Synopsis_EH9L0058EH_W56HZV-19-R-0154.pdf

PDF 192 KB Posted

Attached to
Tank, Fuel, Engine
Solicitation number
W56HZV-19-R-0154
Issued by

About this file

Synopsis Pre-Solicitation W56HZV-19-R-0154

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Solicitation Notice / Synopsis – EH9L0058EH; Tank, Fuel, Engine; NSN 2910-

00-937-9539; Notice Announcement is W56HZV-19-R-0154

The Army Contracting Command – Warren intends to issue a Firm-Fixed Price (FFP)

Long Term Contract (LTC) Request for Proposal (RFP) on 17 May 2019 for the Tank, Fuel, Engine NSN: 2910-00-937-9539; P/N: 11594069; NAICS: 336310.

The RFP will be a Small Business set-aside. The minimum quantity is 6 and the maximum quantity is 223. A LTC only guarantees the minimum quantity and does not guarantee a quantity above the minimum quantity and the maximum quantity. The

Government intends to award the LTC with a quantity of 58 in the first ordering year.

The Tank, Fuel, Engine is for the Full Tracked, Howitzer, Self-Propelled 155MM M109.

The Technical Data Package is competitive, Distribution A. First Article Test (FAT) is required.

The PLT without FAT (with Government approved FAT waiver) is 210 days. The production lead time (PLT) with FAT is 600 days after award for each. The FAT Report

(FATR) is due 360 days after award.

The Government FATR approval time is 30 days after receipt of FATR. Packaging is

Military/B; the special packaging instruction number is AK09379539, dated 22 SEP 16, Rev J. Inspection and Acceptance are Origin. Free on Board is Origin.

File details come from the government source that posted it.