This is a solicitation for the M256A2 Chemical Agent Detector Kit, NSN 6665-01-563-7473, Part Number 5-77-3497. The Army Materiel Command is seeking 11,568 units with an option for an additional 11,568 units. Responses are due by 29 November 2019. The contract will be a firm-fixed-price award for delivery to Blue Grass Army Depot in Richmond, Kentucky between 270-300 days after award. The solicitation requires first article testing, production lot testing, and item unique identification marking.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W56HZV-20-R-0033

X

2020MAR19

2020APR2005:00pm

DOA4

2020MAR19 SEE SCHEDULE

W56HZV

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

DANIEL POEHLING

(586)282-7516

CCTA-APS-A

DANIEL.C.POEHLING.CIV@MAIL.MIL

1 66

X 1

X 5 X 10

X 13 X 15 X 20

X 26

X 28

X 32

X 49

X 50

X 58

X 65

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: DANIEL POEHLING

Buyer Office Symbol/Telephone Number: CCTA-APS-A/(586)282-7516

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: Detection and Alarm Devices

*** End of Narrative A0000 ***

1. This Request for Proposal (RFP) is full and open competition.

2. This RFP will result in a Firm-Fixed Price contract for the following requirement:

Noun: M256A2 Chemical Agent Detector Kit (CADK)

NSN: 6665-01-563-7473

Part Number: 5-77-3497

Base Quantity: 11,568 each (EA)

Option Quantity: 11,568 EA

NAICS: 334511

3. The Government intends to award without discussions in accordance with FAR Clause 52.215-1, Instructions to Offerors - Competitive

Acquisition.

4. First Article Test (FAT) and Production Lot Test (PLT) are required.

5. The contractor is authorized to ship early with no quantity restrictions and at no additional cost to the Government.

6. All shipments will be FOB Destination to the following ship-to address:

(W22PVJ) XU BLUE GRASS ARMY DEPOT

XU GEN SUP STORAGE PT CRP WHSE 211

431 BATTLEFIELD MEMORIAL HIGHWAY

RICHMOND, KY 40475-5070

*** END OF NARRATIVE A0001 ***

A.1. Electronic Contracting

(a) All Army Contracting Command Warren solicitations will be publicized on the System for Award Management website

(https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal beta.SAM.gov, however until beta.SAM.gov can accept proposals offerors should follow the instructions in paragraph (c) below.

(c) With the recent transition from www.FBO.gov to www.beta.sam.gov , the website has been experiencing a number of issues. Interested

Offerors shall submit a proposal via email to the Contract Specialist (daniel.c.poehling.civ@mail.mil) and cc the corresponding

Contracting Officer (lee.f.tappy.civ@mail.mil) with the subject header: Proposal Submission - W56HZV-20-R-0033 (company name and CAGE number). Once a proposal is received, the Contract Specialist/Contracting Officer will reply to the respective Offeror stating receipt of proposal submission.

(1) Maximum size of each e-mail shall be 10 megabytes. You may use multiple e-mail messages for each bid/submission, however, you must annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3.

2 66

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Bids can be submitted can be submitted using any of the following electronic formats:

(2) Microsoft Office Products ; Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.

(3) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.

(4) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages.

All linked information must be contained within your electronic bid/offer and be accessible offline.

(5) Other electronic formats are not acceptable.

Ensure that filenames of attachments DO NOT contain spaces to limit virus scanners rejecting the email as unscannable.

(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the

Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

(f) Solicitations may remain posted on beta.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.

(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the

Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the

Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

A.2. ACKNOWLEDGEMENT OF AMENDMENTS

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date: __________________ _____

3 66

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A.3. ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON

Information regarding the Ombudsperson for this contract is located at the following website:

http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html

A.4. DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title

22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(b) To be eligible to gain access to this export controlled TDP (via FedBizOpps) an offeror must have a current DD 2345, Militarily

Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow access to export controlled TDPs once certification is confirmed. Upon receipt of certification, an offeror may request the TDP in accordance with the instructions stated in the solicitation's Section C.

(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the

TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

A.5. ALL OR NONE

Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.

*** END OF NARRATIVE A0002 ***

4 66

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 M256A2 CADK

NSN: 6665-01-563-7473

Mfr CAGE: 81361

Mfr Part Number: 5-77-3497

0001AA PRODUCTION QUANTITY - M256A2 CHEMICAL AGENT ___________________________________________

DETECTOR KIT 11568 EA $ $ ____________ ______________ __________________

COMMODITY NAME: M256A2 CADK

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH9C1500EH PRON AMD: 02

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 5-77-3497:81361

REVISION: B

DATE: 31-JUL-2013

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION D, PARAGRAPH D.1.

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Inspection/Acceptance at Origin means the contractor

MUST contact DCMA to arrange for a Government inspection BEFORE production under CLIN 0001AA is shipped. Failure to have production inspected and accepted at Origin will result in its rejection at

Destination. Rejected production will be returned at the contractor's expense.

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W56HZV9273V800 W22PVJ J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 6,000 0270

002 5,568 0300

FOB POINT: Destination

5 66

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SHIP TO:

(W22PVJ) XU BLUE GRASS ARMY DEPOT

XU GEN SUP STORAGE PT CRP WHSE 211

431 BATTLEFIELD MEMORIAL HIGHWAY

RICHMOND,KY,40475-5070

0001AB FIRST ARTICLE TEST REPORT - M256A2 CADK 1 LO $ _______________________________________ __________________

SERVICE REQUESTED: FAT REPORT - M256A2 CADK

CLIN CONTRACT TYPE:

Firm Fixed Price

FIRST ARTICLE TEST REPORT, PURSUANT TO THE

REQUIREMENTS OF FAR 52.209-3, FIRST ARTICLE APPROVAL -

CONTRACTOR TESTING (SEE SECTION I).

The First Article Test Report (FATR) is due 210 days after award. See CDRL A005 in Exhibit A for delivery requirements.

FATR approval/disapproval will be determined by the

Contracting Officer, who will be identified at time of award.

First Article testing is broken into two separate parts as identified under Section E Narrative E0001, Subsection E.2., First Article Testing. The offer shall provide a price below for each part of the testing with the sum of the parts equalling the total

FAT price for CLIN 0001AB.

Part One: $_______________________ ________________

Part Two: $_______________________

Total FAT Price: $_______________________

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0210

0002 M256A2 CADK

NSN: 6665-01-563-7473

6 66

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Mfr CAGE: 81361

Mfr Part Number: 5-77-3497

0002AA UNEXERCISED OPTION PRODUCTION QUANTITY - M256A2 _______________________________________________

CADK 11568 EA $ ____ __________________

See Range Pricing

COMMODITY NAME: M256A2 CADK

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

500 3000 $

3001 6000 $

6001 9000 $

9001 11568 $

OPTION QUANTITY, PURSUANT TO THE CLAUSE

ENTITLED OPTION FOR INCREASED - SEPARATELY PRICED

LINE ITEM (52.217-7).

The quantity stated for the option CLIN DOES

NOT Form a part of the basic contractual quantity

(CLIN 0001AA). However, part or all of it may be added to the contract by exercise of the option clause, at the discretion of the Government.

The failure of the offeror to insert unit range prices above applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the

Government, at the basic contract unit price

(CLIN 0001AA),and the offer will be evaluated for award accordingly.

See Section M Narrative M0001, Subsection M.4., Evaluation Criteria for Range Pricing.

**IF THE UNEXERCISED OPTION QUANTITY IS

INCREMENTALLY EXERCISED, THE GOVERNMENT WILL

ORDER A MINIMUM ORDER QUANTITY OF 500 EACH FOR

EACH ORDER.**

(End of narrative B001)

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 5-77-3497:81361

REVISION: B

DATE: 31-JUL-2013

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION D, PARAGRAPH D.1.

UNIT PACK: 001

LEVEL PRESERVATION: Military

7 66

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 11,568 UNDEFINITIZED

FOB POINT: Destination

SHIP TO:

(W22PVJ) XU BLUE GRASS ARMY DEPOT

XU GEN SUP STORAGE PT CRP WHSE 211

431 BATTLEFIELD MEMORIAL HIGHWAY

RICHMOND,KY,40475-5070

See Section F Clause 52.211-8, Time of Delivery, for option delivery schedule.

(End of narrative F001)

0003 DATA ITEMS __________

A004 EXHIBIT A - CDRL A004 - DD FORM 1423 1 LO $ ** NSP ** ____________________________________ __________________

SERVICE REQUESTED: MEETING MINUTES

CLIN CONTRACT TYPE:

Firm Fixed Price

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 UNDEFINITIZED

A006 EXHIBIT A - CDRL A006 - DD FORM 1423 1 LO $ ** NSP ** ____________________________________ __________________

SERVICE REQUESTED: PRODUCTION LOT TEST REPORT

CLIN CONTRACT TYPE:

Firm Fixed Price

8 66

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 UNDEFINITIZED

A007 EXHIBIT A - CDRL A007- DD FORM 1423 1 LO $ ** NSP ** ___________________________________ __________________

SERVICE REQUESTED: CERTIFICATE OF COMPLIANCE

CLIN CONTRACT TYPE:

Firm Fixed Price

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 UNDEFINITIZED

9 66

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1. TECHNICAL DATA PRODUCT LIST (TDPL)/ENGINEERING EXCEPTIONS

a. The following TDPL is applicable to this procurement of M256A2 Chemical Agent Detector Kit (CADK), NSN 6665-01-563-7473, P/N 5-77-

3497:

1. TDPL: 20190536:81361, dated 07 May 2019

b. Engineering Exceptions:

1. Delete the following from the TDPL:

PL5-67-266

5-67-267

5-67-268

MIL-D-51410

MIL-D-51411

MIL-D-51412

MIL-DTL-32578

MIL-DTL-51408

MIL-DTL-51409

QSTAG-211

QSTAG-242

NOR 843-0008-004

NOR 972-0046-001

2. Disregard para 3.6.1.b in MIL-DTL-51490D. Government will not furnish the MOPP IV gloves. Contractor is responsible for purchasing the MOPP IV gloves for the Releasable liner disc test in para 3.3.5.2.3.

3. The following will be provided as Government Furnished Materials (GFMs). See GFM list attached.

- M8 Paper (NSN 6665-00-050-8529)

- M9 Paper (NSN 6665-01-226-5589)

- Technical Manual, TM 3-6665-426-10

4. Live agent testing is required. Laboratory conducting the test must be certified and approved by the CCDC-CBC Lab Certification team (POC: Mr. Adrian Henry, 309-782-8711, email: adrian.c.henry.civ@mail.mil).

5. A Safety Data Sheet (SDS) shall be prepared and furnished to the Government upon request. A copy of the SDS shall also be included in every shipment of the M256A2 kits.

C.2. TECHNICAL DATA PACKAGE INFORMATION

a. The following Xd item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[ X ] 2. The TDP for this solicitation resides within DOD Safe Site (https://safe.apps.mil/ ). Offerors shall email the Contract

Specialist (daniel.c.poehling.civ@mail.mil), with subject header: TDP Pick-up - W56HZV-20-R-0033 (company name and CAGE code).

The email shall have the following information:

a. Name of person picking up [name must match the person representing the company on the Joint

Certification Program (JCP) website, https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/ ]

b. Email of person picking up (company email only)

c. CAGE code

* Note: One pick-up request per offeror *

10 66

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Once a request for a "Pick-up" is received, the Contract Specialist will set up the TDP "Drop Off" DOD Safe Site, an automatic notification will be generated via DOD Safe Site to the Offeror giving the contractor access to the TDP.

Making a Pick-up from the DoD Safe Site:

There are two ways to pick-up files that have been dropped off (*Note: if encryption was used in the drop-off, you will be prompted to enter a passphrase. Please contact the sender to share the passphrase securely.):

- All users can click on the link provided in the notification email they were sent.

- All users can click on the Pick-up link and manually enter the Claim ID and Claim Passcode provided to them through email or other means.

When viewing a drop-off, the user will see quite a few things:

- The list of files that were uploaded

- The sender and recipient information that the sender entered when the drop-off was created

- A list of pick-ups that have been made if the drop-off was created by the logged-in user

The recipient has 7 days to pick-up the files. Each night, drop-offs that are older than 7 days are removed from the system.

b. If solicitation is Export Controlled:

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS).\~ Currently certified contractors should enter the MPIN which will be verified before proceeding to the next step.\~ To obtain certification, go to http://www.dlis.dla.mil/jcp/

Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt.

SAM will allow access to export controlled TDPs once certification is confirmed.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

c. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the SAM system administrator at Army Contract Command - Warren (DTA) with all the information needed to grant a contractor access. SAM will subsequently automatically generate an email stating when the requesting contractor has permission to view or download TDP items. Allow two (2) to three (3) working days to complete this SAM-TDP access/approval process through SAM.

d. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.

Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ . The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.

e. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and Non-

Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.

C.3. CONFIGURATION MANAGEMENT DOCUMENTATION

a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is

11 66

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and

Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.

d. All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent;

that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the Contractor must submit the applicable documentation listed in sub-paragraphs e (i) through e (iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) Documentation or use of DD Form 1692 (current revision) and delivery of data per DI-SESS-80639 is detailed in paragraph 3.3.1 of EIA-649-1 for ECPs.

(ii) Documentation or use of DD Form 1694 (current revision) and delivery of data per DI-SESS-80640 is detailed in paragraph 3.3.2 of EIA-649-1 for RFVs.

(iii) Documentation or use of DD Form 169 (current revision) and delivery of data per DI-SESS-80642 is detailed in paragraph 3.3.4 of EIA-649-1 for NORs.

(iv) Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.

f. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.

g. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.

C.4. USE OF CLASS I and CLASS II OZONE DEPLETING SUBSTANCES

(a) Definitions.

(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) _ of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at:

http://www.epa.gov/ozone/science/ods/index.html

(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.

(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that the contractor can meet or produce only by the use of CIODS.

(b) Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of CIODS without the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition

Executive. Thus, no CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

C.5. START OF WORK MEETING

a. The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within

30 days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort.

The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.

b. The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel may be invited to the meeting: Contracting Officer's Representative (COR) identified in Section G or in an appointment letter; Quality Assurance personnel; DCMA; etc. All Government invitees shall be given at least 14 days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor shall provide the Government with minutes of the Start of Work Meeting within 7 days after the meeting is held.

*** END OF NARRATIVE C0001 ***

12 66

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D.1. PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)

(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 001

(4) SPECIAL PACKAGING INSTRUCTION NUMBER: P5-77-3497

(a) REVISION: C

(b) DATE OF REVISION: 06 May 2019

(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ ) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging

Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the

"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")

(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(c) Marking:

(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not.

Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see "http://www.acq.osd.mil/log/sci/ait.html " l (best viewed with Internet Explorer 11 or higher) for the current DoD

Suppliers Passive RFID Information Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at http://dodprocurementtoolbox.com/page/unique-id/tools ) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

13 66

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.

The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organizations compliance program.

(e) Hazardous Materials (As applicable):

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.

(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the

United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the

SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to

PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

(g) SUPPLEMENTAL INSTRUCTIONS:

REFERENCE CONTRACT NUMBER AND CLIN NUMBER ON EACH BOX.

PLACE A RED X AND THE WORDS SHORT BOX ON THE FRONT OF ANY BOX THAT HAS A SHORT QUANTITY, THEN PLACE THAT BOX/BOXES WITH THE MARKINGS

SHOWING ON THE TOP FRONT OF THE PALLET LOAD.

*** END OF NARRATIVE D0001 ***

14 66

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below:

Quality Management System - ISO 9001:2015 Requirements - not including paragraph 8.3.

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E.1. INSPECTION AND ACCEPTANCE POINTS: ORIGIN

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

E.2. FIRST ARTICLE TESTING

(a) First Article Testing (FAT) on M256A2 CADK shall consist of the two parts listed below. The contractor is responsible for completion of all testing regardless of who conducts the testing. The contractor shall include all Government test data in the FAT report.

PART ONE: The First Article sample shall consist of 100 each M256A2 CADKs, PN: 5-77-3497, manufactured using the same methods,________ materials, equipment, and processes as will be used during regular production. The First Article sample shall contain no more than one lot of each component, material, and reagent. The First Article sample shall be submitted for inspection and approval in accordance with the terms of the contract. In accordance with MIL-DTL-5190D, the First Article sample items shall be examined in accordance with the classification of characteristics paragraph 4.3.5 and inspected for compliance with all of the requirements of the applicable drawings, paragraph 3.2. First Article sample items shall then be inspected by test and examination in accordance with Table III. For the testing samplers, the contractor shall perform color response and sensitivity testing in accordance with MIL-DTL-5190D, paragraph 4.4.2.5, and shall expose the samplers to environmental stress in accordance with paragraph 4.4.3.

PART TWO: The packaging FAT shall consist of 22 unit pack containers and their contents and meet all the requirements of SPI P5-77-3497________ and all applicable specifications or standards. The contractor shall subject the packaging samples to all tests and inspections.

(b) A First Article Test Report (FATR) shall be completed by the contractor documenting the results of all inspections and testing

(including supplier and vendor inspection records and certifications, when applicable). The FATR shall include actual inspection and test results to include measurements, recorded test data, and certifications (if applicable) keyed to each drawing, Quality Assurance

Provisions (QAPs), and specification characteristics.

15 66

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(c) At least 30 calendar days before the beginning of contractor performed first article tests, the contractor shall notify the

Contracting Officer, DCMA Administrative Contracting Officer (ACO), and DCMA Quality Assurance Representative (QAR) in writing of the time and location of the testing so that the Government may witness the tests.

E.3. SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING)

(a) In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.

(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:

(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.

(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.

(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.

(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.

(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to Procuring Contracting Officer (PCO).

(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the

Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. The contractor is responsible for all testing costs resulting from the causes listed in this paragraph.

E.4. PRODUCTION LOT TESTING (CONFORMANCE INSPECTION - Contractor)

(a)The Contractor shall conduct production lot testing (PLT) for each production lot to be tendered to the Government for acceptance.

(b) The samples shall be selected, examined, and tested in accordance with:

16 66

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Production Lot testing shall be required for each lot in accordance with MIL-DTL-51490D, paragraphs 4.3, Table IV, and CLASSIFICATION OF

CHARACTERISTICS 4.3.5 (a), (b), (c), and (d). A lot shall consist of detector kits produced by one manufacturer, at one plant, from the same materials, under essentially the same manufacturing conditions, and at essentially the same time. A lot of detector kits shall incorporate no more than one lot of each component, material, and reagent. The lot numbering system shall be as specified in MIL-STD-

1168. Every item in the lot shall be inspected for critical characteristics. The lot represented shall be rejected when non-conformance to a critical characteristic is found.

(c) The samples shall be randomly selected from the entire lot by, or in the presence of, the Government Quality Assurance

Representative (QAR). The Contractor shall notify the QAR in writing at least five (5) workdays in advance, when the lot is ready for sample selection. The Contractor shall inspect production lots for conformance to the contracts requirements prior to selecting PLT samples. Unless otherwise authorized by the Contracting Officer, test samples shall not be submitted pursuant to this provision where the Contractor has determined that the lot does not conform to all contract requirements.

(d) Within 10 days of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .