W56HZV21R0111-0002.pdf

PDF 26 KB Posted

Attached to
Telescope, Elbow
Solicitation number
W56HZV-21-R-0111
Issued by

View the file

Other files

File Type Posted
W56HZV21R0111-0003.pdf PDF
W56HZV21R0111-0001.pdf PDF
W56HZV21R0111.pdf PDF
First Article Waiver Worksheet.pdf PDF
Files to view 2D-3D Files.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0002 2022JAN28

W56HZV

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

NICHOLAS LANG

EMAIL: NICHOLAS.A.LANG.CIV@ARMY.MIL

W56HZV-21-R-0111

2022JAN04

X

X 2022FEB18 05:00pm

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 7

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: NICHOLAS LANG

Buyer Office Symbol/Telephone Number: CCTA-APS-D/(586)282-4440

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

Solicitation: W56HZV-21-R-0111

Amendment: 0002

1. The purpose of this Amendment 0002 to Solicitation W56HZV-21-R-0111 is to:

SF30:____

a) Extend Solicitation close date 15 calendar days as follows:

FROM: February 03, 2022

TO: February 18, 2022

SECTION E:_________

a) Add Paragraph E.6 - Wipe Test Requirements for Newly Procured Radioactive Commodities.

SECTION I:_________

a) Add clause 52.223-7, Notice of Radioactive Materials.

This concludes all Sections affected by this Amendment.

2. The contractor is required to acknowledge this Amendment 0001, in Paragraph A.8 - Acknowledgement of Amendments of their proposal submission.

3. Proposals shall be submitted electronically to email address: nicholas.a.lang.civ@army.mil by 5:00 PM EST on 18 February 2022.

4. All other terms and conditions of solicitation W56HZV-21-R-0111 remain unchanged.

*** END OF NARRATIVE A0003 ***

2 7

W56HZV-21-R-0111

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN ________________________________________

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

E.2 NOTICE REGARDING FIRST ARTICLE ______________________________

(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.

(b) When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.

(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.

E.3 SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING) ________________________________________________________________________

(a) In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.

(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:

(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.

(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the

First Article Test Report.

(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the

First Article Test Report.

(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item

3 7

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.

(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished in accordance with (IAW) CDRL A002 First Article Test Report.

(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the

Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the

Government shall be borne by the Contractor.

E.4 INSPECTION AND ACCEPTANCE (FIRST ARTICLE APPROVAL) __________________________________________________

In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:

(a) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed IAW CDRL A002 First Article

Test Report (FATR).

(b) CDRL A002 - First Article Test Report (FATR) shall be compiled by the contractor to the contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated Government representative to determine that the First Article Test was successfully completed.

E.5 DRAWINGS FOR INSPECTION _______________________

(a) When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications and any applicable

Engineering Exceptions associated to the drawings, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.

(b) If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.

E.6 WIPE TESTING REQUIREMENTS FOR NEWLY PROCURED RADIOACTIVE COMMODITIES ____________________________________________________________________

(a) In accordance with the following procedures, the wipe test shall be conducted on devices containing Hydrogen-3 (Tritium), Nickel-63, and Americium-241. The Wipe Test is intended to verify that devices containing radioactive material do not impose a threat to the environment or to an individual's health. The removable activity shall not exceed 1,000 disintegrations per minute (DPM).

(b) Applicable Documents for Hydrogen-3 (Tritium) & Nickel-63.

ANSI N42.9-1972

Standard Test Procedures for Photomultipliers for Scintillation Counting and Glossary for Scintillation Counting Field

ANSI N42.15-1980

American National Standard Performance Verification of Liquid Scintillation Counting System

ANSI N42.16-1986

American National Standard Specifications for Sealed Radioactive Check Sources Used in Liquid Scintillation Counters

(c) Requirements.

4 7

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(1) When conducting wipe testing for Hydrogen-3 (Tritium) and Nickel-63, the suitable filter for liquid scintillation (LS) is a cellulose nitrate filter which dissolves or becomes transparent when mixed with LS fluid. Use only one type of filter and ensure that the liquid scintillation counter is calibrated using the same type of filter for background as is used to take all the nickel and tritium wipes. Dampen the filter (with distilled water) prior to wiping the device. The suitable filter paper for Americium-241 (Am-241) is a pressure-sensitive smear.

(2) Using moderate finger pressure, wipe the radioactive surface (not to exceed a 4 by 4 inch square) of the device with filter paper.

(i) For tritium devices, the radioactive surface is the external area adjacent to the source(s).

(ii) When performing this procedure on the Chemical Agent Monitor (CAM) (Nickel-63), the area to be wiped is the exterior surface of the CAM around the protective cap of the nozzle.

(iii) For the M43A1 Chemical Agent Detector (Americium-241), separate the top case assembly from the bottom case assembly.

There are two areas which shall be wiped with a single wipe - the exposed area of the cell module and the area around the exit port.

(3) Place wiped filter papers for Hydrogen-3 (Tritium) & Nickel-63 items in scintillation counter vials with 1 ml of distilled water.

For Am-241 wipes place each filter into a sealable plastic bag. Assure the bags or vials are identified and traceable to the item tested.

(4) Prepare the wipe for analysis according to the filter used. These analysis procedures shall be operated in accordance with the manufacturer's recommendations.

(i) Wipe analysis for Hydrogen-3 (Tritium) & Nickel-63 items shall be analyzed on a liquid scintillation counter. Operate the liquid scintillation counter in accordance with the documents cited in paragraph (b) above.

(ii) Wipe analysis for the M43A1 Chemical Agent Detector shall be analyzed by a gas flow proportional counting system or equivalent alpha detection instrumentation. The gas flow proportional counting system used to evaluate wipe tests shall be calibrated by an alpha reference source traceable to the National Institute of Standards & Technology at least every three months, and checked by an alpha reference source prior to each day's operational.

(5) Test results including a record of the amount of activity of each sample and verification of performance of the liquid scintillation counting system for Hydrogen-3 (Tritium) and Nickel-63 items are to be provided as specified in the Data Item Description (DID).Results of instrument calibration, required in paragraph (4) above for flow proportional counting (Americium-241), will be submitted to the government procuring office.

(6) The Contractor shall have an independent testing laboratory conduct wipe testing and analysis on the deliverable end item as described above. The sample for wipe testing may be submitted to the independent testing laboratory of the Contractors choice. An independent testing laboratory representative may perform wipe testing at the Contractor's facility as long as the wipe tests are analyzed at the independent testing laboratory.

(7) Wipe Test sampling shall be conducted as follows:

(i) A wipe test shall be performed on the entire First Article (FAT) sample(s) (if FAT is required by the contract).

(ii) A wipe test shall be performed on each production lot. A random sample shall be selected from each production lot in accordance with the table below:

Lot Size Sample Size

1 - 30 All

31 - 50 30

51 - 100 37

101 - 200 40

201 - 300 43

301 - 400 44

401 - 2,000 45

2,001 - 100,000 75

(iii) Prior to selection of the wipe test sample, the lot shall have met all other contract requirements. A sample shall not be submitted from the rejected lot unless authorized by the Contracting Officer.

(iv) Sample units shall be randomly selected from the entire lot by the Government Quality Assurance Representative.

(8) The Nuclear Regulatory Commission (NRC) requires radiation exposures to be as low as reasonable achievable (ALARA), see 10 CFR

5 7

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

20.1101. But, in any case, failure of any sample unit to meet the maximum activity level of no more than 1,000 Disintegrations per

Minute shall be cause for the Government to halt further product acceptance and for the Contractor to immediately perform a failure analysis and take corrective action. The failure analysis, in addition to isolating the root cause of the excessive activity level, shall include the Contractor's assessment with rationale as to the extent the condition is present in both in process and delivered product (i.e., identification of the suspect items). The Contractor's corrective action shall address the positive measures taken to prevent recurrence of the condition in the future as well as corrective actions to be taken on all suspect product. Both the failure analysis and corrective action shall be subject to review and approval by the Government prior to re-initiation of Government product acceptance.

(9) The independent testing laboratory employed by the Contractor must be licensed by the NRC or the applicable NRC Agreement State, or by the equivalent regulatory agency when the independent testing laboratory is located outside the United States. The subcontracting under this solicitation and the resulting contract is open to competition between Department of Defense activities and private firms.

Under the authority of 10 U.S.C. 2208(j), applicable working capital funded activities are available as potential subcontractors. The point of contact for safety concerns relating to radioactive commodities in contracts is Ms. Karen L. McGuire, TACOM LCMC Radiation

Safety Program Manager, DSN 786-7635, commercial 586-282-7635; email: karen.l.mcguire4.civ@mail.mil.

(10) The independent testing laboratory must be able to verify the performance of the instrumentation used to analyze the wipe tests.

Documentation shall be provided in accordance with the Data Item Description.

*** END OF NARRATIVE E0001 ***

6 7

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

I-1 CHANGED 52.223-7 NOTICE OF RADIOACTIVE MATERIALS JAN/1997

(a) The Contractor shall notify the Contracting Officer or designee, in writing, 60 days prior to the delivery of, or prior to completion of any servicing required by this contract of, items containing either

(1) radioactive material requiring specific licensing under the regulations issued pursuant to the Atomic Energy Act of 1954, as amended, as set forth in Title 10 of the Code of Federal Regulations, in effect on the date of this contract, or

(2) other radioactive material not requiring specific licensing in which the specific activity is greater than 0.002 microcuries per gram or the activity per item equals or exceeds 0.01 microcuries.

Such notice shall specify the part or parts of the items which contain radioactive materials, a description of the materials, the name and activity of the isotope, the manufacturer of the materials, and any other information known to the Contractor which will put users of the items on notice as to the hazards involved (OMB No. 9000-0107).

(b) If there has been no change affecting the quantity of activity, or the characteristics and composition of the radioactive material from deliveries under this contract or prior contracts, the Contractor may request that the Contracting Officer or designee waive the notice requirement in paragraph (a) of this clause. Any such request shall --

(1) Be submitted in writing;

(2) State that the quantity of activity, characteristics, and composition of the radioactive material have not changed; and

(3) Cite the contract number on which the prior notification was submitted and the contracting office to which it was submitted.

(c) All items, parts, or subassemblies which contain radioactive materials in which the specific activity is greater than 0.002 microcuries per gram or activity per item equals or exceeds 0.01 microcuries, and all containers in which such items, parts or subassemblies are delivered to the Government shall be clearly marked and labeled as required by the latest revision of MIL-STD 129 in effect on the date of the contract.

(d) This clause, including this paragraph (d), shall be inserted in all subcontracts for radioactive materials meeting the criteria in paragraph (a) of this clause.

(End of Clause)

7 7

PADDS ERRATA SHEET PAGE

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

CHANGED IF60039 52.223-7 01-JAN-1997 NOTICE OF RADIOACTIVE MATERIALS

(a) The Contractor shall notify the Contracting Officer or designee, in writing, 60 days prior to the delivery of, or prior to completion of any servicing required by this contract of, items containing either

(1) radioactive material requiring specific licensing under the regulations issued pursuant to the Atomic Energy Act of 1954, as amended, as set forth in Title 10 of the Code of Federal Regulations, in effect on the date of this contract, or

(2) other radioactive material not requiring specific licensing in which the specific activity is greater than 0.002 microcuries per gram or the activity per item equals or exceeds 0.01 microcuries.

Such notice shall specify the part or parts of the items which contain radioactive materials, a description of the materials, the name and activity of the isotope, the manufacturer of the materials, and any other information known to the Contractor which will put users of the items on notice as to the hazards involved (OMB No. 9000-0107).

(b) If there has been no change affecting the quantity of activity, or the characteristics and composition of the radioactive material from deliveries under this contract or prior contracts, the Contractor may request that the Contracting Officer or designee waive the notice requirement in paragraph (a) of this clause. Any such request shall --

(1) Be submitted in writing;

(2) State that the quantity of activity, characteristics, and composition of the radioactive material have not changed; and

(3) Cite the contract number on which the prior notification was submitted and the contracting office to which it was submitted.

(c) All items, parts, or subassemblies which contain radioactive materials in which the specific activity is greater than 0.002 microcuries per gram or activity per item equals or exceeds 0.01 microcuries, and all containers in which such items, parts or subassemblies are delivered to the Government shall be clearly marked and labeled as required by the latest revision of MIL-STD 129 in effect on the date of the contract.

(d) This clause, including this paragraph (d), shall be inserted in all subcontracts for radioactive materials meeting the criteria in paragraph (a) of this clause.

(End of Clause)

W56HZV-21-R-0111 0002

SECTION A
SECTION E
SECTION I

File details come from the government source that posted it. Updated .