate greater than the maximum sustainable delivery rate under paragraph (b)(2) of this clause, nor will the exercise of this option extend delivery more than 24 months beyond the scheduled final delivery.

(d) Price negotiation.

(1) Unless the option cost or price was previously agreed upon, the Contractor shall, within 30 days from the date of option exercise, submit to the Contracting Officer a cost or price proposal (including a cost breakdown) for the added or accelerated items.

(2) Failure to agree on a cost or price in negotiations resulting from the exercise of this option shall constitute a dispute concerning a question of fact within the meaning of the Disputes clause of this contract. However, nothing in this clause shall excuse the Contractor from proceeding with the performance of the contract, as modified, while any resulting claim is being settled.

(End of clause)

6 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

I-4 CHANGED 252.237-7023 CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES OCT/2010

(a) Definitions. As used in this clause --

(1) Essential contractor service means a service provided by a firm or individual under contract to DoD to support mission-essential functions, such as support of vital systems, including ships owned, leased, or operated in support of military missions or roles at sea;

associated support activities, including installation, garrison, and base support services; and similar services provided to foreign military sales customers under the Security Assistance Program. Services are essential if the effectiveness of defense systems or operations has the potential to be seriously impaired by the interruption of these services, as determined by the appropriate functional commander or civilian equivalent.

(2) Mission-essential functions means those organizational activities that must be performed under all circumstances to achieve DoD component missions or responsibilities, as determined by the appropriate functional commander or civilian equivalent. Failure to perform or sustain these functions would significantly affect DoD's ability to provide vital services or exercise authority, direction, and control.

(b) The Government has identified all or a portion of the contractor services performed under this contract as essential contractor services in support of mission-essential functions. These services are listed in attachment "To be explicity defined or negotiated in individual orders, or as authorized in writing prior by Contracting Officer", Mission-Essential Contractor Services, dated TBD.

(c)(1) The Mission-Essential Contractor Services Plan submitted by the Contractor, is incorporated in this contract.

(2) The Contractor shall maintain and update its plan as necessary. The Contractor shall provide all plan updates to the Contracting

Officer for approval.

(3) As directed by the Contracting Officer, the Contractor shall participate in training events, exercises, and drills associated with

Government efforts to test the effectiveness of continuity of operations procedures and practices.

(d)(1) Notwithstanding any other clause of this contract, the Contractor shall be responsible to perform those services identified as essential contractor services during crisis situations (as directed by the Contracting Officer), in accordance with its Mission-

Essential Contractor Services Plan.

(2) In the event the Contractor anticipates not being able to perform any of the essential contractor services identified in accordance with paragraph (b) of this clause during a crisis situation, the Contractor shall notify the Contracting Officer or other designated representative as expeditiously as possible and use its best efforts to cooperate with the Government in the Government's efforts to maintain the continuity of operations.

(e) The Government reserves the right in such crisis situations to use Federal employees, military personnel, or contract support from other contractors, or to enter into new contracts for essential contractor services.

(f) Changes. The Contractor shall segregate and separately identify all costs incurred in continuing performance of essential services in a crisis situation. The Contractor shall notify the Contracting Officer of an increase or decrease in costs within ninety days after continued performance has been directed by the Contracting Officer, or within any additional period that the Contracting Officer approves in writing, but not later than the date of final payment under the contract. The Contractor's notice shall include the

Contractor's proposal for an equitable adjustment and any data supporting the increase or decrease in the form prescribed by the

Contracting Officer. The parties shall negotiate an equitable price adjustment to the contract price, delivery schedule, or both as soon as is practicable after receipt of the Contractor's proposal.

(g) The Contractor shall include the substance of this clause, including this paragraph (g), in subcontracts for the essential services.

(End of clause)

7 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0001 BASE PERFORMANCE WORK STATEMENT 15-AUG-2023 020 EMAIL

Attachment 0009 SECTION L SUPPLEMENT 20230815 15-AUG-2023 016 EMAIL

Attachment 0010 SECTION M SUPPLEMENT 20230815 15-AUG-2023 008 EMAIL

Attachment 0011 PAST PERFORMANCE INSTRUCTIONS 15-AUG-2023 002 EMAIL

Attachment 0012 COST WORKBOOK INSTRUCTIONS 15-AUG-2023 001 EMAIL

Attachment 0013 TASK ORDER 01 - PWS 15-AUG-2023 034 EMAIL

Attachment 0014 TASK ORDER 01 - QUANTITIES/FTE 15-AUG-2023 001 EMAIL

Attachment 0017 TASK ORDER 01 - CDRLS 15-AUG-2023 034 EMAIL

8 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

L-1 CHANGED 252.237-7024 NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES OCT/2010

(a) Definitions. Essential contractor service and mission-essential functions have the meanings given in the clause at 252.237-7023, Continuation of Essential Contractor Services, in this solicitation.

(b) The offeror shall provide with its offer a written plan describing how it will continue to perform the essential contractor services listed in attachment "To be explicitly defined in Task Order/Delivery Order requirements, Plan submission is not required and will not be incorporated as an IDIQ attachment", Mission Essential Contractor Services, dated "TBD", during periods of crisis. The offeror shall--

(1) Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;

(2) Address in the plan, at a minimum --

(i) Challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves;

(ii) The time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site;

(iii) The components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home;

(iv) Any established alert and notification procedures for mobilizing identified ``essential contractor service'' personnel; and

(v) The approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis.

(End of provision)

9 9

SECTION A
SECTION E
SECTION F
SECTION I
SECTION J
SECTION L
2023-08-17T16:03:10-0400
ROBERTS.ERIC.J.1536319456

File details come from the government source that posted it. Updated .