As of 8 January 2014 1

STATEMENT OF WORK (SOW)

FOR

DEVELOPMENT AND IMPLEMENTATION OF

FAILURE MODES, EFFECTS, AND CRITICALITY ANALYSIS (FMECA)

FOR

LADS MODEL E

1. SCOPE. The Contractor shall develop and submit a Failure Modes, Effects and Criticality Analysis

(FMECA). A FMECA systematically identifies the likely modes of failure, the possible effects of each failure, and the criticality of each effect on mission completion, environmental impacts, health hazards, and system safety. The stated system and reports shall be developed and produced in accordance with this

SOW and applicable military standards (MIL-STDs) and regulations. The FMECA shall only be applicable to the changes that have resulted from the ECPs that comprise differences between the LADS

Model D and Model E.

CDRL Authority Title SOW

Para.

A006 DI-SESS-81758A Failure Modes, Effects, and Criticality Analysis 3

2. APPLICABLE DOCUMENTS.

Document ID

Title

MIL-HDBK-502A

(For Guidance Only)

Department of Defense Handbook, Product Support Analysis

3. FMECA REQUIREMENTS.

3.1 Initial Report. The initial report will be based on all available preliminary information and estimates. In instances that actual data is not available, estimates shall be used. The FMECA shall be submitted in

Microsoft Word or Microsoft Excel. The report will contain the following specific content:

3.1.1 Likely Modes of Failure

3.1.2 Possible Effects of each failure

3.1.3 Criticality of each effect on:

3.1.3.1 Mission Completion

3.1.3.2 System Safety

As of 8 January 2014 2

3.1.3.3 Environment

3.1.3.4 Other outcomes of significance

3.2 Final Report. The Final FMECA report will reflect changes derived from test events. It will consist of a digital file (PDF, Excel, MS Word or equivalent). Specific content shall include the items required in the

Preliminary Report.

4. ACCEPTANCE/REJECTION OF DELIVERABLES.

4.1. Acceptance/Rejection of FMECA Submissions. The Government shall evaluate and determine acceptance of the Initial and Final FMECA submissions. If any submission is found to be in error, insufficient, or otherwise does not meet the requirements in this SOW and the associated CDRL, the submission shall be rejected and considered a draft until the Contractor corrects the errors. If the Government rejects a submission, it will remain in rejected status until the Government approves that submission. No scheduled submission requirement shall be considered to have been met until the Government has accepted the submission.

4.1.1. Letter of Acceptance/Rejection of FMECA Submissions. The Government will provide written notification of acceptance or rejection to the Contractor.

5. FMECA-RELATED MEETINGS/CONFERENCES.

5.1. FMECA Review Board. The Government reserves the right to convene a FMECA review board to resolve any questions are issues.

END OF SOW