W56HZV21R0057.pdf

PDF 169 KB Posted

Attached to
Stowage Box - ICV Kit NSN: 2540-01-617-0810
Solicitation number
W56HZV21R0057
Issued by

View the file

Other files

File Type Posted
W56HZV-21-R-0057_0009.pdf PDF
W56HZV-21-R-0057_0008.pdf PDF
W56HZV-21-R-0057-0007.pdf PDF
W56HZV21R0057_0004.pdf PDF
W56HZV21R0057- 0003.pdf PDF
W56HZV21R0057-0002.pdf PDF
W56HZV21R0057-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W56HZV-21-R-0057

X

2021SEP09

2021NOV0511:59pm

DOA4

2021SEP09 SEE SCHEDULE

W56HZV

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

DAWN M. HESSELL

(586)282-5844

CCTA-APS-B

DAWN.M.HESSELL.CIV@MAIL.MIL

1 71

X 1

X 5 X 9

X 14 X 16 X 22

X 29

X 31

X 49

X 50

X 65

X 68

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: DAWN M. HESSELL

Buyer Office Symbol/Telephone Number: CCTA-APS-B/(586)282-5844

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

This solicitation is intended to result in the award of a single Requirements contract for the estimated supplies specified. The resulting contract will establish pricing to be utilized through issuance of delivery orders for discrete quantities for the period stated in the schedule. The Government bears no responsibility to issue an initial minimum order upon base contract award. For further guidance related to a Requirements type contract, see FAR 16.503 and FAR clause 52.216-21, Requirements.

The ordering period is 18 months.

Range pricing is required.

Procurement is a Small Business Set-Aside

NSN: 2540-01-617-0810

p/n: 57K9469

Noun: Stowage Box - ICV Kit

REQUIREMENTS:

1. Higher-Level Contract Quality Requirement: ISO 9001:2015

2. Ballistic Testing is required

3. Welding of armor grade steel in accordance with MIL-STD-3040.

Technical Data Package: A TDP is available.

Always download the TDP. The TDP may be updated. The date on the top-level drawing does not change when the specs or lower level drawings are revised.

The TDP is EXPORT CONTROLLED, Distribution D

Export Controlled. JCP Certification is required. You must request access to the TDP via beta.SAM.gov and have JCP Certification.

Joint Certification Program (EXPORT CONTROL):

You must be certified under the United States/Canada Joint Certification Program (JCP)

(https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/ ) to be granted access to the technical data (TDP) for this solicitation.

Please read this solicitation. There are several clauses and provisions throughout this solicitation that require information to be provided. Sign, scan, and submit the entire solicitation to the Contract Specialist.

Note: include your CAGE code on the solicitation.

Electronic Contracting AS6311

(a) All Army Contracting Command Detroit Arsenal (ACC-DTA) solicitations will be publicized on the System for Award Management website

(https://www.SAM.gov ). Any additional attachments, including Technical Data Packages (TDPs), when available electronically, will be separate attachments in SAM.gov.

2 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(b) Interested offerors shall submit a proposal via email to the Contract Specialist (dawn.m.hessell.civ@mail.mil) and Cc the

Contracting Officer (mark.r.hirsch.civ@mail.mil) with the subject header: Proposal Submission (Solicitation number). Once a proposal is received, the Government will reply confirming receipt of the proposal.

(c) Pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued by Office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, to be received by the Government office designated in the solicitation by the time specified.

(d) It is the responsibility of the offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the

Government infrastructure (emailed to the Contract Specialist) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

(e) Solicitations may remain posted on SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit a proposal.

(f) Any award issued from this solicitation will be distributed electronically. In the event of a Freedom of Information Act (FOIA) request for a copy of any award issued from this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552.

Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation.

(h) For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement

Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

ALL OR NONE AS7316

Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

(1) Only one award will be made as a result of this solicitation.

(2) Offers submitted for less than the total quantities of all the items in this solicitation will be deemed non-responsive.

ACKNOWLEDGEMENT OF AMENDMENTS AS7001

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

3 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Amendment Number: Date:

DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE AS7227

(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title

22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily

Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's

Section C Technical Data Package instructions.

(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to DESTROY all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

(d) Destruction of this technical data shall be accomplished by shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON AS7040

Information regarding the Ombudsperson for this contract is located at the following website: https://www.tacom.army.mil/cmo/index.html

*** END OF NARRATIVE A0001 ***

4 71

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SUPPLIES AND PRICES/COSTS:

THIS IS A REQUIREMENTS CONTRACT, FAR 52.216-21

IN THE FOUR DIGIT ITEM NUMBERS

(CLINS) THAT FOLLOW, THE NUMBERING SYSTEM

THAT IS USED IS AS FOLLOWS:

THE FIRST THREE DIGITS SIGNIFY ITEM AND

THE FOURTH (LAST) DIGIT SIGNIFIES THE

APPLICABLE CONTRACT YEAR, i.e., CLIN 0011

IS FOR THE FIRST ITEM - FIRST ORDERING

YEAR.

THE FOLLOWING DEFINITIONS APPLY TO THE

ENTIRE SOLICITATION AND RESULTING CONTRACT:

FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE

OF AWARD PLUS 548 DAYS (18 MONTHS).

NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL

ORDER IS THE PRICE FOR THE ORDERING YEAR IN

WHICH THE ORDER IS ISSUED. THE DELIVERY DATE

DOES NOT DETERMINE THE ORDERING YEAR.

The information presented below applies to

CLIN 0011.

Minimum Quantity: 6 Each

Maximum Quantity: 54 Each

There is no guaranteed quantity

(End of narrative A001)

5 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0011 ORDERING PERIOD 1 EST 54 EA $ _________________ __________________

See Range Pricing

NSN: 2540-01-617-0810

COMMODITY NAME: STOWAGE BOX - ICV KIT

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 19207

Mfr Part Number: 57K9469

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

6 21 $

22 38 $

39 54 $

Ballistic Testing and Government approval is required before Production in accordance with clause ES6650

"Ballistic Testing".

(End of narrative B001)

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 57K9469

DATE: 08-AUG-2018

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

6 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0012 BALLISTIC TESTING $ _________________ __________________

SERVICE REQUESTED: BALLISTIC TESTING

CLIN CONTRACT TYPE:

Firm Fixed Price

Ballistic Testing for P/N 12648289 ONLY

Ballistic Testing IAW MIL-DTL-12560

Ballistic Testing and Government approval is required in accordance with clause ES6650

"Ballistic Testing" before Production can commence.

Follow instructions in clause ES6650

The Government is responsible for testing costs at

Aberdeen Proving Ground, Maryland.

(End of narrative B001)

Deliveries or Performance _________________________

7 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0013 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________

A001 DATA ITEM $ ** NSP ** $ ** NSP ** _________ ______________ __________________

COMMODITY NAME: BALLISTIC TESTING REPORT

Packaging and Marking _____________________

Deliveries or Performance _________________________

FOB POINT:

SHIP TO:

(Y00003) SEE NARRATIVE ON DD 1423

8 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

TECHNICAL DATA PACKAGE INFORMATION CS6334

The following applies to this solicitation:

The TDP for this solicitation resides within SAM.gov.

TDP is Distribution Level: D

TDP is Export Controlled. The contractor must have an active JCP Certification.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.)

or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the

TDP to all SUBCONTRACTORS at every level.

(3) Reference the provision Distribution and Destruction of Export Control Technical Data Package (Warren) AS7227 and Reference

DFARS clause 252.225-7048 Export-Controlled Items for information

(4) Upon completion of the purposes for which Government Technical Data has been provided, the contractor is required to DESTROY all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.

DRAWING LIMITATIONS CS7002

(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:

(1) depict the completed (item(s), and

(2) serve as the basis for inspection of the completed item(s).

(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.

(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.

(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.

(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.

9 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN CS7522

(a) The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S.

Government OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the Governments critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

(b) The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC

Officers.

(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.

Note: The contractor may use the TACOM OPSEC Plan in lieu of developing a new OPSEC Plan.

OPSEC TRAINING REQUIREMENT CS7523

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty and annually thereafter.

All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:

https://securityawareness.usalearning.gov/opsec/index.htm .

Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officers

Representative (COR), if assigned to the contract, and the Contracting Officer (PCO).

ADDITIONAL SECURITY LANGUAGE

Controlled Unclassified Information (CUI): CUI is unclassified information requiring application of access, distribution controls, and protective measures which meets the standards for safeguarding and dissemination controls pursuant to statute, and government-wide policies under Executive Order (EO) 13556. The types of information considered CUI for the program are technical data and information marked Unclassified//For Official Use Only (U//FOUO) by the U.S. Government. Examples of technical data consist of research and engineering data, engineering drawings, associated lists, specifications, standards, process sheets, manuals, technical reports, catalog-item identifications, and computer software documentation. The Contractor shall adhere to the below guidelines for handling U//FOUO information accompanied by DoDM 5200.01-V4, DoD Information Security Program: Controlled Unclassified Information

(CUI), DODI 5230.24, Distribution Statements on Technical Documents, Army Regulation (AR) 25-55, The Department of the Army Freedom of Information Act Program, AR 25-2, Information Assurance and AR 25-1, Army Information Technology. FOUO/CUI/Technical data will follow the release instructions as identified in the Distribution Statement.

Discretionary access control measures must be used to preclude access to CUI by users who are not authorized access to CUI. After working hours, when not in physical possession of the owner, all electronic assets containing CUI must be afforded a reasonable degree of physical protection to prevent theft of program information (e.g., locking up laptops or cable locking them to a stationary base, storing in trunk, or storing out of sight).

INFOSEC/MARKING OF DOCUMENTS: All technical documents containing critical technology generated in connection with this contract will be marked IAW Department of Defense Instruction 5230.24 Distribution Statements on Technical Documents, dated August 23, 2012 (DoDI

5230.24), Enclosure 4, Paragraph 2d, on page 18.

ADDITIONAL GUIDELINES FOR CONTROLLED UNCLASSIFIED INFORMATION October 2020

10 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

General: There are types of information that are not classified but that require application of access and distribution controls and protective measures for a variety of reasons. This information is known as controlled unclassified information (CUI). The types of information considered CUI are U.S. Government technical information and information listed at the CUI registry

(https://www.archives.gov/cui/registry/category-list ). When handling CUI material, all personnel are to comply with these requirements and follow their company policy and/or applicable Non-Disclosure Agreement (NDA) concerning the protection of proprietary information in situations not clearly stated herein.

Technical Information Description: Any recorded information related to experimental, developmental, or engineering works that can be used to define an engineering or manufacturing process, or can be used to design, procure, produce, support, maintain, operate, repair, or overhaul program material. The data may be graphic or pictorial delineations in media (e.g., computer software, drawings, or photographs), text in specifications, related performance or design documents, or computer printouts. Examples of technical information include research and engineering data, engineering drawings, and associated lists, specifications, standards, process sheets, manuals, technical reports, catalog-item identifications, and related information, and computer software documentation.

CUI Information Description: Unclassified Information that requires safeguarding or dissemination controls pursuant to and consistent with applicable law, regulations, and government-wide or LRGWP policies but is not classified under EO 13526, (Classified National

Security Information).

CUI Markings All documents containing CUI will carry the CUI markings in accordance with DoDI 5200.48. Discontinue all use of legacy or other markings not permitted or included in either the CUI Registry or DoDI 5200.48. Marking of Technical Information will include the statement provided in the Security Classification Guide. If the contents of the technical document require more than one

Distribution Statement, apply the most restrictive statement. This does not preclude additional mandated markings as may be required by the contract.

Protection of CUI Information

Access: CUI may be released only to an individual who has a valid need for such access in connection with the accomplishment of a lawful and authorized Government purpose. Further dissemination of such information will be at the discretion of the Government

Security Manager. All personnel supporting this contract shall sign a CUI Non- disclosure Agreement prior to gaining access to the information. Personnel no longer requiring access to CUI must dispose (see Disposal below) or surrender any in their possession and terminate future access to it.

Storing/Handling: During working hours, take reasonable steps to minimize risk of access to CUI by unauthorized personnel. After working hours, when not in physical possession of the owner, all CUI (whether hardcopy or optical media (e.g., DVDs, CDs) that contain CUI) must be afforded a reasonable degree of physical protection to prevent theft of program information (e.g., store CUI information in locked desks or file cabinets, locked rooms, cable lock laptops, storing in a trunk, storing out of site or similar means). Do not display CUI in public places (e.g., airports, airplanes, restaurants). Electronic storing and processing of CUI shall be in accordance with DFARS 252.204-7012 Safeguarding Controlled Defense Information and Cyber Incident Reporting. Do not process CUI on public computers (e.g., those available for use by the general public in kiosks, hotel business centers), public wireless networks or computers that do not have access control. Personally owned computers and personally owned devices are not authorized to process CUI. Portable electronic devices (e.g., smartphones, laptop computers, tablets), non- portable computers, and removable media (e.g., external hard drives, flash drives, USB drives; not including optical media) must be physically and electronically protected as described in this instruction, DFARS

252.204-7012 and DoDI 8582.01.

Dissemination: CUI printed documents and material may be transmitted through mail channels, commercial carrier or hand-carried without formal courier orders. CUI information may be disseminated to DoD personnel and DoD contractors to conduct official business for the program. If dissemination is required outside of DoD personnel or DoD contractors, contact the Government Security Manager for approval. Technical information will follow the release instructions identified in the Distribution Statement. Use secure communications whenever possible; however, land-line telephones are more secure than cellular telephones and should be used whenever available for discussions involving CUI. Transmit voice and facsimile transmissions only when you have a reasonable assurance that only authorized recipients will have access to the transmission. Digital transmission shall comply with the below:

All transmission and/or dissemination of CUI (i.e., email and file transfers) must use NIST/NIAP-approved cryptographic products/algorithms, e.g., DoD-approved Public Key Infrastructure Certification or DoD Safe Exchange at https://safe.apps.mil/ .

These are available at http://iase.disa.mil/pki/eca or http://csrc.nist.gov/groups/STM/cmvp/documents/140-1/140val-all.htm . This encryption requirement includes communications that contain passcodes to teleconferences or web conferences where there is a reasonable expectation that CUI may be discussed. When encryption is not available, a government collaborative suite (aka Integrated

Digital Environment [IDE]) must be used to transmit CUI.

- Contractor-hosted collaborative suites may be used for digital transmission and/or dissemination of CUI by personnel not located on a government backbone (e.g., NIPRNET), provided the following conditions apply: 1) Use only NIST/NIAP-approved cryptographic

11 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

products/algorithms. The latest validation lists may be obtained at http://iase.disa.mil/pki/eca or http://csrc.nist.gov/groups/STM/cmvp/documents/140-1/140val-all.htm ; and, 2) Use an internally hosted service that does not use a third-party collaborative suite service provider.

- Do not post CUI to web pages that are publicly available or have access limited only by domain/IP restrictions. As permitted by other contract provisions, CUI may be posted to web pages that control access through the use of a DoD approved Public Key

Infrastructure Certification and that provide protection via use of secure sockets, or other equivalent technologies. These are available at http://iase.disa.mil/pki/eca .

- As new technologies become available in the electronics arena, care should be given to providing a reasonable degree of protection from known vulnerabilities.

- The Internet is Public Access. CUI must be reviewed and officially approved by the TACOM Public Affairs Officer for public release before placing on the Internet. This is not applicable when the Internet is used for e-mail transmissions and encryption is used as noted above.

Disposal: The contractor shall ensure any covered defense information provided by the Government under this contract is destroyed or sanitized from contractor-owned media and reported in accordance with NIST Special Publication (SP) 800-88, Rev 1, Guidelines for

Media Sanitization, December 2014, and in accordance with Section 2002.14 of Title 32, CFR. Destroy CUI documents may be destroyed by means approved for classified information or by any other means making it unreadable, indecipherable, and unrecoverable.

Report of Loss of CUI: Report any loss of CUI to the Government Security Manager. Initial reports shall be made as expeditiously as possible in all cases within 72 hours of discovery. If additional information is required after submission and review of the initial report, guidance will be provided at that time. Initial report content shall include the following information as available.

- Applicable dates, including dates of compromise and dates of discovery

- Threat methodology, including all known resources used (e.g. IP addresses, domain names, software tools)

- Account of what actions the threat(s) may have taken on victim system/network

- What information may have been compromised or lost, and its potential impact on government programs

CONFIGURATION MANAGEMENT DOCUMENTATION CS7110

a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph

3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and

Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.

d. All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent, that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the Contractor must submit the applicable documentation listed in sub-paragraphs e (i) through e (iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) Documentation or use of DD Form 1692 (current revision) and delivery of data per DI-SESS-80639 is detailed in paragraph 3.3.1 of

EIA-649-1 for ECPs.

(ii) Documentation or use of DD Form 1694 (current revision) and delivery of data per DI-SESS-80640 is detailed in paragraph 3.3.2 of

EIA-649-1 for RFVs.

12 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(iii) Documentation or use of DD Form 169 (current revision) and delivery of data per DI-SESS-80642 is detailed in paragraph 3.3.4 of

EIA-649-1 for NORs.

(iv) Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.

f. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.

g. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.

h. Reference the following website to obtain the data item. https://quicksearch.dla.mil/qsSearch.aspx

*** END OF NARRATIVE C0001 ***

13 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS) DS6515

(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: A

(3) QUANTITY PER UNIT PACKAGE: 001

(4) SPECIAL PACKAGING INSTRUCTION NUMBER. AK16170810

(a) REVISION: C

(b) DATE OF REVISION: 11 December 2020

(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI): is included in the TDP

(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ ) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging

Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the

"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")

(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(c) Marking:

(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not.

Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html (best viewed with Internet Explorer 11 or higher, or Firefox) for the current

DoD Suppliers Passive RFID Information Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at:

https://www.acq.osd.mil/dpap/pdi/uid/guides.html ) for development of the UII and MIL-STD-129 for UII package marking requirements.

Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using

14 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.

The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organizations compliance program.

(e) Hazardous Materials (As applicable):

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.

(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the

United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the

SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to

PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

(g) SUPPLEMENTAL INSTRUCTIONS: None

*** END OF NARRATIVE D0001 ***

15 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO: 9001:2015

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

BALLISTIC TESTING ES6650

CLIN: 0001AA

Noun: Stowage Box, ICV Kit

NSN: 2540-01-161-0810

CDRL: A001

(a) In addition to inspection requirements set forth in applicable drawings and/or specifications, the specification(s) indicated below shall apply to this contract:

Ballistic Testing is required for part number 12648289 ONLY.

Ballistics Testing in accordance with MIL-DTL-12560

(b) The above specifications require Ballistic Testing unless specifically waived by drawing or other contractual document. Prior to production and during production, if required by specification, the quantity of test samples required by any of the above specifications shall be accompanied by test data required by individual specification.

The test data shall include:

(1) Declared chemical analysis and chemical analysis results representing material for test (if required by specification).

(2) Mechanical Properties Test Results (if required by specification).

(3) Charpy Impact Test results representing material for test (if required by specification).

(4) Brinnel or Rockwell hardness test results representing material for test (if hardness values are required by specification).

(5) Radiographic Inspection Record to include data required by ASTM E1742 including marking and acceptance requirement. (If

Radiographic Inspection is required by the specification.)

(6) Stress Corrosion Resistance Test results required by paragraph 3.4 of MIL-DTL-46063 and paragraph 3.5 of MIL-DTL-46027 (if required by the contract or specification).

16 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(c) In addition to the requirements of paragraph (b), test plates related to qualification of weld procedure or weld repair procedure shall be accompanied by data to include information required by format of specification and shall also identify position of welding.

(If Ballistic Qualification of Weld Procedure is required by specification). Unless otherwise specified by the applicable drawing/specification, or contractual clause, a minimum of one ballistic test specimen shall be prepared for each material thickness, joint design, configuration, and weld procedure.

(d) Items to be tested shall be marked to include all marking requirements of the individual specification. Further, Identify P/N(s) that the test item represents.

(e) The contractor may use its own form to supply required data specified in paragraphs (b) and (c) above. The data shall accompany test samples and shall be forwarded to:

Commander USA ATC

Bldg. 358 (ext 3-4938)

ATTN: CSTE-DTC-AT-SL-V

(D. Gessleman)

400 Colleran Rd.

APG, MD 21005-5059

IMPORTANT: contractor must obtain approval from the Contracting Officer prior to shipping test samples to APG. Also, the contractor shall clearly mark the Developmental Test Command Project Number on the outside of the shipping container.*

*The Developmental Test Command Project Number will be provided by the Contracting Officer after the supplier notifies the

Contracting Officer of the approximate shipping date of the ballistic test samples.

(f) One copy of the required data, (see paragraph (e)), not to include test samples, shall be forwarded to:

U.S. Army Tank Automotive and Armaments Command, ATTN: AMSRD-TAR-E/ PM Survivability

6501 E. 11 Mile Road

Detroit Arsenal, MI 48397-5000.

Data shall be verified for accuracy by DCMA (QAR) at the contractor's facility.

(g) In order for the Procuring Activity to obtain ballistic test funds in a timely manner, the contractor shall adhere to the following:

At least 60 days prior to shipment of ballistic test samples, the contractor shall furnish written notification to the:

U.S. Army Tank-Automotive and Armaments Command

ATTN: AMSRD-TAR-E/ PM Survivability

6501 E. 11 Mile Road

Detroit Arsenal, Michigan 48397-5000, with a copy furnished to the DCMA Administrative Contracting Officer (ACO), Contracting Officer, and Contract Specialist, advising of the approximate shipment date. This information shall include:

(1) Prime Contractor:

(2) Prime Contract Number:

(3) Material Specification:

(4) Number of Test Samples:

(5) Heat Numbers:

(6) Sample Weight:

(7) Sample Dimensions:

(8) Steel/Aluminum/Composite Manufacturer

(9) Part Number

(h) Ballistic testing shall be scheduled not later than 10 days after receipt of the contractor test item(s). Testing and the preparation of summary report and findings for the Contracting Officer shall require an additional 20 days. The contractor shall, at

17 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

its request, be entitled to a day-for-day extension in the delivery schedule if the Government does not conduct and approve or disapprove the ballistic testing pursuant to the timeframes identified in paragraphs (i) herein. Summary Report and findings shall be submitted in accordance with CDRL A001.

(i) Within 45 calendar days after receipt by the Contracting Officer of a report of test results from the test activity, the

Contracting Officer shall provide the contractor with written notice of approval or disapproval of the ballistic test.

(1) Test Approval shall constitute authorization for the contractor to begin full-rate production of items conforming to the approved test sample(s).

(2) Notice of test disapproval shall be accompanied by identification of the special nature of the item failure(s). A failure to pass ballistic testing shall be deemed a failure of the contractor to make delivery within the meaning of the DEFAULT clause in section I of this contract. The Government may order the contractor to provide one or more additional sample items, with previous deficiencies corrected, for a follow-on ballistic test. All costs for such additional test items, to include costs of transportation to the test site, and all costs of retesting, shall be borne by the contractor, who shall not be entitled to any equitable adjustment on account of such costs. The contractor shall provide the quantity of additional sample items within the time period directed by the Government, and shall not be entitled to an equitable adjustment in price, or to an extension in delivery schedule, on account of any retesting occasioned by a failure to pass ballistic testing.

(3) Prior to Government approval of ballistic testing, the contractor many not acquire material or components for, or begin production of, the balance of the contractual quantity except at the contractor's sole risk. Such costs, if incurred prior to

Government approval of the ballistic test, shall not be allocable to this contract for progress-payment purposes or for termination settlements.

INSPECTION AND ACCEPTANCE POINTS: ORIGIN ES7001

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT:

CAGE:

NAME:

ADDRESS:

CITY, STATE, ZIP

ACCEPTANCE POINT:

CAGE:

NAME:

ADDRESS:

CITY, STATE, ZIP

REWORK AND REPAIR OF NONCONFORMING MATERIAL ES7012

(a)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .