DRAFT_W56KGU_17_R_0013.pdf
PDF 794 KB Posted
- Solicitation number
- W56KGU-17-R-0013
About this file
DRAFT
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W56KGU-17-R-0013
X
DOA7
SEE SCHEDULE
W56KGU
W6QK ACC-APG DIVISION A
6001 Combat Drive
APG, MD 21005-1846
PIERRE BELJOUR
(443)861-4680
CCAP-CCA
PIERRE.R.BELJOUR.CIV@MAIL.MIL
1 59
X 1
X 3 X 11
X 32 X 33
X 38
X 40
X 50
X 51
X 57
X 59
DRAFT
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: PIERRE BELJOUR
Buyer Office Symbol/Telephone Number: CCAP-CCA/(443)861-4680
Type of Contract 1: Cost Plus Fixed Fee
Type of Contract 2: Firm Fixed Price
Kind of Contract: Research and Development Contracts
*** End of Narrative A0000 ***
******************* DRAFT REQUEST FOR PROPOSAL (RFP)********************
Issuance of the DRAFT RFP will commence the Question & Answer period. All questions are due on the 05/17/2017 @ 12PM, Eastern Standard __________
Time. Please use the attached Q&A form to submit your questions. When submitting your questions please use the following header in your
E-mail Subject Line: Q&A COMPANYNAME Solicitation#.
The answers to the questions submitted will be posted on FedBizop with the final RFP. When the final RFP is posted an additional 2 days will be permitted to submit additional questions.
Questions directed to Government personnel other than the Contracting Officer or Contract Specialist are prohibited.
THIS DRAFT RFP IS NOT AN AUTHORIZATION TO START WORK. THE GOVERNEMENT WILL NOT PAY ANY PREPERATION OR PROPOSAL COST ASSOCIATED WITH THIS
DRAFT
RFP
The Official RFP will be release at a later date.
******************* DRAFT REQUEST FOR PROPOSAL (RFP)********************
*** END OF NARRATIVE A0001 ***
2 59
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 LABOR, G&A, FEE 1 LO $ _______________ __________________
SERVICE REQUESTED: BASE YEAR
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2019
0002 MATERIAL 1 LO $ ________ __________________
SERVICE REQUESTED: BASE YEAR
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2019
0003 TRAVEL 1 LO $ ______ __________________
SERVICE REQUESTED: BASE YEAR
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2019
0004 OTHER DIRECT COST (ODC) 1 LO $ _______________________ __________________
3 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: BASE YEAR
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2019
0005 PHASE IN 1 LO $ ________ __________________
SERVICE REQUESTED: 30 DAYS
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 01-FEB-2018
0006 CONTRACTOR MANPOWER REPORTING (ALL PERIODS) ___________________________________________
Contractor Manpower Reporting shall be In Accordance
With (IAW) Paragraph 5.7 of the Performance Work
Statement dated 24 March 2017, as set forth in section
C.
(End of narrative B001)
0007 CONTRACT DATA REQUIREMENTS LIST (CDRL) ALL PERIODS __________________________________________________
A001 DI-MGMT-80227 1 LO $ ** NSP ** _____________ __________________
SERVICE REQUESTED: STATUS REPORT
CLIN CONTRACT TYPE:
Firm Fixed Price
4 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A002 DI-MISC-80711A 1 LO $ ** NSP ** ______________ __________________
SERVICE REQUESTED: SCIENTIFIC AND TECH REPORT
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A003 DI-SESS-81002D 1 LO $ ** NSP ** ______________ __________________
SERVICE REQUESTED: DESIGNS AND DRAWINGS
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A004 DI-SAFT-80102B 1 LO $ ** NSP ** ______________ __________________
SERVICE REQUESTED: SAFETY ASSESSMENT REPORT
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
5 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
1001 LABOR, G&A, FEE 1 LO $ _______________ __________________
SERVICE REQUESTED: OPTION YR 1
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2020
1002 MATERIAL 1 LO $ ________ __________________
SERVICE REQUESTED: OPTION YR 1
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2020
1003 TRAVEL 1 LO $ ______ __________________
SERVICE REQUESTED: OPTION YR 1
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2020
1004 ODC 1 LO $ ___ __________________
SERVICE REQUESTED: OPTION YR 1
6 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2020
2001 LABOR, G&A, FEE 1 LO $ _______________ __________________
SERVICE REQUESTED: OPTION YR 2
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2021
2002 MATERIAL 1 LO $ ________ __________________
SERVICE REQUESTED: OPTION YR 2
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2021
2003 TRAVEL 1 LO $ ______ __________________
SERVICE REQUESTED: OPTION YR 2
CLIN CONTRACT TYPE:
Cost No Fee
7 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2021
2004 ODC 1 LO $ ___ __________________
SERVICE REQUESTED: OPTION YR 2
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2021
3001 LABOR, G&A, FEE 1 LO $ _______________ __________________
SERVICE REQUESTED: OPTION YR 3
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2022
3002 MATERIAL 1 LO $ ________ __________________
SERVICE REQUESTED: OPTION YR 3
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2022
8 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
3003 TRAVEL 1 LO $ ______ __________________
SERVICE REQUESTED: OPTION YR 3
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2022
3004 ODC 1 LO $ ___ __________________
SERVICE REQUESTED: OPTION YR 3
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2022
4001 LABOR, G&A, FEE 1 LO $ _______________ __________________
SERVICE REQUESTED: OPTION YR 4
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2023
4002 MATERIAL 1 LO $ ________ __________________
9 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: OPTION YR 4
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2023
4003 TRAVEL 1 LO $ ______ __________________
SERVICE REQUESTED: OPTION YR 4
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2023
4004 ODC 1 LO $ ___ __________________
SERVICE REQUESTED: OPTION YR 4
CLIN CONTRACT TYPE:
Cost No Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 31-DEC-2023
10 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
Soldier Tactical/Expeditionary Power and Energy Generation Services
In Support of
CERDEC, Command, Power and Integration Directorate Power Division
24 March 2017
Part 1
General Information
1. General: This is a non-personnel services contract to provide Soldier Tactical/Expeditionary Power and Energy Generation Services _______ in support of the United States Armys Communications-Electronics Research, Development and Engineering Center (CERDEC), Command Power and Integration Directorate (CP&I), Power Division (PD) located at Aberdeen Proving Ground, Maryland and Fort Belvoir, Virginia. The
Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government regarding the performance of the contact in accordance with this PWS. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, ____________________________________ tools, materials, supervision, and other items and non-personal services necessary to perform Soldier Tactical/Expeditionary Power and
Energy Generation Research & Development function of the United States Armys Communications-Electronics Research, Development and
Engineering Center (CERDEC), Command Power and Integration Directorate (CP&I), Power Division (PD) located at Aberdeen Proving Ground, Maryland and Fort Belvoir, Virginia as defined in this Performance Work Statement except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background: The Command Power and Integration Directorate (CP&I), Power Division (PD) located at Aberdeen Proving Ground, Maryland __________ and Fort Belvoir, Virginia supports a multitude of programs related to the generation, storage, management and distribution of power and energy. The devices that these efforts impact range from soldier worn devices to large trailer mounted generators. These programs incorporate all aspects of the life cycle of these technologies, starting with the advanced development of emerging state of the art technologies through prototype system integration, (including engineering design, fabrication, assembly and packaging), to installation, test and evaluation, and eventually fielding, sustainment and follow-on support.
1.3 Objectives: All work performed pursuant to this PWS shall be consistent with FAR part 35, Research and Development Contracting. __________
This effort is intended to provide labor and materials for the development of advanced power and energy technologies for insertion into
Soldier, Small Unit (i.e. Squad & Platoon operational units) and Expeditionary (i.e. Base Camps & Tactical Sites) systems. The technologies to be considered include, but are not limited to:
- Energy Storage Extreme lightweight materials and components with advanced electrochemical technologies that can enable safe operation for periods greater than 72 hours.
- Fuel Cells State of the art technologies to enable the use of ruggedized man wearable and man portable fuel cells.
- Energy Harvesting Man wearable and man portable technologies that enable on-the-move and stationary power generation from alternative or renewable energy sources for periods greater than 72 hours.
- Power Management & Distribution High efficiency, lightweight, multi-path, cable-less distribution architectures, innovative management algorithms and advanced power network control standards and applications.
- Non-Fossil Fuel Based Power Generation Power generation technologies that are chemically stable, non-fossil fuel based and can enable continuous power generation for periods greater than 72 hours.
- Fast/Ultra-fast Charging Methodologies Charging methods utilizing novel electronic circuit designs that enable safe battery charging of a fully depleted battery within one (1) hour or less.
- Electromechanical Energy Conversion Advancements in generator, internal/external combustion, Stirling engine and environmental control technologies that significantly minimize energy losses through advanced electronic controls to extend operational life of expeditionary power systems.
- Advanced Power Source Analysis Tools Advanced analysis tools that include data collection of existing and prototype power source designs and using this data for modeling and simulation to enable technical decision making.
- Diagnostic/Prognostic Test & Evaluation Equipment State-of-the-art test and evaluation equipment that enables accurate identification, examination and forecasting of power & energy technology performance.
1.4 Scope: The contractor shall support CP&ID/PD by providing timely, efficient, cost effective and quality support for the purpose of _____ meeting the technical and programmatic requirements of the Power Division. The support required may be provided at the contractors facility, Aberdeen Proving Ground, Maryland, Ft. Belvoir, Virginia, or at test events so designated by the Government. Services include
11 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
but are not limited to support of the following:
- Management and Administrative Support
- Engineering and Development
- Demonstrations, Experiments and Assessments
- Scientific Research
- Program/Project Management
- Testing
- Logistics
1.5 General Information ___________________
1.5.1 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed _______________ in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractors quality control program is the means by which s/he assures him or herself that his work complies with the requirement of the contract. The QCP shall be submitted with the proposal as it is part of the evaluation factor. Upon award three copies of a comprehensive written QCP shall be submitted to the contracting officer (KO) and contracting officer representative
(COR) within 5 working days and whenever changes are made thereafter. The contractor must control the quality of the services and deliverables provided in support of this contract; the contractor must maintain substantiating evidence that services conform to contract quality requirements and furnish such information to the government if requested.
1.5.2 Quality Assurance: The contractor shall provide a Quality Assurance Surveillance Plan (QASP) and the Government will evaluate the _________________
Contractors performance under this contract in accordance with the QASP. The QASP shall be submitted with the proposal as it is part of the evaluation factor. Upon award three copies of a comprehensive written QASP shall be submitted to the contracting officer (KO) and contracting officer representative (COR) within 5 working days and whenever changes are made thereafter. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.5.3 Hours of Operation: The Contractor is responsible for providing services, no earlier than 0630 hours and ends no earlier than __________________
1500 hours. The core work hours are from 0900 to 1500 hours. All hours are Eastern Time zone. Work week is Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.5.3.1 Extended Workweek or Overtime Hours: Contractor-workweek is forty (40) hours. The Contractor will obtain written approval from ____________________________________ the COR prior to incurring any billable extended or overtime hours in excess of the stated contractor workweek.
1.5.3.2 CONUS Holiday: The contractors will not normally be expected to work on the following holidays consistent with the established _______________
Government schedule for these holidays (alternate days to compensate for any authorized holidays, which fall on Saturday or Sunday) in accordance with the Service Contract Act:
New Years Day
Presidents Day
Martin Luther King Jr Birthday
Memorial Day
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving Day
Christmas
The above holidays are observed at overseas sites as well. Therefore, OCONUS personnel will not normally work on the above cited holidays. The above holidays do not constitute billable time for this contract.
1.5.3.3 Facility Closing: During a normal work week if the Government Facility is closed due to inclement weather (e.g., ice, snow, __________________ etc.), or force majeure, duty time for contractor personnel performing onsite at the Government Facility will not constitute billable time for the contractor. The contractor shall not include any hours for which the on-site facilities are not available for performance, such as inclement weather or force majeure, unless other arrangements, such as telework, have been pre-approved by the government.
1.5.3.4 Teleworking Agreement: Contractor personnel performing onsite at the Government Facility may be authorized to Telework under ______________________ this effort with approval from the COR. The Contractor shall ensure that its telework policy is consistent with all aspects of the
CERDEC Telework Policy, CER 690-1 prior to authorizing telework for contractor personnel working on this effort.
1.5.4 Place of Performance: The work to be performed under this contract will be performed at Aberdeen Proving Ground (APG), Maryland ____________________ and Ft. Belvoir, Virginia. Unclassified work may be performed at the contractors/subcontractors facility. All other work in support of
12 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
the PWS, shall be performed onsite at a Government Facility.
During the performance of this PWS, Continental United States (CONUS) travel may be required to various locations, facilities during the performance to support such test events, attend technical meetings, and other such efforts required to support various programs.
Locations include but not limited to: Fort Benning, Georgia, Fort Gordon, Georgia, Redstone Arsenal, Alabama, Joint Base McGuire-Dix-
Lakehurst, Fort Devens Massachusetts and Washington D.C.
Outside the Continental United States (OCONUS) travel may also be required to but not limited to Belgium and Sweden, upon approval from the COR/COTR.
1.5.5 Period of Performance: The performance period is a one (1) year base, four (4) twelve (12) month option periods. ______________________
1.5.6 Security Requirements. _____________________
1.5.6.1 Contractor shall have a Secret facility with no safe guarding required. Contractor may have access to COMSEC material/equipment which will be required in the performance of this contract. Contractors requiring access to Classified COMSEC Material within a
Government facility are subject to the Department of the Army Cryptographic Access Program (DACAP) IAW, AR 380-40. For access to COMSEC on site, a visit request is required and the visit request should indicate COMSEC briefing and date. Approval by the Government Task
Leader (COR/CM OR COTR) is required prior to granting COMSEC access to a subcontractor. Contractor may require access to NORTH AMERICA
TREATY ORGANIZATION (NATO) information which requires a final U.S. Government clearance and special briefings. USAREUR IAW AR 380-15.
The NATO briefing form can be found at the following site: http://security.research.ucf.edu/documents/briefings/north Access to foreign government information may be required. If classified information is accessed then a clearance is required. IAW AR 380-5.
Secret Internet Protocol Router Network (SIPRnet) may be required at Government installations. Contractor must have a final Secret clearance or interim Top Secret. COMSEC and NATO briefing must only be given by the Facility Security Officer (FSO) and recorded on a visit request.
1.5.6.2 Contractor shall have and access to FOR OFFICAL USE ONLY (FOUO) and shall be handled IAW AR 25-55.Secret Internet Protocol
Router Network (SIPRnet) may be required at Government installations. Contractor must have a final Secret clearance or interim Top
Secret. COMSEC and NATO briefing must only be given by the FSO and recorded on a visit request.
1.5.6.3 In performing this contract Contractors will have access to classified material ONLY at another Government or Contractor facility as directed by the Government Task Leader (COR/CM OR COTR ). Contractor may be required to access Security Classification guides (SCG) which may be located at the following site: https://www.dtic.mil
1.5.6.3.1 Contractor may be required to have access to classified information outside U.S. Locations include but not limited to
Belgium and Sweden, upon approval from COR/CM OR COTR.
1.5.6.3.2 Contractor shall have access to Army Regulations, the contractor can go to the following website for Defense
Technical Information Center (DTIC) and register for Scientific and Technical Information Services. All contractors should have access to DTIC. https://www.dtic.mil
1.5.6.4 Contractor shall be required to have an Operations Security (OPSEC) Standard Operating Procedure (SOP)/Plan within 90 days of contract award and provide a copy to the COR who will provide to the Government OPSEC Officer for review and approval. The plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. Contractor personnel performing Information Technology (IT) sensitive duties on site may be required an investigation, IAW AR 25-2.
1.5.6.5 All contractors/subcontractors supporting this effort must be U.S. citizens. When a clearance is required, the contractor must be able to obtain and maintain a minimum of a Secret Clearance.
1.5.6.6 All visit requests (VRs) for CERDEC directorates will be processed through JPAS, Scattered Castles or M3. On the C4ISR campus located at Aberdeen Proving Ground (APG), the attached "C4ISR Visit Request Form," (CECOM Form 5207-E, AUG 14), will only be required for visitors without a security clearance. The C4ISR form will be submitted to the POC for approval and signature. ALL visit requests must be submitted three business days prior to expected time of arrival.
1.5.6.7 All training indicated within the PWS and ATO Cover sheet MUST be completed as directed and submit to COR.
1.5.6.8 The Facility Security Officer (FSO) should receive a copy of the PWS and DD 254 for use throughout life of contract. FSO will send a signed copy of DD 254 for all sub contracts. FSOs shall be permitted to submit a Common Access Card (CAC) request for themselves, through the COR, to the CERDEC Industrial Security Office for processing. This will allow the FSO to send PII to the
Government in a secure fashion.
1.5.6.9 AT Level I training: All Contractor employees, to include subcontractor employees, who are required to work onsite in controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within
13 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
30 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil
1.5.6.10 Access and General Protection/Security Policy and Procedures: Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation
Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection
Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.5.6.11 Contractors requiring CAC: Before CAC issuance, the Contractor employee requires, at a minimum, a favorably adjudicated
National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The
Contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
All on site contractors must turn in their CAC and C4ISR Campus Badge to the Industrial Security Office, Building 6010 Room 201C prior to departing CERDEC. Out processing procedures for specific directorates shall be followed. FSO must notify the CERDEC Industrial
Security Office prior to the departure of an employee.
1.5.6.12 AT Awareness Training for Contractor Personnel Traveling Overseas: US based Contractor employees and associated subcontractor employees are required take Government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13.
Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact. US based contractor employees and associated sub-contractor employees will submit an Isolated Personnel Report (ISOPREP) prior to deployment, in accordance with AR 525-28, Personnel Recovery. The Contractor is required to fill out the survey on NIPRNET at https://medinah.sed.apg.army.mil/PRO-File prior to deployment.
1.5.6.13 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program
(training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR
NLT 30 calendar days after contract award.
1.5.6.14 Army Training Certification Tracking System (ATCTS): All contractor employees with access to a Government Information System
(IS) must be registered in the ATCTS at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the IS and then annually thereafter.
1.5.6.15 Operational Security: Per AR 530-1 Operations Security, the contractor employees working on site must complete Level I OPSEC
Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.1.5.4.10
For Information Assurance (IA)/Information Technology (IT) training. All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working
IA/IT functions must comply with DoD and Army training requirements in DoD 8570.01, DoD 8570.01-M and AR 25-2 within six months of appointment to IA/IT functions.
1.5.6.16 Threat Awareness Reporting Program: For all contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting
Program (TARP), contractor employees must receive annual TARP training by a Counterintelligence agent or other trainer as specified in
AR 381-12 paragraph 2-4b.
1.5.6.17 Contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC
Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
1.5.6.18 Information Assurance (IA)/Information Technology (IT) training. All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoD 8570.01, DoD 8570.01-M and AR 25-2 within six months of appointment to IA/IT functions.
1.5.6.19 Information Assurance (IA)/information technology (IT) certification. Per DoD 8570.01-M , DFARS 252.239.7001 and AR 25-2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
1.5.6.20 Contracts that require handling or access to classified information. Contractor shall comply with FAR 52.204-2, Security
Requirements. This clause involves access to information classified Confidential, Secret, or Top Secret and requires contractors to
14 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
comply with (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-
M); (2) any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor.
1.5.6.21 Critical Program Information (CPI) is defined as information/technologies resident in a particular system or program which if divulged to unauthorized persons, would likely result in the reduction of a critical U.S. military technological advantage. In as much, CPI may be identified by the Government during a contracted effort and if identified must be protected by the contractor in accordance with guidance outlined in a Program Protection Plan (PPP), written in collaboration with the contractor. The aforementioned PPP will establish policy and procedures for the protection of CPI.
1.5.6.22 Threat Awareness Reporting Program. For all contractors with security clearances. Per AR 381-12 Threat Awareness and
Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.
1.5.6.23 Contractor employees working onsite at a Government Facility will be held responsible for completing the courses listed below.
Off-site contractors must take the online course equivalent for LIVE courses. That course equivalent URL is identified below the actual course located in Total Employee Development (TED). On-site contractors must take the LIVE course if offered.
- Anti-Terrorism Force Protection (LIVE Training for ALL On-Site employees, online version will be accepted for Off-Site employees ONLY https://atlevel1.dtic.mil/at/)
- Combating Trafficking In Persons Awareness Training (CTIP) Access via TED
- Operational Security (OPSEC) Training (LIVE Training for ALL On-Site employees, online version will be accepted for Off-Site employees
ONLY. https://ted.csd.disa.mil/ted/online_training/STV13_009/STV13_009_OPSEC_video.cfm)
- Threat Awareness and Reporting Program (TARP) (LIVE Training for ALL On-Site employees, online version will be accepted for Off-Site employees ONLY https://www.lms.army.mil)
- DoD Cyber Awareness Challenge Training Access via TED
- Records Management Training Access via TED
- Personal Identification Information (PII) (http:iatraining.disa.mil/eta/piiv2/launchPage.htm)
- Annual Security Training (Annual Refresher Training) (Course Site to be determined)
1.5.6.24 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
1.5.6.25 Key Control. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards.
No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the COR.
1.5.6.26 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon notification of the COR, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the
Contractor. N/A
1.5.6.27 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractors employees.
The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR.
1.5.6.28 Lock Combinations. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractors Quality Control
Plan.
1.5.7 Special Qualifications: None ______________________
1.5.8 Post Award Conference/Periodic Progress Meetings: ________________________________________________
1.5.8.1 Post Award Meeting. The Contractor shall attend any post award conference convened by the contracting activity or contract __________________ administration office in accordance with Federal Acquisition Regulation Subpart 42.5. A kick-off meeting will be conducted within 30 days of contract award at APG, MD. The meeting shall be attended by the KO, COR, COTR, other Government personnel, and Contractor PM and applicable staff. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government. The Contractor shall present an overview
15 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
of its entire contractual effort to include, as a minimum:
- Key Personnel
- Program Schedule
- Key processes for execution of delivery orders
- Process for procuring materials
- Lead-times for implementing required subcontracting efforts
1.5.8.2 Monthly Status Reviews. The contractor shall host a monthly meeting with the, COR, COTR and other Government personnel, as ______________________ appropriate, to review the Contractor's performance. The agenda for these meetings will consist, at a minimum the following items:
- Contractor appraising the Government of problems, if any, being experienced and recommended corrective action.
- Summary of all open tasks and material purchases
- Status of funding expenditures for open tasks
- Potential new task starts
1.5.9 Key Personnel: The follow personnel are considered key personnel by the Government: The Contractor shall provide a contract ______________ manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the
Contractor when the manager is absent shall be designated in writing to the KO and COR. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 4:30p.m Eastern Time zone, Monday thru Friday except Federal holidays or when the
Government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:
Administrative Assistant:
Requires a High School Diploma with 3 years experience in office administration. Performs a variety of clerical, administrative and records management functions within program management. Utilizes various software programs and other methods to collect, track, document, and reconcile programmatic and administrative data relative to project management and all aspects of administrative support.
Budget Analyst (Intermediate):
Requires BS/BA in Business, Accounting or a related discipline with 3 years experience. Four years of direct relevant experience may be substituted for education. Performs a variety of budgetary functions implementing the organizations budgetary program, policies, and procedures. Develops, formulates and revises the programs budget request. Responsible for developing estimates for labor, travel and other budgetary elements. Manages assigned program in accordance with funding limitations provided. Consolidates the accuracy of budget data estimates by the use of statistical techniques, e.g., extensions, averages, trend analysis of historical data. Monitors and tracks obligations and expenditures for assigned activity accounts on related budgetary forms, schedules, and reports. Verifies that obligations and expenditures occur on a timely basis in accordance with the annual work plan and regulatory controls, and are within amounts programmed. Resolves any discrepancies.
Electrical Engineer (Intermediate):
Requires BS in Electrical Engineering or related scientific /technical discipline with 3 years experience. Must have the technical background and skills to perform in all phases of hardware design, development, and documentation. Performs fundamental engineering duties in preliminary designs, performing tests, taking measurements and performing system analyses or simulations. Applies standard practices and techniques in specific engineering assignments. Prepares data and documentation when applicable. Instructs, as required, engineering technicians.
Electrical Engineer (Journeyman):
Requires BS in Electrical Engineering or related scientific /technical discipline with 5 years experience. Must have the technical background and skills to perform in all phases of hardware design, development, and documentation. Performs fundamental engineering duties in preliminary designs, performing tests, taking measurements and performing system analyses or simulations. Applies standard practices and techniques in specific engineering assignments. Prepares data and documentation when applicable. Instructs, as required, engineering technicians.
Electrical Engineer (Senior):
Requires BS in Electrical Engineering or related scientific /technical discipline with 10 years experience. Must have the technical background and skills to perform in all phases of hardware design, development, and documentation. Performs fundamental engineering duties in preliminary designs, performing tests, taking measurements and performing system analyses or simulations. Applies standard practices and techniques in specific engineering assignments. Prepares data and documentation when applicable. Instructs, as required, engineering technicians.
Electronics Technician (Intermediate):
Requires a High School Diploma. Preferred to be a graduate of a technical school with 3 years experience in electronics practices.
Must have capability to distinguish between hardware and software problems in multi-vendor systems. Performs installation, test, preventive maintenance, troubleshooting, and repair for communications equipment, electronics equipment, large computers, minicomputers, or microprocessors, including buses for those in a networked environment. Installs, operates, troubleshoots communications-electronics equipment, power distribution systems, signal distribution systems and RF distribution systems for complex systems such as military shelters, aircraft, ground vehicles, etc., as may be applicable. Ability to work from and interpret engineering drawings and technical
16 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
specifications.
Electronics Technician (Journeyman):
Requires a High School Diploma. Preferred to be a graduate of a technical school with 5 years experience in electronics practices.
Must have capability to distinguish between hardware and software problems in multi-vendor systems. Performs installation, test, preventive maintenance, troubleshooting, and repair for communications equipment, electronics equipment, large computers, minicomputers, or microprocessors, including buses for those in a networked environment. Installs, operates, troubleshoots communications-electronics equipment, power distribution systems, signal distribution systems and RF distribution systems for complex systems such as military shelters, aircraft, ground vehicles, etc., as may be applicable. Ability to work from and interpret engineering drawings and technical specifications.
Electronics Technician (Senior / Lead):
Requires a High School Diploma. Preferred to be a graduate of a technical school with 8 years experience in electronics practices, of which 5 years shall be related to the fabrication and installation of parts for communications-electronics installations in military systems. Must have capability to distinguish between hardware and software problems in multi-vendor systems.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .