STS_Crane_Product_Description.pdf
PDF 4 MB Posted
- Attached to
- Ship-To-Shore Container Cranes
- Solicitation number
- W56HZV19R0285
About this file
This product description document outlines the requirements for procuring two ship-to-shore container cranes to be located at the Military Ocean Terminal in Concord, California. The cranes are to have a capacity of 40 long tons below the spreader and be able to service a Panamax vessel with 13 containers abeam. The scope of work includes design, fabrication, delivery, installation, inspection, testing and commissioning of the cranes and associated equipment in accordance with the specifications. Required equipment comprises the cranes, spreaders, cargo beams, test weights, manuals and initial spare parts. Key crane characteristics include dimensions, lift capacities, speeds and structural design criteria. Extensive documentation requirements are outlined for submittals, drawings, calculations, reports and manuals to demonstrate compliance with specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources_Sought_for_Ship-To-Shore_Cranes_07_AUG_2019.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TWO SHIP-TO-SHORE CONTAINER CRANES
for
MILITARY OCEAN TERMINAL CONCORD
at
CONCORD, CALIFORNIA
APPENDICES
PART 1.0 GENERAL
Definitions
Specifications and Standards
General
US Domestic Codes and Standards and Specifications
International Codes and Standards
Substitution of Codes
Example of List of Codes Used in Industry Procurement Specifications
System Description and Scope of Supply
Scope of Supply
Minimum Criteria
Safety Design Criteria
Design Requirements
Performance Requirements
Unique Identifier Tags
Essential Repair Parts
Submittals
Quality Assurance
Quality Assurance
Government Inspections
Contractor Quality Control
Process Control Audit
Regulatory Requirements (FAA, OSHA)
Meetings
Post-Award Meeting
Design Review Conference
Functional Description and Presentation
Pre-Manufacturing Conference (Manufacturing Kick-Off Meeting)
Pre-Installation Conference
Delivery, Storage and Handling
Existing Conditions
Contractor Requested Engineering Changes
Warranty
Not Used
Design Life
Minimum Support Period
Duty Cycles and Load Spectra
Main Hoist and Trolley Design Duty Cycle
Gantry Drive Design Duty Cycle
Boom Hoist Design Duty Cycle
Rope Inspection Duty Cycles
Main Hoist Load Spectrum
Trolley Load Spectrum
Gantry Drive Load Spectrum
Boom Hoist Load Spectrum
Other Duty Cycles and Load Spectra
Duty Cycle Analysis Requirements
Load Spectra and Design Life Analysis Requirements
Crane Modes
Primary Operating Mode
Semi-Automated Operating Mode
Passing Mode
Stowed Mode
Cargo Beam Mode
Maintenance Mode
Limping Mode(s)
PART 2.0 PRODUCTS
Materials
Ductile Materials
Structural Steel
Structural Pipes and Tubes
High Strength Bolts, Nuts, and Washers
Aluminum Castings
Iron Castings
Steel Castings
Steel Forgings
Bronze Bushings and Thrust Washers
Steel Bars of Special Quality
Steel Bars of Standard Quality
Alloy Steel Bars
Welding Materials
Charpy V-Notch Impact Requirements
Plate Through-Thickness Requirements
Material Traceability
Mechanical Material
Structural Design
General Requirements
Fracture Critical Members
Access for Inspection
Members Subject to Buckling
Welding
Crane Structure
Trolley Girder
Boom
Connections
Trolley Structure
Trolley Rails, Clips, and Pads
Machinery House
Boom Control Station
Access Structures
Counter Weight (Ballast)
Equalizer Girders and Travel Trucks
Stowed Wind Condition Securing Devices
Hatchcover Support Structure
Boom Hoist Failure Prevention
Gantry Frame Deflections and Stiffness
Camber
Design Loads
Seismic Design
Design Loading Conditions
Fatigue Design
Allowable Design Stresses
Calculations
Stability
Wheel Loads
Structural Maintenance Program
Voyage Criteria
Mechanical Design
General Requirements
Safety Factors
Machinery Mounting, Installation, and Alignment
Drive Mechanisms
Shafts, Axles, and Pins
Gear Reducers
Bearings
Drums
Wire Ropes
Reeving
Fleet Angles
Catenary Rope Support System
List, Trim and Skew Adjustment
Headblock
Sheaves
Wheels and Guide Rollers
Couplings
Keys and Keyseats
Bumpers and End Stops
Snag Control
Slap Blocks and Deflector Rollers
Drip pans
Surface Finishes
Seals
Lubrication
Fits
Hydraulic Systems
Brakes
Boom Latch Mechanism
Bushings and Thrust Washers
Electrical Design
General Requirements
Main and Shore Power Supply
Medium Voltage Switchgear
Power Quality Meter (PQM)
Surge Protection Devices (SPD)
Medium Voltage Transformers
Low Voltage Transformers
Drive Control Systems
Converters
Inverters
Power Factor
Motors for the Major Motions
Enclosures
Conduits, Cable Trays, and Fittings
Cables
Terminations and Routing
Cable Reels
Trolley Cable Chain (Energy Chain)
Closed Circuit Television (CCTV)
Marking and Identification
Emergency Modes and Emergency Drives
Controls, Interlocks, and Indicating Devices
Programmable Logic Control (PLC)
PLC Program
Software Version Verification
Control Power Indicator
Anemometer
Emergency Stop Push Buttons
Crane Management System (CMS)
Control System and Network
Remote Crane Management System (RCMS)
Lighting
Convenience Outlets
Space Heaters
Lightning Protection
Intercom
Local Control Stations
Safety Equipment
Other Equipment Design
Operator's Cab
Spreader
Heavy Lift Cargo Beam
Machinery House and Electrical Room
In House Service Cranes
Outside the Machinery House Jib Structure or Monorail
Personnel Elevator
Safety Features
Wire Rope Re-Reeving
Load Weighing System
Wharf Level Cab
Crane Nameplates and Markings
Warning Signs
Test Weight System
Scale Models
Stairs, Ladders, Platforms, and Walkways
Fall Arrest Anchor Points
Automated Brake Tests
Stack Profiling System (SPS)
Air Compressor and Air Distribution System
Manufacture / Erection / Assembly
Corrosion Resistance
Surface Preparation
Paint Application
Faying Surfaces
Galvanizing
Workmanship
Structural Workmanship
Mechanical Workmanship
Electrical Workmanship
Coating
Software and Controls
PART 3.0 EXECUTION
Assembly and Erection
Erection Workmanship
Erection Program
Lubrication
Boom Alignment
Crane Weighing
Factory Inspection and Testing
Builder’s Test and Inspection
Government Drawing Verification
Factory Testing
Delivery
Installation and Inspection
Acceptance Test
Final Government Inspection
Acceptance
Training
Operator Training
Maintenance Training
Reliability and Maintenance Requirements
General
Minimum Reliability
Maintainability
Computerized Maintenance Management System
Special Tools
Spare Parts
Documentation
Operating Instructions
Maintenance Instructions and Manuals
Mechanical Maintenance Manuals
Electrical Maintenance Instructions - Drive System Supplier
Electrical Maintenance Manuals - Non-Drive Components
Structural Inspection Manual
As-Built Calculations
As-Built Drawings
Certificates
Test Documentation
APPENDICES
A –Reference Documents
A1 – Site plan
A2 – Crane and wharf clearance drawing
A3 – Control system inventory
A4 – Reference crane-wharf interface drawings
B – (Sample) Shop Testing Procedures
C – (Sample) Acceptance Testing Procedures
D – Safety
E – Essential Repair Part Stockage List
F – Structural Details for Cranes
PART 1.0 GENERAL
Definitions
Contractor – the Contractor supplying the Cranes and the Contractor’s representatives, subcontractors, and independent engineers retained by the Contractor.
Contractor’s Engineer of Record (Contractor’s EOR) – the Contractor’s professional engineers, for the design of the structure, ancillary structures, mechanical systems, and electrical systems, who shall be responsible for ensuring that the technical requirements of these Specifications are met. See Section 1.3.8 for other requirements, including for signing and sealing design drawings and calculations.
Crane, Cranes, or STS Cranes – the ship-to-shore, rail mounted, container handling gantry Cranes as described in these Specifications, including the structure, trolley, headblock, spreader, all attached and ancillary components, all control systems and components, all monitoring and maintenance systems and components, special tools, spare parts, and all other items defined in these Specifications.
Global Axis – Crane orientation and analysis axis system referenced in the Specification: X axis parallel to trolley travel, Y axis vertical, Z axis parallel to gantry travel.
MOTCO Facility – to be located at Military Ocean Terminal, Concord (MOTCO), Concord, California, USA. See Appendix A for site plan. See Section 0 for restrictions at the MOTCO Facility after delivery.
Point of Common Coupling (PCC) – The location where the Crane electrical system is connected to the wharf electrical system, defined as the end of the reeling cable where it terminates on the wharf furthest from the gantry cable reel on the Crane.
Specifications – This Specification, including appendices, and any clarifications, deviations, or other addenda agreed upon between the Government and the Contractor and incorporated into the Contract. The intent of these Specifications is to provide structural, mechanical, electrical, and functional criteria, dimensions, operating speeds and accelerations, and pertinent details for the design, construction, and installation of reliable and efficiently functioning Cranes with accessories. Unless specifically stated otherwise, the Specification requirements apply to all Cranes and all components, even if the requirement is stated in the singular. One gender means both genders.
Will and Shall – These Specifications are written to the Contractor. When a provision of this Specification requires action by the Contractor, the verb “shall” is used. If the Contractor is allowed to exercise an option when limited alternatives are available, the phrasing “either … or …” is used. However, where the words “or approved equivalent” are used, the Government reserves the option of rejecting the proposed equivalent. Statements provided in the Specification as information to the Contractor use the verbs “may” or “will.” Informational statements typically identify activities or options that “will be taken” or “may be taken” by the Government.
Specifications and Standards
General
The documents below form a part of this Specification to the extent specified herein. In case of difference between the following documents and this Specification, this Specification shall govern to the extent of such difference. In case of material specifications (ASTM), the design shall be based on the issue in effect at the time of bid, but material may be procured in accordance with the issue in effect at the date of manufacture.
Where reference is made to a standard specification, e.g., AWS D1.1, the latest edition in effect on the date of invitation for bids or request for proposal shall apply. If, however, the edition is stated, e.g., ISO 4628/3-1982(E), the stated edition shall apply.
US Domestic Codes and Standards and Specifications
FEDERAL
W-C-375 Circuit Breakers, Molded Case; Branch Circuit and Service
MILITARY
MIL-F-3541 Fittings, Lubrication
FED-STD-595C Color Used in Government Procurement
NAVY SEA SYSTEMS COMMAND (NAVSEA)
OP 3565 Vol. 1 Electromagnetic Radiation Hazards (U) (Hazards to Personnel, Fuel and Other Flammable Materials) (U)
OP 3565 Vol. 2 Electromagnetic Radiation Hazards (U) (Hazards to Ordnance) (U)
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
360 Specification for Structural Steel Buildings
ASSOCIATION FOR IRON AND STEEL TECHNOLOGY (AIST)
TR-06 Technical Report No. 6, Specification for Electric Overhead Traveling Cranes for Steel Mill Service
AMERICAN GEAR MANUFACTURERS' ASSOCIATION (ANSI/AGMA)
908 Geometry Factors for Determining the Pitting Resistance and Bending Strength of Spur, Helical and Herringbone Gear Teeth
2015 Gear Classification and Inspection Handbook – Tolerances and Measuring Methods for Unassembled Spur and Helical Gears (Including Metric Equivalents)
2001 Fundamental Rating Factors and Calculation Methods for Involute Spur and Helical Gear Teeth
2003 Rating the Pitting Resistance and Bending Strength of Generated Straight Bevel, Zerol Bevel and Spiral Bevel Gear Teeth.
2009 Bevel Gear Classification, Tolerances and Measuring Methods
6013 Spur, Helical, Herringbone, and Bevel Enclosed Drives
6109 For Shaft Mounted and Screw Conveyor Drives Using Spur, Helical and Herringbone Gears
AMERICAN IRON and STEEL INSTITUTE (AISI)
AISI 4320 Properties of alloy steel
AISI 4820 Properties of alloy steel
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ABMA 7 Shaft and Housing Fits for Metric Radial Ball and Roller Bearings (Except Tapered Roller Bearings)
A14.3 Ladders - Fixed - Safety
A17.1 Safety Code for Elevators and Escalators
A17.2 Inspectors Manual for Elevators and Escalators
A64.1 Walking and Working Surfaces, Personal Protective Equipment (Fall Protection Systems)
B4.1 Preferred Limits and Fits for Cylindrical Parts
B17.1 Keys and Keyseats
B30.10 Hooks
S1.13 Measurement of Sound Pressure Levels in Air
Z535 Product Safety Signs and Labels
Z26.1 Safety Code for Safety Glazing Materials for Glazing Motor Vehicles Operating on Land Highways
AMERICAN PETROLEUM INSTITUTE (API)
5LX Line Pipe
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
7-16 Minimum Design Loads and Associated Criteria for Buildings and Other Structures
49 Wind Tunnel Testing for Buildings and Other Structures
Paper # 3269 Wind Forces on Structures
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
B30.24 Container Cranes
B46.1 Surface Texture, Surface Roughness, Waviness, and Ly
HST-4 Performance Standard for Overhead Electric Wire Rope Hoist
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
TC-1A How to Qualify and Certify NDT Personnel
ASTM INTERNATIONAL (ASTM)
A6/6M General Requirements for Rolled Steel Plates, Shapes, Sheet Piling and Bars for Structural Use
A27 Mild to Medium Strength Carbon Steel Castings for General Application
A36 Structural Steel
A53 Welded and Seamless Steel Pipe
A106 Seamless Carbon Steel Pipe for High-Temperature Service
A108 Cold-Finished Carbon Steel Bars and Shafting
A123 Zinc Coating (Hot-Dip Galvanized) Coatings on Iron and Steel Products
A148 High-Strength Steel Castings for Structural Purposes
A153 Zinc Coating (Hot-Dip) on Iron and Steel Hardware
A159 Automotive Gray Iron Castings
A242 High-Strength, Low-Alloy Structural Steel
A275 Magnetic Particle Exam of Steel Forgings
A370 Mechanical Testing of Steel Products, Methods and Definitions
A434 Quenched and Tempered Alloy Steel Bars, Hot-Rolled or Cold-Finished
A500 Cold-Formed Welded and Seamless Carbon Steel Structural Tubing
A501 Hot-Formed Welded and Seamless Carbon Steel Structural Tubing
A504 Wrought Carbon Steel Wheels
A536 Ductile Iron Castings
A563 Carbon and Alloy Steel Nuts
A572 High-Strength Low-Alloy Columbium-Vanadium Steels of Structural Quality
A576 Special Quality Hot-Rolled Carbon Steel Bars
A588 High-Strength Low-Alloy Structural Steel
A618 Hot-Formed Welded and Seamless High-Strength Low- Alloy Structural Tubing
A666 Austenitic Stainless-steel, Sheet, Strip, Plate and Flat Bar for Structural Applications
A668 Alloy Steel Forgings for General Industrial Use
A673 Sampling Procedure for Impact Testing of Structural Steel
A709 Structural Steel for Bridges
A759 Carbon Steel Crane Rails
A1085 Cold-Formed Welded Carbon Steel Hollow Structural Sections (HSS)
B6 Zinc (Slab Zinc)
B148 Aluminum Bronze Sand Castings
B271 Copper-Base Alloy Centrifugal Castings
B505 Copper-Base Alloy Continuous Castings
B584 Copper Alloy Sand Casings for General Applications
A1023/A Standard Specification for Stranded Carbon Steel Wire Ropes for General Purposes
C1036 Flat Glass
D4020-96 Ultra-High-Molecular-Weight Polyethylene Molding and Extrusion Materials
E23 Test Methods for Notched Bar Impact Testing of Metallic Materials
F436 Hardened Steel Washers
E543 Standard Specification for agencies performing Nondestructive Testing
F593 Stainless-steel Bolts, Hex Cap Screws, and Studs
F594 Stainless-steel Nuts
F3125 High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa) Minimum Tensile Strength
AMERICAN WELDING SOCIETY (AWS)
A2.4 Welding Symbols
A4.3 Determination of the Diffusible Hydrogen Content of Martensitic, Bainitic, and Ferritic Steel Weld Metal Produced by Arc Welding
A5.1 Carbon Steel Electrodes for Shielded Metal Arc Welding
A5.5 Low-Alloy Steel Covered Arc-Welding Electrodes
A5.20 Mild Steel Electrodes for Flux-Cored Arc-Welding
C4.1 Oxygen-Cut Surfaces and Oxygen Cutting Surface Roughness Gauge
D1.1 Structural Welding Code
D1.3 Structural Welding Code-Sheet Steel
D1.5 Bridge Welding Code
ASSOCIATION OF IRON AND STEEL ENGINEERS (AISE)
No. 11 Brake Standards for Mill Motors
CRANE MANUFACTURERS' ASSOCIATION OF AMERICA, INC. (CMAA)
No. 70 Specifications for Electric Overhead Traveling Cranes
DEFENSE FEDERAL ACQUISITION REGULATIONS (DFAR)
DFARS 252.211-7003 Item Identification and Valuation
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
C37.20.1 IEEE Standard for Metal-Enclosed Low-Voltage Power Circuit Breaker Switchgear
C62.11 IEEE Standard for Metal-Oxide Surge Arresters for Alternating Current Power Circuits
JOINT INDUSTRIAL COUNCIL (JIC)
H-1-1973 Hydraulic Systems
NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATION (NEMA)
ICS 1 Industrial Control and Systems
ICS 1.1 Application, Installation and Maintenance of Solid State Control
ICS 2 Industrial Control Devices, Controllers and Assemblies
ICS 3 Industrial Systems
ICS 6 Enclosures for Industrial Control and Systems
ICS 9 Industrial Control and Systems Power Circuit Accessories
LI 1 Industrial Laminated Thermosetting Products
LS 1 Low Voltage Surge Protective Devices
MG1 Motors and Generators
250 Enclosures for Electrical Equipment (1000 Volts Maximum)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 National Electrical Code
NFPA 70E Standard for Electrical Safety in the Workplace
NFPA 780 Standard for the Installation of Lightning Protection Systems
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
Title 29 CFR, Part 1910
PACIFIC COAST MARINE SAFETY CODE (PCMSC)
RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS (RCSC)
RCSC Specification for Structural Joints Using High-Strength Bolts
STATE OF CALIFORNIA THE DIVISION OF OCCUPATIONAL SAFETY AND
HEALTH (DOSH)
Title 8 Regulations/Inspections for Cranes and Elevators
SOCIETY OF AUTOMOTIVE ENGINEERS, INC. (SAE)
J386 Operator Restraint System for Off-Road Work Machines
J429 Mechanical and Material Requirements for Externally Threaded Fasteners
J995 Steel Nuts
STEEL STRUCTURES PAINTING COUNCIL (SSPC)
SP Surface Preparation
SP 1 Solvent Cleaning
SP 2 Hand Tool Cleaning
SP 3 Power Tool Cleaning
SP 6 Commercial Blast Cleaning
SP 10 Near-White Metal Blast Cleaning
PA Paint Application
PA 2 Conformance to Coating Thickness Requirements
STRUCTURAL STABILITY RESEARCH COUNCIL (SSRC)
SSRC Guide to the Stability Design Criteria for Metal Structures
UNDERWRITERS LABORATORIES (UL)
595 Marine-Type Electric Fixtures
WIRE ROPE TECHNICAL BOARD
Wire Rope User’s Manual
International Codes and Standards
BRITISH STANDARDS (BS)
7608 Guide to fatigue design and assessment of steel products, 2014 edition
CONFORMITE EUORPEENE (CE)
2006/42/EC Machinery Directive
73/23/EC Low Voltage Directive
89/336/EC EMC Directive
DEUTSCHES INSTITUT fur NORMBURG (DIN)
DIN 15072 Crane, tread profile of crane rail wheels and table of rails for different wheel diameters
DIN 536 Crane Rails
DIN 16783 Ultra-high molecular weight polyethylene moulding materials
DIN 6914 High-strength hexagon head bolts with large widths across flats for structural steel bolting
DIN 17200 Carbon Steel Grades
DIN 18800 Structural Steelwork
DIN 15018 Crane, steel structures, verification and analysis
FEDERATION of EUROPEAN MATERIAL HANDLING (FEM)
FEM 1.001 Rules for the design of hoisting appliances
FEM 1.004 Recommendation for the calculation of wind loads on crane structures
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 7778 Steel plate with specified through-thickness characteristics
ISO 9001 Quality Systems-Model for Quality Assurance in Design, Development, Production, Installation, and Servicing
INTERNATIONAL SOCIETY of AUTOMATION (ISA)
ISA Hydraulic Systems
INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)
60204-32 Safety of Machinery – Electrical Equipment of Machines, Part 32
60034-14 Rotating Electrical Machines
Substitution of Codes
The Crane Contractor may select other DIN, FEM, JIS, ISO or BSI codes as applicable as the basis of Crane design in lieu of the referenced codes, provided the Contractor can show, by certification or industry publications, that these codes are equivalent to (meets or exceeds) the codes, with the exception of AISC, ASTM, AWS, NEMA, NFPA, and OSHA which shall govern in any case. If the Contractor selects one of these codes for design of the Cranes, the Contractor shall provide three current English language copies of the code, within 30 days after contract award. Once a code is selected for design, it shall be used for all portions of the Cranes.
Example of List of Codes Used in Industry Procurement Specifications
Unless otherwise noted, the applicable recommendations of the following organizations shall be used. Unless otherwise noted, ‘National’ means USA.
ABBREVIATION STANDARD
ABMA American Bearing Manufacturers Association
AGMA American Gear Manufacturers Association
AISC American Institute of Steel Construction - ASD
AISI American Iron and Steel Institute
AIST Association of Iron and Steel Technology (formerly AISE)
ANSI American National Standards Institute
ASA Acoustical Society of America
ASCE American Society of Civil Engineers
ASM American Society for Metals
ASME American Society of Mechanical Engineers
ASNT American Society for Nondestructive Testing
ASTM American Society for Testing and Materials
AWS American Welding Society - Bridges and Dynamically Loaded Structures
BSI British Standards Institute
CMAA Crane Manufacturer’s Association of America
DIN Deutsche Industrie Normen
DOSH Division of Occupational Safety and Health
EN European Standards
FEM Federation Europeene de la Manutention
IEC International Electrotechnical Commission
IEEE Institute of Electrical and Electronic Engineers
ISA Instrument Society of America
ISO International Standards Organization
NAAMM National Association of Architectural Metal Manufacturers
NEMA National Electrical Manufacturer’s Association
NFPA National Fire Protection Association
NFPA National Fluid Power Association
OSHA Occupational Safety and Health Administration of the United States Department of Labor
PCMSC Pacific Coast Marine Safety Code
SAE Society of Automotive Engineers
SSPC Steel Structures Painting Council
SSRC Structural Stability Research Council
UL Underwriters Laboratory
System Description and Scope of Supply
Scope of Supply
The intent of this Specification is to procure two (2) rail-mounted ship-to-shore container Cranes, to be located at Military Ocean Terminal, Concord (MOTCO), Concord, California.
Crane capacity shall be 40 long ton below the spreader, and the Cranes shall be able to service a Panamax vessel with 13 containers abeam. See Appendix A2, The Cranes shall be equipped with a spreader capable of lifting both single and twin 20-foot containers, single 40-foot containers, and single 45-foot containers. The Cranes shall be designed, fabricated, assembled, facility tested, delivered, installed, inspected, field tested and commissioned, and made ready for use in accordance with this Specification.
The scope of supply shall include the following, as described in this Specification:
Two (2) ship-to-shore Cranes, including rope-towed trolleys (RTT) with main hoist fleet-through reeving and headblocks
Three (3) telescoping 20 ft, 40 ft, 45 ft, separating twin-20 ft spreaders; this includes one (1) spare; refer to Section 2.5.2
One (1) heavy lift cargo beam (total for project); refer to Section 2.5.3
Test weights; refer to Section 2.5.14
Scale model and souvenir models; refer to Section 2.5.15
Initial spare parts; refer to Section 3.8.6
Significant technical features of the Crane include the following.
Local Crane management system (CMS) 2.4.29
Closed circuit television system (CCTV), refer to Section 2.4.19
Hatchcover storage platform on the Crane, landside of the landside rail; refer to Section 2.2.18
Fire detection and suppression system; refer to Section 2.5.4.9
Vessel Profiling System, also known as “stack profiling system” (SPS) and Soft Landing System (part of SPS); refer to Section 2.5.19
Detailed operation and maintenance manuals in English
Electronic security requirements - such as restrictions for WiFi, Bluetooth, internet, etc.;
refer to Section 2.4.30
USA Professional Engineer as Engineer of Record; refer to Section 1.3.8
Crane structure consideration for operations on flexible wharf; refer to Section Error!
Reference source not found.
Minimum Criteria
The criteria specified herein shall be considered the minimum acceptable. If, in the Contractor’s opinion, any of the criteria specified herein or in the referenced standards is in any way inadequate or insufficient for the intended use, it shall be the Contractor’s responsibility to use more stringent criteria.
Except where otherwise specified, the Contractor shall furnish all materials, equipment, tools, labor, and incidentals necessary to fully and completely finish the project according to the true intent and meaning of this Specification and drawings, even though every item or activity is not particularly mentioned or shown in this Specification or drawings.
The Contractor shall remain responsible for adequacy and safety of the design, fabrication, supply, installation, transportation, commissioning, and testing of the equipment specified herein while adhering to the minimum criteria set forth in the Specifications.
Safety Design Criteria
A single electric (power or control) or hydraulic component failure or malfunction shall not damage the Crane or injure personnel.
Where possible, component failure or malfunction shall safely stop the Crane operation. Where this is not possible, a redundant system shall be supplied. The redundant system shall both safely stop the Crane and prevent operation until maintenance personnel make corrections.
A means shall be provided so maintenance personnel may routinely check each redundant or backup system. The checking procedure shall be included in the maintenance manual.
No Crane component shall change state as a result of a power failure. Powering or repowering the Crane or any system within the Crane shall not result in any unanticipated or potentially unsafe motion or condition.
Design Requirements
The Cranes shall, as a minimum, conform to the requirements of the Machinery Directive 2006/42/EC, the Low Voltage Directive 73/23/EC and the EMC Directive 89/336/EC.
Basic Crane design shall be a twin-box girder with a rope-towed trolley, catenary trolleys, and fleet-through main hoist. The hoist machinery shall be enclosed in a separate machinery house.
The machinery house shall include separate rooms for the hoist machinery and all electronic equipment. The electronic control room shall be separately climate controlled. Entrance and egress to the Cranes shall be via both a combination of ladders and stairways, and an elevator on the same landside leg as the cable reel, unless approved otherwise by the Government.
The Cranes shall be equipped with a spreader capable of lifting a single 20-foot container, twin- 20-foot containers, single 40-foot container, and a single 45-foot container. Crane shall have a means of stowing hatches on the landside of the Crane within the backreach of the trolley girder, so as not to infringe on the operating area between the Crane legs. Provisions also shall be made to lift other cargo using temporary slings.
The Crane shall be designed to operate in an outdoor, corrosive marine environment with an ambient temperature range of 20 °F to 110 °F.
Each Crane shall have a Crane number independent of the manufacturer’s serial number. The Crane numbers format shall be the year of manufacture-001 and -002, e.g. 2019-001 and 2019-002 if the Cranes are built in 2019.
The main characteristics of the Cranes are as follows. See the Appendix A2, Crane and Ship Clearance Drawing, for additional requirements.
Capacity
Capacity below the spreader
Twin-twenty 89,600 lb (40 LT, 44.8 t)
Single lift 67,200 lb (30 LT, 33.6 t)
Capacity below the heavy lift cargo beam 89,600 lb (40, 44.8 t)
Principal Dimensions
Gantry rail gauge 80 ft (21.384 m)
Outreach, minimum 127 ft (38.7 m)
Backreach, minimum 35 ft (10.7 m)
Lift height, clear under spreader above WS rail 100 ft (30.5 m)
Lift below waterside rail 35 ft (10.7 m)
Gantry out-to-out width (bumpers uncompressed) 88 ft 6 in (27.0 m)
Minimum clearance inside legs 60 ft (18.3 m)
Clearance under portal tie beam 50 ft (15.2 m)
Waterside rail setback from fender face 12.75 ft (3.9 m)
Boom stowage angle 45° (80° maintenance only)
Rail elevation, waterside vs. landside Same elevation
Allowable Crane Loads on Wharf
Maximum Allowable Service (ASD) Level Wheel Loads
Seaside Operating 30,000 lb/ft (44.7 t/m)
Landside Operating 31,000 lb/ft (46.1 t/m)
Seaside Non-Operating 30,000 lb/ft (44.7 t/m)
Landside Non-Operating 39,000 lb/ft (58.1 t/m)
Maximum Allowable Strength (LRFD) Level Wheel Loads
Seaside Operating 39,000 lb/ft (58.1 t/m)
Landside Operating 40,000 lb/ft (59.5 t/m)
Seaside Non-Operating 39,000 lb/ft (58.1 t/m)
Landside Non-Operating 52,000 lb/ft (77.4 t/m)
Refer to Appendix A4, drawing S-002 for additional maximum crane loads to the wharf, including crane rail lateral loads, crane stowage pin, and crane stop loads.
135 ft (41.2 m) total lift
Performance Requirements
Performance requirements for the Cranes shall be as follows:
Minimum Hoist High Speeds:
No Load under spreader 490 ft/min (150 m/min)
Rated Load under spreader 250 ft/min (76 m/min)
Hoist Acceleration/Deceleration
No Load 4 s
Rated Load 2 s
Minimum Trolley Speed:
With Rated Load 600 ft/min (180 m/min)
Trolley Acceleration/Deceleration
With Rated Load 5 s
Maximum Boom Hoisting Time 5 min
Minimum Gantry Travel High Speed 150 ft/min (45 m/min)
Minimum Gantry Acceleration 6 s
Unique Identifier Tags
The Contractor shall assign unique identifiers to the container Crane and the in-house service cranes in accordance with DFARS 252.211-7003. The Unique Identification Tags shall be attached to the outside of the main electrical disconnect panel of the respective Crane.
Essential Repair Parts
The Contractor shall provide the parts defined in Section 3.8.6.3 and those listed in the Appendix E, Essential Repair Part Stockage List.
After the completion of the design, the Contractor shall provide a list of any additional spare parts with prices for the Government’s consideration and potential purchase.
Submittals
The Contractor shall submit to the Contracting Officer all items of technical documentation listed hereinafter. The Contractor shall ensure that all submittals are entirely legible and suitable for reproduction. The content, number of copies, time of submission, and distribution shall be in accordance with Exhibit A of this Specification and as specified below. Compliance with the requirements of this Specification will be determined by a review of the design and construction submittals by the contracting officer and by field inspection and testing.
The Contractor’s EOR for each discipline shall be a professional engineer registered in the United States. The structural analysis of the Crane and drawings for the crane and trolley primary structures shall be approved by the Contractor's responsible Structural Engineer, who shall be a licensed Structural Engineer in the State of California.
Final design drawings and calculations shall be signed and sealed by the Contractor’s EOR. The intent is to include the structural, mechanical, and electrical systems.
However, this requirement is not intended to include shop drawings, third-party vendor drawings, or ancillary drawings that have no significant impact on the project or that require no engineering. The Contractor shall submit a list of components for which drawings and calculations will need seal and signature—the Contractor shall submit a detailed list of drawings and calculations that will and will not be signed for Government review and approval.
All Crane documentation and submittals shall be in English. Units shall be in U. S. Standard Units or SI Units.
All applicable submittals shall also be provided for the machinery house service crane and any associated lifting gear.
The submittal transmission documents shall clearly identify CDRL Item Number, Crane number and title as a minimum.
SD-01 Preconstruction Submittals
Prior to construction, the Contractor shall submit the following.
SD-01.S Schedule
The Contractor shall submit a schedule which identifies key milestone events in the design, fabrication, and installation of the Crane acquisition. At a minimum, the schedule shall include the following:
1. Post Award Meeting
2. Initial General Arrangement and Design Submittals
3. Government Review of First Design
4. Second General Arrangement and Design Submittals
5. Government Review of Second Design
6. Third General Arrangement and Design Submittals
7. Government Review of Third Design
8. Fabrication Initiation
9. Fabrication Completion
10. On-Site Pre-Installation Conference
11. Government Witnessed Shop Test
12. Contractor Site Mobilization
13. New Crane Installation
14. Government Crane Inspection
15. Field Acceptance Test
16. Crane Acceptance
17. Contract Completion Date
18. Receipt of Final O&M Manuals
19. Completion of Warranty
SD-01.Q Quality System
The Contractor shall submit, prior to fabrication, the written quality control plan for review. The plan shall be followed throughout the contract; any changes shall be submitted to the Contracting Officer. As a minimum, the plan shall include the following:
1. Incoming materials, consumables and machinery
2. Traceability of material
3. Lofting, cutting, fit-up, welding, forming and dimensions of structural materials
4. Welding and inspection procedures
5. Welding and inspection personnel qualification and certification
6. Welding and inspection equipment maintenance and calibration
7. Heat treating, stress relieving and other special treatments
8. Machining, finish surfaces, painting and bolting
9. Installation and alignment
10. Startup and Commissioning Tests
11. Functional Testing
SD-01.I Inspection Specification
Prior to completing the design and before commencing fabrication of the Cranes, the Contractor shall prepare, submit, and obtain the Contracting Officer's approval for inspection specifications. The Contractor shall write inspection specifications for mechanical and electrical components and structural assemblies. During fabrication the approved inspection specifications shall be utilized by the Contractor’s QA personnel to document various measurements and inspections, the partially completed inspection specifications shall be submitted to the Contracting Officer monthly for review. Submit completed inspection specifications upon completion of the contract.
SD-02 Drawings
The Contractor shall submit the drawings listed below for approval. Initial drawing submittals (preliminary, 90%, and final) shall bear a complete title block with a permanent drawing number and a registered professional engineer’s original seal with a dated signature. Subsequent submittals shall bear a new revision number and engineer’s seal with a dated signature for each sheet that has been modified.
The Contractor shall provide design submittals in three phases throughout the process of developing the Crane design.
The first submittal shall be a preliminary design. The preliminary design shall include the following: general arrangements, preliminary Crane stability, maximum wheel loads, selection of components for commonality, failsafe devices and features, ease of maintenance, and design factors utilized. The purpose of the initial submittal and review process is to identify and resolve problems early in the design phase.
The second design submittals shall be a 90% design submittal. The 90% design submittal shall include drawings required in SD-02, product data required in SD-03, and design calculations required in SD-04.
The third design submittal shall be the final 100% design submittal.
The final 100% design submittal shall be approved by the Government. The Government review and approval process does not relieve the Contractor from the responsibility for all aspects of the design of the Crane.
Fabrication of a specific assembly may commence after all submittal components for that assembly are “Approved” by the Government. This approval does not relieve the Contractor of his responsibility to comply with contract requirements.
Drawings within each category (such as structural, mechanical, etc.) shall be numbered consecutively. Each assembly and subassembly drawing shall include an integral Bill of Materials or shall be followed by a consecutively numbered drawing with the applicable Bill of Materials. There shall be no proprietary notes on any drawing. An index for all drawings shall be included.
Preliminary, 90%, and final design drawings shall be provided as a file viewable in Adobe Acrobat as a bookmarked portable document format (.pdf). PDF files shall be black/white with minimum resolution of 600 dpi. Filenames shall be in English.
As-built drawings shall be provided in the following formats:
1. As an editable file in the file format of the program it was originally generated in.
2. As a file in the file format of .dxf or .dwg editable in AutoCAD 2016.
3. A separate copy viewable in Adobe Acrobat as a bookmarked portable document format (.pdf).
NOTE: Applicable drawings listed below shall also be included for the elevator system, machinery house service crane, and all other buy-out assemblies or components as applicable.
SD-02.G General Arrangement Drawings
The Crane assembly and each major component shall be shown in plan, elevation, and end views. All major features of the Crane shall be shown including: clearances, dimensions, lifts, speeds, maximum wheel loads and power supply. The machinery house general layout shall include general locations of major components such as: brakes, motors, speed reducers, gear boxes, walkways, and control panels (including size). The type of structural bolted connection shall be specified on the drawing. In addition, calculated weights shall be shown for the completely assembled Crane and for each major component.
SD-02.B Control System Supplier’s Scope of Supply
The scope of supply, without pricing, from the Control System Supplier shall be provided. The scope of supply shall clearly describe all equipment and services the Control System Supplier is responsible for providing.
SD-02.S Structural Drawings
The structural design drawings shall show the fabrication details, weldments, fastener joint details, Bill of Materials and location and size of all structural members. The fabrication details shall clearly show the size, section, material grade and location (dimensions) of all members; all geometry necessary for layout; elevations; centers and offsets; camber requirements; and joining requirements between elements of built-up elements. Other critical information that shall be provided on the structural design drawings includes the welded-joint configuration. Fastener Joints - Structural joints designed as slip critical shall be labeled as slip critical on drawings. All other structural joints shall be labeled, and the required tensioning methods provided. All members required for fabrication shall be shown on drawings and shall be labeled to correspond with the Bill of Materials.
Structural drawings shall be provided for the following as a minimum:
1. Crane frame
2. Boom and trolley girder
3. Boom hinge
4. Boom latch
5. Trolley rail support at boom hinge
6. Forestay and backstay system
7. Gantry equalizers and trucks
8. Machinery house layout, foundation and support for all components
9. Counterweight or ballast
10. Walkway and ladder fabrication
11. Stowage pin
12. Lifting lugs
13. Trolley frame
14. Operator’s cab
15. Operator vision drawing
16. Quay layout including Crane interface systems layout
17. Crane stops
18. Crane transport and offload, including bracing
SD-02.E Electrical Drawings
The drawings shall at a minimum include:
1. Complete schematic diagram with narrative of any special description of operation. All components shown on schematics shall have labels that correspond to the nameplates that will be on the Cranes. Wiring type, size, and temperature ratings shall be included on schematic diagrams. All optional equipment not installed on the Crane shall be removed from the schematic diagrams. Locations of contacts and coils shall be cross-referenced to each other within the schematic diagrams. For components with adjustable settings, final settings shall be shown on the schematics.
2. Motor nameplate data (including all information called for in NFPA 70, Section 430.7(A) items 1 through 7)
3. Rating and types of over-current protective devices
4. Complete assembly (wiring) diagrams including a component material list showing all electrical components used on the Crane. These drawings shall show the layout of electrical equipment on the Crane, including control panel enclosures, motors, brakes, limit switches, conduits, and conductor systems.
5. Power demand, power factor and harmonics data
6. List of used symbols and designations
7. Grounding system, earthing system and lightning (SPD) protection including location of air terminals
8. Communication drawing of the Programmable Logic Control (PLC) system and the Crane Management System (CMS)
9. Electrical/PLC room layout diagrams.
10. Panel layout diagrams.
11. One-line diagram with circuit breaker sizing
12. Circuit diagram
13. Medium Voltage (MV) equipment arrangement with grounding switch
14. MV panel wiring diagram, MV & control
15. MV key interlock diagram
16. Drive and auxiliary transformer primary and secondary overcurrent protection
17. Drive and auxiliary transformer secondary short circuit and ground detection protection
18. Motor details including torque curves
19. Location and mounting of limit switches, encoders, and devices
20. Conduit & cable trays including routing, underfloor and external to machinery house
21. Layouts of all junction boxes
22. Floodlight illumination and arrangement, circuit segregation
23. Walkway lighting illumination and arrangement, emergency power light arrangement
24. Camera arrangement and layout of CCTV equipment
25. Anti-collision sensor arrangements and sensor details
26. FAA lights
27. Spare parts list, drives, motors, circuit breakers/fuses, controls, communications, PLC
SD-02.M Mechanical Drawings
1. Drive arrangements (including assembled components)
2. Reeving diagram for hoists and trolley, including catenaries
3. Travel trucks arrangements
4. Travel wheels dimensional and assembly including wheel material, wheel tread hardness, wheel to axle fit and assembly cross section details with the end truck frames.
5. Hydraulic systems diagram and schematic
6. Air compressor system
7. Lubrication drawing showing lubrication points
8. Jacking arrangement
9. Gear documentation
10. All drums
11. Sheave dimensional and assembly for top and equalizer sheaves including sheave material, sheave groove hardness and assembly cross section details with the structure that the assembly is mounted on.
12. Trolley assembly
13. Wheel axles
14. Shafts and pins
15. Base mounted component and coupling bolt torque values. Torque values shall be tabulated on drawing and shall consider any lubrication and/or washer types used. Torque values may be on a separate drawing that includes the mechanical arrangement and location of each bolt listed, or they may be listed on the drawing where the torqued bolts are shown.
16. Coupling and brake installation including: locations, applicable shaft engagement, and bore and key details.
17. Lubrication information showing the location of lubrication points, type of lubricant to be used, quantity required and the frequency of lubrication.
SD-02.C Control System and Network Drawings
1. Network diagram must show equipment locations, names, models, and IP addresses on network communications schematic for all PLC, RTU, Supervisory Controller, and Other Network-Capable Devices
2. Software block, flow, and ladder diagrams
3. Layout diagrams for all operator’s stations and cabs showing component placement.
SD-02.D Detail Shop Drawings
Drawings shall show all the information necessary for the fabrication of all parts of the Cranes (except for standard commercial purchased assemblies). The drawings shall specify member size, dimensions with tolerances, surface finishes (roughness symbols), complete material designations, heat treatment, material hardness, ultimate tensile strength, welding symbols, nondestructive testing symbols, complete gear data, etc., as applicable. The drawings shall specify complete information as to the location, type, and extent of all welds. In welded joints where it is important to control shrinkage stresses and distortion, the sequence and technique of the welding process shall be shown. Post-weld heat treatment (such as stress relieving) of high strength steel parts, if employed, shall be recorded on the drawings. Provide ASTM or AISI equivalent designations for non-USA products along with hardening, annealing, or quenching requirements. If Contractor has documentation of standard NDT or weld separate from the drawing(s), the Contractor may submit this to the Government for approval in lieu of showing the requirements on the drawing(s).
SD-02.F Field Notification of Revision (FNR)
During fabrication, erection and testing, the Contractor shall maintain two sets of prints that shall be marked to show modifications required on the drawings so that they accurately reflect the actual condition of the Crane at the time the Crane is offered for acceptance. Each modification shall be documented in an FNR report. The FNR shall list the drawing number, the department issuing the FNR, name and signature of the Contractor representative authorizing the FNR, date, Crane number, a sequential FNR number, reason for the FNR, and a description of the change. Attached to the FNR shall be the marked-up drawing or a copy of the affected area of the drawing with the changes noted. All FNR’s must be submitted to the Government.
SD-03 Product Data
Manufacturer’s catalog data shall be provided for all purchased components of the Cranes and the machinery house cranes. The catalog cuts shall be marked-up or supplemented with additional sheets to clearly identify the model or size, selected options, features, and/or modifications to demonstrate compliance with Specification requirements.
Catalog cuts which show modifications beyond the standard options and all supplemental pages shall bear original signatures and dates of the equipment manufacturer’s authorized representative. Each catalog cut sheet and each supplemental sheet shall clearly identify the item to which it applies. All catalog cuts shall be submitted in one file viewable in Adobe Acrobat and bookmarked as to the location of each catalog cut. The Contractor shall submit for approval the catalog cuts listed below:
NOTE: Applicable catalog cuts listed below shall also be included for the elevator system and machinery house service crane.
SD-03.M Mechanical Product Data
SD-03.M1 Speed reducers including reduction ratio, service factors, detailed drawings of components including gearing and shafts, and ratings for power, torque, and speed
SD-03.M2 Brakes (including electrical information, installation/service manuals and all information required to set or adjust)
SD-03.M3 Packaged hoist (machinery house service crane)
SD-03.M4 Bearings
SD-03.M5 Bumpers and end stops
SD-03.M6 Couplings
SD-03.M7 Load blocks
SD-03.M8 Hook
SD-03.M9 Wheels and sheaves
SD-03.M10 Spreader
SD-03.M11 Wire ropes
SD-03.E Electrical Product Data
SD-03.E1 Variable frequency drives and data recorders (including dynamic braking resistor and reactor selection)
SD-03.E2 Motors and encoders
SD-03.E3 Electrical enclosures
SD-03.E4 Runway electrification
SD-03.E5 Limit switches
SD-03.E6 Trolley electrification
SD-03.E7 Warning and pilot devices
SD-03.E8 Encoders
SD-03.E9 Disconnect switches
SD-03.E10 Fuses and circuit breakers
SD-03.E11 PLCs
SD-03.E12 Lighting
SD-03.E13 Contactors and relays
SD-03.E14 Operator controllers
SD-03.E15 Heating, ventilation, and air conditioning
SD-03.E16 Load indication system
SD-03.E17 Collision avoidance system
SD-03.E18 Cables including medium voltage, variable frequency, reeling, power, control, and data
SD-03.E19 Junction boxes, conduit, conduit fittings, cable trays
SD-03.E20 CCTV cameras and equipment
SD-03.S Structural Product Data
SD-03.S1 Travel trucks (including drive units)
SD-03.S2 Rails
SD-03.S3 Painting system
SD-03.S4 Lift points
SD-03.S5 Swing gates
SD-03.C PLC, RTU, Supervisory Controller, Control System Workstation, and Other Network-Capable Devices
Contractor shall ensure the following is provided in the product data for PLC, RTU, Supervisory Controller, or other network-capable (whether networked or not upon delivery) control devices:
(a) Draft hardware list (Hardware list must include the following for each device):
i. Manufacturer,
ii. Model,
iii. Location,
iv. Key technical ratings (e.g. memory),
v. Serial number
vi. MAC addresses,
vii. IP addresses.
(b) Software List (Software list must include the following for each device):
i. Manufacturer
ii. Version/subversion,
iii. Location/device,
iv. Used network ports/protocols/services.
(c) List and discussion of all security features of Vendor hardware and software.
SD-04 Design Data and Calculations
These calculations shall demonstrate compliance with all design requirements of this Specification. Calculations will not be approved if their evaluation/review is dependent on data or information not previously approved. All variables shall be listed and defined at the beginning of each calculation section and variables shall be in accordance with required references. Drawings shall include complete information so that they may be approved without reference to detail (shop) drawings.
SD-04.S Structural Calculations
SD-04.S1 Table of contents
SD-04.S2 General description of computer programs used with definitions of any special terminology
SD-04.S3 Summary of structural design criteria, including:
Listing of the governing specifications
Listing of all vertical loads; Crane weight shall be provided with centers of gravity, broken down by major component.
Calculations for determining the magnitude of each design load (if a dynamic analysis is used to determine impact loads, this analysis may be submitted separately).
Wind load operating (in service)
Wind load storm (out of service)
Load combinations for stress, stability, and wheel loads
Allowable stresses
Crane stiffness criteria, including for operating on flexible wharf
SD-04.S4 Computer output for the gantry frame and boom including the following information
Sketches showing computer input data including geometry, node numbers, member numbers, global axis, local axis, member properties and boundary restraints
Member forces for each of the specified individual loads—for moving loads, results need not be given for all members for each moving load position; however, maximum and minimum forces and the corresponding moving load positions shall be provided for all members
Displacements at appropriate joints for each of the specified individual loads
Sum of forces at each node; computer results will not be accepted if this summary shows significant round-off error
Stress calculations for members; stress calculations…
This is the start of the file's text. The full file is on GovTribe.