This document is an Amendment to Solicitation W56HZV-24-Q-0004 for the procurement of Rammer Assembly Heads. The key changes in this Amendment are:

  1. The requested delivery schedule for CLIN 0011AA (91 EA) has been changed from 420 days with FAT to 450 days with FAT.

  2. The First Article Test Report submission timeline has been extended from 30 calendar days to 450 calendar days from contract award.

The solicitation is a total small business set-aside for Firm Fixed Price supplies. The Base Quantity is 91 units with a 100% option quantity. The inspection/acceptance point is Origin, FOB Destination. Interested offerors must have valid SAM and JCP accounts to access the Technical Data Package. Proposals are due by the date and time specified in the associated SAM.gov posting and must be valid for a minimum of 120 calendar days after the solicitation closing.

View the file

Other files

File Type Posted
W56HZV24Q0004-0001.pdf PDF
W56HZV-24-Q-0004.pdf PDF
Solicitation SAM posting W56HZV24Q0004_February2024.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0002 2024APR04

W56HZV

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

LEONARD J. MILLER

EMAIL: LEONARD.J.MILLER49.CIV@ARMY.MIL

W56HZV-24-Q-0004

2024FEB16

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 4

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: LEONARD J. MILLER

Buyer Office Symbol/Telephone Number: CCTA-APN-A/(571)588-9392

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: Howitzer, 155MM, M777E1

*** End of Narrative A0000 ***

SOLICITATION: W56HZV-24-Q-0004

AMENDMENT: 0002

1. The purpose of this Amendment is to:

a) FAR 52.211-8 Time of Delivery _____________________________

Change the Requested Delivery Schedule

FROM: CLIN 0011AA 91 EA 420 DAYS WITH FAT

TO: CLIN 0011AA 91 EA 450 DAYS WITH FAT

b) FAR 52.209-3 First Article Approval - Contractor Testing ________________________________________________________

Change the Requested First Article Test Report submission

From:

(b) The Contractor shall submit the first article test report within 30 calendar days from the date of this contract to the

Administerative Contracting Officer (ACO) marked First Article Test Report: Contract No. _________TBD__________, Lot/Item No. P/N ______________________ ____

13006419 Head Rammer and P/N 13006420 Adapter,Female.. Within 30 calendar days after the Government receives the test report, the____________________________________________________

Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article.

The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

To:

(b) The Contractor shall submit the first article test report within 450 calendar days from the date of this contract to the

Administerative Contracting Officer (ACO) marked First Article Test Report: Contract No. _________TBD__________, Lot/Item No. P/N ______________________ ____

13006419 Head Rammer and P/N 13006420 Adapter,Female.. Within 30 calendar days after the Government receives the test report, the____________________________________________________

Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article.

The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

2. All other terms and conditions, except for those addressed above, remain unchanged and are in full force and effect.

*** END OF NARRATIVE A0003 ***

2 4

W56HZV-24-Q-0004

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DELIVERIES OR PERFORMANCE

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

1 CHANGED 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

REQUESTED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER CONTRACT AWARD

CLIN 0011AA 91 EA 450 DAYS WITH FAT

CLIN 0012AA 91 EA 150 DAYS

CLIN 0013AA 1 LO 450 DAYS

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractors date of receipt of the contract or notice of award by adding

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

3 4

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACT CLAUSES

2 CHANGED 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE SEP/1989

I (JAN 1997) AND ALTERNATE II (SEP 1989)

(a) The Contractor shall test 3 unit(s) of Lot/Item P/N 13006419 Head Rammer and P/N 13006420 Adaptor, Female as specified in this contract. At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within 450 calendar days from the date of this contract to the

Administrative Contracting Officer (ACO) marked First Article Test Report: Contract No. ______TBD____________, Lot/Item No. P/N 13006419 ___ _____________

Head Rammer and P/N 13006420 Adaptor, Female. Within 30 calendar days after the Government receives the test report, the Contracting____________________________________________

Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.

A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the

Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the

Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

(End of Clause)

4 4

SUPPLEMENTAL INFORMATION
DELIVERIES OR PERFORMANCE
CONTRACT CLAUSES

File details come from the government source that posted it. Updated .